Expo Line (SkyTrain)

Last updated

Expo Line
Translinkexpo.svg
Mark I Expo Line train, February 2018.jpg
An Expo Line train in New Westminster
Overview
Owner TransLink (South Coast British Columbia Transportation Authority)
Locale Metro Vancouver, British Columbia
Termini
Stations24
Service
Type Rapid transit
System SkyTrain
Operator(s)British Columbia Rapid Transit Company
Rolling stock
Daily ridership288,000 (2022) [a] [1]
History
OpenedDecember 11, 1985;38 years ago (1985-12-11)
Technical
Line length36.4 km (22.6 mi)
Number of tracks2
Track gauge 1,435 mm (4 ft 8+12 in)
Electrification Third rail (linear motor)
Operating speed80 km/h (50 mph)
Route map
Expo Line (SkyTrain) Expo Line highlighted in navy
SeaBus
to Lonsdale Quay
BSicon HUBrg-R.svg
BSicon BOOT.svg
BSicon HUBlg-L.svg
BSicon KINTaq.svg
BSicon dCONTfq.svg
West Coast Express
to Mission
Translinkseabus.svg Translinkwce.svg
BSicon PORTALf.svg
BSicon HUBlf-R.svg
BSicon KINTa-L denim.svg
BSicon HUBrf-L.svg
BSicon tKINTa-R cerulean.svg
‹See TfM› Waterfront
Translinkbusrapid.svg Translinkcanada.svg
BSicon tINT denim.svg
BSicon tSTR cerulean.svg
‹See TfM› Burrard
Translinkbusrapid.svg
Canada Line
to ‹See TfM› YVR–Airport
BSicon tCONTgq cerulean.svg
BSicon mtKRZtu denim+cerulean.svg
BSicon tSTRr cerulean.svg
BSicon tBHF denim.svg
‹See TfM› Granville
BSicon htBHFe@g denim.svg
‹See TfM› Stadium–Chinatown
Millennium Line
to ‹See TfM› VCC–Clark
BSicon hCONTg yellow.svg
BSicon hINT denim.svg
‹See TfM› Main Street–Science World
VIA Rail Canada simplified.svg BSicon LOGO Amtrak2.svg
BSicon STRc2 denim.svg
BSicon hSTR2uh yellow.svg
BSicon hSTR3 denim.svg
BSicon lINT2-L.svg
BSicon hINT+1 denim.svg
BSicon MSTRc4.svg
BSicon hBHF+1~RR denim.svg
BSicon lINT-R.svg
BSicon hBHF2+4 yellow.svg
BSicon hSTRc3 yellow.svg
‹See TfM› Commercial–Broadway
Translinkbus.svg Translinkmillennium.svg
‹See TfM› Nanaimo
BSicon hBHFe denim.svg
BSicon hSTRc1 yellow.svg
BSicon MFADE2+4.svg
BSicon hLSTR+4 yellow.svg
‹See TfM› 29th Avenue
BSicon BHF denim.svg
Translinkbusrapid.svg
‹See TfM› Joyce–Collingwood
BSicon hINTa denim.svg
Vancouver Zone 1
Burnaby Zone 2
BSicon hSTR denim+GRZq.svg
BSicon MFADEg.svg
BSicon hLSTR yellow.svg
‹See TfM› Patterson
BSicon hBHF denim.svg
BSicon KINTa denim.svg
BSicon lhBHF.svg
BSicon KSTRe yellow.svg
‹See TfM› Production Way–University Translinkmillennium.svg
‹See TfM› Metrotown
BSicon hBHF denim.svg
BSicon hINT denim.svg
‹See TfM› Lougheed Town Centre
Translinkmillennium.svg
‹See TfM› Royal Oak
BSicon hBHFe denim.svg
BSicon STR denim.svg
BSicon lhABZgl.svg
BSicon STRl yellow.svg
BSicon hdCONTf@Fq yellow.svg
Millennium Line
to ‹See TfM› Lafarge Lake–Douglas
‹See TfM› Edmonds
BSicon BHF denim.svg
BSicon hSKRZ-A denim.svg
Edmonds Yard
BSicon STR denim.svg
BSicon lhSTRa@f.svg
BSicon uABZl+l.svg
BSicon uKDSTeq.svg
BSicon hSTR denim+GRZq.svg
Burnaby
Coquitlam
Burnaby
New Westminster
BSicon hSTR denim+GRZq.svg
BSicon lhSTRa@fq.svg
BSicon uexKDSTaq.svg
BSicon uexSTRr.svg
BSicon STR denim.svg
BSicon lhABZgr.svg
Future storage facility
‹See TfM› 22nd Street
BSicon hBHF denim.svg
BSicon hSTR denim+GRZq.svg
Coquitlam
New Westminster
‹See TfM› New Westminster
BSicon hBHF denim.svg
BSicon hBHF denim.svg
‹See TfM› Braid
‹See TfM› Columbia
BSicon htBHFa@g denim.svg
BSicon hBHF denim.svg
‹See TfM› Sapperton
BSicon lhSTRa@f.svg
BSicon PORTALg.svg
BSicon PORTALl.svg
BSicon ABZgl denim.svg
BSicon htSTReq denim.svg
BSicon hSTRr denim.svg
New Westminster Zone 2
Surrey Zone 3
BSicon dWASSERq.svg
BSicon hKRZW denim+GRZq.svg
BSicon dWASSERq.svg
Translinkbusrapid.svg
‹See TfM› Scott Road
BSicon hINT denim.svg
‹See TfM› Gateway
BSicon hBHF denim.svg
Translinkbusrapid.svg
‹See TfM› Surrey Central
BSicon hINT denim.svg
Translinkbusrapid.svg
‹See TfM› King George
BSicon hKINTxe denim.svg
   
