Harris Nuclear Plant | |
---|---|
Official name | Harris Nuclear Plant |
Country | United States |
Location | New Hill, Wake County, North Carolina |
Coordinates | 35°38.0′N78°57.3′W / 35.6333°N 78.9550°W |
Status | Operational |
Construction began | January 28, 1978 |
Commission date | May 2, 1987 |
Construction cost | $4.115 billion (2007 USD) [1] |
Owner(s) | Duke Energy |
Operator(s) | Duke Energy |
Nuclear power station | |
Reactor type | PWR |
Reactor supplier | Westinghouse |
Cooling towers | 1 × Natural Draft |
Cooling source | Harris Lake |
Thermal capacity | 1 × 2900 MWth |
Power generation | |
Units operational | 1 × 928 MW |
Make and model | WH 3-loop (DRYAMB) |
Units cancelled | 3 × 900 MW 2 × 1117 MW AP1000 |
Nameplate capacity | 928 MW |
Capacity factor | 101% (2017) 89.0% (lifetime) |
Annual net output | 7986 GWh (2021) |
External links | |
Website | Harris Nuclear Plant Fact Sheet |
Commons | Related media on Commons |
The Harris Nuclear Plant is a nuclear power plant with a single Westinghouse designed pressurized-water nuclear reactor operated by Duke Energy. It was named in honor of W. Shearon Harris, former president of Carolina Power & Light (predecessor of Progress Energy Inc.). [2] Located in New Hill, North Carolina, in the United States, about 20 miles (30 km) southwest of Raleigh, it generates 900 MWe, has a 523-foot (160 m) natural draft cooling tower, and uses Harris Lake for cooling. The reactor achieved criticality in January 1987 and began providing power commercially on May 2 of that year.
The Shearon Harris site was originally designed for four reactors (and still has the space available for them), but only one was built. The final cost approached $3.9B, including safety upgrades mandated after the Three Mile Island accident.
On November 16, 2006, the operator applied to the Nuclear Regulatory Commission (NRC) for a renewal and extension of the plant's operating license. [3] The NRC granted the renewal on December 17, 2008, extending the license from forty years to sixty. [4]
On January 22, 2010, officials at the Nuclear Regulatory Commission announced the electrical generator from the damaged Unit 2 reactor at Three Mile Island would be used at Shearon Harris. [5] The generator was refurbished and installed during a refueling outage in November, 2010.
On February 19, 2008 Progress filed an application with the Nuclear Regulatory Commission (NRC) for a Combined Construction and Operating License (COL). It seeks to build two 1,100 MWe Westinghouse AP1000 pressurized water reactors. Although the NRC had already certified the AP1000 design, the application review was expected to take about 36 months. The new reactors would not be operational before 2018. [6]
Expansion of the plant would require raising the water level of Harris Lake by 20 feet, [7] decreasing the size of Wake County's largest park, with the Cape Fear River as a backup water source.
On May 2, 2013, Duke submitted a request to the NRC to suspend review of the Harris Units 2 and 3 Combined License Application (COLA), effectively halting further development of this project. [8] Duke has determined the forecast operating dates of the proposed reactors falls outside the fifteen-year planning horizon utilized by state regulators in their demonstration of need evaluation. The COLA remains docketed, however, leaving the door open for Duke to restart activities. [9]
Year | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Annual (Total) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
2001 | 651,550 | 587,897 | 650,961 | 600,053 | 641,046 | 612,514 | 633,035 | 632,278 | 392,127 | -7,612 | -7,423 | -17,930 | 5,368,496 |
2002 | 596,616 | 605,885 | 692,186 | 664,354 | 685,426 | 656,254 | 587,765 | 633,905 | 657,210 | 687,635 | 670,898 | 696,922 | 7,835,056 |
2003 | 697,798 | 628,360 | 692,040 | 550,040 | 200,220 | 585,862 | 675,487 | 566,282 | 586,953 | 690,227 | 668,416 | 695,419 | 7,237,104 |
2004 | 696,104 | 651,056 | 691,524 | 640,461 | 378,332 | 655,523 | 674,118 | 676,491 | 658,386 | 324,248 | 268,635 | 693,550 | 7,008,428 |
2005 | 691,938 | 627,883 | 693,146 | 663,595 | 577,180 | 654,438 | 670,675 | 671,369 | 652,216 | 669,072 | 664,739 | 694,577 | 7,930,828 |
