Gigafactory Texas | |
---|---|
Built | 2020‒2022 |
Location | Austin, Texas |
Coordinates | 30°13′N97°37′W / 30.22°N 97.62°W Coordinates: 30°13′N97°37′W / 30.22°N 97.62°W |
Industry | Automotive |
Products | |
Area | 3.3 sq mi (8.5 km2) |
Owner(s) | Tesla Inc. |
Gigafactory Texas (also Tesla Gigafactory 5 or Giga Texas) is an automotive manufacturing facility near Austin, Texas built by Tesla, Inc. Construction began in July 2020, [1] limited production of Model Y began before the end of 2021, [2] [3] and initial deliveries of vehicles built at the factory took place at an opening party called “Cyber Rodeo” on April 7, 2022. [4]
The factory is also planned to be the main factory for the Tesla Cybertruck and the Tesla Semi, and will produce Model 3 and Model Y cars for the Eastern United States. [2] [5] [6] It also serves as the site of Tesla's corporate headquarters. [7] It is the country's second biggest factory by size as well as the second largest building in the world by volume. [8]
Tesla announced a manufacturing training program in cooperation with Austin Community College District on June 15, 2021. [9] [10] [11] The program was expected to start in August 2021 and the course was to last 14 weeks. [12]
Tesla had been considering locations across eight states in the central United States during 2019‒2020. [13]
Community groups and government officials in several areas of the US expressed interest in hosting what was expected to be a very large Tesla Gigafactory manufacturing facility. [14] Some expressing interest in facilitating land procurement, getting over the regulatory obstacles, and considering potential tax incentives. [15] Some used social media marketing aiming to reach Elon Musk directly. [16] [17]
By May 2020, a selection process was underway by Tesla. The short list included Austin, Nashville (Tennessee) and Tulsa (Oklahoma). [18] [19] [20] Two locations in the vicinity of Tulsa had been viewed by Tesla by mid-May. [20] The Tulsa campaign was promoted by G. T. Bynum, the mayor of Tulsa. In May 2020 Bynum discussed the suitability of "Green Country" (Northeastern Oklahoma) [20] and distributed a photomontage of the Cybertruck in Tulsa Police Department livery, with a suggestion of local purchasing, if the Gigafactory were to be situated near Tulsa. [21] On May 20, 2020, wrap advertising was applied to the Golden Driller statue located at the Tulsa Expo Center to create a caricature of Elon Musk, with the word "Tulsa" on statue's belt buckle replaced by the "Tesla" name. [22] [23]
In July 2020, Tesla selected Austin as the site. [24]
In 2014, Tesla evaluated a 1,500-acre (600 ha; 2 sq mi; 6 km2) manufacturing site on U.S. Route 79 at Frame Switch ( 30°32′N97°30′W / 30.54°N 97.5°W ), located between the towns of Hutto and Taylor, north-east of the Greater Austin center as its next factory. [25] [26]
Tesla subsequently chose to construct Giga Nevada (formerly Gigafactory 1) in Nevada in 2014.
By June 2020, a different location near Austin was being considered. It is a 2,100-acre (850 ha; 3.3 sq mi; 8.5 km2) site ( 30°14′N97°36′W / 30.23°N 97.6°W ) bordering Harold Green Road ( now Tesla Rd) and Texas State Highway 130. [27] On June 16, 2020 the Commissioners' court of Travis County discussed a possible incentives package for Tesla. [28] [29] In July 2020, the Del Valle Independent School District approved a tax incentives package worth $68 million, should the Tesla Gigafactory be built. [27]
On July 22, 2020, during a 2Q2020 earnings call, Tesla announced that Del Valle, Austin, Texas had been selected for Gigafactory 5. [2]
By the end of July 2020, construction had begun. [1] The Tesla Gigafactory received state tax incentives worth about $50 million through the Texas Tax Code Chapter 313 program. [30]
The first fully completed Tesla Model Y rolled off the line at Giga Texas in the last week of August 2021 under trial production. [31]
In December 2021, Elon Musk estimated that Giga Texas will require a total investment of at least $10B and may employ as much as 20,000 employees within the company. [32] Observers have spotted production cars in and outside of the factory. [33]
As of March 2022, Tesla battery manufacturers CATL and Panasonic are scouting sites for battery factories in the US, including Kansas and Oklahoma (which are within close proximity of Giga Texas), Mexico and Canada. [34] [35] Each factory on its own may involve a multi-billion dollar investment.
