San Onofre Nuclear Generating Station | |
---|---|
Country | United States |
Location | San Diego County, California |
Coordinates | 33°22′8″N117°33′18″W / 33.36889°N 117.55500°W |
Status | In decommissioning [1] |
Construction began | August 1964 [2] |
Commission date |
|
Decommission date |
|
Construction cost | $8.968 billion (2007 USD, Units 2–3 only) [3] ($12.7 billion in 2023 dollars [4] ) |
Owner(s) |
|
Operator(s) | Southern California Edison |
Nuclear power station | |
Reactor type | PWR |
Reactor supplier |
|
Power generation | |
Units operational | 2 × 1127 MW (permanent shutdown) |
Units decommissioned | 1 × 456 MW |
Nameplate capacity |
|
External links | |
Website | songscommunity |
Commons | Related media on Commons |
The San Onofre Nuclear Generating Station (SONGS) is a permanently closed nuclear power plant located south of San Clemente, California, on the Pacific coast, in Nuclear Regulatory Commission Region IV. The plant was shut down in 2013 after defects were found in replacement steam generators; it is currently in the process of decommissioning. The 2.2 GW of electricity supply lost when the plant shut down was replaced with 1.8 GW of new natural-gas fired power plants and 250 MW of energy storage projects. [6]
The plant is owned by Southern California Edison. Edison International, parent of SCE, holds 78.2% ownership in the plant; San Diego Gas & Electric Company, 20%; and the City of Riverside Utilities Department, 1.8%. When fully functional, it employed over 2,200 people. [5] Located between the Pacific Ocean and the Surf Line, the station is a prominent landmark because of its twin hemispherical containment buildings, which were designed to contain any fission products in the event of an incident.
The plant's first unit, Unit 1, operated from 1968 to 1992. [7] Unit 2 was started in 1983 and Unit 3 started in 1984. Upgrades designed to last 20 years were made to the reactor units in 2009 and 2010; however, both reactors were shut down in January 2012 after premature wear was found on more than 3,000 tubes in replacement steam generators that had been installed in 2010 and 2011. The Nuclear Regulatory Commission investigated the events that led to the closure. In May 2013, Senator Barbara Boxer, the then-chairman of the Senate Environment and Public Works Committee, said the modifications had proved to be "unsafe and posed a danger to the eight million people living within 50 miles of the plant," and she called for a criminal investigation. [8]
In June 2013, Southern California Edison announced the permanent retirement of Unit 2 and Unit 3, citing "continuing uncertainty about when or if SONGS might return to service" and noting that ongoing regulatory and "administrative processes and appeals" would likely cause any tentative restart plans to be delayed for "more than a year". The company stated that "Full retirement of the units prior to decommissioning will take some years in accordance with customary practices. Actual decommissioning will take many years until completion." [9] Controversy continues over Edison's plans for on-site dry cask storage of the considerable amount of nuclear waste created during the facility's decades of operation. [10] [11]
This section needs expansion. You can help by adding to it. (August 2012) |
Unit 1, a first-generation Westinghouse pressurized water reactor that operated for 25 years, closed permanently in 1992; it has been dismantled and is used as a storage site for spent fuel. [12] It had a spherical containment of concrete and steel; the smallest wall was 6 feet (1.8 m) thick. It generated 456 MWe gross, and 436 MWe net, when operating at 100% capacity. [13]
Units 2 and 3, Combustion Engineering two-loop pressurized water reactors, generated 1,127 MWe gross, and 1,070 MWe and 1,080 MWe net respectively, when operating at 100% capacity. [13]