BSicon exhCONTf denim.svg
Future Surrey–Langley
extension (2028)
‹See TfM› Green Timbers
   
BSicon exhBHF denim.svg
Future Surrey–Langley
extension (2028)
‹See TfM› 152 Street
BSicon exhBHF denim.svg
‹See TfM› Fleetwood
BSicon exhBHF denim.svg
‹See TfM› Bakerview–166 Street
BSicon exhBHF denim.svg
‹See TfM› Hillcrest–184 Street
BSicon exhBHF denim.svg
‹See TfM› Clayton
BSicon exhBHF denim.svg
Surrey
Langley Township
BSicon exhSTR denim+GRZq.svg
‹See TfM› Willowbrook
BSicon exhBHF denim.svg
Langley Township
Langley City
BSicon exhSTR denim+GRZq.svg
‹See TfM› Langley City Centre
BSicon exhKBHFe denim.svg

Wheelchair symbol.svg All stations are accessible

The Expo Line is the oldest line of the SkyTrain rapid transit system in the Metro Vancouver region of British Columbia, Canada. The line is owned and operated by BC Rapid Transit Company, a subsidiary of TransLink, and links the cities of Vancouver, Burnaby, New Westminster and Surrey.

Contents

The line was originally known only as "the SkyTrain" from its inception in 1985 until 2002, as it was the system's only line during this time. In 2002, after the opening of the system's second line, the Millennium Line, the original line was given the name "Expo Line". The new name was in recognition of Expo 86 (the World's Fair that Vancouver hosted in 1986) as the transit system had been built in large part as a showcase and an attraction for that fair.

Route

The line is elevated from Stadium–Chinatown to New Westminster stations, except for short at-grade sections between Nanaimo and Joyce–Collingwood stations in East Vancouver, and around the SkyTrain yards at Edmonds station in Burnaby.

The line travels underground for a short stretch between New Westminster and Columbia stations. Just east of Columbia is a junction where the line splits. One branch crosses the Fraser River, via the SkyBridge, and is elevated for the rest of its run through Surrey, with King George as its terminus station. The other branch continues through New Westminster, first through a tunnel and then elevated until it terminates at Production Way–University in Burnaby.

From just west of Nanaimo station all the way to New Westminster station, the Expo Line follows BC Electric's former Central Park Line, which carried interurbans between Vancouver and New Westminster from 1890 to the early 1950s.

History

ICTS demonstration project (1983)

What is now known as SkyTrain began as a demonstration project to showcase the newly developed linear induction propulsion technology to Vancouver and other prospective cities throughout the world. Although Toronto's Scarborough RT was completed before the Expo Line in 1985, the ICTS demonstration was the first system to use SkyTrain technology. The Intermediate Capacity Transit System (ICTS) demonstration was built using the Advanced Rapid Transit (ART) technology developed by the Urban Transportation Development Corporation (now part of Bombardier). Construction began on March 1, 1982, and was completed in early 1983. The demonstration project consisted of just one station and about one kilometre of guideway with no switches. This original station was not "named" during this time as it was the only station, but then in 1985 opened as Main Street station.

As it was a showcase station, Main Street had a different initial design from other stations on the Expo Line that came after it. For example, glass was featured in the station's design, but was missing from other original Expo Line stations, except Stadium station (now Stadium–Chinatown) since it was tied to the Expo grounds. Having preceded other stations on the line by three years, Main Street–Science World was visibly older, and signs of rust and wear were showing before extensive renovations to the station were completed in 2014. [2]

The guideway for the showcase line was a straight section east of the station running over Terminal Avenue. It ended across from where the former Brussels Chocolate factory once was, located on Terminal. There was no guideway west of the station as the track ended immediately at the west end of the platform where the Vancity head office now stands.

The ICTS guideway was built differently from the rest of the Expo Line. The columns were different especially with how they are joined with the guideway. The walkway between the two tracks is of a different but also inferior design from the Expo Line, and it is showing signs of rust that come with the older age of the guideway.

