Calvert Cliffs Nuclear Power Plant | |
---|---|
Country | United States |
Location | Calvert County, near Lusby, Maryland |
Coordinates | 38°25′55″N76°26′32″W / 38.43194°N 76.44222°W |
Status | Operational |
Construction began | June 1, 1968 |
Commission date | Unit 1: May 8, 1975 Unit 2: April 1, 1977 |
Construction cost | $2.206 billion (2007 USD) [1] |
Owner | Constellation Energy |
Operator | Constellation Energy |
Nuclear power station | |
Reactor type | PWR |
Reactor supplier | Combustion Engineering |
Cooling source | Chesapeake Bay |
Thermal capacity | 2 × 2737 MWth |
Power generation | |
Units operational | 1 × 863 MW 1 × 855 MW |
Make and model | CE 2-loop (DRYAMB) |
Units cancelled | 1 × 1600 MW US EPR |
Nameplate capacity | 1718 MW |
Capacity factor | 100.41% (2017) 82.90% (lifetime) |
Annual net output | 14,993 GWh (2021) |
External links | |
Website | Calvert Cliffs Nuclear Power Plant |
Commons | Related media on Commons |
The Calvert Cliffs Nuclear Power Plant (CCNPP) is a nuclear power plant located on the western shore of the Chesapeake Bay near Lusby, Calvert County, Maryland, in the Mid-Atlantic United States. It is the only nuclear power plant in the state of Maryland.
The plant is owned and operated by Constellation Energy and has two 2737 megawatt thermal (MWth) Combustion Engineering Generation II two-loop pressurized water reactors. Each generating plant (CCNPP 1&2) produces approximately 850 megawatt electrical (MWe) net or 900 MWe gross. Each plant's electrical load consumes approximately 50 MWe. These are saturated steam plants (non-superheated) and are approximately 33% efficient (ratio of 900 MWe gross/2700 MWth core). Only the exhaust of the single high-pressure main turbine is slightly superheated by a two-stage reheater before delivering the superheated steam in parallel to the three low-pressure turbines. Unit 1 uses a General Electric–designed main turbine and generator, while Unit 2 uses a Westinghouse–designed main turbine and generator. [2] The heat produced by the reactor is returned to the bay, which operates as a cooling heat-sink for the plant.
Unit 1 went into commercial service in 1975 and Unit 2 in 1977. [2] The total cost of the two units was approximately $766 million (equivalent to $3.85 billion in 2023). [3]
Unit 1 had its two steam generators replaced in 2002 and its reactor vessel closure head replaced in 2006, while unit 2 had its two steam generators replaced in 2003, and its vessel closure head replaced in 2007.[ citation needed ]
The water around the plant (see lower-right-center of photograph) is a very popular place for anglers. Unit 1 & 2 each takes in bay water (from the fenced-in area) to cool its steam driven turbine condensers plus other bay-water–cooled primary and secondary system heat exchangers. The bay water is pumped out at a nominal flow rate of 1.2 million gallons per minute (75,000 L/s) per unit (Unit 1 and 2) for each steam turbine condenser. The water is returned to the bay no more than 12 °F (6.7 °C) warmer than the bay water. Unlike many other nuclear power plants, Calvert Cliffs did not have to utilize water cooling towers to return the hot water to its original temperature. As the water comes out very quickly and creates a sort of artificial rip current, it can be a dangerous place to fish. CCNPP 3 will only need about 10% of the bay cooling water volume needed for Unit 1 and 2 combined. The increase in fish and shellfish impingement and entrainment will be less than 3.5% over Unit 1 and 2 existing conditions.[ citation needed ]
