Caliraya Dam | |
---|---|
Official name | Kalayaan Pumped-Storage Project |
Country | Philippines |
Location | Laguna (province) |
Coordinates | 14°17′18″N121°30′5″E / 14.28833°N 121.50139°E |
Status | Operational |
Construction began | 1939 by the Pedro Siochi and Company |
Dam and spillways | |
Type of dam | Embankment dam |
Impounds | Caliraya River |
Spillways | 1 |
Spillway type | Chute spillway |
Reservoir | |
Creates | Lake Caliraya |
Total capacity | Caliraya Dam and Lumot Dam combined 30,000,000 cubic metres (1.1×109 cu ft) (between maximum and minimum level) |
Catchment area | 92,000 square metres (990,000 sq ft) |
Power Station | |
Operator(s) | CBK Power Co. Ltd. Owner: National Power Corporation |
Type | Pumped-storage hydroelectricity and conventional dam |
Turbines | 2 Francis-type |
Installed capacity | 300 MW (1983) [1] 684.6 MW (2008) [2] Max. planned: 900 MW (Stage I); 2000 MW (Stage II) [3] |
Caliraya Dam is an embankment dam located in the town of Lumban province of Laguna, in the Sierra Madre Mountain Range of the Philippines. The reservoir created by the dam, Lake Caliraya, initially supplied one of the oldest hydroelectric plants in the Philippines, and later became a popular recreational area for numerous water sports and fishing. The dam's construction was started in 1939 under the supervision of the architecture firm of Pedro Siochi and Company and a small hydroelectric plant was operated in 1942. [4]
Lake Caliraya was later connected with another man-made lake, Lumot Lake, to provide more water through a 2.3 km (1.4 mi) underground penstock. [5] Later still the dam and lake were used as the upper reservoir for the Kalayaan Pumped-Storage Hydroelectric plant located west of Lake Caliraya, with Laguna de Bay as the lower reservoir. [1]
In the early years of American occupation, the Bureau of Engineering of the Philippine Commission investigated possible sources for hydroelectric development in the country. Initial surveying were done in Botocan Falls, Caliraya River, Angat River and Agno River. Mr. A. H. Perkins, assistant engineer began investigations of the Caliraya project on November 11, 1903, and his report was submitted to the Philippine Commission on March 23, 1904. Further studies were needed for more accurate and extended data on minimum discharge, rainfall, and area of watershed. Mr. H. F. Labelle, an assistant engineer, performed the observations from April 22, 1904, to September 1, 1904. Extensive gaugings of the stream were made to determine the low-water flow, the watershed area was surveyed, and a rain gauge was established in Barangay San Antonio, Kalayaan a town located within the watershed. A river gauge was also established. [6]
The constructive features of the initial study were as follows: By the construction of a dam on the river, the water would be diverted into a canal 3.75 kilometres (2.33 mi) long to the brow of the bluff, where it would fall through penstocks 240 metres (800 ft) to the powerhouse near the Lumbang River. The power would then be transmitted to Manila, a distance of 98 kilometres (61 mi). To meet the dry-season flow and conserve the flood waters, storage reservoirs would be established on the river at suitable points. This development could be carried out at comparatively small cost and would not require exceptional engineering features. The capacity of the plant could also be increased by diverting the Lumot River to the Caliraya. However, the feasibility of the development was still in question because of storage problems. The theoretical horsepower available at the first proposed power house, with a moderate storage, was estimated at only about 6,000, which could be increased for about one-half of the year during the rainy season. [6]
In 1937, Major General Hugh John Casey was sent to the country by US Army Corps of Engineers upon request by the Philippine Commonwealth to provide assistance in hydroelectric power and flood control for the recently created [7] National Power Corporation (NAPOCOR). The dam construction was started in 1939 from the designs planned by Hugh John Casey, upon approval by the Philippine Commonwealth President Manuel L. Quezon. An embankment dam over 100 feet (30 m) high, was constructed across the Caliraya River at its outlet from a large flat plateau area providing a large water reservoir for generating hydroelectric power for Southern Luzon from the Caliraya hydroelectric plant. A diversion canal was constructed several miles west of the lake to the head of a steep slope about 950 feet (290 m) above Laguna de Bay. Large penstocks were constructed diverting water down to the powerhouse below, with a tailrace to the lake. The high head permitted the use of high-speed turbines and generators at relatively low unit costs. Initial estimate for the project was $5 million, or 10 million pesos, and an output of 40,000 horsepower(30 megawatts). [8]
During World War II, the dam was sabotaged by retreating combined American and Filipino soldiers to prevent its use by invading Japanese who rebuilt it, but later sabotaged it themselves as their own defeat approached.
