DC Towers | |
---|---|
General information | |
Status | DC Tower 1 (complete) DC Tower 2 (under construction) |
Type | Mixed-use: Residential / Office / Hotel |
Town or city | Vienna |
Country | Austria |
Coordinates | 48°13′55″N16°24′46″E / 48.23194°N 16.41278°E |
Construction started | 17 June 2010 |
Completed | 2013 (DC Tower 1) 2026 (DC Tower 2) |
Owner | Deka Immobilien |
Height | 220 m (720 ft) - DC Tower 1 168 m (551 ft) - DC Tower 2 |
Technical details | |
Floor count | 60 (DC Tower 1) 44 (DC Tower 2) |
Floor area | 93,600 m2 (1,008,000 sq ft) - DC Tower 1 61,700 m2 (664,000 sq ft) - DC Tower 2 |
Design and construction | |
Architect(s) | Dominique Perrault |
Structural engineer | Werner Sobek AG |
Website | |
DC Towers |
The DC Towers also known as the Donau City Towers is a mixed-use skyscraper complex in Vienna's District Donaustadt. The towers are designed by French architect Dominique Perrault. [1] Werner Sobek AG was responsible for the structural engineering as well as the facade and height access planning of DC Tower 1. [2]
DC Tower 1, the tallest skyscraper in Austria at 220 metres high (250 metres including the antenna spire), [3] was officially finished with an opening ceremony on 26 February 2014 attended by architect Dominique Perrault and former astronaut Buzz Aldrin. [4] Due to the global financial crisis of 2007, ground breaking had been delayed several times. Eventually, construction was started on 17 June 2010. [5]
As of June 2012, tenants were confirmed for 50 percent of the floor space according to the owner Wiener Entwicklungsgesellschaft für den Donauraum. Most of the available floor space will be used for offices. Baxter International has been confirmed as one of the largest tenants. The upper floors will be used for apartments, while the first 15 floors will house a four-star hotel operated by the Spanish Sol Meliá Group. There will also be a restaurant in one of the top floors.[ citation needed ]
DC Tower 2 will reach 180 metres, making it Vienna's fourth tallest building. [6] It will house offices, shops and rental flats.
The first development concepts for the site in Donau City were already in place in the early 1990s, but they were all rejected. In 2002, the WED (Vienna Development Company for the Danube Region AG) then announced an international design competition for this last section to be developed. The architect Dominique Perrault from Paris was awarded the contract in this expert review process. He was then commissioned to draw up a master plan for the area. Based on these plans, an urban development concept was drawn up and approved by the local council on July 1, 2004. In contrast to previous projects at the site, mixed use was prescribed here. Until a rezoning to 220 meters in 2007, the maximum height of buildings on the site was 120 meters. This value refers to the construction height with the antenna being excluded.
The vacant plot of land, located directly on the Reichsbrücke, was a prime urban development site; the prominent location at the entrance to Donau City required special utilization. A "landmark" that could be seen from far away was to be created. There were 120 different designs before the final concept was developed. Perrault designed two striking double towers as a " bridgehead " as a built entrance gate for the district. The design of the third tower was by the Vorarlberg office of Dietrich Untertrifaller Architekten. [7] [8]
The project was originally scheduled to start in 2007, but construction was delayed several times. [9]
The towers, designed by Dominique Perrault, are being built in collaboration with the Viennese firm Hoffmann-Janz Architekten. The civil engineering was carried out by Porr and the structural work by Max Bögl. A total of around 100,000 cubic metres of concrete and 17,000 tonnes of reinforcing steel were used. The total weight of the tower is 290,000 tonnes.