In February 2009, Calvert Cliffs set a world record for pressurized water reactors (PWRs) by operating 692 days non-stop. [4] In addition, Unit 2's capacity factor in 2008 was a world-record high of 101.37 percent. [5]
Year | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Annual (Total) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
2001 | 1,293,872 | 1,168,618 | 963,457 | 623,493 | 938,578 | 1,202,772 | 1,252,634 | 1,245,846 | 1,212,574 | 1,223,040 | 1,244,048 | 1,287,335 | 13,656,267 |
2002 | 1,288,202 | 862,457 | 645,092 | 619,921 | 639,467 | 829,551 | 1,146,622 | 1,242,220 | 1,211,273 | 1,271,399 | 1,079,479 | 1,292,322 | 12,128,005 |
2003 | 1,292,663 | 872,233 | 647,476 | 784,844 | 1,259,096 | 1,240,051 | 1,270,234 | 1,258,254 | 1,226,338 | 1,293,673 | 1,245,064 | 1,300,787 | 13,690,713 |
2004 | 1,245,680 | 1,218,948 | 1,261,451 | 816,454 | 1,104,627 | 1,250,809 | 1,278,968 | 1,272,708 | 1,231,056 | 1,301,634 | 1,274,705 | 1,323,220 | 14,580,260 |
2005 | 1,322,990 | 1,047,379 | 949,726 | 1,267,648 | 1,307,731 | 1,240,130 | 1,254,931 | 1,252,361 | 1,218,377 | 1,283,417 | 1,249,369 | 1,309,162 | 14,703,221 |
2006 | 1,296,648 | 992,845 | 648,193 | 1,014,558 | 1,303,841 | 1,246,405 | 1,264,266 | 1,258,643 | 1,233,168 | 1,287,865 | 1,153,244 | 1,130,735 | 13,830,411 |
2007 | 1,297,997 | 1,086,076 | 661,313 | 1,182,021 | 1,303,229 | 1,241,232 | 1,266,519 | 1,251,396 | 1,223,218 | 1,264,543 | 1,262,781 | 1,312,867 | 14,353,192 |
2008 | 1,315,326 | 1,069,745 | 976,840 | 1,262,420 | 1,292,113 | 1,231,842 | 1,242,086 | 1,235,296 | 1,213,153 | 1,273,123 | 1,261,192 | 1,305,559 | 14,678,695 |
2009 | 1,303,777 | 1,045,223 | 940,839 | 1,260,328 | 1,291,934 | 1,226,644 | 1,158,547 | 1,245,982 | 1,225,916 | 1,282,637 | 1,259,342 | 1,308,950 | 14,550,119 |
2010 | 1,312,339 | 743,084 | 806,878 | 1,257,938 | 1,140,982 | 1,208,350 | 1,228,584 | 1,234,815 | 1,214,634 | 1,280,334 | 1,256,430 | 1,309,580 | 13,993,948 |
2011 | 1,315,452 | 865,796 | 965,147 | 1,264,689 | 1,298,663 | 1,182,649 | 1,247,953 | 1,171,521 | 1,217,571 | 1,277,972 | 1,273,121 | 1,316,903 | 14,397,437 |
2012 | 1,316,989 | 662,951 | 649,574 | 1,051,724 | 1,309,178 | 1,244,799 | 1,170,262 | 1,147,869 | 1,230,720 | 1,301,649 | 1,196,588 | 1,296,963 | 13,579,266 |
2013 | 1,326,175 | 950,117 | 784,587 | 1,283,601 | 1,094,820 | 1,249,816 | 1,262,218 | 1,258,216 | 1,140,152 | 1,306,577 | 1,279,188 | 1,328,838 | 14,264,305 |
2014 | 1,131,490 | 920,341 | 885,275 | 1,284,065 | 1,258,025 | 1,238,371 | 1,237,907 | 1,262,348 | 1,226,067 | 1,296,681 | 1,277,023 | 1,325,741 | 14,343,334 |
2015 | 1,327,603 | 919,447 | 1,036,388 | 1,184,895 | 1,301,932 | 1,255,122 | 1,279,970 | 1,282,379 | 1,245,002 | 1,317,016 | 1,280,853 | 1,212,718 | 14,643,325 |
2016 | 1,277,060 | 905,712 | 1,081,688 | 1,280,694 | 1,311,965 | 1,232,424 | 1,280,694 | 1,268,992 | 1,241,410 | 1,304,576 | 1,279,860 | 1,295,102 | 14,760,177 |
2017 | 1,329,771 | 853,695 | 1,215,964 | 1,294,186 | 1,328,553 | 1,271,137 | 1,298,704 | 1,293,666 | 1,265,599 | 1,316,555 | 1,295,563 | 1,343,595 | 15,106,988 |
2018 | 1,346,338 | 960,036 | 972,281 | 1,287,475 | 1,333,913 | 1,276,519 | 1,303,698 | 1,283,282 | 1,246,389 | 1,320,437 | 1,305,333 | 1,352,230 | 14,987,931 |
2019 | 1,352,917 | 956,165 | 981,233 | 1,303,153 | 1,334,182 | 1,272,540 | 1,300,484 | 1,284,026 | 1,264,678 | 1,312,355 | 1,302,614 | 1,348,575 | 15,012,922 |
2020 | 1,349,218 | 939,661 | 1,058,722 | 1,298,643 | 1,339,557 | 1,278,643 | 1,299,341 | 1,289,513 | 1,262,085 | 1,323,210 | 1,295,674 | 1,346,290 | 15,080,557 |