There was only a single two-car train running on the north westbound track. After passengers boarded, it ran east toward the end of the test guideway. At the eastern end, the train would stop and after a pause, reverse directions and return to the station. Since there were no switches, only the northern track was used and the train would run back and forth on the same track. There was also a single car mock up parked on the south platform, what is now the eastbound platform. This car was not operational. The two-car train and single car mock up were of a different and unique design to all the production Mark I trains. The red tail lights were located on the bottom beside the headlights, instead of at the top. The end door and window were of a different design. As well, there were black panels on either side of the door, that are not found in the production trains. The whereabouts of these trains is unknown.

The ICTS guideway was retrofitted during the construction of the Millennium Line to accommodate the heavier weight Mark II cars. This was done by adding additional steel-reinforced concrete beams to the columns where they support the guideway. These are clearly visible when driving or walking on Terminal Avenue under the guideway. With the exception of the original ICTS guideway, no other part of the Expo Line required retrofitting for strength in order to accommodate the Mark II cars.

After the 1983 preview closed, the single pair of demonstration cars were sent back to Ontario, which have since served as test trains for the UTDC. The subsequent trains ordered for Expo were designed slightly differently from the demo train set because of issues such as a lack of standardized parts, and the wish to introduce automated computer technology to drive the trains.

Phase I: Waterfront to New Westminster (1985)

Operations and Maintenance Centre 1, located east of Edmonds station in Burnaby SkyTrain Edmonds Operations and Maintenance Centre.jpg
Operations and Maintenance Centre 1, located east of Edmonds station in Burnaby

Following the demonstration project, construction of the first phase of the Expo Line between Vancouver and New Westminster got under way in mid-1983, with guideway construction nearing completion by late 1984, and station construction beginning in early 1985.[ citation needed ] On December 11, 1985, SkyTrain began providing free weekend service, with full revenue service opening on January 3, 1986. [3] [4] Phase I was 21.4 kilometres (13.3 mi) in length, starting at Waterfront station and terminating at New Westminster station. [5] The newly built system had limited Sunday service until 1990, and shorter revenue hours during weekdays than SkyTrain's current revenue schedule as of 2010.

During Expo 86, special shuttle trains ran from a third track at Stadium station, where there was a connection to the monorail serving the main site of the world's fair, to the Canadian pavilion at Waterfront station. Waterfront station was divided in two, with a fence going down the centre of the platform. One side of the platform was used exclusively for the shuttles, and was accessible only from the Canada Place entrance, while the other side was only for revenue service and was only accessible from the main entrance to the east.[ citation needed ]

For the first few years of revenue service until the early 1990s, all trains were lined with carpeting, and train doors did not open automatically but rather at the push of buttons on the interior and exterior of the trains when docked in stations. This on-demand system reflected the small-scale ridership SkyTrain had before Vancouver experienced a major population boost. Due to an inability to steadily maintain the carpeting, wax floors of the same colour were installed between 1992 and 1993.[ citation needed ]

In the planning of the original line, a proposed future station at Boundary Road and Kingsway, or "Boundary station" was to be included to serve employees of BCTel. However, the proposal was scrapped largely due to a fear of the station attracting crime to the neighbourhood and noise-level concerns.[ citation needed ]

Phase II: Columbia and Scott Road stations (1989–1990)

The first extension, or Phase II, was split into two parts. Construction began in 1987, with Columbia station opening on February 14, 1989, adding 600 metres (2,000 ft) of guideway in the City of New Westminster.[ citation needed ] The second segment opened on March 16, 1990, and included Scott Road station in Surrey, crossing the Fraser River via the purpose-built, cable-stayed "SkyBridge", adding 2.5 kilometres (1.6 mi) to the line. [6]

Phase III: Surrey City Centre extension (1994)

Crossover west of King George station Expo Line tracks west of King George Stattion.jpg
Crossover west of King George station

Construction of a 4-kilometre (2.5 mi) second extension, or Phase III, began in late 1991 and opened on March 28, 1994, adding three stations in Surrey's City Centre district in Whalley. [7] Private partnerships with surrounding businesses in the community led to the then-new stations having a different appearance from the rest of the Expo Line. This extension set one of the Expo Line's current eastern terminus at King George station. It also added Gateway and Surrey Central stations.

Branch to Production Way–University (2016)

In 2002, the Millennium Line opened and shared the same track alignment with the Expo Line from Waterfront station in Downtown Vancouver to Columbia station in New Westminster. At Columbia, the two lines diverged, with the Expo Line crossing the Fraser River towards Surrey City Centre and the Millennium Line entering a short tunnel towards northeastern New Westminster and North Burnaby.