In a ten-year project completed in 2011 and costing $671 million, Edison replaced the steam generators in both reactors with Mitsubishi steam generators of the modified design. Because of the reactors' two-loop design, uncommon for such large reactors of that era, the steam generators were among the largest in the industry. [14] A common shortcoming of these large steam generators was tube wear, requiring replacement earlier than their 40-year design life. [14] The steam generators being the largest components in the reactor required a temporary hole through the concrete containment shell. The Unit 2 replacement was completed in 2009 and Unit 3 in 2011. Edison estimated that the modernization would save customers $1 billion during the plant's license period, which at the time ran until 2022. [15] [16]
During its operation until 2012, SONGS provided about 20% of the power to large portions of Southern California. [17]
The San Onofre Nuclear Generating Station (SONGS), operated by Southern California Edison (SCE) is approximately 100 km (60 mi) south of Los Angeles, 6.5 km (4 mi) south of San Clemente, CA. It is located between the Surf Railroad Line and the Pacific Ocean within Marine Corps Base Camp Pendleton. The site originally comprised three nuclear power plants. Unit 1 commenced operation in 1968, and shut down in 1992. Units 2 and 3 permanently ceased operations in June 2013. Dismantlement of Unit 1 is essentially complete. The turbine building was removed and the licensee completed reactor pressure vessel internal segmentation and cutup; however, the licensee was unable to make arrangements for shipping the reactor pressure vessel to a disposal facility because of the size and weight of the vessel and shipping package. The licensee is making plans to ship the vessel offsite during the decommissioning activities for Units 2 and 3 because the radioactivity has decayed to a level that allows it to be treated as low level waste. [12]
SONGS-1 was a Westinghouse 3-loop pressurized water reactor constructed by Bechtel and rated at 1347 MWthermal . It began commercial operation on January 1, 1968, and ceased operation on November 30, 1992. Defueling was completed on March 6, 1993. On December 28, 1993, NRC approved the Permanently Defueled Technical Specifications. On November 3, 1994, SCE submitted a Proposed Decommissioning Plan to place SONGS-1 in SAFSTOR until the shutdown of Units 2 and 3. On December 15, 1998, following a change in NRC decommissioning regulations, SCE submitted a post shutdown decommissioning activities report (PSDAR) for SONGS-1, to commence DECON in 2000. SCE actively decommissioned the facility, and most of the structures and equipment have been removed and sent to a disposal facility. The NRC issued a license amendment in February 2010 releasing the off-shore portions of the Unit 1 cooling intake and outlet pipes in place, under the Pacific Ocean seabed, for unrestricted use. The fuel from Unit 1 was transferred to Phase 1 of the independent spent fuel storage installation (ISFSI). In 2015, the ISFSI was expanded onto the area previously occupied by Unit 1 in order to store all Unit 2 and Unit 3 spent fuel. SCE completed transferring all of the nuclear fuel to dry storage in 2020. [12]
The Unit 1 Reactor Pressure Vessel was transported via rail and then highway to the Energy Solutions disposal facility in Clive, Utah. The shipment left May 24, 2020 from San Onofre and arrived at the disposal facility on July 14, 2020. [12]
The San Onofre station had technical problems over the years. In July 1982, Time wrote, "The firm Bechtel was ... embarrassed in 1977, when it installed a 420-ton nuclear-reactor vessel backwards" at San Onofre. [18] In 2008, the San Onofre plant received multiple citations over issues such as failed emergency generators, improperly wired batteries and falsified fire safety data. [19] [20] In its annual review of 2011, the Nuclear Regulatory Commission (NRC) identified improvements but noted that in the area of human performance, "corrective actions to date have not resulted in sustained and measurable improvement". [19]
According to the NRC, workers at San Onofre were "afraid they will be retaliated against if they bring up safety problems, something that's against the rules". [21] As of 2011, according to the NRC, there had been progress on the issue and the problems were not considered a threat to the safety of plant workers or the public. [21] In November 2011, there was an ammonia leak, and as a precaution company employees were evacuated from the leak area, while the units continued normal operation. [22]