During the night of January 18/19, 2021, concrete foundations for three Giga Press high-press die-casting machines were poured at the north-east corner Giga Texas factory location. [36] [37]
On January 21, 2021 the first Giga Press components started to arrive on site in crates and shipping containers. [38] [39] On January 22, 2021 the base frame of the first Giga Press was unboxed and craned into position. [40]
Elon Reeve Musk is a business magnate and investor. He is the founder, CEO, and Chief Engineer at SpaceX; angel investor, CEO, and Product Architect of Tesla, Inc.; founder of The Boring Company; and co-founder of Neuralink and OpenAI. With an estimated net worth of around US$221.4 billion as of July 2022, Musk is the wealthiest person in the world according to both the Bloomberg Billionaires Index and Forbes' real-time billionaires list.
Tesla, Inc. is an American multinational automotive and clean energy company headquartered in Austin, Texas. Tesla designs and manufactures electric vehicles, battery energy storage from home to grid-scale, solar panels and solar roof tiles, and related products and services. Tesla is one of the world's most valuable companies and remains the world's most valuable automaker with a market capitalization of more than US$760 billion. The company had the most worldwide sales of battery electric vehicles and plug-in electric vehicles, capturing 23% of the battery-electric market and 16% of the plug-in market in 2020. Through its subsidiary Tesla Energy, the company develops and is a major installer of photovoltaic systems in the United States. Tesla Energy is also one of the largest global suppliers of battery energy storage systems, with 3.99 gigawatt-hours (GWh) installed in 2021.
Del Valle is an airport-defined edge city of Austin and part of the Austin–Round Rock–San Marcos Metropolitan Statistical Area. It is founded upon the 19th-century Santiago Del Valle leagues, the largest granted land parcel in Travis County.
Tesla Giga Nevada is a lithium-ion battery and electric vehicle component factory in Storey County, Nevada. The facility, located east of Reno, is owned and operated by Tesla, Inc., and supplies the battery packs for the company's electric vehicles. If fully built out, the building will have the largest footprint in the world.
The Tesla Powerwall is a rechargeable lithium-ion battery stationary home energy storage product manufactured by Tesla Energy. The Powerwall stores electricity for solar self-consumption, time of use load shifting, and backup power. The Powerwall was introduced in 2015 with limited production. Mass production started in early 2017 at Tesla's Giga Nevada factory. As of May 2021, Tesla has installed 200,000 Powerwalls.
Gigafactory or GigaFactory is a generic term referring to "...facilities that produce batteries for electric vehicles on a large scale". The term was initially used by the electric car manufacturer Tesla, Inc. to refer to their battery manufacturing facilities. The concept's success has led to the genericization of the term.
Tesla Energy is the clean energy subsidiary of Tesla, Inc., headquartered in Fremont, California, that develops, manufactures, sells and installs photovoltaic solar energy generation systems, battery energy storage products, as well as other related products and services to residential, commercial and industrial customers.
The Tesla Model Y is a battery electric compact crossover manufactured by Tesla, Inc. Tesla unveiled it in March 2019, started production at its Fremont plant in January 2020, and started deliveries on March 13, 2020.
The Tesla Semi is an all-electric battery-powered Class 8 semi-truck in development by Tesla, Inc. Two concept vehicles were unveiled in November 2017, and production is planned in 2023.
This is the corporate history of Tesla, Inc., an electric vehicle manufacturer and clean energy company founded in San Carlos, California in 2003 by American entrepreneurs Martin Eberhard and Marc Tarpenning. The company is named after Serbian-American inventor Nikola Tesla. Tesla is the world's leading electric vehicle manufacturer, and, as of the end of 2021, Tesla's cumulative global vehicle sales totaled 2.3 million units.
Tesla Gigafactory Berlin-Brandenburg is a European manufacturing plant for Tesla, Inc. in Grünheide (Brandenburg), Germany. The campus is located 35 kilometres (20 mi) south-east of central Berlin and some 8 kilometres (5 mi) southeast of the Berlin state boundary at Erkner/Rahnsdorf. Proximity to Berlin Brandenburg Airport was explicitly cited as a factor in choosing the site. It is Tesla's first manufacturing location in Europe.
Tesla Giga New York is a photovoltaic (PV) cell factory leased by Tesla subsidiary SolarCity in Riverbend, Buffalo, New York. The factory, owned by the State of New York, was built on brownfield land remediated from a former steel mill. Construction of the factory, rebranded as RiverBend, started in 2014 and was completed in 2016–17.
Tesla Giga Shanghai is a factory in Shanghai, China operated by Tesla, Inc. The facility currently hosts the final assembly of the Tesla Model 3 and Tesla Model Y, with Model Y deliveries slated to begin in January 2021. The factory's initial production rate target is 3,000 cars a week, eventually ramping up to 250,000 electric cars per year. The first assembled Model 3s were delivered in December 2019, just twelve months after Tesla began site grading on the Gigafactory in December 2018.
The Tesla Cybertruck is a battery electric light-duty truck announced by Tesla, Inc. in 2019. Three models have been announced, with EPA range estimates of 400–800 kilometers (250–500 mi) and an estimated 0–100 km/h (0–62 mph) time of 2.9–6.5 seconds, depending on the model.