The first activities on the then vacant site were already visible at the end of February 2010. The laying of the foundation stone and the start of construction finally followed on June 17, 2010. [10] In November, the first pile drilling began and the first permanently mounted construction crane was used. In December, construction of the foundation was already in full swing. The settlement behavior in view of the location directly next to the overlay of the Danube bank motorway A22 and the proximity to the Danube required a special deep foundation. Under the base plate, which is 4 meters thick in its core, diaphragm wall piles extend a further 35 meters into the building ground. In the area of the base plate alone, 13,000 cubic meters of concrete were installed. (This corresponds to the load of 1,625 concrete mixer trucks) The civil engineering work was completed in 6 months. [11] [12]
The most progress was visible in 2011. Construction began at the end of March 2011, and the first underground floors were completed at the beginning of April. At the end of April, the first above-ground floor was built and the concrete core took on visible dimensions. There were now five fixed construction cranes in operation. At the beginning of June, the first fixed roof crane was assembled and the movable weather protection was attached. By July, the DC Tower 1 under construction could already be seen from every tall building in Vienna. In the same month, the crane on the left outside of the tower that grows with it was attached to the building, and the first freight elevator was installed on the west side of the tower. In August 2011, the concrete core disappeared into the growing building and the 13th floor was completed. Work also began on raising the glass facade on the west, north and south sides. [13]
In September, construction of the glass facade on the east side of the building began. Since then, the facade has been raised on all four sides of the tower to provide protection from wind and weather, but there was hardly any progress in the construction. This was due to the outrigger floors , which are intended to ensure the stability of the building. These were completed at the end of November, but the expected opening date was postponed from the beginning of 2013 to summer 2013 at the earliest. [14]
From spring 2012, the tower started growing again. Every 4.8 days, the tower grew by one floor. At the end of April 2012, work was started on the 32nd floor, which marks about half of the final construction height. On October 25 of the same year, the 60th and final floor was reached. [15] According to WED, work was carried out six days a week. In late summer 2013, the last facade elements were being assembled. The two construction cranes that were still in use on the tower at the time were gradually dismantled. They had previously grown with the building over the entire construction period. One was attached to the outside of the supporting structure, the other was placed in one of the elevator shafts. [16] [17] On September 19, 2013, the approximately 30-meter-high antenna was finally brought into position using a special helicopter from Heliswiss . The building was thus completed externally. [18]
The official opening ceremony of the hotel and tower took place on February 26, 2014. Guests of honor included architect Dominique Perrault, Vienna Mayor Michael Häupl, former New York Mayor Rudy Giuliani and former astronaut Buzz Aldrin. [19]
The DC Tower 2 is planned to reach 175 m high. The significant difference in height between the buildings is also reflected in the different letters of "DC" in the construction project's logo. However, the start of construction was delayed several times, not least due to the global financial crisis. In the spring of 2016, the building site for Tower 2 was sold to a German real estate fund. [20] [21]
In March 2018, it was announced that the Vienna-based S+B Group had signed a general contractor contract for the second Donau City Tower with the owner of the property, the German company Commerz Real. The planned start of construction in 2019 was not met. In 2020, it was announced that Tower 2 would no longer follow the design of Tower 1. The reason given was that due to the proportion of apartments instead of almost exclusively offices as in Tower 1 as open spaces were desired and these would not be compatible with the wave design. [22]
Construction began in 2022 and the development company expects completion in 2026. [23]
The complex shares its area with the DC Tower 3, a residential serviced apartments regimed building constructed between 2019 and 2022. [24]
The access logic on the ground follows the Donau-City concept: pedestrian and traffic levels are on different levels. The main access to the complex is via the central roundabout of Donau City on the Donau-City-Straße named after it. The address is 1220 Vienna, Donau-City-Straße 7 . Tenants of Tower 1 can drive directly into the garage from this level, visitors and taxis are directed up to the access level -1. For better orientation, this was designed as an open space. This is where the hotel access and the entrance to the public underground car park are located. It has space for 354 vehicles. Deliveries and disposal take place via the central loading yard, which is also located on this level and is connected to the service elevators. The higher pedestrian level can also be reached via open stairs. There are separate entrances for the different user groups on this level.
