Conowingo Dam

Last updated

Conowingo Dam
Maryland - Conowingo Dam - NARA - 23940905 (cropped).jpg
Conowingo Dam, aerial view (1936)
USA Maryland relief location map.svg
Red pog.svg
Location of Conowingo Dam in Maryland
Official nameConowingo Hydroelectric Station
Country United States
Location Cecil and Harford counties, Maryland
Coordinates 39°39′36″N76°10′26″W / 39.66000°N 76.17389°W / 39.66000; -76.17389
StatusOperational
Construction began1926 (completed in 1928)
Opening date1928
Owner(s) Susquehanna Electric Company
Dam and spillways
Type of dam Gravity dam
Impounds Susquehanna River
Height94 ft (29 m)
Length4,648 ft (1,417 m)
Reservoir
CreatesConowingo Reservoir
Total capacity310,000 acre⋅ft (0.38 km3)
Active capacity71,000 acre⋅ft (0.088 km3)
Surface area9,000 acres (3,600 ha)
Maximum length14 mi (23 km)
Maximum water depth105 ft (32 m)
Normal elevation109.2 ft (33.3 m)
Power Station
Operator(s) Constellation Energy
Commission date1928
Type Run-of-the-river
Turbines 7 x 36 MWe, 4 x 65 MWe
Installed capacity 548 MWe
Website
Conowingo Hydroelectric Generating Station

The Conowingo Dam (also Conowingo Hydroelectric Plant, Conowingo Hydroelectric Station) is a large hydroelectric dam in the lower Susquehanna River near the town of Conowingo, Maryland. The medium-height, masonry gravity dam is one of the largest non-federal hydroelectric dams in the U.S., and the largest dam in the state of Maryland.

Contents

The dam sits about 9.9 miles (16 km) from the river mouth at the Chesapeake Bay, 5 miles (8 km) south of the Pennsylvania border and 45 miles (72 km) northeast of Baltimore, on the border between Cecil and Harford counties.

The dam supports a 9,000-acre reservoir, which today covers the original town of Conowingo. During dam construction, the town was moved to its present location about 1 mile (1.6 km) northeast of the dam's eastern end. The rising water also would have covered Conowingo Bridge, the original U.S. Route 1 crossing, so it was demolished in 1927. U.S. Route 1 now crosses over the top of the dam.

The Conowingo Reservoir, and the nearby Susquehanna State Park, provide many recreational opportunities.

Construction and hydroelectric power generation

Postcard of dam Conowingo Dam and Power House, near Bel Air and Havre de Grace, Md (73856).jpg
Postcard of dam
Aerial view, 1931 Maryland - Conowingo Dam - NARA - 23940909 (cropped).jpg
Aerial view, 1931

The area, which appears on a 1612 map by John Smith, was originally known as Smyth's Falls.

On January 23, 1925, Philadelphia Electric Company awarded the construction contract for the dam to Stone & Webster of Boston, [1] who did the design. Construction, which started in 1926, was carried out by the Arundel Corporation of Maryland. [2] (Abandoned railroad tracks for transporting heavy equipment to the dam site can be seen along the western shore of the river below the dam.) When completed in 1928, it was the second-largest hydroelectric project by power output in the United States after Niagara Falls. [3]

Some 5,000 workers flocked to this rural northeastern corner of Maryland, seeking to earn good pay as construction got underway. [4] In addition to those working directly on the dam, large numbers relocated railroad tracks, paved new roads, and constructed steel towers to stretch the heavy transmission lines toward Philadelphia. This was nearly fifty years before Congress passed the Occupational Safety and Health Act, which guaranteed the right to a safe job. While these men struggled to earn a living, many suffered disabling injuries handling high voltage electric lines, tumbling from high elevations, managing explosives, encountering venomous snakes, etc.[ citation needed ]

When Maryland Public Television aired its documentary, "Conowingo Dam: Power on the Susquehanna" for Chesapeake Bay Week in April 2016, the question came up about how many workers died performing their duties. [5] While investigating the death of Hunter H. Bettis on November 26, 1927, Darlington Coroner Wiliam B. Selse commented in The Baltimore Sun that more than twenty men had lost their lives. In an attempt to create a registry or census of job-related fatalities, death certificates, newspaper accounts, and funeral home books were examined. Fourteen individuals were identified. [6]