2021 | 1,350,621 | 1,163,666 | 832,885 | 1,297,994 | 1,337,931 | 1,278,215 | 1,263,359 | 1,288,572 | 1,253,272 | 1,320,373 | 1,259,115 | 1,347,630 | 14,993,633 |
2022 | 1,281,507 | 723,066 | 1,295,799 | 1,289,866 | 1,331,688 | 1,266,856 | 1,285,312 | 1,268,268 | 1,111,644 | 1,325,007 | 1,288,533 | 1,343,138 | 15,833,684 |
2023 | 1,344,780 | 996,006 | 1,070,742 | 1,293,357 | 1,326,605 | 1,272,752 | 1,289,010 | 1,281,383 | 1,237,467 | 1,311,938 | 1,215,009 | 1,344,702 | 15,901,751 |
2024 | 1,325,128 | 726,054 | 1,237,792 | 1,333,089 | 1,329,101 | 1,266,860 | 1,147,305 | 1,280,085 | 1,255,082 | 1,241,487 | -- |
The Nuclear Regulatory Commission (NRC) defines two emergency planning zones around nuclear power plants: a plume exposure pathway zone with a radius of 10 miles (16 km), concerned primarily with exposure to, and inhalation of, airborne radioactive contamination, and an ingestion pathway zone of about 50 miles (80 km), concerned primarily with ingestion of food and liquid contaminated by radioactivity. [7]
The 2010 US population within 10 miles (16 km) of Calvert Cliffs was 48,798, an increase of 86.4 percent in a decade, according to an analysis of U.S. Census data for msnbc.com. The 2010 U.S. population within 50 miles (80 km) was 2,890,702, a decrease of 2.0 percent since 2000. Cities within 50 miles include Washington, D.C., (45 miles to city center). [8]
In 2001, when the Dominion Cove Point LNG plant was scheduled to reopen, many local residents were concerned about the proximity to this nuclear power plant (3 miles). Residents thought that the Federal Energy Regulatory Commission did not consider the risks could be caused by an attack or an explosion before opening the plant. [9]
The NRC's estimate of the risk each year of an earthquake intense enough to cause core damage to the reactor at Calvert Cliffs was 1 in 100,000 for Reactor 1 and 1 in 83,333 for Reactor 2, according to an NRC study published in August 2010. [10] [11]
In the 1960s scientists at Johns Hopkins University became concerned that the discharge of heated cooling water from the plant would be detrimental to a crucial element of the Chesapeake Bay ecosystem, the bay's famed blue crabs. [12] Litigation pursuant to the 1970 National Environmental Policy Act led to a 1971 decision by the District of Columbia Court of Appeals requiring the Atomic Energy Commission (succeeded by the NRC in 1974) to consider the environmental impact of building and maintaining such an atomic energy plant. [13]
In 2000, the NRC extended the license of the plant for 20 additional years, making Calvert Cliffs the first nuclear plant in the United States to receive such an extension. President George W. Bush visited the plant in June 2005, the first time a president had visited a nuclear power plant in nearly two decades. [14]
UniStar Nuclear Energy announced plans to build a unit of the Evolutionary Power Reactor (US-EPR variant) at Calvert Cliffs. UniStar Nuclear Energy, a Delaware limited liability company, was jointly owned by Constellation Energy (CEG) and Électricité de France (EDF), the French builder and supplier of nuclear power plants. The proposed unit was to produce approximately twice the energy of each individual existing unit. On July 13, 2007, UniStar Nuclear Energy filed a partial application to the Nuclear Regulatory Commission to review its plans to build a new nuclear power plant, Calvert Cliffs Nuclear Power Plant 3 (CCNPP 3) based on the AREVA US Evolutionary Power Reactor [15] (US-EPR), Generation III+, [16] four loop pressurized water reactor.