On June 1, 1948, Republic Act No. 216 was passed approving expenditures for the construction of several hydroelectric dams in the Philippines; the act included the diversion of the Lumot River via Lumot Dam to Caliraya Lake for more available water and to raise the height of Caliraya Dam. [9] The dam was rebuilt, raised and inaugurated in 1953 by the (NAPOCOR).
In 1972, President Ferdinand Marcos of the Philippines bestowed upon Casey the honorary title of "the father of water power development in the Philippines, for his pioneering endeavors in the country.[ citation needed ]
The pumped-storage hydroelectric project was commissioned on February 23, 1983, with an initial output of 300 MW from two turbines. [1]
Cavinti, officially the Municipality of Cavinti, is a 3rd class municipality in the province of Laguna, Philippines. According to the 2020 census, it has a population of 23,980 people.
Lumban, officially the Municipality of Lumban, is a 3rd class municipality in the province of Laguna, Philippines. According to the 2020 census, it has a population of 32,330 people.
Lake Caliraya is a man-made lake situated in the municipalities of Lumban, Cavinti, and Kalayaan in Laguna province, Philippines. Created in 1939, the lake has developed as a popular spot for water sports and outdoor recreation including fishing. Surrounding the lake are a number of resorts and vacation homes which cater to tourists.
The Robert Moses Niagara Hydroelectric Power Station is a hydroelectric power station in Lewiston, New York, near Niagara Falls. Owned and operated by the New York Power Authority (NYPA), the plant diverts water from the Niagara River above Niagara Falls and returns the water into the lower portion of the river near Lake Ontario. It uses 13 generators at an installed capacity of 2,525 MW (3,386,000 hp) with an average annual net generation of 15,897,000 MWh between 2014 and 2023, and a capacity factor of 71.9%.
Run-of-river hydroelectricity (ROR) or run-of-the-river hydroelectricity is a type of hydroelectric generation plant whereby little or no water storage is provided. Run-of-the-river power plants may have no water storage at all or a limited amount of storage, in which case the storage reservoir is referred to as pondage. A plant without pondage is subject to seasonal river flows, so the plant will operate as an intermittent energy source. Conventional hydro uses reservoirs, which regulate water for flood control, dispatchable electrical power, and the provision of fresh water for agriculture.
Ambuklao Dam is part of a hydroelectric facility in Baragay Ambuclao, Bokod, Benguet province in the Philippines. With a maximum water storage capacity of 327,170,000 cubic metres (265,240 acre⋅ft), the facility, which is located 36 km (22 mi) from Baguio city, can produce up to 105 megawatts of electricity to the Luzon grid. The main source of water comes from the Agno River, which originates from Mount Data. The dam is located in a conservation area known as the Upper Agno River Basin Resource Reserve.
The Pulangi River ;, also spelled Pulangui, is one of the major tributaries of the Rio Grande de Mindanao, an extensive river system in Mindanao, Philippines. With a length of 320 kilometres (199 mi), it is the longest river in Bukidnon and the 5th longest river in the Philippines. It traverses through majority of the cities and municipalities of Bukidnon from its source in Barangay Kalabugao, Impasugong, Bukidnon.
Magat Dam is a large rock-fill dam in the island of Luzon in the Philippines. The dam is located along the Magat River, a major tributary of the Cagayan River. The construction of the dam started in 1975 and was completed in 1982. It is one of the largest dams in the Philippines. It is a multi-purpose dam which is used primarily for irrigating about 85,000 hectares of agricultural lands, flood control, and power generation through the Magat Hydroelectric Power Plant.
Ōhashi Dam (大橋ダム) is a dam built on the Yoshino River in Agawa District, Kōchi Prefecture of Japan. This concrete dam 73.5 m high. It is a hydroelectric dam of the Shikoku Electric Power Company. It supplies water to the company's hydroelectric plant, Ōhashi Power Station, which can produce up to 5,500 kW. It is the lower reservoir for a pumped-storage hydroelectric plant. The upper reservoir being Inamura Dam. Water flowing between these two can produce up to 615MW. It is a public works which The Japan Society of Civil Engineers has recommended as a site of Public Works Heritage.
The Kölnbrein Dam is an arch dam in the Hohe Tauern range within Carinthia, Austria. It was constructed between 1971 and 1979 and at 200 metres (660 ft) high, it is the tallest dam in Austria. The dam's reservoir serves as the primary storage in a three-stage pumped-storage power system that consists of nine dams, four hydroelectric power plants and a series of pipeline and penstocks. The complex is owned by Verbund power company and is referred to as the Malta-Reisseck Power Plant Group. The installed capacity of the group is 1,028.5 MW and its annual generation is 1,216 gigawatt-hours (4,380 TJ).
