Kasatka-class submarine

Last updated
Russian submarine Kasatka.png
Russian submarine Kasatka
Class overview
NameKasatka class
BuildersBaltic works
OperatorsNaval Ensign of Russia.svg  Imperial Russian Navy
Preceded by Somclass
In commission1904–1922
Completed6
Lost2
Scrapped4
General characteristics as designed
Type Submarine
Displacement
  • 142 t (140 long tons) surfaced
  • 180 t (177 long tons) submerged
Length33.5 m (109 ft 11 in)
Beam3.5 m (11 ft 6 in)
Draught3.4 m (11 ft 2 in)
Propulsion
  • 1 shaft petrol / electric (later diesel electric)
  • 150 kW (200 bhp) / 75 kW (100 hp)
Speed
  • 8.5 knots (15.7 km/h; 9.8 mph) surfaced
  • 5.5 knots (10.2 km/h; 6.3 mph) submerged
Range
  • 700  nmi (1,300 km; 810 mi) at 8 knots (15 km/h; 9.2 mph) (surfaced)
  • 50 nmi (93 km; 58 mi) at 3 knots (5.6 km/h; 3.5 mph) (submerged)
Complement24
Armament

The Kasatka class was a class of submarines built for the Imperial Russian Navy. The six boats were built between 1904 and 1905. They were designed by I. G. Bubnov and were based on the Russian submarine Delfin. The first boat, Kasatka, experienced significant problems with stability on trials and had to have extra flotation added. In 1905, four of the class were transferred from Western Russia to Vladivostok with the outbreak of the Russo-Japanese War. Initially powered by a kerosene/electrical system, the boats were re-built around 1910 with a diesel-electric power plant following the end of the war. The class remained in service throughout World War I. Two were captured by the German Empire in 1918 and handed over to the British following the German surrender. They were scuttled by the British in 1919 to prevent their capture by the Soviets. The remaining four were broken up for scrap in 1922.

Contents

Design and description

I. G. Bubnov was tasked with producing a submarine design following experience with the Russian submarine Delfin, which had been deemed a success. The design was accepted by the Naval Technical Committee on 20 December 1903. [1] As designed the class had a surfaced displacement of 142 tonnes (140 long tons) and displaced 180 tonnes (177 long tons) when submerged. They were 33.5 metres (109 ft 11 in) long with a beam of 3.5 metres (11 ft 6 in) with a draught of 3.4 metres (11 ft 2 in). The submarines were propelled by one shaft powered by a kerosene engine for travel on the surface rated at 150 kilowatts (200 bhp) and an electric motor rated at 89 kilowatts (120 hp). [lower-alpha 1] The Kasatka class had a maximum speed of 8.5 knots (15.7 km/h; 9.8 mph) on the surface and 5.5 knots (10.2 km/h; 6.3 mph) submerged. [2] [3] Initially the design called for a three-shaft propulsion system, but due to the increased hostilities with the Empire of Japan, the submarines were completed with only the one shaft-design. [3] They had a range of 700 nautical miles (1,300 km; 810 mi) at 8 knots (15 km/h; 9.2 mph) surfaced and 50 nautical miles (93 km; 58 mi) at 3 knots (5.6 km/h; 3.5 mph) submerged. The class was armed with four torpedoes carried externally in Drzewiecki drop collars and one machine gun. Vessels of the class had a complement of 24. [2] [3]

Modifications

In 1906–1907, new conning towers were installed aboard the submarines to rectify buoyancy issues. [4] In 1910, the Kasatka class were rebuilt with new power plants. They received a diesel-electric system which included a diesel engine rated at 89 kilowatts (120 bhp). The displacement of the submarines increased to 155 tonnes (153 long tons) surfaced and 189 tonnes (186 long tons) submerged. Two of the class, Nalim and Skat, were given a 47 mm (1.9 in) gun in 1915. [2] [3]

Ships

Kasatka-class submarines [2] [3] [4]
NameBuilderLaunchedCompletedFate
Kasatka (Касатка) Baltic Works, St. Petersburg 1904March 1905 Broken up 1922
Keta (ex Feldmarshal Graf Sheremetev)1904May 1905Broken up 1922
Makrel (Макрель)19071907Broken up 1922
Nalim (Налим)8 September 1904May 1905 Scuttled at Sevastopol 26 April 1919
Okun (Окунь)19041907Broken up 1922
Skat (Скат)1904March 1905Scuttled at Sevastopol 26 April 1919