The third reactor was intended to address a need for more baseload power generation in the Mid-Atlantic region. The unit proposed to be located south of the existing units 1 and 2, set back from the shoreline. Although only a single unit, its power plant footprint was almost twice the size of the existing units together. It was to have a closed-loop cooling system using a single hybrid mechanical draft cooling tower, incorporating plume abatement for no visible water vapor plume from the tower. Units 1 and 2 use an open-cycle heat dissipation system without cooling towers. The cooling tower of the Unit 3 reactor was to release two thirds of its waste heat to the atmosphere. The proposed EPR design was a saturated steam plant with one high-pressure turbine in tandem with three low-pressure turbines and a main generator design similar to Unit 1 and 2. Alstom was to supply the main steam turbine and main generator.
On November 13, 2007, UniStar Nuclear Energy filed an application for a certificate of public convenience and necessity with the Maryland Public Service Commission for authority to construct CCNPP 3. This application is being considered in Case Number 9127. [17]
Opponents and supporters of the proposed third reactor at Calvert Cliffs were involved in a series of public hearings before officials of the US Nuclear Regulatory Commission. In March 2009, Bill Peil of southern Calvert County asked the NRC to deny an emissions permit for the reactor due to health and safety concerns he asserted that the plant posed to the community. UniStar Nuclear Energy President and CEO George Vanderheyden urged the NRC to approve the air permit application. [18]
In October 2010, Constellation Energy said that it had reached an impasse in negotiations for a federal loan guarantee to build the proposed third reactor. The government sought a fee of $880 million on a guarantee of about $7.6 billion, to compensate taxpayers for the risk of default. Constellation Energy replied that such a fee would doom the project, “or the economics of any nuclear project, for that matter”. [19] [20] [21]
In November 2010 a deal to transfer Constellation Energy Group's stake in a nuclear development company to its French partner, EDF Group, closed, according to the U.S. Securities and Exchange Commission. A month prior, Constellation agreed to sell its 50 percent stake in UniStar Nuclear Energy to EDF for US$140 million, giving EDF sole ownership of the joint venture and its plans to develop a third unit at Calvert Cliffs in Southern Maryland. The deal called for EDF to transfer 3.5 million shares it owns, valued around US$110 million, to Constellation and give up its seat on the Constellation board. EDF designee Samuel Minzberg resigned.
In April 2011 the NRC stated that UniStar is not eligible to build a third reactor, as it is not a US owned company since Constellation pulled out of the partnership in 2010. The NRC would continue to process the application, but a license would not be issued until the ownership requirements were met. The reactor was estimated to cost $9.6 billion. [22]
Constellation Energy merged into Exelon in 2012.
In 2015 Areva, struggling with internal restructuring of its corporation, withdrew from the certification process for the US EPR reactor design, effectively putting on hold plans for the deployment of a European reactor in the US. [23] [24]
Unit 2 at the Calvert Cliffs nuclear power plant was shut down on September 5, 2013, after a malfunction during testing. It was re-opened September 10, 2013, after the required maintenance was performed. [25]
The Calvert Cliffs Nuclear Power Plant consist of two operational reactors, one additional was proposed in 2007 and withdrawn.