In late 2016, the SkyTrain system underwent a service change in preparation for the opening of the Evergreen Extension, resulting in a new branch of the Expo Line serving four stations that were originally built for the Millennium Line. On October 22, 2016, this branch began service from Columbia to Sapperton, Braid, Lougheed Town Centre, and Production Way–University stations, while the Millennium Line began running between VCC–Clark and Lougheed Town Centre (and later, Lafarge Lake–Douglas) stations, effectively ending nearly 15 years of Millennium Line service between Waterfront and Braid. The main Expo Line service between Waterfront and King George stations remained in place, operating at the same frequency levels. [8] [9]

Technology

The Expo Line uses a fleet of Innovia ART and Innovia Metro trains built by Bombardier Transportation (now Alstom). Like the Millennium Line, the trains are powered by linear induction motors rather than the conventional electric (rotary) motors used on the Canada Line. Expo Line trains are operated by the same SelTrac automated train control system used in the rest of the SkyTrain network.

The 2023 fleet consists of six-car Mark I trains using the Innovia ART 100, two- and four-car Mark II trains (operating in coupled pairs of two cars) using the Innovia ART 200, and four-car Mark III trains using the Innovia Metro 300.

Expansions

Capacity upgrades

Before the purchase of some Mark II vehicles in 2009, the Expo line was operating at capacity while carrying 12,000 passengers per hour per direction (pphpd). Its ultimate design capacity was 19,400 pphpd using six-car Mark I trains operating at 93-second headways. However, exclusively operating a fleet of five-car trains would increase the capacity to 25,700 pphpd if Mark II trains were used. [10] :1,16

Several options have been considered over the system's history to increase capacity on the Expo Line, including:

In late 2020, TransLink ordered 41 Alstom Mark V trainsets in five-car configurations. [12] These trains are based on the previous Mark III trains; however, each train will have an additional carriage and will have more internal space. [13] Each five-car Mark V train will be able to hold 672 passengers regularly, both seated and standing, with a potential crush capacity of up to 1,207 passengers. [14] The order will provide for both an increase in the number of trainsets and ultimately a total replacement of the mid-1980s to early 1990s Mark I rolling stock. [15] Construction will be required at some stations to accommodate the 80-metre (260 ft) length of the Mark V trainsets, but no service interruptions will be necessary. [16]

Surrey–Langley extension

The Surrey Langley SkyTrain Project is a 16-kilometre (9.9 mi) elevated extension of the Expo Line from King George SkyTrain Station in Surrey to 203 Street in Langley City, routed mostly along Fraser Highway. [17] Anticipated to open in 2029, [18] it will be built in one phase (a change from earlier plans) and include the following eight stations: [19]

StationCityLocationTransit exchange
Green TimbersSurreyFraser Highway at 140 StreetNo
152 StreetSurreyFraser Highway at 152 StreetNo
FleetwoodSurreyFraser Highway at 160 StreetNo
Bakerview–166 StreetSurreyFraser Highway at 166 StreetYes
Hillcrest–184 StreetSurreyFraser Highway at 184 StreetNo
ClaytonSurreyFraser Highway at 190 StreetNo
WillowbrookLangley TownshipFraser Highway at 196 StreetYes
Langley City CentreLangley CityIndustrial Avenue at 203 Street [20] Yes

The 2008 Provincial Transit Plan included a 6-kilometre (3.7 mi) extension from King George station in Surrey east to Guildford, then along 152 Street to Fraser Highway and southeast to 168 Street; a further extension to Willowbrook Shopping Centre in Langley Township was also included in the plan. [21] In 2011, as part of phase 2 of the Surrey Rapid Transit Study, different possibilities were examined for expanding rapid transit along multiple corridors in the South of Fraser region. [22] In addition to SkyTrain, light rail and bus rapid transit were also in consideration. In 2016, TransLink was building dual business cases for LRT and SkyTrain technologies. [23]

In November 2018, following a change of government in Surrey, the Metro Vancouver Mayors' Council voted to indefinitely suspend the at-grade Surrey light rail project in favour of extending the Expo Line from King George station to Langley City. This extension would be 16 kilometres (9.9 mi) long and add eight stations to the Expo Line. [24] [25] The $1.65 billion in funding that was earmarked for the light rail project was intended to be used to construct part of this extension to Langley but was insufficient to fund the entire extension, with $1.9 billion more needed to complete the project. [26] The existing funding would extend the line 7 kilometres (4.3 mi) to Fleetwood in Surrey and add 4 new stations, terminating at 166th Street.