The dam was built with 11 turbine sites, although only 7 turbines were initially installed, driving generators each rated for 36 megawatts. A turbine house, on the southwestern end of the dam, encloses these seven units. One additional "house" unit provides 25 Hz power for the dam's electric railroad system (identical to that used by the Pennsylvania Railroad, which had an electrified line [now under Norfolk Southern ownership] running on the eastern shore). In 1978, four higher-capacity turbines were added. Each of these turbines drives a 65-megawatt generator, increasing the dam's electrical output capacity from 252 to 548 megawatts. The four newer turbines are in the open air section at the northeast end of the powerhouse. The generators produce power at 13,800 volts. This is stepped up to 220,000 volts for transmission, primarily to the Philadelphia area. The dam contributed 2.1 million megawatt-hours to the electrical grid in 2021. [7]

Through subsidiaries and mergers, the dam is now operated by the Susquehanna Electric Company, which is part of Constellation Energy. The current Federal Energy Regulatory Commission license for the dam was issued in 2021 and expires in 2071. [8]

The Conowingo Hydroelectric Station would be a primary black start power source if the regional PJM power grid ever had a widespread emergency shutdown (blackout). [9] [10]

Flood control

Spillway on east side of the dam Conowingo Dam Spillway 2016.jpg
Spillway on east side of the dam

The dam has 53 flood control gates, starting at the northeastern end of the powerhouse and spanning the majority of the dam. The floodgates are operated by three overhead cranes rated for 60 short tons (53.6 long tons; 54.4 t) each which were originally built by the Morgan Engineering Company of Ohio. The cranes run on rails the length of the dam and are electrically powered from lines that run above the face of the dam. A 4th crane was installed in 2006 at the powerhouse end of the rails, which required installing new power rails below the existing power wires. By 2017, all original overhead cranes had been replaced. The original Morgan cranes were removed and scrapped. The new cranes have backup generators installed on them to allow operation during a facility grid power failure.

In 1936, all the floodgates were opened for the first time. During Hurricane Agnes, in June 1972, all 53 floodgates were opened, for only the second time, and explosives planted to blow a section of the weir, as the waters rose during the early morning hours of June 24 within 5 feet (1.52 m) of topping the dam (a record crest of 111.5 ft (34.0 m), 3 feet (0.91 m) above normal level for the entire 14-mile (23 km) long Conowingo Reservoir.) Paul English, dam superintendent, released a bulletin at 10:30 p.m. on June 23 saying that the water levels were reaching a point at which the stability of the dam "cannot be controlled. When it reaches 111 feet (33.8 m)...it will be in the hazy area...It is not known...whether a structure of the dam may give and...people downstream should be advised." [11] At this time, the flow sensor in the dam recorded its record discharge of 1,130,000 cu ft/s (32,000 m3/s), and the stream height gauge, at the dam's downstream side, registered a record 36.85 feet (11.23 m). [12] On January 20, 1996, the gauge recorded its second-highest recorded crest of 34.18 feet (10.42 m). [12] A severe ice jam also developed behind the dam on this date. The record minimum recorded discharge was on March 2, 1969, when the flow sensor registered 144 cu ft/s (4.1 m3/s).

On September 9, 2011, 44 flood gates were opened due to the impact of the remnants of Tropical Storm Lee. The Susquehanna River level behind the dam was 32.41 feet (9.88 m), the third-highest in history. The town of Port Deposit, located 5 miles southeast of the dam, was evacuated. [13]

On July 26, 2018, 20 of the 53 floodgates were opened due to rising floodwaters resulting from several days of torrential downpours in the Mid-Atlantic. The Susquehanna River saw water levels of over 26.25 feet (8.00 m), placing nearby cities, like Port Deposit, at risk of flooding like in 2011. [14] The ecological impact of this event is not known, but Chesapeake Bay ecologists are concerned about the health of the Chesapeake Bay with the influx of sediment and limiting nutrients, such as phosphorus and nitrogen, impacting water clarity and promoting algal blooms. [15] The Coast Guard issued warnings for all vessels in the Chesapeake Bay regarding the fields of debris, floating and submerged, that had been released when the floodgates opened.