A mid-cycle inspection report spanning July 2011 to June 2012 revealed three incidents relating to human performance. An additional issue concerned a failure to develop procedures for a "cyber security analysis of electronic devices" that was later corrected. [23]
In 2012, coolant fluid was found in the oil system of a backup diesel generator, which would have caused the generator to fail if needed. An internal investigation found "evidence of potential tampering", making sabotage by staff a possible cause. [24]
Southern California Edison stated after the Fukushima disaster in 2011 that the station was "built to withstand a 7.0 magnitude earthquake directly under the plant". [25] Additionally, there was a 25-foot wall to protect the plant from a tsunami which could be potentially generated by the active fault 5 miles offshore. [26] The closest tectonic fault line is the Christianitos fault, less than a mile away, which is considered inactive or "dead", but other active faults in the vicinity might pose some threat. [27]
The NRC's estimate of the yearly risk of an earthquake intense enough to cause core damage to the reactor at San Onofre was 1 in 58,824, according to a study it had published in August 2010. [28] [29]
In June 2012 S. David Freeman, the former head of the Southern California Public Power Authority and "a longtime anti-nuclear voice", [30] described San Onofre and Diablo Canyon as "disasters waiting to happen: aging, unreliable reactors sitting near earthquake fault zones on the fragile Pacific Coast, with millions of Californians living nearby". [31]
The San Onofre plant used seawater for cooling, like some other seaside facilities in Southern California, lacking the large cooling towers typically associated with nuclear generating stations. Limited available land next to SONGS would likely have required towers to be built on the opposite side of Interstate 5. [32]
More than 4,000 tons of spent nuclear fuel are stored at San Onofre. [33]
The NRC defines two emergency planning zones around nuclear power plants: 1) a plume exposure pathway zone with a radius of 10 miles (16 km), concerned primarily with exposure to, and inhalation of, airborne radioactive contamination, and 2) an ingestion pathway zone of about 50 miles (80 km), concerned primarily with ingestion of food and liquid contaminated by radioactivity. [34] The average prevailing westerly wind direction at San Onofre blows inland 9 months of the year. [35]
The 2010 U.S. population within 10 miles (16 km) of San Onofre was 92,687, an increase of 50.0 percent in a decade, according to an analysis of U.S. Census data for msnbc.com. The 2010 U.S. population within 50 miles (80 km) was 8,460,508, an increase of 14.9 percent since 2000. [36] Three of the cities within 20 miles of the facility are San Clemente and Laguna Beach in Orange County and Oceanside in San Diego County. [37] [38] San Diego is 45 miles south of the facility, and Los Angeles is 60 miles north of the facility. [39]
On August 6, 1977, about a thousand anti-nuclear protesters marched outside the nuclear generation station, while units 2 & 3 were under construction. [40]
On March 11, 2012, more than 200 activists protested at the San Onofre Nuclear Generating Station to mark the one-year anniversary of the Fukushima Daiichi nuclear disaster. Two Japanese residents who lived through the Fukushima meltdowns and congressman Raymond Lutz, spoke. They said the generators which had been offline since January 2012, should remain off. [41] In May 2012, environmental and anti-nuclear activists gathered at Southern California Edison's Irvine headquarters calling for the San Onofre plant to be decommissioned. [42]
On January 31, 1996, an adult cat was discovered outside of Unit 1 by an animal control officer. Since it was wet from rain and seemed abnormally listless, the officer kept the cat overnight in a cage in his garage. The officer released the cat near the plant on the next day, having observed that it returned to normal levels of alertness.