On July 25, 2019, the Mayors' Council voted to extend the Expo Line to Fleetwood using the existing funds. [27] The council also voted to proceed with preparing a detailed business case for the full Surrey–Langley SkyTrain extension, which was expected to be completed by early 2020. If approved by the end of the third quarter of 2020, construction would have started in early 2022, with revenue service to Fleetwood projected to have started in late 2025. [26]

On October 8, 2020, during the 2020 provincial election campaign, the BC NDP pledged to work with senior levels of government to obtain the $1.5 billion needed to complete the full extension to Langley. [28]

On July 9, 2021, Prime Minister Justin Trudeau announced that the federal government would provide up to $1.3 billion to build the SkyTrain extension to Langley in a single phase. [29] At that time, the cost of the project was estimated between $3.8 and $3.95 billion in total, more than $650 million in excess of the earlier $3.13 billion estimate from TransLink, with the rest of the funding being split between TransLink and the provincial government. [29] [30] The full extension to Langley was planned to be constructed as a single project, rather than in two phases, and open in 2028. [31] In July 2022, the provincial government officially approved this one-phase plan. Procurement for contractors was slated to start later in 2022, with major construction expected to begin in 2024. [32] On March 7, 2024, the provincial Ministry of Transportation announced that SkyLink Guideway Partners had been selected to build the elevated guideway for the extension. [33] On August 15, 2024 the Ministry of Transportation stated that the extension was now expected to be completed in 2029, with an estimated cost of $6 billion. [18]

Stations

StationOpenedCityConnectionsLocation
Waterfront 1985 Vancouver Translinkseabus.svg Translinkcanada.svg Translinkwce.svg Translinkbusrapid.svg Cordova between Granville and Seymour
Burrard 1985Vancouver Translinkbusrapid.svg Burrard between Melville and Dunsmuir
Granville 1985VancouverGranville between Georgia and Dunsmuir; adjacent to Pacific Centre
Stadium–Chinatown 1985VancouverBeatty at Dunsmuir; adjacent to Rogers Arena; near BC Place and Chinatown
Main Street–Science World 1985Vancouver BSicon LOGO Amtrak2.svg VIA Rail Canada simplified.svg Pacific Central Main at Terminal; near Science World
Commercial–Broadway 1985/2002 [b] Vancouver Translinkmillennium.svg Translinkbus.svg Commercial at Broadway
Nanaimo 1985VancouverEast 24th Avenue at Nanaimo
29th Avenue 1985VancouverEast 29th Avenue at Atlin
Joyce–Collingwood 1985Vancouver Translinkbusrapid.svg Joyce at Vanness
Patterson 1985 Burnaby Patterson between Beresford and Central
Metrotown 1985BurnabyBeresford and Central between Silver and Telford; adjacent to Metropolis at Metrotown
Royal Oak 1985BurnabyBeresford at Royal Oak
Edmonds 1985Burnaby18th Street near Griffiths
22nd Street 1985 New Westminster 22nd Street at 7th Avenue
New Westminster 1985New Westminster8th Street between Columbia and Carnarvon; integrated with Shops at New West
Columbia 1989New Westminster4th Street between Columbia and Carnarvon; branches split
King George branch
Scott Road 1990 Surrey Translinkbusrapid.svg Scott Road near King George Boulevard
Gateway 1994Surrey108 Avenue at University Drive
Surrey Central 1994Surrey Translinkbusrapid.svg Central Avenue at City Parkway; adjacent to Central City
King George 1994Surrey Translinkbusrapid.svg King George Boulevard at Holland Commons; adjacent to King George Hub
Production Way–University branch
Sapperton 2002New WestminsterBrunette at Spruce; adjacent to Royal Columbian Hospital
Braid 2002Brunette at Braid; near Highway 1
Lougheed Town Centre 2002Burnaby Translinkmillennium.svg Lougheed Highway at Austin; adjacent to the City of Lougheed shopping centre
Production Way–University 2002 Translinkmillennium.svg Translinkbuses.svg SFU Lougheed Highway at Production Way

See also

Notes

  1. Combined with Millennium Line
  2. Commercial–Broadway station was originally two separate stations—Broadway station and Commercial Drive station. Broadway station was completed in 1985, while Commercial Drive station was completed in 2002; the stations were merged in 2009. [34]

Related Research Articles

<span class="mw-page-title-main">SkyTrain (Vancouver)</span> Automated rapid transit system in Metro Vancouver, Canada

SkyTrain is the medium-capacity rapid transit system serving the Metro Vancouver region in British Columbia, Canada. SkyTrain has 79.6 km (49.5 mi) of track and uses fully automated trains on grade-separated tracks running on underground and elevated guideways, allowing SkyTrain to hold consistently high on-time reliability. In 2023, the system had a ridership of 141,339,300, or about 455,700 per weekday as of the third quarter of 2024.

<span class="mw-page-title-main">TransLink (British Columbia)</span> Transportation authority in Metro Vancouver, Canada

TransLink, formally the South Coast British Columbia Transportation Authority and previously the Greater Vancouver Transportation Authority, is the statutory authority responsible for the regional transportation network of Metro Vancouver in British Columbia, Canada, including public transport, major roads and bridges. Its main operating facilities are located in the city of New Westminster.