Ecology and environmental impacts

Conowingo Dam bridge
Coordinates 39°40′N76°10′W / 39.66°N 76.17°W / 39.66; -76.17
CarriesTwo lanes of US 1.svg US 1
ID number 100000120001010
Characteristics
Width20 ft (6.1 m)
Statistics
Daily traffic 8850 (in 2002)
View north on US 1 just before crossing the dam 2016-06-11 09 59 57 View north along U.S. Route 1 (Conowingo Road) in northeastern Harford County, Maryland, approaching the southwest end of the Conowingo Dam on the Susquehanna River.jpg
View north on US 1 just before crossing the dam

The river water impounded by the dam forms the 14-mile (23 km) long Conowingo Reservoir, known locally as Conowingo Lake. The reservoir is used as a drinking water supply for Baltimore and the Chester Water Authority; as cooling water for the Peach Bottom Nuclear Generating Station; and for recreational boating and fishing. In low rainfall or drought conditions, balancing the desire to maintain the reservoir level with the water flow needs for the downstream ecology is one of the challenges faced by the dam operators. [16]

The Conowingo Dam, and to a lesser extent the Holtwood and Safe Harbor Dams further upstream, stopped migratory fish species, especially American shad, from swimming further up the Susquehanna River to spawn. In 1984, a fish capture feature was added at Conowingo and shad were trucked upstream above all three dams and released. This program ended in 1999. A fish lift was installed in 1991. All three dams completed installation of fish lifts in time for the 2000 season. During the 2000 migration season, 153,000 American shad passed through the Conowingo fish lift. "However, passage rates of shad from Conowingo to Holtwood have been only 30 to 50 percent, suggesting that fish are having difficulty moving upstream in the waters of the Conowingo pool." [17]

The three dams are also involved with another ecological concern. Normally, the reservoirs above each dam trap sediment and nutrients that run off from the Susquehanna River watershed and prevent some of that from reaching the Chesapeake Bay. A 1998 USGS study suggests that the reservoirs may reach capacity before 2020, and cease to reduce the nutrient and sediment load hitting the bay. However, the scouring of major floods, and other factors, affect this. [18]

Conowingo-dam-panorama.jpg
Conowingo Dam, seen downstream from the southwest shore of the Susquehanna River

See also

Related Research Articles

<span class="mw-page-title-main">Patapsco River</span> River in Maryland, United States

The Patapsco River mainstem is a 39-mile (63 km) river in central Maryland that flows into the Chesapeake Bay. The river's tidal portion forms the harbor for the city of Baltimore. With its South Branch, the Patapsco forms the northern border of Howard County, Maryland. The name "Patapsco" is derived from the Algonquian pota-psk-ut, which translates to "backwater" or "tide covered with froth."

<span class="mw-page-title-main">Lake Chelan Dam</span> Dam in Chelan, Washington

Lake Chelan Dam officially known as the Lake Chelan Hydroelectric Project is located approximately 32 miles (51 km) north of the city of Wenatchee in Chelan County. The dam is located at the lower or southeasterly end of 50.4 miles long Lake Chelan, and is within the limits of the city of Chelan. The powerhouse is located near the community of Chelan Falls. The reservoir has 677,400 acre-feet (835,600,000 m3) of usable water storage. The 10-year average generation for the Project is 365,000 megawatt hours.

<span class="mw-page-title-main">Hartwell Dam</span> Dam in Georgia, USA

Hartwell Dam is a concrete and embankment dam located on the Savannah River at the border of South Carolina and Georgia, creating Lake Hartwell. The dam was built by the U.S. Army Corps of Engineers between 1955 and 1962 for the purposes of flood control, hydropower and navigation. The concrete and earthen structure spans 15,840 feet (4,828 m). The concrete section is 1,900 feet (579 m) long and rises 204 feet (62 m) above the riverbed at its apex. The Hartwell Dam currently produces 468 million KWh of electricity annually, has prevented over $40 million in flood damage since completion and also provides recreation, water quality, water supply, along with fish and wildlife management.

<span class="mw-page-title-main">Conowingo, Maryland</span> Unincorporated community in Maryland, United States

Conowingo is a community in northwestern Cecil County, Maryland, United States. The community replaced a previous one that was inundated by a reservoir.

<span class="mw-page-title-main">Holtwood Dam</span> Dam in Pennsylvania, USA

Holtwood Dam is the oldest of three major dams built across the lower Susquehanna River, and the middle location of the three. It was constructed as the McCalls Ferry Dam between 1905 and 1910 by the Pennsylvania Water & Power (PW&P) Company. The dam was renamed Holtwood in honor of two company executives. PW&P merged with Pennsylvania Power & Light (PPL) in 1955. In 2015 Talen Energy took over PPL's generation and immediately sold the Holtwood plant to Brookfield Renewable Energy Partners to comply with federal antitrust requirements.

