Herbert A. Wagner Generating Station

Last updated
Herbert A. Wagner Generating Station
Herbert A. Wagner Generating Station aerial.jpg
H.A. Wagner (center, on the water) and Brandon Shores Generating Stations, with Francis Scott Key Bridge
Herbert A. Wagner Generating Station
CountryUnited States
Location Anne Arundel County, Maryland
Coordinates 39°10′43″N76°31′37″W / 39.17861°N 76.52694°W / 39.17861; -76.52694
StatusOperational
Commission date Unit 1: February, 1956
Unit 2: January, 1959
Unit 3: August, 1966
Unit 4: August, 1972
Owner(s) Talen Energy June 2015 - Present
Thermal power station
Primary fuel Residual fuel oil, bituminous coal, natural gas
Turbine technology Steam turbine
Cooling source Chesapeake Bay
Power generation
Nameplate capacity 1,040 MWe
External links
Website Talen Energy
Commons Related media on Commons

The Herbert A. Wagner Generating Station is an electric generating station located on Fort Smallwood Road north of Orchard Beach in Anne Arundel County, Maryland, just east of Glen Burnie, and is operated by the Raven Power Holdings, LLC, a subsidiary of Riverstone Holdings LLC. The H. A. Wagner station consists of natural gas fueled Unit 1, nominally rated at 133 MWe, coal-fired Unit 2 rated at 136 MWe, coal-fired Unit 3 rated at 359 MWe, and oil-fired Unit 4 rated at 415 MWe. [1] [2] Talen Energy will convert the coal-fired units to alternative fuels by 2025. [3]

Contents

The station shares a 483-acre (195 ha) site adjacent to the Patapsco River with the Brandon Shores Generating Station. The Brandon Shores plant dominates the site with its 700-foot (210 m) exhaust and 400-foot (120 m) flue-gas desulfurization system stacks.

Fuel delivery

The Wagner and Brandon Shores generating stations consume approximately 4.8 million tons of coal annually. [4] Coal for both stations and number 6 fuel oil for Wagner Unit 4 is delivered by barge. Although there is a railroad spur into the site that could be used for coal shipments to the site, it is unused and would require improvements to restore it to an operational state. An estimate in a 2007 report indicated that the cost of returning this rail line to operation with the necessary material handling equipment would potentially exceed US$20 million. [4]

Natural gas for the Wagner unit 1 is provided by a pipeline.

Dispatch of electricity

The electrical output of Brandon Shores Generating Station is dispatched by the PJM Interconnection regional transmission organization.

Wagner Generating Station from Cox Creek, with the 700-foot (210 m) stacks of the Brandon Shores plant at left and the active 400-foot (120 m) Brandon Shores stack just visible Herbert A. Wagner plant MD1.jpg
Wagner Generating Station from Cox Creek, with the 700-foot (210 m) stacks of the Brandon Shores plant at left and the active 400-foot (120 m) Brandon Shores stack just visible

History

The Wagner Generating Station's oil-fired Unit 1 commenced operations in 1956. [2] Unit 2, consisting of a Babcock & Wilcox 1800 psig steam boiler and General Electric single reheat steam turbine, began operations as a coal-fired plant in 1959. Coal-fired Unit 3, which has a Babcock & Wilcox 3500 psig supercritical boiler and a Westinghouse double-reheat cross compound turbine, commenced operations in 1966. [2] The oil-fired unit 4 began operations in 1972. [2] Unit 2 was converted to fuel oil to comply with state and federal air quality requirements in 1972, and then modified to allow a return to burning coal in 1987. [5] Units 2, 3, and 4 were also converted to use natural gas during startup operations in 1987. [5] Additional air pollution controls were added to the plants in the 1980s.

The plant is named for Herbert Appleton Wagner (1867–1947), who was president of the Consolidated Gas and Electric of Baltimore, the predecessor company of Constellation Energy, from 1915 through 1942. [6] Wagner also held a patent on a self-starting, single-phase motor and founded in 1891 the Wagner Electric Manufacturing Company in St. Louis, Missouri. [6]

2012 sale

The plant was originally constructed by a predecessor company of Constellation Energy, which was later purchased by Exelon in 2012. On August 9, 2012, Exelon announced that it had reached an agreement, subject to regulatory approvals, for the sale of the Charles P. Crane, Brandon Shores, and Herbert A. Wagner Generating Stations to Raven Power Holdings LLC, a newly formed portfolio company of Riverstone Holdings LLC, for approximately $400 million. [7] Exelon had committed to divest the plants as condition for regulatory approval of its merger with Constellation Energy to alleviate concerns regarding potential market power in the regional wholesale electricity market. The sale was completed on November 30, 2012.