<span class="mw-page-title-main">Innovia Metro</span> Automated rapid transit system

Innovia Metro is an automated rapid transit system manufactured by Alstom. Innovia Metro systems run on conventional metal rails and pull power from a third rail but are powered by a linear induction motor that provides traction by using magnetic force to pull on a "fourth rail" placed between the running rails. However, newer versions of the technology are available with standard electric rotary propulsion.

<span class="mw-page-title-main">Millennium Line</span> Rapid transit line in Metro Vancouver, Canada

The Millennium Line is the second line of the SkyTrain rapid transit system in the Metro Vancouver region of British Columbia, Canada. The line is owned and operated by BC Rapid Transit Company, a subsidiary of TransLink, and links the cities of Vancouver, Burnaby, Coquitlam and Port Moody. The line was opened in 2002 and was named in recognition of the new millennium.

<span class="mw-page-title-main">King George station</span> Metro Vancouver SkyTrain station

King George is an elevated station on the Expo Line of Metro Vancouver's SkyTrain rapid transit system. The station is located in the south end of the Surrey City Centre district of Surrey, British Columbia, Canada, and is one of the outbound termini of the Expo Line, the other being Production Way–University station. The station is located on King George Boulevard at Holland Commons, just north of Fraser Highway.

<span class="mw-page-title-main">Braid station</span> Metro Vancouver SkyTrain station

Braid is an elevated station on the Expo Line of Metro Vancouver's SkyTrain rapid transit system. The station is located near the intersect of Braid Street and Brunette Avenue in the Brunette Creek neighbourhood of New Westminster, British Columbia, Canada. Positioned near the Coquitlam border, the station is a major transfer point for bus routes serving the Tri-City area.

<span class="mw-page-title-main">New Westminster station</span> Metro Vancouver SkyTrain station

New Westminster is an elevated station on the Expo Line of Metro Vancouver's SkyTrain rapid transit system. The station is located at the intersection of Columbia Street and 8th Street in New Westminster, British Columbia. In 2012, the station was incorporated into the Shops at New West complex, making it the first train station in Canada to have a direct connection to a shopping centre at the platform level.

<span class="mw-page-title-main">Lougheed Town Centre station</span> Metro Vancouver SkyTrain station

Lougheed Town Centre is an elevated station on the Expo and Millennium Lines of Metro Vancouver's SkyTrain rapid transit system. The station is located at Lougheed Highway and Austin Road in Burnaby, British Columbia, Canada. Initially a Millennium Line station, a reorganization of SkyTrain service patterns in 2016 brought a branch of the Expo Line over the existing tracks to serve the station. It is one of three stations where transfer between the Expo Line and the Millennium Line is possible, the other two such points of transfer being Commercial–Broadway and Production Way–University stations.

<span class="mw-page-title-main">Edmonds station (SkyTrain)</span> Metro Vancouver SkyTrain station

Edmonds is an at-grade station on the Expo Line of Metro Vancouver's SkyTrain rapid transit system. The station is located southwest of the intersection of Griffiths Drive and 18th Avenue, near Edmonds Street, south of Kingsway in the Edmonds area of Burnaby, British Columbia.

<span class="mw-page-title-main">22nd Street station (SkyTrain)</span> Metro Vancouver SkyTrain station

22nd Street is an elevated station on the Expo Line of Metro Vancouver's SkyTrain rapid transit system. It is located on 7th Avenue and 22nd Street in the Connaught Heights neighbourhood of New Westminster, British Columbia, Canada. Due to its proximity to the Queensborough interchange, where the Queensborough Bridge meets with Stewardson and Marine Ways, the station serves as a hub for regional bus routes.

<span class="mw-page-title-main">Evergreen Extension</span> 2016 extension of Metro Vancouvers SkyTrain Millennium Line

The Evergreen Extension is a 10.9-kilometre-long (6.8 mi) extension of the Millennium Line of Metro Vancouver's SkyTrain rapid transit system. The extension runs from Lougheed Town Centre in Burnaby to Lafarge Lake–Douglas in Coquitlam and included six new SkyTrain stations and an upgraded existing station on the Millennium Line. It began operations on December 2, 2016.

<span class="mw-page-title-main">Transportation in Vancouver</span>

Transportation in Vancouver, British Columbia, has many of the features of modern cities worldwide. Unlike many large metropolises, Vancouver has no freeways into or through the downtown area. A proposed freeway through the downtown was rejected in the 1960s by a coalition of citizens, community leaders and planners. This event "signalled the emergence of a new concept of the urban landscape" and has been a consistent element of the city's planning ever since.

