Denny Centre

Last updated
Denny Centre
Denny Centre under construction, March 2021.jpg
Under construction in March 2021
Denny Centre
General information
Status Topped-out
TypeResidential and retail
Location2014 Fairview Avenue
Seattle, Washington, US
Coordinates 47°37′06″N122°20′02″W / 47.61833°N 122.33389°W / 47.61833; -122.33389 Coordinates: 47°37′06″N122°20′02″W / 47.61833°N 122.33389°W / 47.61833; -122.33389
Construction startedAugust 2018
Estimated completion2021
Height
Architectural440 ft (130 m)
Technical details
Floor count42
Design and construction
Architecture firm ZGF Architects, Cotter Architects
Developer Bosa Properties
Other information
Number of units442 apartments
Parking308 spaces
References
[1]

Denny Centre is a future high-rise building that is under construction in the Denny Triangle neighborhood of Seattle, Washington, United States. The 42-story tower will have 440 apartments and is located on a triangular lot at the intersection of Denny Way and Fairview Avenue. Construction began in 2018 and is expected to be completed in 2021.

Contents

History

The triangular lot on the southeast side of Denny Way and Fairview Avenue was home to a two-story office and retail building named the Denny Center, which was built in 1937. [2] [3] The lot was purchased by Vancouver-based Bosa Properties for $8 million in May 2007, with plans to not redevelop the building immediately. [4] The firm filed plans to build a 450-unit residential tower on the property with the city government in September 2015. Bosa Properties, owned by Robert Bosa, was joined in the Denny Triangle neighborhood by Bosa Development (owned by his brother, Nat Bosa), who developed the Insignia Towers complex. [5]

A preliminary design for the 41-story tower by ZGF Architects and Cotter Architects was unveiled in November 2015, featuring rounded edges to contrast with the "sharp, rectangular" designs of nearby high-rises. [6] [7] The tower's design underwent six revisions through consultations with the city government by the time its final environmental impact statement was released in February 2017. [3] The project, renamed the Denny Centre, began construction in August 2018, a few months after the existing building had been demolished. [8] To replace construction site visits during the COVID-19 pandemic, which restricted cross-border travel for the developers and architects based in Canada, remote tours via 360-degree video were used by the contractors on the project. [9] The tower is expected to be completed in late 2021. [1]

Design

Denny Centre is a 42-story high-rise with 442 apartment units and a three-story podium with 10,000 square feet (930 m2) of retail space. The tower will have 308 parking stalls in a five-story underground garage accessed from Virginia Street. [3] The tower has an undulating façade with softened edges, inspired by the "collision between two city grids". [6] [10]

Related Research Articles

3rd & Cherry

3rd & Cherry, formerly Seattle Civic Square, is a proposed 629-foot (192 m) tall, 57-story skyscraper in downtown Seattle, Washington. The residential high-rise, located near Seattle City Hall and the Seattle Civic Center, will have 520 condominiums and amenity spaces, including a public plaza at ground level and retail spaces.

Aspira (building)

Aspira is a 400-foot-tall (122 m) skyscraper in the Denny Triangle neighborhood of Seattle, Washington. It has 37 floors, and mostly consists of apartments, of which there are 325 units. Parking spaces total 355. Construction began in 2007 and was completed in late 2009. The building is located on Stewart Street at Terry Avenue.

The Net (building)

The Net, formerly known as The Marion, is a planned high-rise office building in Downtown Seattle, Washington, United States. In its current iteration, it is planned to be 36 stories tall and include 850,000 square feet (79,000 m2) of office and retail space. The project is being developed by Urban Visions, which previously proposed a 77-story tower on the site that would have become the tallest building in the city. It was later downsized to 60 stories after a design competition and 36 stories after further refinement.

Cirrus (Seattle building)

Cirrus is a 440-foot-tall (130 m) residential skyscraper in the Denny Triangle neighborhood of Seattle, Washington. The building, named after the cirrus cloud, has 41 floors and is located at the intersection of Westlake Avenue, 8th Avenue and Lenora Street. Construction on Cirrus, then known as 2030 8th Avenue, began in May 2013 and opened in 2015. The building was originally designed for condominiums but was reconfigured for smaller apartments by architects Weber Thompson after GID Development desired a move to the rental market.