Scheduled Closure

On November 10, 2020 Talen Energy (parent company of Raven Power) announced a settlement with the Sierra Club that the plant would cease burning coal and convert to alternative energy sources by the end of 2025. [3]

Cooling

All four Wagner units are cooled using water from intake structures from a basin on the Patapsco River using two circulating water pumps per unit. [8] Water from units 1, 2, and 3 is returned to the river by a discharge canal upstream of the intake basin while water from unit 4 uses a discharge canal downstream of the intake basin. [8]

See also

Related Research Articles

<span class="mw-page-title-main">Peach Bottom Nuclear Generating Station</span> Nuclear power plant in Pennsylvania

The Peach Bottom Atomic Power Station is an American nuclear power plant that is located 50 miles (80 km) southeast of Harrisburg in Peach Bottom Township, York County, Pennsylvania. Situated close to the Susquehanna River, it is three miles north of the Maryland border.

<span class="mw-page-title-main">Exelon</span> American utility company

Exelon Corporation is a public utility headquartered in Chicago, Illinois, and incorporated in Pennsylvania. Exelon is the largest electric parent company in the United States by revenue and is the largest regulated electric utility in the United States with approximately 10 million customers. The company is ranked 99th on the Fortune 500.

<span class="mw-page-title-main">Constellation Energy</span> Energy company headquartered in Baltimore, Maryland

Constellation Energy Corporation is an American energy company headquartered in Baltimore, Maryland. The company provides electric power, natural gas, and energy management services. It has approximately two million customers across the continental United States.

Hal B. Wansley Power Plant is a power station located in northeastern Heard County, between Franklin and Carrollton, in the state of Georgia, United States. Its various units, powered by coal, oil, and natural gas, are operated by Southern Company, Georgia Power Company, Oglethorpe Power Corporation, Municipal Electric Authority and Dalton Utilities.

<span class="mw-page-title-main">Morgantown Generating Station</span> American energy generation

The Morgantown Generating Station is a 1,477 MW electric generating plant owned by GenOn Holdings LLC., located in the unincorporated town of Newburg, Maryland, near Morgantown, on the Potomac River. The station was built in 1970.

<span class="mw-page-title-main">Dickerson Generating Station</span>

The Dickerson Generating Station is an 853 MW electric generating plant owned by NRG Energy, located approximately two miles west of Dickerson, Maryland, on the eastern banks of the Potomac River.

<span class="mw-page-title-main">Chalk Point Generating Station</span> Electricity-generating plant owned by NRG Energy

The Chalk Point Generating Station is an electricity-generating plant, comprising oil and natural gas fired units, owned by NRG Energy, located near the town of Eagle Harbor, Maryland, United States, on the Patuxent River.

Cayuga Generating Station is an electricity-generating facility, located in Eugene Township, Vermillion County, near Cayuga, Indiana. Its almost identical, coal-fired Units 1 and 2 were launched into service in 1970 and 1972, and have a combined name-plate generating capacity of 1,062 MWe. Unit 4 is powered by natural gas, but can also be switched to oil. There are also four minor oil-fired units of internal combustion design. The facility is entirely owned by Duke Energy.

Petersburg Generating Station is a major coal-fired power plant in Indiana, rated at 2.146-GW nameplate capacity. It is located on the White River near Petersburg in Pike County, Indiana, just 1 mile (1.6 km) upstream from a much smaller coal-fired Frank E. Ratts Generating Station. Petersburg G.S. is owned and operated by AES Indiana.

<span class="mw-page-title-main">Gould Street Generating Station</span> Former electric generating plant in Baltimore, Maryland, US

The Gould Street Generating Station was a former 100 MW electric generating plant operated by Exelon that was located on Gould Street in south Baltimore, Maryland, USA. The plant was adjacent to an elevated section of freeway I-95 and was south of the Riverside neighborhood and west of the Locust Point neighborhood of Baltimore. The plant site, located on the shore of the Middle Branch of the Patapsco River, was used for the generation of electric power for over one hundred years before being shut down on June 1, 2019. The site was purchased by Greenspring Realty Partners, Inc. for $3.1 million in December 2019. Demolition began in October 2020. The original brick buildings, the large storage tanks behind them, and other minor structures on the southwest portion of the property were demolished as of March 2021, but as of April 2022 the larger steel building to the northeast on the property remains. A large portion of the property was acquired by Weller Development in July 2021 and the future of the remaining structure and the property is not known.

The Victoria County Station was a proposed nuclear power plant, in Victoria County, 13.3 miles south of Victoria, Texas. The plant, consisting of two 1535 MWe General-Electric-Hitachi economic simplified boiling water reactors was applied for by the Exelon Nuclear Texas Holdings, LLC on September 2, 2008. The project was canceled in August 2012.