The tower's security concept provides for the separation of the individual visitor flows, which is facilitated by the Donau City, which is laid out on different levels. The building is divided into individual security areas, in which the movement flows as well as the entrances and exits are controlled and monitored. In the reception areas, separation systems and in the elevators, intelligent control technology prevent the mixing of user groups. The distribution of people within the building is carried out via 29 elevators and two escalators. Two elevators are designed as full-fledged freight and fire service elevators with a nominal load of up to 2,500 kg. The DC Tower currently has the fastest elevators in Austria. At up to 8 m/s (around 29 km/h), the highest floor can be reached in 40 seconds. [25]
The public areas and hotel floors are accessed separately by four fully glazed elevators. However, a cantilevered spiral staircase is also installed in the base building. The main elevators in the tower are equipped with a destination selection system , where the destination floor is selected before entering the cabin. The system then directs the user to an elevator, thus enabling shorter waiting times and fewer stops. In the DC Tower, this system has been expanded so that the access controls are also connected to the elevator control. This means that the next elevator is assigned as soon as the passengers pass through the security gates. [26]
Since the beginning of 2014, the five-star Meliá Vienna hotel of the Spanish chain Meliá Hotels International has been located on the lower 15 floors of Tower 1, with 253 rooms and 1,079 m² of event space. The hotel also has restaurants on the 57th and 58th floors. [27] The second floor also houses a 1,700 m² fitness club with a wellness area and indoor pool. Most of the remaining floors are rented out as office space. Baxter International was announced as the first major tenant in 2011. [28] The Austrian subsidiary of Astellas Pharma moved into the tower at the beginning of 2015. [29] Other office tenants include voestalpine, the auditing firm PwC Austria , the IBM Client Innovation Center Austria, and CRRC ZELC, a subsidiary of the Chinese rail vehicle manufacturer CRRC , which has established its European headquarters here. [30] On level 58 there is a terrace at a height of 207 metres. The part facing the city centre is run by the bar located here, the second half was accessible as a paid viewing platform ( sky terrace ) until the end of 2016. [31] Since October 2014, ORS has also been using the 245-metre antenna to broadcast television programmes. [32]
Tower 2 will have restaurants and co-working spaces in the base area, offices up to the 30th floor, and apartments on the remaining floors.
Tower 3, just northeast of the couple, is used entirely as a student residence.
The owner of the site of Tower 1 and responsible for the overall development is WED Wiener Entwicklungsgesellschaft für den Donauraum , which emerged from Expo AG in 1991. The builder and owner was VIENNA DC Tower 1 Liegenschaftsbesitz GmbH, which was initially a company of the WED Group, but was sold to the German Deka Immobilien in July 2017. The sales price was not announced; the investment volume for Tower 1 was originally 300 million euros. [36] The properties in the tower are marketed by bareal Immobilientreuhand GmbH. In September 2016, over 90 percent of the space had been allocated. [37] [38] The building site for Tower 2 was sold to Commerz Real 's real estate fund hausInvest in spring 2016 ; the purchase price was also kept confidential. [39] The neighboring property of DC Tower 3 is also owned by the German real estate fund. [40] However, the land adjacent to the buildings on the banks of the Danube is owned by the City of Vienna, was previously leased and has been under renovation since 2018. [41] [42] [43]
The DC Tower 1 is the tallest building in Austria, but the tallest building in the country is still the nearby Donauturm . It is two meters taller than the DC Tower 1. The large ratio of the height to the narrow width of the narrow side makes the tower one of the slenderest skyscrapers in the world. Measured from the ground, the tower is 260 meters high.
"The primary aim of the planning was not to set new height records, but to create a well-designed building that impresses with its sophisticated design and high quality. The height of the tower results from the ambition to preserve the attractive aesthetics of a slim tower when building the planned cubic dimensions."
