| Line 7 | |
|---|---|
| | |
| A line 7 train entering Jinjiaqiao South station | |
| Overview | |
| Status | In operation (Moyang to Changlou is postponed, Chunqiulu to Moyang is under construction) |
| Owner | Suzhou Rail Transit Co., Ltd |
| Termini | |
| Stations | 29 |
| Service | |
| Type | Rapid transit |
| System | Suzhou Metro |
| Operator(s) | Suzhou Rail Transit Co., Ltd |
| Technical | |
| Line length | 35.2 km |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line 7 of the Suzhou Metro is north-south rapid transit line in Suzhou. Construction started on December 25, 2019. Changlou - Hongzhuang section started operation on December 1, 2024, but the operation of Moyang - Changlou section is postponed due to the construction of Suzhou North railway station.
The section between Hongzhuang and Muli stations was previously operated as branch line of Line 4. [1] The combined line will be 40.6 km long. In addition, a 4-station, 7.11 km northern extension from Moyang to Chunqiu Road started construction in May 2022, for an opening in 2026.
| Segment | Commencement | Length | Station(s) | Name |
|---|---|---|---|---|
| Hongzhuang — Muli | 15 April 2017 | 11.1 km (6.90 mi) | 7 | Phase 1 south section (taken over from line 4 branch) |
| Changlou — Hongzhuang | 1 December 2024 [3] | 20 | Phase 1 middle section | |
| Moyang — Changlou | 2027? | 4 | Phase 1 north section | |
| Baidang South | 1 | infill station |
| Station name [4] | Connections | Distance km | Location | Notes | ||
|---|---|---|---|---|---|---|
| English | Chinese | |||||
| Chunqiulu | 春秋路 | - | 0 | Xiangcheng | Northern extension. Under construction | |
| Chunguanglu | 春光路 | - | ||||
| Yongchanglu | 永昌路 | |||||
| Shiganglu | 石港路 | |||||
| Moyang | 莫阳 | 4 | - | Operation postponed | ||
| Zhujing | 朱泾 | |||||
| Suzhou North Railway Station | 高铁苏州北站 | 2 10 | ||||
| Xuenan | 雪南 | |||||
| Changlou | 常楼 | |||||
| Dengyun | 登云 | |||||
| Litanghelu | 蠡塘河路 | |||||
| Chunshenhudonglu | 春申湖东路 | |||||
| Huayuanlu East | 华元路东 | |||||
| Baidang North | 白荡北 | 8 | ||||
| Baidang South | 白荡南 | |||||
| Banjing | 板泾 | SIP | ||||
| Yangjing | 洋泾 | |||||
| Jicuiqiao | 积翠桥 | |||||
| Central Park | 中央公园 | 1 | ||||
| Reyunqiao | 惹云桥 | 6 | ||||
| Huangtiandang | 黄天荡 | 5 | ||||
| Loufeng | 娄葑 | |||||
| Qunli | 群力 | |||||
| Tongyuanlu South | 通园路南 | 3 | ||||
| Linjiatan | 林家潭 | Wuzhong | ||||
| Guoxiang | 郭巷 | 2 | ||||
| Yinshan | 尹山 | |||||
| Jinjiaqiao South | 金家桥南 | |||||
| Fengjinlu | 枫津路 | |||||
| Hongzhuang | 红庄 | 4 | ||||
| Lishu | 蠡墅 | |||||
| Shihu Moshe | 石湖莫舍 | |||||
| Yuexi | 越溪 | |||||
| Wenxi Lu | 文溪路 | |||||
| Tian'edang Lu | 天鹅荡路 | |||||
| Suzhouwan North | 苏州湾北 | |||||
| Muli | 木里 | |||||
| Fleet numbers | Year Built | Time in service | Builder | Class | Number in service | No of car | Assembly | Rolling stock | Number | Depots | Line assigned | Notes |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 396 (66 sets) | 2023-2025 (planned) | N/A | CRRC Nanjing Puzhen | B | Never built | 6 | Tc+Mp+M - M + Mp+Tc | PM227 | 070101-076606 (0701-0766) | None | 7 (planned) | The order scrapped in February 2023. |
| 300 (50 sets) | 2023-2025 [a] | 2024-present | CRRC Nanjing Puzhen | B | 132 (22 sets) | 6 | Tc+Mp+M - M + Mp+Tc | PM259 | 070101-075006 (0701-0750) | Tian'Edang Yard Songling Depot Yuanhe Yard | 7 | Converted from PM101, PM102 and PM116. |