Arrivé High-rise hotel and residences in Seattle, Washington, US

Arrivé is a 440-foot (130 m), 41-story skyscraper in the Belltown neighborhood of Seattle, Washington. The $190 million project, originally named Potala Tower after the Potala Palace in Tibet, was designed by Weber Thompson and consists of 342 apartments and a 142-room hotel. It was financed partially by Chinese nationals through the EB-5 visa program and began construction in April 2015.

Kinects

Kinects is a residential skyscraper in the Denny Triangle neighborhood of Seattle, Washington. The 440-foot-tall (130 m), 40-story tower has 357 apartments and a 3,500-square-foot (330 m2) restaurant at its base. It was completed in July 2017, after two years of construction. The building is located along Minor Avenue between Stewart and Howell streets, on the same block as the under construction AMLI Arc and Tilt 49 complex.

Helios (building)

Helios, also known as 2nd & Pine, is a residential skyscraper in downtown Seattle, Washington. The 40-story tower is 440 feet (130 m) tall with 398 luxury apartments. Plans for the project were first proposed in 2013 and construction began in late 2014. It is located at the intersection of 2nd Avenue and Pine Street near the Pike Place Market and the city's retail core.

Kiara (building)

Kiara is a residential skyscraper in Seattle, Washington. The 40-story, 435-foot-tall (133 m) tower has 461 apartments and was completed in 2018. It is first skyscraper in the South Lake Union neighborhood and is one of the few highrise buildings outside of Downtown Seattle. The building is located at the intersection of Denny Way and Terry Avenue, near the headquarters of The Seattle Times and the Cornish College of the Arts.

AMLI Arc

AMLI Arc, also known as Tilt 49, is a mixed-use building complex in Seattle, Washington. It consists of two buildings, both facing Boren Avenue between Stewart and Howell streets: a 41-story, 440-foot-tall (130 m) residential skyscraper with 368 apartments to the south; and an 11-story, 307,296-square-foot (28,548.7 m2) office building with retail space to the north. Tilt 49 shares this block with the under construction Kinects residential tower as well as the cancelled Daola Tower.

Tower 12

Tower 12 is an apartment building in Seattle, Washington. The 34-story, 392-foot-tall (119 m) skyscraper has 314 apartments as well as 7,000 square feet (650 m2) of ground-level retail space. It is located at the northwest corner of 2nd Avenue and Virginia Street near Pike Place Market and Victor Steinbrueck Park at the southwestern edge of the Belltown neighborhood.

Stratus (building)

Stratus is a residential high-rise building in Seattle, Washington. The 43-story skyscraper, located in the Denny Triangle neighborhood, was completed in 2017, with 396 apartments and ground-floor retail space.

McKenzie Apartments

The McKenzie Apartments is a residential high-rise building in Seattle, Washington. The 40-story skyscraper, located in the Denny Triangle neighborhood, was completed in 2018 and has 450 apartments.

McGuire Apartments Demolished high-rise building in Seattle, Washington

The McGuire Apartments was a 25-story apartment building in the Belltown neighborhood of Seattle, Washington. The $32 million, 272-unit building opened in 2001, but was closed in 2010 after the discovery of major structural flaws and corrosion that forced evacuation and demolition. The building was demolished in 2011 using heavy machinery and filled with dirt. The site was re-excavated in 2017 for a new residential building that opened in 2019.

Nexus (building)

Nexus is a high-rise residential building in Seattle, Washington, United States. The 40-story, 440-foot (130 m) tower has 389 condominiums, retail space, and a parking garage for 316 vehicles. Nexus is located at 1200 Howell Street in the Denny Triangle neighborhood, adjacent to Interstate 5. The project, developed by Burrard Group, was announced in 2015 and began construction in early 2017. It opened in February 2020.