The Tesla Cyberquad is an electric quad bike all-terrain vehicle (ATV) concept presented by Tesla, Inc at the Tesla Cybertruck's November 2019 unveiling. Concluding the presentation at the company's Design Studio in Hawthorne, Elon Musk announced 'one more thing', at which point the ATV was shown being loaded onto the back of the Cybertruck. Observers have pointed to elements seen at the unveiling indicating that the Cyberquad prototype had been built by swapping the powerplant and plastics on a Yamaha Raptor. Certain images from the rear suggest the vehicle also appears to have the powertrain borrowed from Zero Motorcycles.
Giga Press are a series of aluminium die casting machines manufactured by Idra Group in Italy. They are notable for being the largest high-pressure die casting machines in the world, with a clamping force of 55,000 to 61,000 kilonewtons. Each machine weighs 410–430 tonnes (900,000–950,000 lb).
Tesla, Inc. has been criticized for its cars, workplace culture, business practices, and occupational safety. Many of the company's criticisms are also directed toward Elon Musk, its angel investor, CEO, and Product Architect. Critics have also accused the company of deceptive marketing, promises, and fraud. Some critics have highlighted Tesla's downplay of issues, and a few have been retaliated by the company for whistleblowing.
Tesla Bot, also known as Optimus, is a conceptual general-purpose robotic humanoid under development by Tesla, Inc. It was announced at the company's Artificial Intelligence (AI) Day event on August 19, 2021. CEO Elon Musk claimed during the event that Tesla would likely build a prototype by 2022. Musk is on record having said that he thinks Optimus "has the potential to be more significant than the vehicle business over time."
asked if Tulsa, Oklahoma remains in the mix for a possible Tesla production site, Musk simply said the company continues to consider "several options." … looking for $68 million worth of property tax credits from a Travis County school district. … in the official documents that "eight states" were also under consideration.
Tesla is in talks with Nashville officials to locate a factory there that will produce its all-electric Cybertruck and Model Y crossover
Tesla has picked Austin, Texas, and Tulsa, Oklahoma, as finalists for its new U.S. assembly plant … officials visited Tulsa … and were shown two sites. … site selection process is secret, … no final decision has been made. … new factory will be Tesla's biggest so far. … factory to be in the center of the country and closer to East Coast markets.
narrowed it down to two cities to build a new US Gigafactory for Cybertruck production, and they are Austin, Texas, and Tulsa, Oklahoma … Associated Press reported on the finalists … visited Tulsa to view two potential sites for the Gigafactory. … mayor G.T. Bynum said "…can't imagine a better place than Green Country."
Mayor of Tulsa G.T. Bynum has a simple proposition: If Tesla builds its future Cybertruck Gigafactory in the Oklahoma city, he wants Cybertruck police vehicles … tweeted a rendering of a Cybertruck decked out in local police livery, following reports his city is a finalist among Tesla's choices. … added it would "only be right to buy local,"
at the Golden Driller... "Hey Kurt, we have some people who want to wrap the Driller!" That's the phone call Kurt Stenstrom of Meeks Group received over the weekend … "This is the first time the face has ever been wrapped," he said.
… workers were busy adorning the distinctive Tesla "T" on the chest of the iconic Golden Driller at the Tulsa County fairgrounds. The Tesla name also now appears on the belt buckle of the statue. … planning a news conference for
Hutto EDC, with the assistance of the city of Taylor, Hutto ISD, Williamson County and the state of Texas, put together an incentive package worth more than $800 million over 20 years. … cities of Hutto and Taylor had secured more than 1,000 acres of land south of the intersection of Hwy. 79 and FM 3349 to build the factory with rail access nearby. It was believed the factory would have brought approximately 6,500 jobs to the area.
+/- 1,486 acres … Industrial or Corporate headquarters … Access to BNSF and Union Pacific Class 1 railroads
Del Valle Independent School District approved an incentive agreement with Tesla, … build a 4-5 million square-foot electric vehicle … Gigafactory at the intersection of State Highway 130 and Harold Green Road … 2,100 acres, … $68 million — by capping the property value for 10 years. … 5,000 jobs
negotiating possible incentives … Austin American-Statesman reported on … Travis County Commissioners Court is scheduled to discuss terms of the deal on
Item 21 on Travis Commissioners Court agenda calls for the members to “Consider and take appropriate action on a project under Travis County Code Chapter 28." … Chapter 28 of the Travis County Code contains guidelines for economic development incentives. … United Auto Workers, … believes "that item 21 on the agenda is related to Tesla," … "…moratorium on economic incentives. In May, the commissioners lifted the moratorium for two months…" … will be talked about in "executive session," … UAW … sent a letter
{{cite web}}
: Missing or empty |title=
(help)