Reactor unit [26] | Reactor type | Capacity(MW) | Construction started | Electricity grid connection | Commercial operation | Shutdown | |
---|---|---|---|---|---|---|---|
Net | Gross | ||||||
Calvert Cliffs-1 | CE 2-loop | 855 | 918 | 01/06/1968 | 03/01/1975 | 08/05/1975 | |
Calvert Cliffs-2 | 850 | 911 | 01/06/1968 | 07/12/1976 | 01/04/1977 | ||
Calvert Cliffs-3 (planned) [27] | US-EPR | 1600 | ? | ||||
Areva S.A. was a French multinational group specializing in nuclear power, active between 2001 and 2018. It was headquartered in Courbevoie, France. Before its 2016 corporate restructuring, Areva was majority-owned by the French state through the French Alternative Energies and Atomic Energy Commission (54.37%), Banque publique d'investissement (3.32%), and Agence des participations de l'État (28.83%). Électricité de France, in which the French government has a majority ownership stake, owned 2.24%; Kuwait Investment Authority owned 4.82% as the second largest shareholder after the French state.
The Browns Ferry Nuclear Power Plant is located on the Tennessee River near Decatur and Athens, Alabama, on the north side of Wheeler Lake. The site has three General Electric boiling water reactor (BWR) nuclear generating units and is owned entirely by the Tennessee Valley Authority (TVA). With a generating capacity of nearly 3.8 gigawatts, it is the third most powerful nuclear power plant in the United States, behind the Palo Verde Nuclear Power Plant in Arizona and the Vogtle Nuclear Power Plant in Georgia, and the most powerful generating station operated by TVA.
The EPR is a Generation III+ pressurised water reactor design. It has been designed and developed mainly by Framatome and Électricité de France (EDF) in France, and by Siemens in Germany. In Europe, this reactor design was called European Pressurised Reactor, and the internationalised name was Evolutionary Power Reactor, but is now simply named EPR.
Dresden Generating Station is the first privately financed nuclear power plant built in the United States. Dresden 1 was activated in 1960 and retired in 1978. Operating since 1970 are Dresden units 2 and 3, two General Electric BWR-3 boiling water reactors. Dresden Station is located on a 953-acre (386 ha) site in Grundy County, Illinois near the city of Morris. It is at the head of the Illinois River, where the Des Plaines River and Kankakee River meet. It is immediately northeast of the Morris Operation—the only de facto high-level radioactive waste storage site in the United States. It serves Chicago and the northern quarter of the state of Illinois, capable of producing 867 megawatts of electricity from each of its two reactors, enough to power over one million average American homes.
The Callaway Plant is a nuclear power plant located in Callaway County, Missouri. The plant is Missouri's only nuclear power plant and is close to Fulton, Missouri. The 2,767 acres (1,120 ha) site began operations on December 19, 1984. It generates electricity from one 1,190-megawatt Westinghouse four-loop pressurized water reactor and a General Electric turbine-generator. The Ameren Corporation owns and operates the plant through its subsidiary Ameren Missouri. It is one of several Westinghouse reactors designs called the "Standard Nuclear Unit Power Plant System," or SNUPPS.
The Peach Bottom Atomic Power Station is an American nuclear power plant that is located 50 miles (80 km) southeast of Harrisburg in Peach Bottom Township, York County, Pennsylvania. Situated close to the Susquehanna River, it is three miles north of the Maryland border.
The Prairie Island Nuclear Generating Plant is an electricity-generating facility located in Red Wing, Minnesota, along the Mississippi River, and adjacent to the Prairie Island Indian Community reservation.
Nine Mile Point Nuclear Station is a nuclear power plant with two nuclear reactors located in the town of Scriba, approximately five miles northeast of Oswego, New York, on the shore of Lake Ontario. The 900-acre (360 ha) site is also occupied by the James A. FitzPatrick Nuclear Power Plant.