Service history

The first submarine of the class, Kasatka was ordered in the 1903 building programme on 2 January 1904, with the rest ordered as part of the 1904 Emergency Programme, with the next four ordered on 24 February 1904 and Feldmarshal General Sheremetev on 26 March 1904. [3] [4] Feldmarshal General Sheremetev was paid for by public subscription with the Sheremetev family as major donors. [2] Due to the outbreak of the Russo-Japanese War, construction was accelerated on the submarines and only Kasatka ran sea trials. [3] [4] During trials, Kasatka had trouble during operation of the ballast tanks, steering gear and water entered the submarine through the main hatch when submerged. The latter problem was rectified by the addition of two floats attached to the aft casing first on Kasatka and then on the others. Kasatka was then transferred to Vladivostok by rail, followed by the rest between September and December 1904 with the exception of Makrel and Okun. Makrel and Okun remained in the west and were used as evaluation boats for the design. Kasatka and Skat became operational in March 1905, followed by Feldmarshal General Sheremetev and Nalim in May 1905. [2] [3] Completion of Makrel and Okun took until 1907. [4] At Vladivostok, the submarines were used as a deterrent against Japanese warships. They operated out to 150 nautical miles (280 km; 170 mi) from the coast and remained as visible as possible, remaining at sea for up to five days, though some patrols lasted two weeks. Upon completion Makrel and Okun were assigned to the 1st Division of the Baltic Fleet. [5]

During World War I, Nalim and Skat were transferred to the Black Sea in 1915 and joined the Black Sea Fleet. That same year, Feldmarshal General Sheremetev and Kasatka were transferred to the Baltic Sea and joined the Baltic Fleet. [3] In June 1915, Okun and Makrel were among the submarines deployed off the Kurland coast. Okun engaged the German cruiser SMS Augsburg, but missed. However, the submarine threat led the German command to withdraw their ships from around Windau. In August, the two submarines were ordered to the Gulf of Riga as part of the Russian attempt to defend against the German High Seas Fleet's movements in the area. Following the arrival of British submarine reinforcements, the smaller Russian submarines were deployed on coastal defence missions in the Baltic. After the entry of the Romania into the war on the side of the Allies in 1916, Nalim and Skat were based at Batumi but remained relatively inactive. Kasatka and Feldmarshal General Sheremetev transferred to Arkhangelsk in 1915 and 1916 respectively, arriving via inland waterways. In 1917, the two submarines were sent back to the Baltic for overhaul. [6]

In March 1917, Nalim and Skat were removed from service. In August 1917, Feldmarshal General Sheremetev was renamed Keta. In 1918, Kasatka, Makrel and Okun were transferred to the Caspian Sea. In April 1918, Nalim and Skat were re-activated and used against the Soviets. After the Treaty of Brest-Litovsk was signed ending the Russian participation in World War I, they briefly flew the flag of the Ukrainian State before the Germans seized Nalim and Skat. In November 1918, following the Armistice of 11 November 1918 which ended World War I, the British took over the submarines after the German Empire surrendered. [2] [3] The two subs were later scuttled by the British at Sevastopol to prevent their capture by the Soviets during the Russian Civil War. [3] The surviving boats were broken up for scrap in 1922. [2]

Notes

  1. Watts has the petrol engine rated at 130 kilowatts (180 bhp) and the electric motor rated at 45 kilowatts (60 hp).

Citations

  1. Friedman & Noot 1991, p. 11.
  2. 1 2 3 4 5 6 7 8 Budzbon 1986, p. 312.
  3. 1 2 3 4 5 6 7 8 9 10 11 Watts 1990, p. 161.
  4. 1 2 3 4 5 Friedman & Noot 1991, p. 12.
  5. Friedman & Noot 1991, pp. 20–21, 32.
  6. Friedman & Noot 1991, pp. 41–44, 58, 60.