On February 1, 1996, four kittens were found at the plant in a small space between two of Unit 1's administration buildings by plant workers. They were discovered outside of the radiologically controlled area but tripped contamination alarms when the workers of the plant attempted to set the kittens free. Health physics personnel responded to the scene and frisked the kittens for radioactive contamination. None of the workers handling the kittens were contaminated, however, the kittens each measured 6000 counts per minute. The kittens were given warm baths with shampoo, which reduced the radioactivity to 1000 counts. [43] The kittens were taken for further screening, where they were found to have been contaminated with Cesium-137, Cesium-134, and Cobalt-60. [44] The radioactive activity within the kittens began sharply decreasing, and the kittens were declared to be in healthy condition. [45]
In trying to find the kittens' mother, the workers learned of the animal control officer's incident the day prior. The officer was frisked for contamination. No contamination was found on the officer, but there were trace amounts of radioactive isotopes on a rag the officer used to dry the mother and on feces excreted within its cage. As the search continued, the remains of the cat were found on Interstate 5. Health physics personnel analyzed the remains, finding identical activity as the kittens. The kittens were adopted by plant workers, having been named Alpha, Beta, Gamma, and Neutron. [46]
Unit 2 was shut down in early January 2012 for routine refueling and replacement of the reactor vessel head. [48] On January 31, 2012, Unit 3 suffered a radioactive leak largely inside the containment shell, with a release to the environment below allowable limits, and the reactor was shut down per standard procedure. [49] [50] [51] On investigation, the replacement steam generators from 2011 in both units were found to show premature wear on over 3,000 tubes, in 15,000 places. [52] Plant officials pledged not to restart until the causes of the tube leak and tube degradation were understood. [48] Neither unit was ever restarted. There were no blackouts due to the lack of SONGS electricity; more pollution was caused by the use of natural gas plants to make up for the lost power generation, and additional cost led to higher utility bills. [53]
In March 2012, the NRC forbade the plant to be reopened until the causes of its equipment problems were thoroughly understood and fixed. [54] [55] At the same time, Irvine Councilman Larry Agran called for the plant to be decommissioned safely and as soon as possible. [33] Concerns included "nuclear waste stored at the plant, health hazards from radioactive material, and inadequate evacuation plans". Resolutions passed in neighboring cities Laguna Beach and San Clemente called for safer and more secure nuclear waste storage. San Clemente voted to request public information about radiation levels near the plant. The spokesman for Edison International said "the company will work to prepare detailed responses to council and community member questions and concerns". [33]
In June 2012 the environmental group Friends of the Earth filed a legal petition with the NRC, asking that any decision to restart SONGS be considered a de facto NRC license amendment which required a public hearing, rather than a decision by the NRC commissioners. Friends of the Earth submitted evidence and sworn statements of John Large of the London-based nuclear consulting engineers Large & Associates, demonstrating that the steam generating tube degradation was a generic fault of the Mitsubishi design and that Edison's power derating of the two nuclear units would not lower the rate of wear or the risk of catastrophic tube failure. [56] SCE and NRC staff filed statements opposing the petition. [55] [57]
In July 2012, the NRC's final report identified ten issues that needed followup and stated "the plant will not be permitted to restart until the licensee has developed a plan to prevent further steam generator tube degradation and the NRC independently verifies that it can be operated safely." [58] As of July 2012 [update] , the cost related to the shutdown had reached $165 million, with $117 million of that being the purchasing of power from other sources to replace the output of the plant. [59] The Chairman of Edison International Ted Craver stated the possibility that reactor 3 might be scrapped as "It is not clear at this time whether Unit 3 will be able to restart without extensive additional repairs". [59]
In August 2012, Southern California Edison announced plans to lay off one-third, or 730, of the plants employees; the company said that the downsizing had been planned more than two years before. Rochelle Becker of the Alliance for Nuclear Responsibility said the layoffs showed that the company was not honest about their plans for the power plant. [5] [60]
In September 2012, Allison Macfarlane, the NRC Chairwoman, said that the plant would be down for a prolonged period, and that Unit 3 would be defueled in September 2012 because the unit had been significantly damaged. [61] Due to the shutdown, the NRC ended requirements to monitor non-operating systems. [23]
In October 2012, SCE submitted a "Unit 2 Return to Service Report" about corrective actions, such as plugging worn tubes and preventively plugged additional tubes. It proposed a restart limiting Unit 2 to 70% power, to prevent excessive tube vibration, until an inspection within 150 days of operation. [55] [62] SCE reported that most of the excessive wear had been in limited areas, due to higher speed and drier steam than computer modeling had predicted, and inadequate tube support at the U-bend. Analysis had concluded operating at 70% power would eliminate the conditions that caused excessive wear. [63]
In November 2012, the NRC decided to refer the Friends of the Earth hearing request to the Atomic Safety and Licensing Board. [55] By November 2012, the cost of the outage was over $300 million, [64] and discussion of restarting Unit 2 had been postponed. [65]