<span class="mw-page-title-main">Safe Harbor Dam</span> Dam in Pennsylvania, USA

The Safe Harbor Dam is a concrete gravity dam, with an associated hydroelectric power station, on the lower Susquehanna River. It is the most northerly and last of three Great Depression-era public electrification projects' hydroelectric dams, and was constructed between April 1, 1930, and December 7, 1931. It created a long and relatively shallow lake, known as Lake Clarke, along the upper stretch of the Conejohela Valley. The creation of the lake shrank the upper Conejohela Flats in size.

<span class="mw-page-title-main">Muddy Run Pumped Storage Facility</span> Dam

Muddy Run Pumped Storage Facility was built by the Philadelphia Electric Company and is a pumped-storage hydroelectric generation facility in Drumore Township, Pennsylvania, United States. When completed in 1968, Muddy Run was the largest pumped-storage facility in the world. Muddy Run has a capacity of 1,071 megawatts. The facility is operated by the Susquehanna Electric Company, a subsidiary of Constellation Energy. Ernest Spey was the superintendent of Conowingo Hydroelectric Dam and the new Muddy Run facility until 1989.

<span class="mw-page-title-main">York Haven Dam</span> Dam in Pennsylvania, US

The York Haven Dam is a low head, run-of-the river, dam and hydroelectric plant that is located on the Susquehanna River in the United States.

<span class="mw-page-title-main">Susquehannock State Park</span>

Susquehannock State Park is a Pennsylvania state park on 224 acres (91 ha) in Drumore Township, Lancaster County, Pennsylvania in the United States. The park is on a scenic plateau overlooking the Susquehanna River and Conowingo Reservoir. The park is named for the Susquehannock people, who lived in the area. Susquehannock State Park is located on small roads a few miles south of Pennsylvania Route 372 and west of Pennsylvania Route 272. The nearest city is Quarryville, Pennsylvania, about 12 miles (19 km) East.

<span class="mw-page-title-main">Douglas Dam</span> Dam in Tennessee, United States

Douglas Dam is a hydroelectric dam on the French Broad River in Sevier County, Tennessee, in the southeastern United States. The dam is operated by the Tennessee Valley Authority (TVA), which built the dam in record time in the early 1940s to meet emergency energy demands at the height of World War II. Douglas Dam is a straight reinforced concrete gravity-type dam 1705 feet long and 202 feet high, impounding the 28,420-acre (11,500 ha) Douglas Lake. The dam was named for Douglas Bluff, a cliff overlooking the dam site prior to construction.

<span class="mw-page-title-main">Cougar Dam</span> Dam in Oregon, U.S.

Cougar Dam is a 519-foot (158 m) tall rockfill hydroelectric dam in the U.S. state of Oregon. It has a gated concrete spillway and a powerhouse with two turbines totaling 25 megawatts of electric power.

The Dix Dam is a dam on the Dix River located between Mercer and Garrard County, Kentucky. It was constructed to generate hydroelectricity and prevent flooding of the Kentucky River but is better known for creating Herrington Lake.

<span class="mw-page-title-main">Lake Pueblo State Park</span> State park in Colorado, United States

Lake Pueblo State Park is a state park located in Pueblo County, Colorado. It includes 60 miles (97 km) of shoreline and 10,000 acres (40 km2) of land. Activities it offers include two full-service marinas, recreational fishing, hiking, camping and swimming at a special swim beach.

<span class="mw-page-title-main">Richard B. Russell Dam</span> Dam in Georgia, USA

Richard B. Russell Dam is a concrete-gravity and embankment dam located on the Savannah River at the border of South Carolina and Georgia, creating Richard B. Russell Lake. The dam was built by the U.S. Army Corps of Engineers between 1974 and 1985 for the purposes of flood control, hydroelectricity, recreation, additional stream flow regulation, water supply, and fish and wildlife management. The concrete structure of the dam spans 1,904 feet (580 m) and rises 210 feet (64 m) above the riverbed, housing a hydro-power plant with an installed 600 megawatts (800,000 hp) capacity. The Richard B. Russell Dam is the final large dam completed by the U.S. Army Corps in the Savannah River Basin and lies 30 miles downstream from the Hartwell Dam (1962) and 37 miles (60 km) upstream from the J. Strom Thurmond Dam (1954).

<span class="mw-page-title-main">Paulo Afonso Hydroelectric Complex</span> Brazilian hydroelectric project

The Paulo Afonso Hydroelectric Complex, also known as the Paulo Afonso Complex, is a system of three dams and five hydroelectric power plants on the São Francisco River near the city of Paulo Afonso in Bahia, Brazil. The complex exploits an 80-metre (260 ft) natural gap on the river, known as the Paulo Afonso Falls. Constructed in succession between 1948 and 1979, the dams support the Paulo Afonso I, II, III, IV and Apollonius Sales (Moxotó) power plants which contain a total of 23 generators with an installed capacity of 4,279.6 megawatts (5,739,000 hp).