Related Research Articles

Juliett-class submarine

The Project 651, known in the West by its NATO reporting name Juliett class, was a class of Soviet diesel-electric submarines armed with cruise missiles. They were designed in the late 1950s to provide the Soviet Navy with a nuclear strike capability against targets along the east coast of the United States and enemy combatants. The head of the design team was Abram Samuilovich Kassatsier. They carried four nuclear-capable cruise missiles with a range of approximately 300 nautical miles (560 km), which could be launched while the submarine was surfaced and moving less than four knots (7.4 km/h). Once surfaced, the first missile could be launched in about five minutes; subsequent missiles would follow within about ten seconds each. Initially, the missiles were the inertially-guided P-5. When submarine-launched ballistic missiles rendered the P-5s obsolescent, they were replaced with the P-6 designed to attack aircraft carriers. A special 10 m2 target guidance radar was built into the forward edge of the sail structure, which opened by rotating. One boat was eventually fitted with the Kasatka satellite downlink for targeting information to support P-500 4K-80 "Bazalt" anti-ship cruise missiles. The Juliett class had a low magnetic signature austenitic steel double hull, covered by two inches (51 mm) thick black tiles made of sound-absorbing hard rubber.

Russian submarine <i>Delfin</i>

Delfin was the first combat-capable Russian submarine. She was commissioned in 1903 and decommissioned in 1917, having served during World War I. During a test dive in 1904, 25 crew were killed.

German submarine <i>U-2331</i> German World War II submarine

German submarine U-2331 was a Type XXIII U-boat built for Nazi Germany's Kriegsmarine during World War II and intended for service against allied shipping in coastal waters. She was a brand new, high-technology electric U-boat which was lost when only one month old in a bizarre training accident in the Baltic Sea. Built at Hamburg, she was constructed at speed, as she and her sisters were seen as war winning weapons and thus vitally important to the German war effort.

<i>Aréthuse</i>-class submarine

The Aréthuse class were submarines built for the French Navy in the 1950s. They were designed as attack submarines for anti-submarine warfare and were referred to as Sous-marins de Chasse by the French Navy. These submarines had advanced sensors and were very quiet. They were influenced by the World War II German Type XXIII U-boats. The Daphné class are an enlarged version built for the French, Pakistani, Portuguese, Spanish and South African navies.

The Russian submarine AG-12 was an AG-class submarine, designed by the American Holland Torpedo Boat Company/Electric Boat Company, built for the Imperial Russian Navy during World War I. The submarine was fabricated in Canada, shipped to Russia and reassembled for service with the Baltic Fleet. She was scuttled by the Russians at Hanko in April 1918.

Finnish submarine <i>AG-16</i>

The AG-16 was an AG-class submarine, designed by the American Holland Torpedo Boat Company/Electric Boat Company, built for the Imperial Russian Navy during World War I. The submarine was fabricated in Canada, shipped to Russia and reassembled for service with the Baltic Fleet. The boat was originally named AG-13, but was redesignated AG-16 after AG-15 sank and later repaired in 1917. She was scuttled by the Russians at Hanko in April 1918.

HMS <i>E1</i> Submarine of the Royal Navy

HMS E1 was a British E-class submarine that was built by Chatham Dockyard and cost £101,700. E1 was laid down on 14 February 1911. She was launched on 9 November 1912 and was commissioned on 6 May 1913. During World War I she was part of the British submarine flotilla in the Baltic.

HMS E10 was a British E class submarine built by Vickers, Barrow-in-Furness. She was laid down on 10 July 1912 and was commissioned on 10 March 1914. She costed £105,700. E10 was lost in the North Sea on or around 18 January 1915.

HMS <i>E13</i> Submarine of the Royal Navy

HMS E13 was a British E class submarine built by HM Dockyard, Chatham. E13 was laid down on 16 December 1912 and was commissioned on 9 December 1914. The hull cost £101,900.

HMS E22 was a British E-class submarine built by Vickers, Barrow-in-Furness. She was laid down on 27 August 1914 and was commissioned on 8 November 1915.

<i>Karp</i>-class submarine Warship

The Karp class were a class of submarines built by Krupp Germaniawerft for the Imperial Russian Navy. The class, composed of three boats were ordered in the 1904 emergency programme as a result of the Russo-Japanese War. The design was a twin hull type powered by a kerosene-electric power plant with a 16-fathom diving limit. The boats were delivered late for the war and transferred to the Black Sea Fleet by rail in 1908. In 1909, Kambala was lost. The other two submarines remained in service until their withdrawal in March 1917. They were taken over in April 1918 by the Ukrainian State before being captured by the German Empire in May and transferred to the British following the German surrender in November. The British scuttled Karp and Karas in 1919 to prevent their capture by the Soviets.

