China Railway Tianchi

Last updated
Tianchi diesel multiple unit
Manufacturer CRRC Qingdao Sifang
Constructed2005
Number built1 set
Formation3 cars (1M2T)
Capacity10 (test equipment and limited passenger seating)
OperatorsFlag of the People's Republic of China.svg China Ministry of Railways
China Railway Shenyang Group
Specifications
Width3.204 m (10.51 ft)
Height4.050 m (13.29 ft)
Wheelbase 2.600 m (8.53 ft)
Maximum speed
  • Service:
  • 180 km/h (110 mph)
  • Design:
  • 200 km/h (120 mph)
Axle load Power car: ≤21.5 t (47,000 lb)
Trailer car: ≤14.5 t (32,000 lb)
Prime mover(s) Cummins diesel engine
Power output2,100 kW (2,800 hp) (engine)
Tractive effort 2,240 kW (3,000 hp) (total traction)
TransmissionAC-DC-AC electric
Bogies SD-200, SW-220
Braking system(s) Rheostatic braking, air braking
Track gauge 1,435 mm (4 ft 8+12 in) standard gauge

The Tianchi is a high-speed comprehensive dynamic inspection DMU developed by CRRC Qingdao Sifang of China South Locomotive & Rolling Stock Corporation Limited. The train adopts a "one power car and two trailer cars" formation, AC transmission system, and new high-speed bogies. Its design maximum speed is 200 km/h (120 mph), and it also features track, signaling, and pantograph-catenary inspection functions.

Contents

Technical characteristics

Overall structure

The Tianchi diesel multiple unit adopts a "one power car and two trailer cars" formation (Mc+T+Tc), consisting of 1 power car with a driver's cab, 1 intermediate trailer car, and 1 trailer car with a driver's cab. The power car features a drum-shaped frame-type load-bearing car body and a through double-sided internal corridor. From front to back, it consists of the driver's cab, electrical compartment, power compartment, and braking auxiliary compartment. Fuel tanks and battery sets are installed between the two bogies under the car body. The train also adopts a streamlined front end to reduce air resistance during high-speed operation. The trailer car with a driver's cab contains a comprehensive inspection room, 4 seating compartments, 1 conference room, as well as a catering room, washrooms, and toilets. A dedicated inspection pantograph is installed on the roof. The intermediate trailer car houses various dynamic and static inspection equipment. The comprehensive inspection equipment on the train includes track inspection equipment, communication and signaling inspection equipment, and pantograph-catenary inspection equipment. The train power supply system is 380 V three-phase AC. [1]

Transmission system

The main transmission system is an AC-DC-AC electric transmission. The diesel engine directly drives a synchronous main traction generator to produce three-phase electric power, which is then rectified into direct current by a three-phase full-wave main silicon rectifier to supply power to 2 traction inverters. The inverters then convert the DC power into variable-frequency three-phase AC power, which is supplied to the 4 asynchronous traction motors on the two bogies. The train uses a "LonWorks" network control system, consisting of a train bus and a multifunction vehicle bus. The train bus comprises 2 sets of shielded twisted pair cables running through the entire train, while the vehicle bus within the power car is a single set of shielded twisted pair cables connecting all control units. [1]

Bogies

The power car's running gear uses SD-200 type bolsterless high-speed bogies. The bogies feature a fully welded "H"-shaped frame, single tie-rod axle box positioning, and primary suspension with axle box coil springs and hydraulic shock absorbers. The secondary suspension uses a high-flexibility coil spring structure, and is equipped with vertical and lateral hydraulic shock absorbers and anti-hunting dampers. Tractive effort and braking force are transmitted through a central push-pull low-position traction device. The traction motors are installed using a double-sided six-link wheelset hollow shaft fully suspended drive device.

The trailer car bogies use SW-220 type high-speed bogies. This type of bogie was jointly developed by Sifang Rolling Stock Company and Kawasaki Heavy Industries of Japan, drawing on the bogie structure and experience of the 500 Series Shinkansen electric multiple unit. It features an "H"-shaped welded frame, swing-arm type axle box suspension and positioning device. The central suspension system is a bolsterless air spring structure, and the car body and bogie are also equipped with anti-hunting shock absorbers. The basic braking system is axle disc brakes with electronic anti-slip devices, with three brake discs installed on each axle. [1]

Train formation

Car typePower carIntermediate trailer carControl car
Power configuration●● ●●
(Mc)
〇〇 〇〇
(T)
〇〇 〇〇
(Tc)
Car numberTianchi 0001WX25DT 999252Tianchi 0001
Manufacturer CRRC Qingdao Sifang
BogiesSD-200SW-220SW-220
Main equipmentDriver's cab
Diesel engine set
AC transmission system
Comprehensive inspection equipmentDriver's cab
Comprehensive inspection equipment
Inspection pantograph

Usage

The "Tianchi" train was delivered to the China Railway Shenyang Group in December 2005, [2] initially adopting a "one power car and one trailer car" formation. In 2005, Sifang Rolling Stock Company manufactured an additional intermediate trailer car for the "Tianchi" train, expanding its formation to "one power car and two trailer cars". Besides being used for comprehensive line inspection within the Shenyang Railway Group's jurisdiction, the "Tianchi" train can also serve as a special train for railway bureau leaders. It is usually parked at the Shenyang North Locomotive Depot.

On April 25, 2018, the "Tianchi" train underwent trial runs on the Shenyang–Dalian Railway, with two additional 25B type non-powered trailer cars added to its formation.

See also

References

  1. 1 2 3 Li Yi (September 2002). "High-Speed Dynamic Comprehensive Inspection Trainset". Railway Rolling Stock (in Chinese). 40 (9). Qingdao: Sifang Rolling Stock Research Institute: 14–18. ISSN   1002-7602.
  2. "China's first high-speed inspection train successfully developed in Qingdao". Qingdao Daily. 2003-12-26. Archived from the original on 2017-12-01. Retrieved 2012-06-15.