<span class="mw-page-title-main">The City of Lougheed</span> Shopping mall

The City of Lougheed is the second-largest shopping centre in Burnaby, British Columbia, Canada, with 57,100 square metres (615,000 sq ft) and over 160 shops and services. It opened in 1969 and is located in the northeast corner of Burnaby near the Coquitlam border. The centre is located adjacent to Lougheed Town Centre station, an interchange station that connects the Expo Line and Millennium Line of Metro Vancouver's SkyTrain rapid transit system.

<span class="mw-page-title-main">SkyTrain (Vancouver) rolling stock</span> Fleet of automated trains in Metro Vancouver, Canada

The SkyTrain is a rapid transit system located in the Metro Vancouver region of the Canadian province of British Columbia, with a number of different models of rolling stock.

The SkyTrain rapid transit system in Greater Vancouver, Canada, was conceived as a legacy project of Expo 86 and was finished in time to showcase the fair's theme: "Transportation and Communication: World in Motion – World in Touch". Construction was funded by the provincial and federal governments. Vancouver had plans as early as the 1950s to build a monorail system, with modernist architect Wells Coates pencilled in to design it; that project was abandoned. The lack of a rapid transit system was said to be the cause of traffic problems in the 1970s, and the municipal government could not fund the construction of such a system. During the same period, Urban Transportation Development Corporation, then an Ontario crown corporation, was developing a new rapid transit technology known as an "Intermediate Capacity Transit System". In 1980, the need for rapid transit was great, and Ontario needed buyers for its new technology. "Advanced Rapid Transit" was selected to be built in Vancouver to showcase the Ontario project at Expo 86.

The Surrey Light Rail system was a planned 10.5-kilometre (6.5 mi) network in Surrey, British Columbia containing one light rail line radiating from the ‹See TfM›Surrey Central SkyTrain station and transit hub. First proposed in 2012 by Surrey mayor Dianne Watts, construction on the project was planned to start in 2019 with an opening date set for 2024. At the inauguration of the new Surrey City Council on November 5, 2018, and after a change of municipal leadership, the newly installed council unanimously voted to "indefinitely suspend" the project in favour of an extension of the SkyTrain Expo Line to Langley Centre.

<span class="mw-page-title-main">Arbutus station</span> Metro Vancouver SkyTrain station

Arbutus is a planned underground station on the Millennium Line of Metro Vancouver's SkyTrain rapid transit system. It will be located at the northeast corner of the intersection of West Broadway and Arbutus Street in the Kitsilano neighbourhood of Vancouver, British Columbia, Canada, and will be the western terminus of the Millennium Line when completed. Originally scheduled to open in 2025, the station's projected opening has been pushed back twice; as of May 2024, it is scheduled to open in late 2027.

<span class="mw-page-title-main">Urban rail transit in Canada</span> List of Canadian passenger rail systems confined to urban areas

Urban rail transit in Canada encompasses a broad range of rail mass transit systems, including commuter rail, rapid transit, light rail, and streetcar systems.

<span class="mw-page-title-main">R6 Scott Rd</span> Express bus service in Metro Vancouver, Canada

The R6 Scott Rd is an express bus service with bus rapid transit elements in Metro Vancouver, British Columbia, Canada. Part of TransLink's RapidBus network, it travels along Scott Road and 72 Avenue in Surrey and connects Scott Road station, North Delta, and Newton.