In December 2012, the last of the four old steam generators was transported to Clive, Utah for disposal. [66]
In February 2013, the NRC asked the steam generator manufacturer Mitsubishi Heavy Industries to provide a redacted version of a report on the plant's steam generators for publication. [67] [68] The report described the changes made in the replacement steam generator including the removal of a support cylinder, changes to the tube support plates and anti-vibration bars, and addition of about 400 tubes. [69]
In December 2013, the NRC cited SONGS for failing to properly check the steam generator design, which had caused the plant shutdown. [70] The finding did not carry any fine or penalty but complicated SCE's legal position that they did nothing wrong. The California Public Utilities Commission was considering whether to order a multimillion-dollar refund to SCE customers. [71]
On May 13, 2013, the Atomic Safety and Licensing Board issued its decision on the Friends of the Earth hearing request filed in June 2012. [72] [73] It determined the current NRC process on this issue constituted a de facto license amendment requiring an adjudicatory public hearing, for three independent reasons: [55]
In May 2013, Senator Barbara Boxer asked that the United States Justice Department investigate possible malfeasance by Edison officials, and released a 2004 letter by an Edison executive that expressed worries that the new steam generators, though similar, would not be "like for like" replacements and could lead to the same kind of potential "disastrous" issues that in fact led to the plant's shutdown in 2012. In making the request for a possible criminal investigation, Boxer stated "This correspondence leads me to believe that Edison intentionally misled the public and regulators in order to avoid a full safety review and public hearing in connection with its redesign of the plant." Edison denied any wrongdoing. [52] [74] but reportedly signaled it might shut the plant down for good should the company not be allowed to restart one of the reactors at 70% of capacity. [74]
On June 7, 2013, Southern California Edison announced it would "permanently retire" Unit 2 and Unit 3, ending their attempt to restart the plant at a reduced capacity. The utility said it would cut the SONGS workforce from about 1,500 to some 400 employees, with most reductions "expected to occur in 2013". The company also said it would "pursue recovery of damages from Mitsubishi Heavy Industries, the supplier of the replacement steam generators", [9] [75] although the contract limited liability to $138 million and excluded consequential damages. [63] [76] The chief executive of Edison International explained that the current licenses expire in 2022, and with post-Fukushima requirements, which include re-evaluating earthquake vulnerability, it was uncertain renewal would be economic, so it made little sense making costly and politically difficult repairs now that would not make a return on investment before 2022. [77]
California Senator Dianne Feinstein signaled approval of the decision to permanently close the plant, stating "I firmly believe this is the right thing to do for the more than 7 million Californians who live within 50 miles of San Onofre." However, Representative Darrell Issa, whose voting district includes the nuclear station, was more downbeat, saying "our communities now face the loss of employment for more than a thousand highly skilled workers and an essential local source of low-cost, clean energy." Issa also pledged to work to improve the prospects for nuclear power nationwide. In contrast, Sierra Club Director Kathryn Phillips applauded the move, saying in a statement that "We hope, especially, that the utilities will take this opportunity to help get more locally generated renewable energy, such as rooftop solar, into their portfolios." [78]
In 2015, State Attorney General Kamala Harris opened an investigation of the Office of Ratepayer Advocates, San Diego Gas and Electric, and Southern California Edison. California state investigators searched the home of California utility regulator Michael Peevey and found hand written notes, which showed that Peevey had met with an Edison executive in Poland, where the two had negotiated the terms of the San Onofre settlement leaving San Diego taxpayers with a $3.3 billion bill to pay for the closure of the plant. The investigation was closed amid Harris's 2016 run for the US Senate position, which opened when Barbara Boxer retired. [79] [80]
Total greenhouse gas emissions from power plants in California increased by 35% from 2011 to 2012, according to figures from the California Air Resources Board, which per the World Nuclear News is partly due to the early closure of San Onofre. [81]
Decommissioning San Onofre will take numerous years until the process is complete. [9] In February 2014 SCE announced that it would be auctioning off non-radioactive equipment from the former nuclear plant March 2015. [82] In August 2014, SCE announced decommissioning would take 20 years, cost $4.4 billion and spent fuel would be held on-site in dry casks indefinitely, while Low Level Radioactive Waste would be disposed in Texas and Utah. [83] On December 20, 2016, SCE announced it had selected a joint venture of AECOM and EnergySolutions as decommissioning general contractor for SONGS. [84]
This section may be confusing or unclear to readers. In particular, it needs to separate the pros and cons, not try to string them together without any indication that contrast is meant. Without sources for the underlying facts, it's not repairable.(March 2020) |
Since the Yucca Mountain nuclear waste repository plan was terminated in 2008, nuclear waste will have to be stored on site in San Onofre until Congress finds another location for a nuclear waste repository. [85]
SONG's nuclear waste is in steel-lined concrete pools known as wet storage. According to the NRC, nuclear waste must sit in these pools for about 5 years in order to cool. It then must be transferred into a more permanent, dry storage, consisting of 80 underground steel lined concrete monoliths.