1120 Denny Way

1120 Denny Way is a complex of two high-rise residential buildings that are under construction in South Lake Union, Seattle, Washington, United States. The buildings will both be 41 stories tall, with a total of 1,179 apartments, and connected by a 12-story podium with retail and amenity space. 1120 Denny Way is being developed by Onni Group, which is also redeveloping the adjacent Seattle Times Building site. The project began construction in 2017 and is planned to be completed in 2021.

The Emerald (building) Skyscraper in Seattle, Washington, U.S.

The Emerald is a mixed-use 40-story skyscraper in downtown Seattle, Washington, United States. The tower includes 262 luxury condominiums, retail space, and amenity spaces on outdoor terraces. It began construction in July 2017 and was completed in October 2020.

Spire (Seattle building)

Spire is a future 41-story residential skyscraper in the Belltown neighborhood of Seattle, Washington, United States. The building sits in a triangular block adjacent to the intersection of Denny Way and Wall Street, roughly between the Belltown and Denny Triangle neighborhoods. When completed in 2021, it will have 352 condominiums and a rooftop terrace and amenity space.

Bellevue 600 Proposed high-rise office building in Bellevue, Washington, United States

Bellevue 600 is a future high-rise office building developed by Amazon in Bellevue, Washington, United States. It began construction in 2021 and is scheduled to be completed in 2024. The 43-story, 600-foot-tall (180 m) building would join 555 Tower as the tallest building in Bellevue. The project is located in Downtown Bellevue at the intersection of Northeast 6th Street and 110th Avenue Northeast, adjacent to the Bellevue Transit Center and a future Link light rail station. A second phase would construct a 27-story tower to the west, replacing an existing office building.

1200 Stewart Future twin skyscraper complex in the Denny Triangle, Seattle

1200 Stewart is a future twin skyscraper complex in the Denny Triangle neighborhood of Seattle, Washington, US. The project is located at the intersection of Stewart Street and Denny Way and includes 1,014 apartments and retail space in two 48-story buildings. The retail space, housed in a three-story podium with an indoor galleria, is planned to feature a music venue and a Boeing 747-400 fuselage. It began construction in 2018 and is scheduled to be completed in early 2022.

References

  1. 1 2 Denny Centre at Emporis
  2. "Denny Center". Kauri Investments. Retrieved May 4, 2021.CS1 maint: discouraged parameter (link)
  3. 1 2 3 Miller, Brian (February 3, 2017). "Bosa Properties completes EIS for 42-story tower on Fairview" . Seattle Daily Journal of Commerce . Retrieved May 4, 2021.CS1 maint: discouraged parameter (link)
  4. "Business Briefs: Development firm buys Denny Center". The Seattle Times . May 2, 2007. p. C1. Retrieved May 4, 2021.CS1 maint: discouraged parameter (link)
  5. Levy, Nat (September 3, 2015). "Real Estate Buzz: Another Bosa brother has his eye on Seattle". Seattle Daily Journal of Commerce. Retrieved May 4, 2021.CS1 maint: discouraged parameter (link)
  6. 1 2 Levy, Nat (November 20, 2015). "Bosa shows design for 420-unit apartment tower in Seattle". Seattle Daily Journal of Commerce. Retrieved May 4, 2021.CS1 maint: discouraged parameter (link)
  7. DeMay, Daniel (November 6, 2015). "Take a look at this twisty tower proposed for Seattle's Denny Triangle neighborhood". Seattle Post-Intelligencer . Retrieved May 4, 2021.CS1 maint: discouraged parameter (link)
  8. Stiles, Marc (August 23, 2018). "'We believe in Seattle:' Despite inventory glut, developer starts apartment tower". Puget Sound Business Journal . Retrieved May 4, 2021.CS1 maint: discouraged parameter (link)
  9. Porter, Lynn (January 21, 2021). "Multivista helps developers monitor projects from a distance during pandemic" . Seattle Daily Journal of Commerce. Retrieved May 4, 2021.CS1 maint: discouraged parameter (link)
  10. Stiles, Marc (November 4, 2015). "Developer says new curvy Seattle tower would impart 'a gentle sense of movement and protest'". Puget Sound Business Journal. Retrieved May 4, 2021.CS1 maint: discouraged parameter (link)