Lumot River Dam is an embankment dam located between the towns of Cavinti and Lumban, in the province of Laguna, Philippines. The dam was constructed across Lumot River creating a reservoir now known as Lumot Lake or Sierra Lake. Lumot Lake provides additional water through a Bell-mouth spillway and tunnel to Caliraya Lake, which in turn serves as the upper reservoir for the Kalayaan Pumped-Storage Hydroelectric Plant.
Lumot Lake, also known as Sierra Lake, is a man-made water reservoir located in the towns of Cavinti and Lumban of Laguna province, in the Sierra Madre Mountains of the Philippines. The lake was created when Lumot Dam, an embankment dam, was constructed damming the Lumot River, creating an auxiliary water reservoir for Lake Caliraya as part of the Kalayaan Pumped-Storage Hydroelectric Plant. The waters between the two lakes are conveyed by a 2.3 kilometres (1.4 mi) penstock.
The Shin-Takasegawa Pumped Storage Station (新高瀬川発電所) uses the Takase River to operate a pumped storage hydroelectric scheme about 12 kilometres (7.5 mi) west of Ōmachi in Nagano Prefecture, Japan. Part of the system is within Chūbu-Sangaku National Park.
The Pulangi IV Hydroelectric Power Plant, also known as the Pulangi Dam, is located on the Pulangi River near Maramag in Bukidnon province on the island of Mindanao in the Philippines. It uses two reservoirs, produced by damming the Pulangi River, to supply water to a run-of-the-river hydroelectric power plant; the power plant is capable of generating 255 megawatts (342,000 hp) of power. Construction began in 1982; the first two generators became operational in December 1985, with the last generator being commissioned in 1986.
The Helms Pumped Storage Plant is located 50 mi (80 km) east of Fresno, California in the Sierra Nevada Mountain Range's Sierra National Forest. It is a power station that uses Helms Creek canyon on the North Fork of the Kings River for off-river water storage and the pumped-storage hydroelectric method to generate electricity. After being planned in the early 1970s, construction on the plant began in June 1977 and commercial operations began on 30 June 1984. It has an installed capacity of 1,212 MW and is owned by Pacific Gas and Electric Company.
The Edolo Pumped Storage Plant is located along the Oglio River just downstream of Edolo, Brescia Province in the Lombardy region of Italy. Using the pumped-storage hydroelectric method, it has an installed capacity of 1,000 megawatts (1,300,000 hp). Its generators were commissioned between April 1984 and November 1985. Lake Avio was previously completed in 1929 and Lake Benedetto completed in 1940.
The Yuba–Bear Hydroelectric Project is a complex hydroelectric scheme in the northern Sierra Nevada in California, tapping the upper Yuba River and Bear River drainage basins. The project area encompasses approximately 400 square miles (1,000 km2) in Nevada, Placer, and Sierra Counties. Owned by the Nevada Irrigation District, it consists of 16 storage dams plus numerous diversion and regulating dams, and four generating stations producing 425 million kilowatt hours of electricity each year. The Yuba–Bear Hydroelectric Project consists of the Bowman development, Dutch Flat No. 2 development, Chicago Park development, and Rollins development.
The Upper North Fork Feather River Project is a hydroelectric scheme in the Sierra Nevada of California, within Lassen and Plumas Counties. The project consists of three dams, five power plants, and multiple conduits and tunnels in the headwaters of the North Fork Feather River, a major tributary of the Feather—Sacramento River systems. The total installed capacity is 362.3 megawatts (MW), producing an annual average of 1,171.9 gigawatt hours (GWh). The project is also contracted for the delivery of irrigation water between March 31 and October 31 of each year. The project is owned and operated by Pacific Gas and Electric Company.
The Pantabangan–Carranglan Watershed Forest Reserve is a conservation area located in the upper reaches of the Pampanga River in Nueva Ecija, Philippines, and borders the Sierra Madre and Caraballo Mountains in Aurora and Nueva Vizcaya. It encompasses 84,500 hectares of the drainage basin surrounding the Pantabangan Lake, an impoundment of the Pampanga River by the Pantabangan Dam. The multi-purpose dam is situated at the confluence of Pampanga River's two headwaters, namely the Pantabangan and Carranglan Rivers in the municipality of Pantabangan. It stretches above the dam site for 21 kilometres (13 mi) to where Carranglan River originates in the Caraballo on the north, and for 18 kilometres (11 mi) to where Pantabangan River originates in the Sierra Madre on the east. It is considered a critical watershed for the agricultural economy and hydroelectric power generation in the region of Central Luzon.
Seattle Municipal Light and Power Plant, also known as Cedar Falls Historic District, is a public hydroelectric plant near North Bend, Washington operated by Seattle City Light. The plant was the first publicly-owned electrical generating plant for Seattle and one of the earliest in the country for a municipality of its size. It was listed on the National Register of Historic Places in 1997.