The shape was born from the idea of a monolith broken in the middle. This "jagged stone" is recognizable by the wave-like structure on the southeast side, but was only to receive its negative form with Tower 2 and thus come into its own spatially and visually. Due to changed requirements, Tower 2 will not follow the design of Tower 1, so the planned design will not be completed. The two towers will then form a "city gate", with the two halves facing the Danube and standing at a slight angle to each other. The space that will develop between them is crucial for Perrault. Identity and urban space can only be created with several towers. Standing alone, DC Tower 1 is only a good solitaire. Dominique Perrault wanted to build a uniform volume of glass and not a supporting structure with four curtain walls . The black color and the reflections of the surroundings help to take away the tower's texture and weaken the two-dimensional image. The floors that can be read from the outside should recede into the background. The “liquid facade” is modelled on the Danube, as proximity to the water is essential for the architect. It represents great potential for Donau City, but is currently not being properly exploited. [45] The associated stylistic element of the differently offset “waves” is therefore not only found on the outer skin; it also appears repeatedly inside, for example in the hotel rooms. [46]
The glass façade consists of 32,000 m² of solar protection insulating glass and was manufactured in Austria. Of these, 10,000 m² of glass surfaces were screen printed; also to reduce the risk of bird strikes. [47]
The flowing and immaterial character that the exterior reflects was interpreted in the opposite way in the interior. Here, the rooms were to be very present and physically perceptible. In the halls and corridors that are open to the public, for example, the full-surface natural stone surfaces underline the robust aesthetic. The lift lobbies were designed with metal panels, which radiate a warmth that is not typical of the material due to their differently treated surfaces. [48] The public hotel areas in the base building are connected by a "floating" spiral staircase, the stairwell of which simultaneously forms an atrium that tapers towards the top and provides a view of the tower. Its round steps are covered with white Bianco Sivec marble from Macedonia and are tapered at the sides. [49]
In addition to a detailed study of the subsoil, the key parameters and basis for the structural design were the susceptibility to wind, both towards the tower and from it. As a result, a model of the tower and its surroundings was built to examine it in the wind tunnel. With regard to the downdrafts that occur in Donau City , the wind comfort in the area close to the ground was also to be optimized. The results of the investigations were slight adaptations to the building and the positioning of umbrella-like structures around the tower. These provide additional protection against sunlight and falling objects. [50]
The reinforced concrete structure is elastic. At the height of the 58th floor, the tower can sway by up to 45 centimeters, and at the top of the antenna by up to one meter. In order to reduce the movement below the limit of perception and to increase user comfort, a vibration absorber in the form of a 305-ton mass pendulum was installed between the 56th and 60th floors. It consists of steel plates and a 54 m³ water tank, which ensures the supply of the wall hydrant system in an emergency. The pendulum hangs at the four corner points on two 16 m long steel cables. It is guided by rails, so it swings in defined paths and is coordinated with the slender side of the building. The pendulum always moves in the opposite direction to the natural vibration of the tower. The length of the cable can be variably adjusted to the final natural frequency. However, this only occurred some time after completion, since a newly built structure is initially relatively stiff and only becomes more elastic over time. [51] [52]
So-called outriggers are installed in the building services floors on levels 16/17 and 43/44, which give the DC Tower more stability. Two-meter-thick reinforced concrete ceilings connect the core with the load-bearing external columns and improve the rigidity of the load-bearing system. The outrigger floors are each twice as high as a standard floor, reserved for building services systems and can only be seen from the outside by the grilled air inlet openings in the facade. The outrigger construction as such is not recognizable, however. The cantilevered bay windows on the wave-like southeast side are supported by steel profiles subjected to tension or compression. [53]
