Third and Lenora | |
---|---|
Former names | Third and Lenora |
General information | |
Status | Completed |
Type | Mixed use |
Location | 2031 3rd Avenue Seattle, Washington, US |
Coordinates | 47°36′46″N122°20′32″W / 47.61278°N 122.34222°W |
Construction started | September 2017 |
Topped-out | August 2019 |
Completed | 2020 |
Height | |
Architectural | 440 ft (130 m) |
Top floor | 440 ft (130 m) |
Technical details | |
Floor count | 38 |
Floor area | 700,000 square feet (65,000 m2) |
Design and construction | |
Architecture firm | Perkins and Will |
Developer | Martin Selig Real Estate |
Civil engineer | KPFF Consulting Engineers |
Main contractor | Lease Crutcher Lewis |
Other information | |
Number of units | 222 apartments |
Parking | 221 spaces |
Website | |
3rdandlenora.com | |
References | |
[1] |
The Modern (formerly Third and Lenora) is a mixed-use high-rise building in the Belltown neighborhood of Seattle, Washington, United States. The 38-story tower, developed by Martin Selig, includes offices, retail, and 222 residential units. Construction began in September 2017 and was completed in 2020. It was originally leased to The We Company for use by their WeWork co-working and WeLive co-living ventures until the company ran into financial issues and the lease was terminated after the building was topped out. [2]
Martin Selig Real Estate announced its intention to build a 36-story residential and office tower in October 2014, shortly after purchasing three buildings on 3rd Avenue near Lenora Street for a total of $16.9 million. [3] One of the block's buildings housed the Jewish Federation of Greater Seattle and was the site of a shooting in 2006. [4] [5]
The mixed-use project initially had 140 luxury apartments and 13 floors of office space, but was changed to 384 market-rate apartments and 9 floors of offices during design review. [6] The downtown design review board approved the revised design in March 2016. [7] Co-working company WeWork was announced as the building's main tenant in September by Selig, and confirmed in August 2017. [8] WeWork was planned to occupy 200,000 square feet (19,000 m2) of office space on the lower nine floors, while the upper 23 floors would have 384 co-living residential units under the WeLive brand. [9]
The city government approved the design of Selig's Third and Lenora project in April 2017, with no major conditions or changes. [10] The owner of a nearby printing shop filed an appeal of the city's design approval over the width of the tower, measuring 178 feet (54 m) facing 3rd Avenue, but the hearing examiner declined to take action. [11] [12] The three buildings on the site were demolished in August 2017 and construction of the Third and Lenora building began a month later under the direction of general contractor Lease Crutcher Lewis. [13] [14]
The building was topped out in August 2019 with the completion of steel framing for the two-story penthouse and amenities center. [15] In October 2019, Martin Selig Real Estate announced that its lease with WeWork would be terminated by mutual agreement amid the latter's financial situation following its cancelled initial public offering. [16] [17] Selig stated that he would continue to work on the near-complete building, which was originally scheduled to open in late 2020. [2] The opening was pushed back to late 2021 due to the COVID-19 pandemic and additional work required to convert the WeLive units to 222 apartments. A children's play area is planned for the 12th floor as part of the conversion to larger apartments for families. The project was renamed the "Modern" in late 2020. [18]
Leasing of the residential units began in 2022 while the office portion remained vacant. A proposal to convert the office portion into 160 residential units on eight floors was filed by Selig in January 2024. [19]
The Modern was designed as a mixed-use development with 38 stories and a total of 700,000 square feet (65,000 m2) of space. It has 5,500 square feet (510 m2) of retail space, 176,500 square feet (16,400 m2) of offices on nine floors, and 222 residential units. [18] The building has a five-level underground parking garage with 221 spaces. [15] The top two floors of the building are an amenity space for residents with a gym and a "conservatory". [6] The project was designed by Perkins and Will and features a large setback above the 12th floor and a mid-level terrace to separate the office and residential floors. [11] [20]
F5 Tower is a 660-foot-tall (200 m) skyscraper in Downtown Seattle, Washington. It consists of 44 floors and is the sixth-tallest building in Seattle.
2nd & Pike, also known as the West Edge Tower, is a 440-foot-tall (130 m) residential skyscraper in Seattle, Washington. The 39-story tower, developed by Urban Visions and designed by Tom Kundig of Olson Kundig Architects, has 339 luxury apartments and several ground-level retail spaces. The 8th floor includes a Medical One primary care clinic.
Cirrus is a 440-foot-tall (130 m) residential skyscraper in the Denny Triangle neighborhood of Seattle, Washington. The building, named after the cirrus cloud, has 41 floors and is located at the intersection of Westlake Avenue, 8th Avenue and Lenora Street. Construction on Cirrus, then known as 2030 8th Avenue, began in May 2013 and opened in 2015. The building was originally designed for condominiums but was reconfigured for smaller apartments by architects Weber Thompson after GID Development desired a move to the rental market.
4/C, also known as 4th & Columbia, is a proposed supertall skyscraper in Seattle, Washington, United States. If built, the 1,020-foot-tall (310 m), 91-story tower would be the tallest in Seattle, surpassing the neighboring Columbia Center, and the first supertall in the Pacific Northwest. The project has been under development by Miami-based Crescent Heights since 2015 and undergone several design changes and modifications under three architecture firms. As of 2023, 4/C is expected to have 1,090 residential units—apartments up to the 64th floor and condominiums from the 65th to 90th floor—along with several coworking and retail spaces. The latest version was designed by Skidmore, Owings & Merrill.