References

  1. "TransLink 2022 Transit Performance Review" (PDF). TransLink. Retrieved June 23, 2023.
  2. "Transportation and Financial Base Plan for 2013 to 2015 and Outlook for 2016 to 2022" (PDF). TransLink. October 30, 2012. Archived from the original (PDF) on November 14, 2017. Retrieved November 14, 2017.
  3. Farrow, Moira; Cox, Sarah (December 11, 1985). "Glitter, bands and balloons". The Vancouver Sun. p. A1. Retrieved December 8, 2022 via Newspapers.com.
  4. "In business, on time: System's first riders all had their reasons". The Vancouver Sun. January 3, 1986. p. A1. Retrieved December 8, 2022 via Newspapers.com.
  5. Hall, Neal (December 27, 1986). "Happy birthday, SkyTrain". The Vancouver Sun. p. B12. Retrieved December 8, 2022 via Newspapers.com.
  6. Schaefer, Glen (March 16, 1990). "Ride across river offers new views". The Province. p. 14. Retrieved December 8, 2022 via Newspapers.com.
  7. "SkyTrain Your City to City Connection" (PDF). The Buzzer. BC Transit. March 11, 1994. Archived (PDF) from the original on December 17, 2021. Retrieved October 7, 2022.
  8. "Changes Coming to SkyTrain October 22". TransLink. September 19, 2016. Archived from the original on September 24, 2016. Retrieved September 19, 2016.
  9. Johnston, Jesse (October 22, 2016). "SkyTrain network changes start today". CBC News. Archived from the original on January 20, 2022. Retrieved October 27, 2016.
  10. Expo Line Upgrade Strategy - Project Summary (PDF) (Report). May 7, 2012. Retrieved January 4, 2024.
  11. "Skytrain, Vancouver's advanced rapid transit system". Thales Group. Archived from the original on April 5, 2012. Retrieved November 17, 2011.
  12. "TransLink to buy 205 new SkyTrain cars from Bombardier for $723 million | Urbanized". dailyhive.com. Retrieved August 17, 2023.
  13. "New rendering of the future SkyTrain cars, arriving starting later this year | Urbanized". dailyhive.com. Retrieved August 17, 2023.
  14. Chan, Kenneth (December 22, 2023). "First new generation SkyTrain cars arrive in Metro Vancouver | Urbanized". dailyhive.com. Retrieved January 4, 2024.
  15. "End of the line in sight for two generations of old SkyTrain cars | Urbanized". dailyhive.com. Retrieved August 17, 2023.
  16. Chan, Kenneth (February 16, 2023). "TransLink begins upgrade of SkyTrain stations to handle longer trains | Urbanized". DailyHive. Retrieved December 8, 2023.
  17. "Surrey Langley SkyTrain". www.surrey.ca. City of Surrey. December 11, 2019. Retrieved December 1, 2023.
  18. 1 2 "Surrey-Langley SkyTrain cost rises by $2B, opening delayed 1 year". cbc.ca. Archived from the original on August 15, 2024. Retrieved August 15, 2024.
  19. "Surrey Langley SkyTrain Project - Project Overview". Ministry of Transportation and Infrastructure, Province of British Columbia. Retrieved December 1, 2023.
  20. Chan, Kenneth (May 12, 2022). "BC government seeking public input on Surrey-Langley SkyTrain design | Urbanized". dailyhive.com. Retrieved December 7, 2023.
  21. Nagel, Jeff (January 16, 2008). "More SkyTrains for Surrey". Surrey Leader. Archived from the original on January 20, 2008. Retrieved February 21, 2008.
  22. "Rapid Transit Principles for the Broadway Corridor and the UBC Line Rapid Transit Study". TransLink. Archived from the original on January 13, 2012. Retrieved November 17, 2011.
  23. Nagel, Jeff (June 7, 2016). "Line to Langley may still be SkyTrain: TransLink CEO". Abbotsford News . Archived from the original on November 30, 2018. Retrieved February 13, 2018.
  24. McElroy, Justin (November 15, 2018). "Metro Vancouver mayors agree to suspend Surrey LRT, start process for SkyTrain to Langley". CBC News. Archived from the original on December 4, 2021. Retrieved November 30, 2018.
  25. Chan, Kenneth (July 20, 2018). "SkyTrain along Fraser Highway to Langley will cost $2.9 billion, says TransLink". Daily Hive. Archived from the original on March 6, 2021. Retrieved November 30, 2018.
  26. 1 2 Saltman, Jennifer (July 26, 2019). "Mayors' Council votes to proceed with plan for Surrey-Langley SkyTrain". Vancouver Sun. Archived from the original on August 27, 2019. Retrieved August 27, 2019.
  27. Pablo, Carlito (July 25, 2019). "Divided Metro Vancouver mayors approve new SkyTrain from King George Station to Fleetwood". The Georgia Straight. Archived from the original on August 27, 2019. Retrieved August 27, 2019.
  28. Claxton, Matthew (October 8, 2020). "Horgan pledges NDP will complete $1.5 billion SkyTrain extension to Langley". Surrey Now-Leader. Archived from the original on November 24, 2021. Retrieved October 25, 2020.
  29. 1 2 Chan, Kenneth (July 9, 2021). "Trudeau announces $1.3 billion for Surrey-Langley SkyTrain, confirms UBC support | Urbanized". DailyHive. Archived from the original on October 26, 2021. Retrieved July 11, 2021.
  30. Weichel, Andrew (July 9, 2021). "Federal government providing up to $1.3 billion for Surrey-Langley SkyTrain extension". CTV News Vancouver. Archived from the original on December 8, 2021. Retrieved July 9, 2021.
  31. Chan, Kenneth (July 14, 2022). "16-km-long Surrey-Langley SkyTrain extension receives full government approval | Urbanized". dailyhive.com. Retrieved July 24, 2022.
  32. Chan, Kenneth (July 14, 2022). "16-km-long Surrey-Langley SkyTrain extension receives full provincial and federal approval". Daily Hive. Retrieved July 20, 2022.
  33. Little, Simon (March 7, 2024). "Early work to start on Surrey-Langley SkyTrain line guideway build team named". Global News. Archived from the original on March 7, 2024. Retrieved March 16, 2024.
  34. "What's That Name Again? Canada Line Start Brings Station Name Changes". TransLink. August 28, 2009. Archived from the original on March 25, 2018. Retrieved June 26, 2021.
Template:Attached KML/Expo Line (SkyTrain)
KML is from Wikidata