Green Line (SacRT)

Last updated

Green Line
GreenLinesacrt.jpg
Light rail car wearing a promotional Green Line wrap
Overview
StatusService suspended until summer 2026 [1]
Owner Sacramento Regional Transit District
Locale Sacramento, California
Termini
Stations7
Service
Type Light rail
System SacRT light rail
ServicesLine 519
Daily ridership440 (Q2 2018) [2]
History
OpenedJune 15, 2012;13 years ago (2012-06-15) [3]
Technical
Number of tracks2
CharacterAt-grade street running
Track gauge 4 ft 8+12 in (1,435 mm) standard gauge
Electrification Overhead line,  750 V DC
Route map
Green Line (SacRT) Green Line highlighted in green
BSicon gexCONTg.svg
proposed extension
to Sacramento Airport
BSicon gKBHFxa.svg
7th & Richards/
Township 9
Greyhound no dog.svg BSicon BUS2.svg
BSicon geBHF.svg
7th & Railyards
planned
BSicon CONTgq.svg
BSicon gmKRZu.svg
BSicon CONTfq.svg
BSicon LOGO Amtrak2.svg
BSicon gbSHI2lr.svg
BSicon CONTgq saffron.svg
BSicon STRq saffron.svg
BSicon gSTR.svg
BSicon tSTR+r saffron.svg
BSicon STR+r saffron.svg
BSicon tSTR+r saffron.svg
BSicon gmABZg+r +saffron.svg
  Gold  
BSicon tSTR saffron.svg
BSicon glBHFf.svg
BSicon gSTR.svg
BSicon tSTR saffron.svg
BSicon glBHFg.svg
BSicon gSTR.svg
County Center (7th & I8th & H)
BSicon tSTR saffron.svg
BSicon gSTRf.svg
BSicon tSTR saffron.svg
BSicon glBHFg.svg
BSicon gSTR.svg
8th & K
BSicon tSTR saffron.svg
BSicon tSTR+l denim.svg
BSicon gmABZg+l +denim.svg
BSicon STRq denim.svg
BSicon gSTR.svg
BSicon tSTR saffron.svg
BSicon tSTR+l denim.svg
BSicon STR+l denim.svg
BSicon dCONTfq denim.svg
BSicon tSTR black.svg
BSicon gexlBHFf.svg
BSicon gSTR.svg
BSicon tSTR black.svg
BSicon gSTRg.svg
7th & K
closed 2016
BSicon tSTR black.svg
BSicon glBHFf.svg
BSicon gSTR.svg
BSicon tSTR black.svg
BSicon glBHFg.svg
BSicon gSTR.svg
7th & Capitol8th & Capitol
BSicon tbSHI2+lr black.svg
BSicon gbSHI2+lr.svg
BSicon tSTR black.svg
BSicon glBHF.svg
BSicon gSTR.svg
8th & O
BSicon BUS2.svg
BSicon tSTR black.svg
BSicon glBHF.svg
BSicon gSTR.svg
Archives Plaza
BSicon uKDSTaq.svg
BSicon tSTR black.svg
BSicon guABZgr+r.svg
R Street Yard
BSicon KSTRa saffron.svg
BSicon tKSTRe black.svg
BSicon tKSTRa denim.svg
BSicon glBHF.svg
BSicon gKSTRe.svg
13th Street
BSicon tCONTf denim.svg
BSicon CONTf saffron.svg
Blue
Gold
BSicon tSTRq saffron.svg
BSicon gSTRq.svg
Other service sharing
Green Line tracks
BSicon tSTRq black.svg
BSicon gSTRq.svg
Multiple services sharing
Green Line tracks

Wheelchair symbol.svg All stations are accessible

The Green Line is a currently out-of-service light rail line in Sacramento, California, and is one of the three lines of the Sacramento Regional Transit District (SacRT) light rail system. It opened on June 15, 2012, [3] and runs between 13th Street station and 7th & Richards/Township 9 station. The Green Line runs through north downtown to Township 9 in the River District, and is projected eventually to reach Sacramento International Airport. The line only operates on weekdays. [4]

Contents

Due to construction work with a new infill station at 7th Street and Railyards Boulevard near the Sacramento Railyards, service on the line has been suspended since June 16, 2025 and will not resume until summer 2026. Bus stops near the closed 7th & Richards/Township 9 station are open for alternate transportation during the closure. [5]

History

In the 1990s, SacRT started identifying corridors for new light rail extensions and selected an alignment for a new line that would reach the Sacramento Airport from Sacramento via Natomas. [6] Formal planning for the line began in the early 2000s. Construction for the initial segment of the Green Line that runs to the River District began in late 2009 after finalizing environmental review in early 2009. [7] The initial line opened for service on June 15, 2012, with a single new station at Township 9. [8]