SCE decided on Holtec International to design the dry storage canisters. The canisters will be 5⁄8 inch (16 mm) thick compared to the 1⁄2 inch (13 mm) thickness used for most other canisters in the US. These steel-lined concrete monoliths right next to the Pacific Ocean exceed California's earthquake requirements and Edison says they are designed to withstand fire and tsunamis.
The canisters are prone to cracking mainly because of chloride-induced stress corrosion from being close to the ocean. The canisters cannot be inspected for cracks. Kris Singh, president and CEO of Holtec, says that they are working on developing inspection methods, but that even if cracks could be detected, there is no way to repair them.
As an added safety measure, Holtec is providing an extra canister on site. The Electric Power Research Institute (EPRI) will be using new technologies in order to detect and protect these canisters from cracking. EPRI believes the best method for chloride-induced stress-corrosion cracking is to apply proactive practices, which include using standard methods to classify the corrosivity of the site environment, monitoring the site-specific absolute humidity, and planning for visual inspection of the canister surface in a timeframe based on the results.
In April 2017 Southern California Edison agreed to move spent nuclear fuel off the site, following legal action by San Diego environmental group Citizens Oversight. [86]
In July 2020, the California Coastal Commission approved an inspection and maintenance program that will allow Southern California Edison to continue to store spent nuclear fuel in a storage site at San Onofre. [87]
In July 2013 SCE started a 90-day dispute resolution process with Mitsubishi Heavy Industries. [88] The dispute resolution was unsuccessful, so a binding arbitration process run by the International Chamber of Commerce commenced in October 2013. [76] [89] SCE claimed $7.57 billion (930 billion yen), but MHI argues that compensation is limited to $137 million by their contract. [90]
In October 2015 the owners reached a $400 million settlement with their insurers for outages caused by the failure. SCE received $312.8 million, SDG&E $80 million, and the city of Riverside $7.16 million. The arbitration claim against MHI continued to be pursued through the International Chamber of Commerce. [91]
In March 2017 the International Chamber of Commerce ordered MHI to pay $125 million compensation, the liability limit contained in the contract. [92] The tribunal rejected claims of fraud and gross negligence against Mitsubishi, and ordered the claimants to pay MHI $58 million in legal fees and costs.
The San Onofre Nuclear Generating Station is shown in the 1987 film Made in U.S.A. directed by Ken Friedman and starring Adrian Pasdar, Chris Penn and Lori Singer. SONGS was also featured in Godfrey Reggio's 1982 experimental film Koyaanisqatsi , where sunbathers are shown on San Onofre State Beach in front of the station. [93] Passing reference is made to the design of the containment shields (which resemble breasts) in the lyrics of the Descendents song "Kids" from their 1986 album Enjoy! , and in the cult comedy The Naked Gun (1988). [94]
The nuclear generating station was also used as a backdrop for the nondescript Californian nuclear reactor in the film Cloud Atlas (2012).
Unit 1 was shown in a season 2 episode of Batman in 1967, "The Mad Hatter Runs Afoul".
It is also shown in the 2017 series Animal Kingdom as the backdrop to several surf scenes.
In the 2010 series The Event the powerplant was a target for the theft of fuel rods by extraterrestrials to use as fuel to teleport more of their people to Earth.
Southern California Edison (SCE), the largest subsidiary of Edison International, is the primary electric utility company for much of Southern California. It provides 15 million people with electricity across a service territory of approximately 50,000 square miles.