2006 | 691,473 | 624,282 | 689,215 | 144,735 | 256,719 | 651,468 | 665,897 | 665,520 | 588,819 | 689,625 | 669,468 | 692,047 | 7,029,268 |
2007 | 691,771 | 626,054 | 685,273 | 660,878 | 678,022 | 648,431 | 666,547 | 661,605 | 600,239 | 137,065 | 667,641 | 679,524 | 7,403,050 |
2008 | 692,158 | 644,233 | 684,058 | 661,179 | 679,592 | 648,293 | 672,513 | 436,426 | 656,281 | 686,147 | 668,900 | 691,631 | 7,821,411 |
2009 | 693,809 | 624,890 | 688,165 | 342,241 | 441,456 | 659,020 | 680,311 | 678,090 | 657,569 | 689,492 | 551,057 | 697,061 | 7,403,161 |
2010 | 690,254 | 632,140 | 695,980 | 666,054 | 685,081 | 654,660 | 677,181 | 677,639 | 653,802 | 11,904 | 336,596 | 699,324 | 7,080,615 |
2011 | 695,889 | 622,800 | 697,118 | 668,969 | 685,747 | 657,595 | 676,763 | 678,847 | 661,806 | 693,847 | 675,050 | 697,696 | 8,112,127 |
2012 | 700,273 | 654,589 | 692,354 | 421,429 | -7,575 | 461,809 | 691,734 | 698,837 | 681,896 | 711,705 | 692,239 | 715,075 | 7,114,365 |
2013 | 716,430 | 638,321 | 692,542 | 683,333 | 324,651 | 512,112 | 696,829 | 645,140 | 656,853 | 708,893 | 175,051 | 438,208 | 6,888,363 |
2014 | 606,998 | 645,639 | 714,360 | 684,365 | 535,765 | 670,317 | 696,617 | 698,502 | 678,978 | 709,000 | 692,342 | 715,692 | 8,048,575 |
2015 | 716,758 | 650,304 | 712,106 | 15,096 | 333,847 | 671,653 | 695,019 | 696,555 | 677,127 | 706,975 | 692,525 | 704,212 | 7,272,177 |
2016 | 716,122 | 673,699 | 712,660 | 687,985 | 706,362 | 676,975 | 695,043 | 696,569 | 672,401 | 136,077 | 416,053 | 723,105 | 7,513,051 |
2017 | 721,046 | 643,988 | 717,641 | 688,333 | 709,239 | 680,788 | 698,805 | 701,133 | 674,279 | 556,960 | 697,080 | 719,281 | 8,208,573 |
2018 | 593,388 | 643,338 | 715,370 | 128,815 | 459,520 | 701,420 | 724,583 | 723,583 | 701,214 | 733,607 | 721,164 | 741,912 | 7,587,914 |
2019 | 744,045 | 669,919 | 737,793 | 704,407 | 720,979 | 691,860 | 708,692 | 710,988 | 687,739 | 221,209 | 268,342 | 744,621 | 7,610,594 |
2020 | 743,483 | 694,486 | 677,007 | 716,207 | 735,529 | 621,287 | 716,872 | 649,871 | 702,747 | 732,024 | 715,179 | 570,901 | 8,275,593 |
2021 | 741,049 | 668,251 | 740,789 | 529,499 | 364,993 | 605,624 | 721,395 | 719,843 | 702,654 | 732,369 | 720,298 | 739,969 | 7,986,733 |
2022 | 745,709 | 670,409 | 739,405 | 671,858 | 725,765 | 699,163 | 716,382 | 647,562 | 0 | 0 | 5,616,253 | ||
2023 |
The Shearon Harris Nuclear Power Plant consists of one operational reactor. Three additional units were cancelled. Two additional reactors were planned and cancelled in 2013. [11]
Reactor unit [12] | Reactor type | Capacity(MW) | Construction started | Electricity grid connection | Commercial operation | Shutdown | |
---|---|---|---|---|---|---|---|
Net | Gross | ||||||
Shearon Harris-1 | Westinghouse 3-loop | 900 | 960 | 28 January 1978 | 19 January 1987 | 2 May 1987 | |
Shearon Harris-2 [12] | 1 January 1978 | Cancelled construction on 1 December 1983 | |||||
Shearon Harris-3 [13] | Cancelled construction on 1 December 1981 | ||||||
Shearon Harris-4 [14] | |||||||
Shearon Harris-2 (cancelled) | AP1000 | 1117 | ? | ||||
Shearon Harris-3 (cancelled) |
As of September 2017, the Harris plant is one of three out of the 99 plants in the country to have no Nuclear Regulatory Commission (NRC) findings during the past 4 quarters of inspections. [15]
The NRC's risk estimate for an earthquake intense enough to cause core damage to the reactor at Shearon Harris was 1 in 434,783, according to an NRC study published in August 2010. [16] [17]
The Nuclear Regulatory Commission defines two emergency planning zones around nuclear power plants: a plume exposure pathway zone with a radius of 10 miles (16 km), concerned primarily with exposure to, and inhalation of, airborne radioactive contamination, and an ingestion pathway zone of about 50 miles (80 km), concerned primarily with ingestion of food and liquid contaminated by radioactivity. [18]
The 2010 U.S. population within 10 miles (16 km) of Shearon Harris was 96,401, an increase of 62.6 percent in a decade, according to an analysis of U.S. Census data for msnbc.com. The 2010 U.S. population within 50 miles (80 km) was 2,562,573, an increase of 26.0 percent since 2000. Cities within 50 miles include Raleigh (21 miles to city center), Durham (24 miles to city center), and Fayetteville (39 miles to city center). [19]
