SkyTrain station | |||||||||||
General information | |||||||||||
Location | Richmond | ||||||||||
Coordinates | 49°11′21″N123°07′54″W / 49.189254°N 123.131677°W | ||||||||||
Owned by | TransLink | ||||||||||
Platforms | Side platforms | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Status | Under construction | ||||||||||
Fare zone | 2 | ||||||||||
History | |||||||||||
Opening | 2024 | (planned)||||||||||
Future services | |||||||||||
|
Capstan is an elevated station under construction on the Canada Line of Metro Vancouver's SkyTrain rapid transit system. [1] It will be located at the intersection of No. 3 Road and McMyn Way, one block north of Capstan Way in Richmond, British Columbia, Canada, and will be the first infill station on the Canada Line when completed. It is expected to open in 2024. [2]
A station at Capstan Way in Richmond was originally planned to open shortly after the rest of the Canada Line but plans to construct it were cancelled in March 2009. Pinnacle International and Concord Pacific, the developers of the Sun Tech City project, could not fund the $25 million required to build the station. The developers could only offer $15 million up front, but this sum was not accepted by TransLink and the City of Richmond. [3]
In May 2012, the City of Richmond made an agreement with TransLink and the developers to fund the project. The developers were to pay a fee of just over $8,500 per unit, with the specific amount adjusted in October to account for inflation. At the time, it was thought it would take approximately 15 years to amass the required funds. By September 2017, based on development permit applications, the full $27.8 million could be collected by mid-2018, nine years earlier than expected. [4]
In November 2017, the City of Richmond released $3.5 million to TransLink to cover the costs of designing the station. By May 2019, $32 million had been raised, exceeding the required $27.8 million, which had been reached in November 2018. [5] By December 2019, the station was still in the detailed design stage. [6]
Initially the completion of the station was projected for mid-2022; [7] [8] a nearby construction conflict and internal changes at InTransitBC, the private operator of the Canada Line, later pushed this date to March 2023. [9] The opening date was subsequently pushed back to the first quarter of 2024 due to supply chain issues. [2]
Construction of the station began on September 2, 2021, [10] and required various service reductions and periods of single tracking on the Richmond branch of the Canada Line across several months. [11] [12]
SkyTrain is the medium-capacity rapid transit system serving the Metro Vancouver region in British Columbia, Canada. SkyTrain has 79.6 km (49.5 mi) of track and uses fully automated trains on grade-separated tracks running on underground and elevated guideways, allowing SkyTrain to hold consistently high on-time reliability. In 2023, the system had a ridership of 141,339,300, or about 446,400 per weekday as of the fourth quarter of 2023.
Richmond is a city in the coastal Lower Mainland region of British Columbia, Canada. Mainly a suburban city, it occupies almost the entirety of Lulu Island, between the two estuarine distributaries of the Fraser River. Encompassing the adjacent Sea Island and several other smaller islands and uninhabited islets to its north and south, the suburb neighbours Vancouver and Burnaby on the Burrard Peninsula to the north, New Westminster and Annacis Island to the east, Delta to the south, and the Strait of Georgia to the west.
The Expo Line is the oldest line of the SkyTrain rapid transit system in the Metro Vancouver region of British Columbia, Canada. The line is owned and operated by BC Rapid Transit Company, a subsidiary of TransLink, and links the cities of Vancouver, Burnaby, New Westminster and Surrey.
The Millennium Line is the second line of the SkyTrain rapid transit system in the Metro Vancouver region of British Columbia, Canada. The line is owned and operated by BC Rapid Transit Company, a subsidiary of TransLink, and links the cities of Vancouver, Burnaby, Coquitlam and Port Moody. The line was opened in 2002 and was named in recognition of the new millennium.
The Canada Line is a rapid transit line in Greater Vancouver, British Columbia, Canada, that is part of the SkyTrain system. The line is owned by TransLink and InTransitBC and is operated by ProTrans BC. Coloured turquoise on route maps, it operates as an airport rail link between Vancouver, Richmond, and the Vancouver International Airport (YVR). The line comprises 16 stations and 19.2 kilometres (11.9 mi) of track; the main line runs from Vancouver to Richmond while a 4-kilometre (2.5 mi) spur line from Bridgeport station connects to the airport. It opened on August 17, 2009, ahead of the 2010 Winter Olympics.