The Charles P. Crane Generating Station was a 400 megawatt (MW) coal power plant located on the Carroll Island Road in Bowleys Quarters, Maryland, 14 miles (23 km) east of Baltimore. The power plant was operated by C.P. Crane, LLC, a subsidiary of Avenue Capital Group. The station had two coal-fired generating units, rated at 190 and 209 MW nominal capacity, and powered by cyclone steam boilers. It also had a 16 MW oil-fired combustion turbine. The Crane station occupies 157 acres (64 ha) on the Middle River Neck Peninsula adjacent to the Seneca Creek tributary of the Gunpowder River, and is on the rural side of the Baltimore County Urban Rural Demarcation Line. The plant was closed in June 2018 and demolished via building implosion in August 2022.

<span class="mw-page-title-main">Brandon Shores Generating Station</span> Electric generating station in Anne Arundel County, Maryland, US

The Brandon Shores Generating Station is an electric generating station located on Fort Smallwood Road north of Orchard Beach in Anne Arundel County, Maryland, near Glen Burnie, and is operated by Raven Power Holdings, Inc. Brandon Shores consists of two Babcock & Wilcox coal-fired boilers and two General Electric steam turbines with a combined nominal generating capacity of 1370 MWe. Unit 1 went into operation in May 1984 and Unit 2 in May 1991.

<span class="mw-page-title-main">Riverside Generating Station</span> Electric generating station in Dundalk, Maryland, US

The Riverside Generating Station is a 261 MW electric generating station operated by Exelon that is located at 4000 Broening Highway in Dundalk, Maryland. The station is on Sollers Point on the Patapsco River.

Warrick Generating Station is a 755-MWe coal-fired electricity-generating station, located southeast of Newburgh in Warrick County. It sits on the north bank of Ohio River, downstream of the F. B. Culley Generating Station. The plant has four coal-fired, steam-powered turbines with a combined generating capacity of 791 MWe. Alcoa owns three of the four generating stations, which were placed into service in the early 1960s. The largest unit, known as Unit 4, is 323-MWe unit jointly owned by Alcoa and Vectren. This larger unit was placed in operation in 1970.

<span class="mw-page-title-main">Brunner Island Steam Electric Station</span>

Brunner Island Steam Electric Station is a coal-fired, alternatively natural gas-powered electrical generation facility in York County, Pennsylvania. It occupies most of the area of the eponymous island on Susquehanna River. The power plant has three major units, which came online in 1961, 1965, and 1969, with respective generating capacities of 334 MW, 390 MW, and 759 MW. In addition, three internal combustion generators were installed in 1967. Talen Energy will stop coal use at the plant in 2028.

Talen Energy is an independent power producer founded in 2015. It was formed when the competitive power generation business of PPL Corporation was spun off and immediately combined with competitive generation businesses owned by private equity firm Riverstone Holdings. Following these transactions, PPL shareholders owned 65% of Talen's common stock and affiliates of Riverstone owned 35%. As a condition for FERC approval Talen agreed to divest approximately 1,300 megawatts of generating assets in the PJM Interconnection Region to mitigate FERC's competitiveness concerns. On December 6, 2016, Riverstone Holdings completed the purchase of the remaining 65% of Talen's common stock, making it a privately owned company.

The Perryman Generating Station is a 353 MW electric generating peaking power plant owned by Constellation Energy, located in Baltimore, Maryland. Perryman has five units; four are oil-fired, and one is natural gas-fired.

References

  1. "Existing Electric Generating Units in the United States, 2006" (Excel). Energy Information Administration, U.S. Department of Energy. 2006. Retrieved 2008-07-14.
  2. 1 2 3 4 "Environmental Review of Proposed Air Pollution Control Project at H. A. Wagner" (pdf). Maryland Department of Natural Resources. February 23, 2007. Retrieved 2009-01-02.
  3. 1 2 Pacella, Rachael (2020-11-11). "Owner of Brandon Shores and Wagner power plants in Pasadena will stop burning coal by end of 2025". The Baltimore Sun.
  4. 1 2 "Environmental Review of Proposed Air Pollution Control Project at Brandon Shores" (PDF). Maryland Department of Natural Resources. February 5, 2007. Archived from the original (PDF) on March 7, 2013. Retrieved 2008-12-30.
  5. 1 2 Maryland Public Service Commission Order No. 67682, Case No. 7975, March 17, 1987.
  6. 1 2 King, Thomson (1950). Consolidated of Baltimore 1816-1950: A History of Consolidated Gas Electric Light and Power Company of Baltimore. Baltimore: Consolidated Gas Electric Light and Power Co. pp. 171, 205, 285–97.
  7. "Exelon Agrees to Sell Three Maryland Coal Plants to Raven Power Holdings LLC" (Press release). Exelon. Aug 9, 2012. Retrieved Aug 13, 2012.
  8. 1 2 "Ecological Studies at the H. A. Wagner Plant" (PDF). Lawler Matusky & Skelly Engineers. March 1980. Retrieved 2009-02-25.