In 2016, low ridership on the Green Line and the lack of development at Township 9 led the SacRT Board to consider closing the line in 2017. [9]

Line description

The Green Line begins at its current northern terminus at the 7th and Richards / Township 9 station in the River District. From there it initially travels south on 7th Street on a single-track. Reaching downtown, the Green Line goes to two tracks at G Street as one-way tracks for 7th and 8th Streets where it joins the Blue and Gold Lines. It then turns westward on O Street, southward on 12th, then eastward in an alley paralleling Q and R Streets, before reaching its southern terminus at 13th Street station.

Station listing

The following table lists the current stations of the Green Line, from north to south.

Key
Closed station
StationOpenedTransfers
7th & Richards/​Township 9 June 15, 2012Aiga bus trans.svg Sacramento Regional Transit: 11, 33
County Center
(southbound: 7th & I, northbound: 8th & H)
  • Aiga bus trans.svg Sacramento Regional Transit: 11, 51, 102, 103, 106, 107, 109, 129, 134
St. Rose of Lima Park
(northbound: 8th & K)
2007
  • Aiga bus trans.svg Sacramento Regional Transit: 30, 38, 62, 86, 88, 142 (Airport Express)
  • Aiga bus trans.svg North Natomas Jibe
  • Aiga bus trans.svg Yolobus: 42A, 42B, 43, 43R, 230
St. Rose of Lima Park
(southbound: 7th & K)
March 12, 1987Closed September 30, 2016
7th & Capitol (southbound)
8th & Capitol (northbound)
March 12, 1987
  • Aiga bus trans.svg Sacramento Regional Transit: 11, 30, 38, 51, 62, 86, 88, 102, 103, 106, 107, 109, 129, 134, 142 (Airport Express), E10, E11, E12, E13, E14, E15, E16, E17, E18
  • Aiga bus trans.svg North Natomas Jibe
  • Aiga bus trans.svg Roseville Transit: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10 [10]
  • Aiga bus trans.svg Yolobus: 42A, 42B, 43, 43R, 230
8th & O
  • Aiga bus trans.svg Sacramento Regional Transit: 11, 51, 102, 103, 106, 107, 109, E10, E11, E12, E13, E14, E15, E16, E17, E18
  • Aiga bus trans.svg North Natomas Jibe
  • Aiga bus trans.svg Yolobus: 42A, 42B, 43, 43R, 230
Archives Plaza
13th Street

Future expansion

SacRT map of proposed extension Sacramento RT Green Line extension.png
SacRT map of proposed extension

The Green Line to Sacramento International Airport (SMF) light rail future extension Project will extend service 13 miles (21 km) to Sacramento International Airport. [11] As of May 2019, future new Green Line stations, South to Northwest from the existing 7th & Richards/Township 9 Station, are:

References

  1. "Green Line Light Rail Temporarily Suspended". Sacramento Regional Transit District.
  2. RT Quarterly Ridership Report (PDF) (Report). Sacramento RT. June 2018. Retrieved December 12, 2018.
  3. 1 2 "Sacramento Green Line Open". Light Rail Transit Association. June 16, 2012. Archived from the original on March 7, 2016. Retrieved August 19, 2012.
  4. "RT Light Rail Schedules: 519 Green Line" (PDF). Sacramento Regional Transit. Retrieved August 19, 2012.
  5. "Green Line Light Rail Temporarily Suspended". Sacramento Regional Transit District.
  6. "History of the Project". Sacramento RT. Archived from the original on August 21, 2015. Retrieved December 23, 2018.
  7. "Green Line to the River District". Sacramento RT. Archived from the original on September 27, 2015. Retrieved December 23, 2018.
  8. Shannon, Chris (June 15, 2012). "Light Rail Makes First Step Toward Natomas". The Natomas Buzz. Retrieved December 23, 2018.
  9. Bizjack, Tony (May 20, 2016). "Light-rail Green Line may shut in Sacramento to save money". Sacramento Bee. Retrieved August 22, 2016.
  10. "Roseville Transit Commuter Bus Services Guide" (PDF). Roseville Transit . April 1, 2020.
  11. "Green Line to the Airport". Green Line 2 Airport. Sacramento RT. Archived from the original on May 13, 2016. Retrieved December 14, 2018.

Commons-logo.svg Media related to Green Line (Sacramento RT) at Wikimedia Commons

Template:Attached KML/Green Line (SacRT)
KML is from Wikidata