During FEMA's most recent evaluation of state and local government's plans and preparedness included emergency operations for the plant, no deficiencies or areas requiring corrective actions were identified. [20]
The anti-nuclear group "N.C. Waste Awareness and Reduction Network" (NC-WARN) questioned the facility's safety and security record calling it "insufficient" and claiming "it is the most dangerous nuclear plant in the US". [21] [22] However, the plant's technical and security systems have passed all Nuclear Regulatory Commission (NRC) standards [23] as of 2008 [update] , including protection and security, and no worker or area resident has been injured as a result of the plant's operation.
In 2010, Project Censored, a non-profit, investigative journalism project, ranked the safety issues at Shearon Harris the 4th most under-reported story of the year, because of the risk of fires at what are the largest spent-fuel pools in the country. [24]
In August 2007, NC WARN dropped a lawsuit against Progress Energy that was intended to delay or prevent expansion of Shearon Harris, claiming that continuing the legal battle would cost at least $200,000. [25]
On May 16, 2013, Shearon Harris Unit 1 initiated an unplanned shutdown when reviews of ultrasonic data from a refueling outage in spring 2012 determined a 1/4" flaw was inside the 6"-thick Reactor Pressure Vessel Head. The flaw was near the nozzle for a control rod drive mechanism and attributed to primary water stress corrosion cracking, though no actual leakage was detected. Due to high radiation levels, the repairs required robotic aid. [26]
The United States Nuclear Regulatory Commission (NRC) is an independent agency of the United States government tasked with protecting public health and safety related to nuclear energy. Established by the Energy Reorganization Act of 1974, the NRC began operations on January 19, 1975, as one of two successor agencies to the United States Atomic Energy Commission. Its functions include overseeing reactor safety and security, administering reactor licensing and renewal, licensing radioactive materials, radionuclide safety, and managing the storage, security, recycling, and disposal of spent fuel.
Cooper Nuclear Station (CNS) is a boiling water reactor (BWR) type nuclear power plant located on a 1,251-acre (506 ha) site near Brownville, Nebraska between Missouri River mile markers 532.9 and 532.5, on Nebraska's border with Missouri. It is the largest single-unit electrical generator in Nebraska.
Pilgrim Nuclear Power Station (PNPS) is a closed nuclear power plant in Massachusetts in the Manomet section of Plymouth on Cape Cod Bay, south of the tip of Rocky Point and north of Priscilla Beach. Like many similar plants, it was constructed by Bechtel, and was powered by a General Electric BWR 3 boiling water reactor inside of a Mark 1 pressure suppression type containment and generator. With a 690 MWe production capacity, it produced about 14% of the electricity generated in Massachusetts.
Three Mile Island Nuclear Generating Station is a closed nuclear power plant on Three Mile Island in Pennsylvania on the Susquehanna River just south of Harrisburg. It has two separate units, TMI-1 and TMI-2.
Braidwood Generating Station is located in Will County in northeastern Illinois, U.S. The nuclear power plant serves Chicago and northern Illinois with electricity. The plant was originally built by Commonwealth Edison company, and subsequently transferred to Com Ed's parent company, Exelon Corporation. Following Exelon's spin-off of their Generation company, the station was transferred to Constellation Energy.
The Brunswick nuclear power plant, named for Brunswick County, North Carolina, covers 1,200 acres (490 ha) at 20 feet (6.1 m) above sea level about 5 miles (8.0 km) from the Atlantic Ocean. The site is adjacent to the town of Southport, North Carolina, and to wetlands and woodlands, and was opened in 1975.