The Diablo Canyon Power Plant is a nuclear power plant near Avila Beach in San Luis Obispo County, California. Following the permanent shutdown of the San Onofre Nuclear Generating Station in 2013, Diablo Canyon is now the only operational nuclear plant in California, as well as the state's largest single power station. It was the subject of controversy and protests during its construction, with nearly two thousand civil disobedience arrests in a two-week period in 1981.
The Palo Verde Generating Station is a nuclear power plant located near Tonopah, Arizona, in western Arizona. It is located about 45 miles (72 km) west of downtown Phoenix. Palo Verde generates the most electricity of any power plant in the United States per year, the largest power plant by net generation as of 2021. Palo Verde also has the third-largest rated capacity of any U.S power plant. It is a critical asset to the Southwest, generating approximately 32 million megawatt-hours annually.
Dresden Generating Station is the first privately financed nuclear power plant built in the United States. Dresden 1 was activated in 1960 and retired in 1978. Operating since 1970 are Dresden units 2 and 3, two General Electric BWR-3 boiling water reactors. Dresden Station is located on a 953-acre (386 ha) site in Grundy County, Illinois, at the head of the Illinois River, near the city of Morris. It is immediately northeast of the Morris Operation—the only de facto high-level radioactive waste storage site in the United States. It serves Chicago and the northern quarter of the state of Illinois, capable of producing 867 megawatts of electricity from each of its two reactors, enough to power over one million average American homes.
The Crystal River Nuclear Plant also called the Crystal River 3 Nuclear Power Plant, or simply CR-3, is a closed nuclear power plant located in Crystal River, Florida. As of 2013 the facility is being decommissioned, a process expected to last 60 years. The power plant was completed and licensed to operate in December 1976, and operated safely for 33 years until shutdown in September 2009. It was the third plant built as part of the 4,700-acre (1,900 ha) Crystal River Energy Complex (CREC) which contains a single nuclear power plant, while sharing the site with four operational fossil fuel power plants.
The North Anna Nuclear Generating Station is a nuclear power plant on a 1,075-acre (435 ha) site in Louisa County, Virginia, in the Mid-Atlantic United States. The site is operated by Dominion Generation company and is jointly owned by the Dominion Virginia Power corporation (88.4%) and by the Old Dominion Electric Cooperative (11.6%).
The Watts Bar Nuclear Plant is a Tennessee Valley Authority (TVA) nuclear reactor pair used for electric power generation. It is located on a 1,770-acre (7.2 km²) site in Rhea County, Tennessee, near Spring City, between Chattanooga and Knoxville. Watts Bar supplies enough electricity for about 1.2 million households in the Tennessee Valley.
The Virgil C. Summer Nuclear Power Station occupies a site near Jenkinsville, South Carolina, in Fairfield County, South Carolina, approximately 20 miles (32 km) northwest of Columbia.
Zion Nuclear Power Station was the third dual-reactor nuclear power plant in the Commonwealth Edison (ComEd) network and served Chicago and the northern quarter of Illinois. The plant was built in 1973, and the first unit started producing power in December 1973. The second unit came online in September 1974. This power generating station is located on 257 acres (104 ha) of Lake Michigan shoreline, in the city of Zion, Lake County, Illinois. It is approximately 40 direct-line miles north of Chicago, Illinois and 42 miles (68 km) south of Milwaukee, Wisconsin.
The Enrico Fermi Nuclear Generating Station is a nuclear power plant on the shore of Lake Erie near Monroe, in Frenchtown Charter Township, Michigan on approximately 1,000 acres (400 ha). All units of the plant are operated by the DTE Energy Electric Company and owned by parent company DTE Energy. It is approximately halfway between Detroit, Michigan, and Toledo, Ohio. It is also visible from parts of Amherstburg and Colchester, Ontario as well as on the shore of Lake Erie in Ottawa County, Ohio. Two units have been constructed on this site. The first unit's construction started on August 4, 1956 and reached initial criticality on August 23, 1963, and the second unit received its construction permit on September 26, 1972. It reached criticality on June 21, 1985 and was declared commercial on November 18, 1988. The plant is connected to two single-circuit 345 kV Transmission Lines and three 120 kV lines. They are operated and maintained by ITC Transmission.