As one of the first Austrian high-rise buildings, the DC Tower 1 was built and equipped according to the energy and sustainability requirements of the EU Commission for a "Green Building" certificate and according to the US LEED system. [54] In January 2015, the tower was awarded the highest quality level, platinum status . During the certification process, 82 out of 110 possible points were achieved. [55]
The assessment takes into account parameters such as sustainable site quality, savings in drinking water consumption, optimized energy consumption, sustainable and resource-saving use of materials, but also comfort and user satisfaction in the workplace. Building energy is reduced by photovoltaic systems and energy-feeding elevators. The tower is powered by green electricity . In the underground car park, alternatively powered cars have the opportunity to "refuel" with the electricity generated by the building. [56]
Rainwater management means that rainwater that falls on the built-up areas is left in the natural water cycle or is used further and is not fed into the sewers. To avoid excessive energy losses of heat or cold, a grid structure is incorporated into every second window. As is usual in modern high-rise buildings, individual (narrow) windows can be opened completely. A perforated sheet is placed in front of them for protection. A concrete core temperature control system was installed in the tower over an area of 22,900 m². This system uses the mass of the concrete as a heat storage device and enables the resource-saving cooling of the office floors in summer and their heating in winter. Due to the low operating temperature, this system is energy efficient. [57]
The air conditioning systems use a two-stage heat recovery system. The tower's heating requirement is 27.41 kWh/m².a. In the event of a power failure, there is a 2,000 hp diesel generator. On the roof there is a rail-mounted facade maintenance system, consisting of two cranes, each weighing 30 tons. These maneuver the gondolas used to clean and maintain the glass facade. A complete cleaning of the facade takes around a month. The building services and security systems are monitored from the control center on the 2nd floor. A total of four floors, two each in the lower (floors 16/17) and upper (floors 43/44) areas of the tower, are reserved exclusively for building services systems. The upper technical floor also contains Vienna's highest transformer station of the Wiener Netze . From the outside, these floors can only be recognized by the grilled air supply openings in the facade. [58]
Hans Hollein was an Austrian architect and designer and key figure of postmodern architecture. Some of his most notable works are the Haas House and the Albertina extension in the inner city of Vienna.
Dominique Perrault is a French architect and urban planner. He became world known for the design of the French National Library, distinguished with the Silver medal for town planning in 1992 and the Mies van der Rohe Prize in 1996. In 2010 he was awarded the gold medal by the French Academy of Architecture for all his work. He was named as the 2015 Praemium Imperiale Laureate for Architecture.
Vienna City Hall is the seat of local government of Vienna, located on the Rathausplatz in the Innere Stadt district. Constructed from 1872 to 1883 in a neo-Gothic style according to plans designed by Friedrich von Schmidt, it houses the office of the Mayor of Vienna, as well as the chambers of the city council and Vienna Landtag diet.
Torre del Caballito is a skyscraper located on the Paseo de la Reforma #10 at the Cuauhtemoc delegation in Mexico City. It was designed by Grupo Posadas de Mexico. It is 135 metres and 35 storeys tall. 33 of the floors are used as office space which measures 60,000 square meters. It also has 15 underground parking levels. The building's total area is 131,000 square meters.
Donau City, or Vienna DC, is a new part of Vienna's 22nd District Donaustadt, next to both the Reichsbrücke and the left bank of the Danube's 21.1 km new channel, Neue Donau.
Shanghai Tower is a 128-story, 632-meter-tall (2,073 ft) megatall skyscraper located in Lujiazui, Pudong, Shanghai. It is the tallest building in China and the world's third-tallest building by height to architectural top. It is the tallest and largest LEED Platinum certified building in the world since 2015. It had the world's fastest elevators at a top speed of 20.5 meters per second until 2017, when it was surpassed by the Guangzhou CTF Finance Center, with its top speed of 21 meters per second. Designed by the international design firm Gensler and owned by the Shanghai Municipal Government, it is the tallest of the world's first triple-adjacent supertall buildings in Pudong, the other two being the Jin Mao Tower and the Shanghai World Financial Center. Its tiered construction, designed for high energy efficiency, provides nine separate zones divided between office, retail and leisure use. The US-based Council on Tall Buildings and Urban Habitat cites it as "one of the most sustainably advanced tall buildings in the world."