The H. B. Robinson Steam Electric Plant, also known as Robinson Nuclear Plant, is a nuclear power plant located near Hartsville, South Carolina. The plant consists of one Westinghouse 759 MW pressurized water reactor. The site once included a coal-fired unit that generated 174 MW and a combustion turbine unit that generated 15 MW.
The Calvert Cliffs Nuclear Power Plant (CCNPP) is a nuclear power plant located on the western shore of the Chesapeake Bay near Lusby, Calvert County, Maryland in the Mid-Atlantic United States. It is the only nuclear power plant in the state of Maryland.
The Edwin Irby Hatch Nuclear Power Plant is near Baxley, Georgia, in the southeastern United States, on a 2,244-acre (9 km²) site. It has two General Electric boiling water reactors with a total capacity of 1,848 megawatts. Previously, the reactors had a combined capacity listing of 1,759 MW. Unit 1 went online in 1974 and was followed by Unit 2 in 1978. The plant was named for Edwin I. Hatch, president of Georgia Power from 1963 to 1975, and chairman from 1975 to 1978.
The North Anna Nuclear Generating Station is a nuclear power plant on a 1,075-acre (435 ha) site in Louisa County, Virginia, in the Mid-Atlantic United States. The site is operated by Dominion Generation company and is jointly owned by the Dominion Virginia Power corporation (88.4%) and by the Old Dominion Electric Cooperative (11.6%).
The Sequoyah Nuclear Plant is a nuclear power plant located on 525 acres (212 ha) located 7 miles (11 km) east of Soddy-Daisy, Tennessee, and 20 miles (32 km) north of Chattanooga, abutting Chickamauga Lake on the Tennessee River. The facility is owned and operated by the Tennessee Valley Authority (TVA).
The Prairie Island Nuclear Generating Plant is an electricity-generating facility located in Red Wing, Minnesota, along the Mississippi River, and adjacent to the Prairie Island Indian Community reservation.
The Joseph M. Farley Nuclear Generating Plant is located near Dothan, Alabama, in the southern United States. The twin-unit nuclear power station sits on a largely wooded and agricultural 1,850-acre (750 ha) site along the Chattahoochee River, approximately 5 miles (8.0 km) south of Columbia, Alabama, in Houston County.
The Virgil C. Summer Nuclear Power Station occupies a site near Jenkinsville, South Carolina, in Fairfield County, South Carolina, approximately 20 miles (32 km) northwest of Columbia.
Grand Gulf Nuclear Station is a nuclear power station with one operational GE BWR reactor. It lies on a 2,100 acres (850 ha) site near Port Gibson, Mississippi. The site is wooded and contains two lakes. The plant has a 520-foot natural draft cooling tower. As of January 2023, the plant employs 675 people.
Point Beach Nuclear Plant is a nuclear power plant located on Lake Michigan in the town of Two Creeks, Wisconsin, United States. The plant was built by Wisconsin Electric Power Company, and previously operated by the Nuclear Management Company. The plant is currently owned and operated by NextEra Energy Resources, of Juno Beach, Florida.
St. Lucie Nuclear Power Plant is a twin nuclear power station located on Hutchinson Island, near Port St. Lucie in St. Lucie County, Florida. Both units are Combustion Engineering pressurized water reactors. Florida Power & Light commissioned the station in 1976 and continues to operate the station. Minor shares of Unit 2 are owned by the Florida Municipal Power Agency (8.81%) and the Orlando Utilities Commission (6.08%).
Comanche Peak Nuclear Power Plant is located in Somervell County, Texas. The nuclear power plant is located 40 miles (64 km) southwest of Ft. Worth and about 60 miles (97 km) southwest of Dallas. It relies on nearby Comanche Creek Reservoir for cooling water. The plant has about 1,300 employees and is operated by Luminant Generation, a subsidiary of Vistra Corp.
The Oconee Nuclear Station is a nuclear power station located on Lake Keowee near Seneca, South Carolina, and has a power output capacity of over 2,500 megawatts. It is the second nuclear power station in the United States to have its operating license extended for an additional twenty years by the Nuclear Regulatory Commission (NRC).
The McGuire Nuclear Station is a nuclear power plant located about 17 miles (27 km) northwest of Charlotte, North Carolina, on the state's largest lake, Lake Norman. It is a 32,500-acre (13,200 ha) lake created in 1963 by Duke Power for the Cowans Ford Hydroelectric Station. The McGuire units use the lake's water for cooling.
{{cite web}}
: CS1 maint: archived copy as title (link)