The Serra da Mesa Dam, once known as Sao Felix, is an embankment dam on the Tocantins River near Minaçu in Goiás, Brazil. The dam serves an associated hydroelectric power plant with a 1,275 megawatts (1,710,000 hp) installed capacity. The dam creates the largest reservoir by volume in Brazil.

<span class="mw-page-title-main">Engineer Souza Dias Dam</span> Dam in Mato Grosso do Sul, Brazil

The Engineer Souza Dias Dam, formerly known as the Jupiá Dam, is an embankment dam on the Paraná River near Três Lagoas in Mato Grosso do Sul, Brazil. It was constructed for hydroelectric power production, flood control and navigation. Studies on the dam and power plant began in 1951 which recommended the dam along with the Ilha Solteira Dam. The dam was inaugurated in 1968 and its generators were commissioned between 1969 and 1974.

<span class="mw-page-title-main">Três Marias Dam</span> Dam in Minas Gerais, Brazil

The Três Marias Dam, also known as Bernardo Mascarenhas, is an embankment dam on the São Francisco River near Três Marias in Minas Gerais, Brazil. It was constructed for hydroelectric power production and flood control. The dam was completed in 1961 and its first generator was operational in 1962. The dam's power plant is named after Bernard Mascarenhas who in 1889, built South America's first major hydroelectric power plant in Brazil, the Marmelos Zero Power Plant.

The Conejohela Flats are a group of islands in the flooded Conejohela Valley, a large floodplain along the southernmost 30 miles (50 km) of the Susquehanna River in Pennsylvania and Maryland in the United States. The valley was flooded primarily during the early 1900s by the construction of the Holtwood, Conowingo, and Safe Harbor dams from 1910 to 1931.

References

  1. "PRR Chronology 1926 (citing New York Times)" (PDF).
  2. "History Matters! Interpretive Plan for the Lower Susquehanna Heritage Greenway" (PDF). p. 162. Archived from the original (PDF) on February 24, 2006. Retrieved July 15, 2006.
  3. "A Hydro Plant That Rivals Niagara." Popular Science Monthly, November 1930, p. 49.
  4. "Visitors get to see the inner workings of Conowingo Dam". Baltimore Sun. September 21, 2015. Retrieved March 9, 2023.
  5. "Conowingo Dam: Power on the Susquehanna". Maryland Public Television. Retrieved February 4, 2019.
  6. "On Labor Day: Remembering Those Who Died While Building the Conowingo Dam". Window on Cecil County's Past. September 7, 2015. Retrieved February 4, 2019.
  7. "eGrid Data Explorer". EPA.
  8. "FERC Renews Conowingo Dam's Operating License, Preserving Maryland's Largest Source of Renewable Energy" . Retrieved November 3, 2022.
  9. "Exelon Corporation: Conowingo" . Retrieved February 20, 2011.
  10. "Conowingo Hydroelectric Project (FERC No. 405)". Low Impact Hydropower Institute. June 23, 2008. Archived from the original on May 10, 2008. Retrieved November 14, 2008.
  11. http://www.portdeposit.org/?a=history_detail and The Baltimore Sun, June 24, 1972
  12. 1 2 "Historical Crests for Susquehanna River at Conowingo Dam". Archived from the original on February 5, 2012. Retrieved September 20, 2006.
  13. "Waiting is over for Maryland river towns, as Susquehanna waters recede". Archived from the original on July 29, 2012. Retrieved September 10, 2011.
  14. "Hogan Administration Announces Statewide Response Efforts for Potential Conowingo Dam Impacts" . Retrieved September 1, 2018.
  15. "Conowingo Dam High Flow Threatens Chesapeake Bay Pollution Goals, Ignites Tensions" . Retrieved September 1, 2018.
  16. "CONOWINGO POOL MANAGEMENT PLAN" (PDF). Archived from the original (PDF) on July 25, 2006. Retrieved July 22, 2006.
  17. "Migratory Fish Restoration and Passage On the Susquehanna River". Safe Harbor Water Power Corporation. Archived from the original on December 30, 2007. Retrieved February 8, 2008.
  18. "USGS Fact Sheet 003-98". 1998. Retrieved November 28, 2009.