The Haus des Meeres is a public aquarium in Vienna, Austria. It is located in Esterhazy Park in the centre of Mariahilf district, one block south of the busy Mariahilfer Straße. The Haus des Meeres houses over ten thousand aquatic beings on an area of around 4,000 square meters (43,000 sq ft) inside a tall concrete flak tower built during World War II. In 2012 the Haus des Meeres attracted a record high of 650,000 visitors. The Haus des Meeres is managed by Aqua Terra Zoo, a private non-profit organization which, according to its web site, receives only marginal financial support from municipal authorities. However, the maintenance costs for the former flak tower are paid by the taxpayer.
The Austria Classic Hotel Wien is a three-star hotel, on Praterstraße in Vienna's second district, the Leopoldstadt. It is a member of the Austria Classic Hotels group and was named 'Hotel Nordbahn' until a rebranding in January 2008.
Stadtpark is a station on U4 of the Vienna U-Bahn. It is located in the Landstraße District. It opened in 1978. It is one of the few Otto Wagner buildings on the U4 that has been preserved almost in its original condition. The station, which is open-air and has two side platforma, is located in a cutting and lies parallel to the Wien Canal. Exits lead via a fixed staircase through a station building into Johannesgasse via a staircase or an elevator directly into the part of the Stadtpark located in the 3rd district. The station building hangs over the portal of the Wienfluss designed by Friedrich Ohmann, an opponent of Otto Wagner. Also in the immediate vicinity of the station are the Kursalon Hübner and the Vienna Ice Skating Club as well as the large InterContinental Vienna Hotel
Heinz Tesar was an Austrian architect who had an international reputation for his church and museum architecture.
The Looshaus is a commercial and residential building at Michaelerplatz 3, between Herrengasse and Kohlmarkt, in Vienna. Designed by Adolf Loos and completed in 1912, it is considered a major building of Viennese Modernism.
Ringturm is a prominent skyscraper in Vienna, Austria, and is the headquarters of the Vienna Insurance Group. It was built from 1953 to 1955 after a design by Erich Boltenstern at the Schottenring. The tower is 73 m (240 ft) tall, with 12,000 m2 (130,000 sq ft) of office space, and is the second highest building within the Vienna Ringstraße, after the Stephansdom. It is a venue for architecture exhibitions, and is known for being turned into a piece of art annually, wrapped in cloth designed by notable artists including Robert Hammerstiel, Xenia Hausner, Arnulf Rainer and Mihael Milunović.
One Forty West is a mixed-use high-rise building in the Westend-Süd district of Frankfurt, Germany. Built between 2017 and 2020, the tower stands at 145 m (476 ft) tall and is the current 22nd tallest building in Frankfurt. It is also part of the Kulturcampus Complex alongside the Senckenberg Turm.
The ADAC Headquarters is a high-rise office building in the Sendling-Westpark district of Munich, Germany. Built between 2006 and 2011, the tower stands at 93 m (305 ft) tall with 23 floors and is the current 7th tallest building in Munich.
The Austro Tower is a high-rise office building in the Landstraße district of Vienna, Austria. Built between 2018 and 2021, the tower stands at 136.6 m (448 ft) with 36 floors and is the current 6th tallest building in Austria.
The One also known as the MGC Plaza 1 is a high-rise residential building in the Landstraße district of Vienna, Austria. Built between 2020 and 2023, the tower stands at 128 m (420 ft) with 39 floors and is the current 7th tallest building in Austria.
Hochhaus Neue Donau also known as the Seidler Tower is a mixed-use high-rise building in the Donau City district of Vienna, Austria. Built between 1999 and 2001, the tower stands at 120 m (390 ft) tall with 34 floors and is the current 11th tallest building in Austria.
The Florido Tower also known as the Peak Vienna is a high-rise office building in the Floridsdorf district of Vienna, Austria. Built between 1999 and 2001, the tower stands at 113 m (371 ft) tall with 31 floors and is the current 13th tallest building in Austria.
The DC Tower 3 is a high-rise residential building in the Donau City district of Vienna, Austria. Built between 2019 and 2022, the tower stands at 109.4 m (359 ft) tall with 34 floors and is the current 17th tallest building in Austria.