<i>Morzh</i>-class submarine

The Morzh-class submarines were built for the Black Sea Fleet of the Imperial Russian Navy shortly before World War I.

<i>U-1</i>-class submarine (Austria-Hungary) Class of submarines

The U-1 class was a class of two submarines or U-boats built for and operated by the Austro-Hungarian Navy. The class comprised U-1 and U-2. The boats were built to an American design at the Pola Navy Yard after domestic design proposals failed to impress the Navy. Constructed between 1907 and 1909, the class was a part of the Austro-Hungarian Navy's efforts to competitively evaluate three foreign submarine designs.

SM <i>U-1</i> (Austria-Hungary) Austro-Hungarian Navys U-1-class submarine

SM U-1 or U-I was the lead boat of the U-1-class of submarines or U-boats built for and operated by the Austro-Hungarian Navy. U-1 was designed by American naval architect Simon Lake of the Lake Torpedo Boat Company, and constructed at the Navy Yard in Pola. She was one of two Lake-designed submarines purchased as part of a competitive evaluation of foreign submarine designs after domestic proposals were rejected by the Navy.

<i>Gazelle</i>-class cruiser Light cruisers of the Imperial German Navy

The Gazelle class was a group of ten light cruisers built for the Imperial German Navy at the turn of the 20th century. They were the first modern light cruiser design of the Imperial Navy, and set the basic pattern for all future light cruisers in Imperial service. The design of the Gazelle class attempted to merge the fleet scout with the colonial cruiser. They were armed with a main battery of ten 10.5 cm (4.1 in) guns and a pair of torpedo tubes, and were capable of a speed of 21.5 knots.

SMS <i>Augsburg</i> Light cruiser of the German Imperial Navy

SMS Augsburg was a Kolberg-class light cruiser of the German Kaiserliche Marine during the First World War. She had three sister ships, SMS Kolberg, Mainz, and Cöln. The ship was built by the Kaiserliche Werft in Kiel; her hull was laid down in 1908 and she was launched in July 1909. Augsburg was commissioned into the High Seas Fleet in October 1910. She was armed with a main battery of twelve 10.5 cm SK L/45 guns and had a top speed of 25.5 knots.

Russian submarine <i>AG-11</i> Russian submarine

The Russian submarine AG-11 was an AG-class submarine, designed by the American Holland Torpedo Boat Company/Electric Boat Company, built for the Imperial Russian Navy during World War I. The submarine was fabricated in Canada, shipped to Russia and reassembled for service with the Baltic Fleet.

Russian submarine <i>AG-22</i> Imperial Russian Navys AG-class submarine

The Russian submarine AG-22 was an AG-class submarine, designed by the American Holland Torpedo Boat Company/Electric Boat Company, built for the Imperial Russian Navy during World War I. The submarine was fabricated in Canada, shipped to Russia and reassembled for service with the Black Sea Fleet. Her reassembly was completed in 1919 by the White Movement during the Russian Civil War, and she joined Wrangel's fleet as it evacuated the Crimea in 1920 and was interned in Bizerte, Tunisia in 1921. AG-22 was abandoned there and subsequently scrapped.

Soviet submarine <i>K-43</i> Soviet-made Charlie-class nuclear-powered cruise missile submarine

K-43 was a Charlie-class nuclear-powered cruise missile submarine operated by the Soviet and Indian navies. It was built between 1964 and 1967 and was commissioned into the Soviet navy on 5 November 1967. It later served as INS Chakra in the Indian Navy from 1988 to 1991.

Soviet submarine <i>K-70</i> Soviet Juliett-class cruise-missile submarine

K-70 was a "Project 651" diesel–electric submarine built for the Soviet Navy during the 1960s. Commissioned in 1965, the boat was armed with long-range cruise missiles to carry out its mission of destroying American aircraft carriers and bases. The missiles could be fitted with either conventional or nuclear warheads. K-70 was initially assigned to the Northern Fleet, but was transferred to the Pacific Fleet a few months later. The submarine was decommissioned in 1989 and subsequently scrapped.

References