The Rancho Seco Nuclear Generating Station is a decommissioned nuclear power plant built by the Sacramento Municipal Utility District (SMUD) in Herald, California.
In the United States, nuclear power is provided by 94 commercial reactors with a net capacity of 97 gigawatts (GW), with 63 pressurized water reactors and 31 boiling water reactors. In 2019, they produced a total of 809.41 terawatt-hours of electricity, which accounted for 20% of the nation's total electric energy generation. In 2018, nuclear comprised nearly 50 percent of US emission-free energy generation.
Edison International is a public utility holding company based in Rosemead, California. Its subsidiaries include Southern California Edison, and unregulated non-utility business assets Edison Energy. Edison's roots trace back to Holt & Knupps, a company founded in 1886 as a provider of street lights in Visalia, California.
Nuclear decommissioning is the process leading to the irreversible complete or partial closure of a nuclear facility, usually a nuclear reactor, with the ultimate aim at termination of the operating licence. The process usually runs according to a decommissioning plan, including the whole or partial dismantling and decontamination of the facility, ideally resulting in restoration of the environment up to greenfield status. The decommissioning plan is fulfilled when the approved end state of the facility has been reached.
San Diego Gas & Electric is a regulated public utility that provides natural gas and electricity to San Diego County and southern Orange County in southwestern California, United States. It is owned by Sempra, a Fortune 500 energy services holding company based in San Diego.
John Henry Large was an English consulting Chartered Engineer primarily known for his work in assessing and reporting upon nuclear safety and nuclear related accidents and incidents, work which has often featured in the media.
Carolinas–Virginia Tube Reactor (CVTR), also known as Parr Nuclear Station, was an experimental pressurized tube heavy water nuclear power reactor at Parr, South Carolina in Fairfield County. It was built and operated by the Carolinas Virginia Nuclear Power Associates. CVTR was a small test reactor, capable of generating 17 megawatts of electricity. It was officially commissioned in December 1963 and left service in January 1967.
Mohave Power Station was a 1580 megawatt electric (MWe) coal-fired power plant that was located in Laughlin, Nevada. Southern California Edison is the majority owner of the plant and was its operator. The plant entered commercial operation in 1971. A steam line that ran near the plant's control room and cafeteria ruptured on June 9, 1985, fatally scalding six and injuring ten more. In 2005, the plant was shut down and was later dismantled.
The Nuclear Regulatory Commission has divided the US territory into four regions:
The 2011 Southwest blackout, also known as the Great Blackout of 2011, was a widespread power outage that affected the San Diego–Tijuana area, southern Orange County, Imperial Valley, Mexicali Valley, Coachella Valley, and parts of Arizona. It occurred on Thursday, September 8, 2011, beginning at about 3:38pm PDT, and was the largest power failure in California history.
SCE and CAISO then scrambled to replace the SONGS generation. In the end, some milestone demand response and energy storage projects made up 261 MW of the needed supply, but the 1,800 MW balance was replaced with new, more flexible natural gas capacity.
Overall, investigators found wear from friction and vibration in 15,000 places, in varying degrees, in 3,401 tubes inside the four replacement generators.
So, you need not worry that an earthquake originating on the Cistianitos fault will damage the San Onofre nuclear generating plant. That fault has not moved for at least 125,000 years, perhaps not since long before then. It is dead.
{{cite web}}
: CS1 maint: archived copy as title (link)Officials in nearby San Clemente and Laguna Beach — both within 20 miles of the San Onofre facility — have registered their fears after significant wear was found on hundreds of tubes carrying radioactive water inside the plant's generators.
Karen Garland, a married mother of two who lives in Oceanside, 17 miles south of the plant, recalls the blackout that affected San Diego and Orange Counties last September.
The San Onofre Nuclear Power Plant rests on the Pacific Coast 60 miles south of Los Angeles and 45 miles north of San Diego, the second and eighth largest cities in the U.S. respectively. The nuclear power plant is within 50 miles of 8.5 million people.