Donald C. Cook Nuclear Plant is a nuclear power plant located just north of the city of Bridgman, Michigan which is part of Berrien County, on a 650-acre (260 ha) site 11 miles south of St. Joseph, Michigan, United States. The plant is owned by American Electric Power (AEP) and operated by Indiana Michigan Power, an AEP subsidiary. It has two nuclear reactors and is currently the company's only nuclear power plant.
The Olkiluoto Nuclear Power Plant is one of Finland's two nuclear power plants, the other being the two-unit Loviisa Nuclear Power Plant. The plant is owned and operated by Teollisuuden Voima (TVO), and is located on Olkiluoto Island, on the shore of the Gulf of Bothnia, in the municipality of Eurajoki in western Finland, about 20 kilometres (12 mi) from the town of Rauma and about 50 kilometres (31 mi) from the city of Pori.
The "Nuclear Power 2010 Program" was launched in 2002 by President George W. Bush in 2002, 13 months after the beginning of his presidency, in order to restart orders for nuclear power reactors in the U.S. by providing subsidies for a handful of Generation III+ demonstration plants. The expectation was that these plants would come online by 2010, but it was not met.
The advanced boiling water reactor (ABWR) is a Generation III boiling water reactor. The ABWR is currently offered by GE Hitachi Nuclear Energy (GEH) and Toshiba. The ABWR generates electrical power by using steam to power a turbine connected to a generator; the steam is boiled from water using heat generated by fission reactions within nuclear fuel. Kashiwazaki-Kariwa unit 6 is considered the first Generation III reactor in the world.
The Economic Simplified Boiling Water Reactor (ESBWR) is a passively safe generation III+ reactor design derived from its predecessor, the Simplified Boiling Water Reactor (SBWR) and from the Advanced Boiling Water Reactor (ABWR). All are designs by GE Hitachi Nuclear Energy (GEH), and are based on previous Boiling Water Reactor designs.
The Susquehanna Steam Electric Station is a nuclear power station on the Susquehanna River in Salem Township, Luzerne County, Pennsylvania.
UniStar Nuclear Energy is a wholly owned subsidiary of EDF, formed in 2007 to develop new nuclear energy facilities in the United States.
The Sizewell nuclear site consists of two nuclear power stations, one of which is still operational, located near the small fishing village of Sizewell in Suffolk, England. Sizewell A, with two Magnox reactors, is now in the process of being decommissioned. Sizewell B has a single pressurised water reactor (PWR) and is the UK's newest nuclear power station. A third power station, to consist of twin EPR reactors, is planned to be built as Sizewell C.
Oldbury nuclear power station is a Magnox nuclear power station undergoing decommissioning. It is located on the south bank of the River Severn close to the village of Oldbury-on-Severn in South Gloucestershire, England. The ongoing decommissioning process is managed by Magnox Ltd, a subsidiary of the Nuclear Decommissioning Authority (NDA).
The Flamanville Nuclear Power Plant is located at Flamanville, Manche, France on the Cotentin Peninsula. The power plant houses three pressurized water reactors (PWRs). Unit 1 and 2, rated 1.3 GWe each, and based on Westinghouse design, were ordered following the Messmer Plan and deliver full power since 1987. Unit 3 is an EPR unit with a nameplate capacity of 1.65 GWe connected to the grid in December 2024. The power plant produced 18.9 TWh in 2005, which amounted to 4% of the electricity production in France. In 2006 there were 671 workers regularly working at the plant. In 2023, 11,7 TWh were produced with 1400 regular workers.
Atmea was a joint venture between Mitsubishi Heavy Industries (MHI) and EDF Group set up in 2006 to develop, market, license and sell the ATMEA1 reactor, a new generation III+, medium-power pressurized water reactor (PWR). The company was headquartered in Paris. The joint venture was abandoned in 2019.
The Bell Bend Nuclear Power Plant was a proposed nuclear power plant, which would have been built on the Bell Bend of the Susquehanna River in Luzerne County, Pennsylvania adjacent to the Susquehanna Steam Electric Station.