The Federal Reserve Bank Building, also known as the Federal Reserve Bank of San Francisco, Seattle Branch, served as the offices of the Seattle branch of the Federal Reserve Bank of San Francisco for over 50 years, from 1951 to 2008.
Arrivé is a 440-foot (130 m), 41-story skyscraper in the Belltown neighborhood of Seattle, Washington. The $190 million project, originally named Potala Tower after the Potala Palace in Tibet, was designed by Weber Thompson and consists of 342 apartments and a 142-room hotel. It was financed partially by Chinese nationals through the EB-5 visa program and began construction in April 2015.
Helios, also known as 2nd & Pine, is a residential skyscraper in downtown Seattle, Washington. The 40-story tower is 440 feet (130 m) tall with 398 luxury apartments. Plans for the project were first proposed in 2013 and construction began in late 2014. It is located at the intersection of 2nd Avenue and Pine Street near the Pike Place Market and the city's retail core.
AMLI Arc, also known as Tilt 49, is a mixed-use building complex in Seattle, Washington, United States. It consists of two buildings, both facing Boren Avenue between Stewart and Howell streets: a 41-story, 440-foot-tall (130 m) residential skyscraper with 368 apartments to the south; and an 11-story, 307,296-square-foot (28,548.7 m2) office building with retail space to the north. Tilt 49 shares this block with the Kinects residential tower as well as the cancelled Daola Tower.
Stratus is a residential high-rise building in Seattle, Washington. The 43-story skyscraper, located in the Denny Triangle neighborhood, was completed in 2017, with 396 apartments and ground-floor retail space.
Qualtrics Tower, formerly known as 2+U and 2&U, is a high-rise office building in Downtown Seattle, Washington. The 500-foot-tall (150 m), 38-story tower is located at 2nd Avenue and University Street and was completed in 2020. The building has 725,000 square feet (67,400 m2) of leasable space, including retail and public spaces on the lower levels. The largest office tenant is Qualtrics, who also hold the naming rights to the building.
The McGuire Apartments was a 25-story apartment building in the Belltown neighborhood of Seattle, Washington. The $32 million, 272-unit building opened in 2001, but was closed in 2010 after the discovery of major structural flaws and corrosion that forced evacuation and demolition. The building was demolished in 2011 using heavy machinery and filled with dirt. The site was re-excavated in 2017 for a new residential building that opened in 2019.
Rainier Square Tower is a mixed-use skyscraper in the Metropolitan Tract of downtown Seattle, Washington. The 850-foot (260 m) tall, 58-story tower is located at Union Street between 4th and 5th Avenues adjacent to the existing Rainier Tower; it is the second-tallest building in Seattle. The $600 million project was completed in 2020, and is the tallest building constructed in the city since the construction of the Columbia Center in 1985.
Onni South Lake Union, also known as 1120 Denny Way, is a complex of two high-rise residential buildings and a hotel in South Lake Union, Seattle, Washington, United States. The residential buildings—both be 41 stories tall—comprise a total of 827 apartments. They are connected by a 12-story hotel with retail and amenity space. 1120 Denny Way was developed by Onni Group, which is also redeveloping the adjacent Seattle Times Building site. The project began construction in 2017 and was completed in 2022.
The Emerald is a mixed-use 40-story skyscraper in downtown Seattle, Washington, United States. The tower includes 262 luxury condominiums, retail space, and amenity spaces on outdoor terraces. It began construction in July 2017 and was completed in October 2020.
Spire is a 41-story residential skyscraper in the Belltown neighborhood of Seattle, Washington, United States. The 440-foot (130 m) building sits in a triangular block adjacent to the intersection of Denny Way and Wall Street, roughly between the Belltown and Denny Triangle neighborhoods. It has 343 condominiums, retail space, and a rooftop terrace. The building has an automated parking system in its underground garage with capacity for 266 vehicles.
Bellevue 600 is a future high-rise office building developed by Amazon in Bellevue, Washington, United States. It began construction in 2021 and is scheduled to be completed in 2024. The 43-story, 600-foot-tall (180 m) building would join 555 Tower as the tallest building in Bellevue. The project is located in Downtown Bellevue at the intersection of Northeast 6th Street and 110th Avenue Northeast, adjacent to the Bellevue Transit Center and a future Link light rail station. A second phase would construct a 27-story tower to the west, replacing an existing office building.
WB1200, also known as 1200 Stewart, is a future twin skyscraper complex in the Denny Triangle neighborhood of Seattle, Washington, United States. The project is located at the intersection of Stewart Street and Denny Way and comprises 1,014 apartments and retail space in two 48-story buildings. The retail space, housed in a three-story podium with an indoor galleria, is planned to feature a music venue and a Boeing 747-400 fuselage. It began construction in 2018 and is scheduled to be completed in 2024.
Ren, stylized as REN and also known as Denny Centre, is a residential high-rise building in the Denny Triangle neighborhood of Seattle, Washington, United States. The 42-story tower has 440 apartments and is located on a triangular lot at the intersection of Denny Way and Fairview Avenue. Construction began in 2018 and was completed in early 2022.
The Langham, Seattle is a future high-rise luxury hotel in Seattle, Washington, United States. It is scheduled to open in 2026 with 187 rooms and suites operated by the Langham Hospitality Group. The 42-story building will incorporate the facade of the Terminal Sales Annex, a historic landmark on the site at 1931 2nd Avenue. The building was designed by Kengo Kuma & Associates and Ankrom Moisan Architects.
{{cite web}}
: CS1 maint: unfit URL (link)