Waterfront station is a major intermodal public transportation facility and the main transit terminus in Vancouver, British Columbia, Canada. It is on West Cordova Street in Downtown Vancouver, between Granville and Seymour Street. The station is also accessible via two other street-level entrances, one on Howe Street to the west for direct access to the Expo Line and another on Granville Street to the south for direct access to the Canada Line.
King George is an elevated station on the Expo Line of Metro Vancouver's SkyTrain rapid transit system. The station is located in the south end of the Surrey City Centre district of Surrey, British Columbia, Canada, and is one of the outbound termini of the Expo Line, the other being Production Way–University station. The station is located at the corner of King George Boulevard and 100 Avenue, just north of Fraser Highway.
Burrard is an underground station on the Expo Line of Metro Vancouver's SkyTrain rapid transit system. The station is located in Downtown Vancouver on Burrard Street, where Melville and Dunsmuir Streets meet, and is the western terminus of the R5 Hastings St that provides service to Simon Fraser University.
Metrotown is an elevated station on the Expo Line of Metro Vancouver's SkyTrain rapid transit system, and is located along Central Boulevard, directly across from the Metropolis at Metrotown shopping centre, in Burnaby, British Columbia, Canada. As of 2022, it is the second-busiest station in the SkyTrain system.
Brentwood Town Centre is an elevated station on the Millennium Line of Metro Vancouver's SkyTrain rapid transit system. The station is located above Lougheed Highway east of Willingdon Avenue in Burnaby, British Columbia, Canada. The station is adjacent to the Amazing Brentwood, a mid-size shopping centre.
22nd Street is an elevated station on the Expo Line of Metro Vancouver's SkyTrain rapid transit system. It is located on 7th Avenue and 22nd Street in the Connaught Heights neighbourhood of New Westminster, British Columbia, Canada. Due to its proximity to the Queensborough interchange, where the Queensborough Bridge meets with Stewardson and Marine Ways, the station serves as a hub for regional bus routes.
Richmond–Brighouse is an elevated station on the Canada Line of Metro Vancouver's SkyTrain rapid transit system. Located in the Brighouse area of Richmond, British Columbia, Canada, it is one of the outbound terminus stations of the Canada Line, the other being YVR–Airport. Like YVR–Airport, Richmond–Brighouse only has a single track.
Sea Island Centre is an at-grade station on the Canada Line of Metro Vancouver's SkyTrain rapid transit system. The station is located on Sea Island in Richmond, British Columbia.
Broadway–City Hall is an underground station on the Canada Line of Metro Vancouver's SkyTrain rapid transit system. The station is located at the intersection of West Broadway and Cambie Street in Vancouver, British Columbia and is within walking distance of Vancouver City Hall, City Square Shopping Centre, Vancouver General Hospital and related facilities, as well as the surrounding Fairview and Mount Pleasant neighbourhoods.
Yaletown–Roundhouse is an underground station on the Canada Line of Metro Vancouver's SkyTrain rapid transit system. The station is located on Davie Street at Mainland Street, approximately 80 metres (260 ft) northwest of Pacific Boulevard, and serves the residential and retail areas of Yaletown and Downtown Vancouver in Vancouver, British Columbia, Canada.
Vancouver City Centre is an underground station on the Canada Line of Metro Vancouver's SkyTrain rapid transit system. The station is located on Granville Street, between West Georgia Street and Robson Street in Downtown Vancouver, and serves the shopping and entertainment districts along Granville and Robson streets, and the office and shopping complexes of Pacific Centre and Vancouver Centre.
Marpole Loop is a public transit exchange in the Marpole neighbourhood of Vancouver, British Columbia, Canada. The exchange is a part of Metro Vancouver's TransLink transit network. It is the southernmost transit exchange located within the city of Vancouver.
Great Northern Way–Emily Carr is a planned underground station for the Millennium Line of Metro Vancouver's SkyTrain rapid transit system. It will be located at the intersection of Great Northern Way and Thornton Street adjacent to the Emily Carr University of Art and Design in the Strathcona neighbourhood of Vancouver, British Columbia, Canada. Originally scheduled to open in 2025, the station's projected opening was pushed back to early 2026 in November 2022.
Oak–VGH is a planned underground station for the Millennium Line of Metro Vancouver's SkyTrain rapid transit system. It will be located at the southwest corner of the intersection of West Broadway and Laurel Street near Vancouver General Hospital in the Fairview neighbourhood of Vancouver, British Columbia, Canada. Originally scheduled to open in 2025, the station's projected opening was pushed back to early 2026 in November 2022.