Green Timbers station

Last updated

Green Timbers
Translinkexpo.svg
SkyTrain station
Green Timbers station (2025).jpg
Green Timbers station construction in August 2025
General information
LocationSurrey
Coordinates 49°10′43″N122°50′03″W / 49.17861°N 122.83417°W / 49.17861; -122.83417
Owned by TransLink
Platforms Side platforms
Tracks2
Construction
Structure typeElevated
Accessibleyes
Other information
StatusUnder construction
Fare zone3
History
Opening2029(4 years' time) (2029)
Services
Preceding station TransLink Following station
King George
towards Waterfront
Expo Line
Langley extension (opens 2029)
152 Street
Location
Green Timbers station

Green Timbers is an elevated station under construction on the Expo Line of Metro Vancouver's SkyTrain rapid transit system. It will be located above Fraser Highway on the east side of 140 Street in the Surrey City Centre district of Surrey, British Columbia, Canada.

Contents

The station is named after the nearby Green Timbers Urban Forest Park and will be adjacent to the Jim Pattison Outpatient Care and Surgery Centre. [1] It is scheduled to open in 2029. [2] [3]

Structure and design

Due to the protected Green Timbers Urban Forest Park zone, [4] the station is built over the Fraser Highway, and access to the platform is done from underneath the platforms and from the side of the station. [5] [6] Immediately to the east of the station, a pocket track spanning to 96 Avenue is being constructed with the capacity to store several trains and allow for potential short turn service at Green Timbers. [7] [8]

References

  1. "Green Timbers Station" (PDF). Surrey Langley SkyTrain. Government of British Columbia. June 2024. Archived (PDF) from the original on September 1, 2024. Retrieved July 15, 2025.
  2. Chan, Kenneth (December 1, 2023). "Official names of the eight new stations of Surrey-Langley SkyTrain revealed". Daily Hive. Archived from the original on December 2, 2023. Retrieved December 2, 2023.
  3. Chan, Kenneth (January 6, 2025). "It's official: Major construction now underway on 16-km-long Surrey-Langley SkyTrain". Daily Hive. Archived from the original on January 6, 2025. Retrieved January 7, 2025.
  4. "Green Timbers Urban Forest Park | City of Surrey". City of Surrey. December 11, 2019. Archived from the original on July 9, 2025. Retrieved August 19, 2025.
  5. Ruttle, Joseph (March 31, 2025). "Short stretch of Fraser Highway closed all summer for SkyTrain construction". Vancouver Sun. Archived from the original on April 1, 2025. Retrieved July 15, 2025.
  6. "Green Timbers Station – Surrey Langley SkyTrain Project (Station Design Boards, November 2024)" (PDF). govTogetherBC / Engage BC. Government of British Columbia, Ministry of Transportation and Infrastructure. November 2024. Retrieved August 19, 2025.
  7. Chan, Kenneth (September 14, 2020). "SkyTrain project includes four-lane widening of Fraser Highway in Green Timbers". Daily Hive. Archived from the original on September 16, 2020. Retrieved July 15, 2025.
  8. "Surrey Langley SkyTrain Business Case Update – Ridership Report – Revision #2" (PDF). McElhanney. Government of British Columbia. March 15, 2022. p. 16. Archived (PDF) from the original on October 31, 2022. Retrieved July 15, 2025.