London to Brighton in Four Minutes

Last updated

London to Brighton in Four Minutes
London to Brighton in Four Minutes (cropped).jpg
Title card of 1953 film
GenreDocumentary
Directed byDon Smith
Narrated byDavid Lloyd James
ComposersDavid Hart, "Sabre Jet"
Production
Running time5:24 minutes
Original release
Network BBC Television
Release1953 (1953)

London to Brighton in Four Minutes is a short film produced by the BBC Film Unit in the early 1950s showing a train journey from London Victoria to Brighton in England. The camera was manually undercranked to produce a fast motion film so that the journey lasted only four minutes instead of the actual time of about one hour.

Contents

It was originally shown on BBC Television's Children's Newsreel and over the years its frequent repeat transmissions became very popular with British television viewers of all ages. Later versions were produced, particularly in 1983 and 2013, showing some of the cultural and operational changes that had taken place. The films show the train driver's view ahead during a journey aboard the Brighton Belle .

1953 BBC Film Unit film

The BBC Film Unit's London to Brighton in Four Minutes is a short film about a London to Brighton train journey, produced in 1953. [note 1] It was mostly filmed from the driver's point of view looking straight ahead [note 2] with the filming done so that the journey was spectacularly fast, lasting only four minutes instead of the real travel time of about one hour. [1] [7] The ride was aboard the Brighton Belle , a Pullman train, along the Brighton Main Line from London Victoria to Brighton on the south coast of England. [4] [7]

The film was made by Don Smith and the first version was narrated by David Lloyd James for an edition of BBC Television's Children's Newsreel regular weekend programme. [4] [7]

Video of the film and subsequent history
Nuvola apps kaboodle.svg1953: London to Brighton in Four Minutes London to Brighton Train Journey: 1953 – uploaded to YouTube by BBC South. [1]
Nuvola apps kaboodle.svg1983: London to Brighton in 3½ Minutes London to Brighton Train Journey: 1983 – uploaded to YouTube by BBC South. [8]
Nuvola apps kaboodle.svg2013: London to Brighton by Train in 3 minutes 18 seconds London to Brighton Train Journey: 2013. – uploaded to YouTube by BBC South. [9]
Nuvola apps kaboodle.svg1953–2013: London to Brighton Side by Side London to Brighton Train Journeys: 1953 - 2013 – uploaded to YouTube by BBC South. [10] [note 3]
Nuvola apps kaboodle.svg2013 BBC report: London to Brighton Train Journeys: 1953 - 2013 – uploaded to YouTube by BBC South. [12] [13]
Nuvola apps kaboodle.svgActive map and 2013 film Active map synchronised with embedded YouTube video – video content uploaded to YouTube by BBC South. [note 4] [14]

For the most part the camera was manually undercranked at about two frames per second for fast motion display at 25 frames per second. [4] The film's commentator described this as "trick photography" and said the train was appearing to run the 51 miles (82 km) at an average speed of 765 miles per hour (1,231 km/h). [1] 35 mm film was used and each time a 100-foot (30 m) film magazine ran out and was replaced, normal-speed shots of the engine driver were slotted in for continuity. The soundtrack of music and background noises were recorded magnetically for over-dubbing – the sound of the train was actually that of a jet engine and clapping was used for the noises at station platforms and through bridges and tunnels. [4] [7] The music is "Sabre Jet" composed by David Hart. [note 5] [16]

Later, a version with a different commentary was made for the main Television Newsreel programme with a name change to Go Slow on the Brighton Line. Whereas the children's version only has narration at the beginning and end of the journey, in the revised version with a different narrator the names of some of the stations being passed are mentioned. [4]

Subsequent programmes

In the early years of BBC television the film was transmitted quite often as part of their normal schedule and became very well known to the television audience. [5] [17] [18] As such it was a dramatic variation on the BBC's rather frequent "interludes" (such as the "Potter's Wheel") which were merely gap-fillers between programmes and which had a generally tranquil atmosphere. [19] [20] The BBC still shows the film on rare occasions. [5] [21] To show the changing conditions over two periods of thirty years the journey was also filmed in 1983 and 2013, again using time-lapse photography to show the journeys at high speed. [13] [22] [note 6] In addition, a version was produced showing the three films synchronised side by side. [10]

Changes between 1953 and 2013

In 1953 Brighton Main Line was operated by the Southern Region of British Railways, then recently nationalised. The Brighton Belle operated using electrical multiple units running on the third-rail system previously introduced by Southern Railway. [6]

In 1958 the small station for Gatwick Racecourse was enlarged and renamed Gatwick Airport serving the rapidly expanding Gatwick Airport. The 1963 Beeching Report led to steam locomotives being withdrawn from the line and the closure of many branch lines and nearly all goods yards. [23] The Brighton Belle named-train service was ended in 1972. [24] In 1982 Southern Region became the London and South Eastern sector and the following year all signal boxes were replaced by three rail operating centres. The express service between Victoria and Gatwick Airport was taken over by the InterCity sector in 1984 and rebranded Gatwick Express . The privatisation of British Rail in the mid-1990s led to six different rail franchises all running on the Brighton Line; Connex South Central, Connex South Eastern, Gatwick Express, Thameslink, Thames Trains and Virgin CrossCountry. [25]

By 2013, while freight on the Brighton Line had almost disappeared and the complexity of branch lines had diminished, passenger traffic boomed with a new town at Crawley, expanded business at Brighton and Croydon, and increased traffic at Gatwick Airport. The 1988 Thameslink project opened the way for through trains to run between Brighton and Bedford, north of London – this route does not go to Victoria but branches off to cross the River Thames at Blackfriars Railway Bridge and reaches north of London via the reopened Snow Hill tunnel. [25]

BBC South Today produced news reports in 2013 describing the changes on the journey between 1953 and 2013. [12] [13] Because of heavier traffic there were no longer any non-stop journeys between the two stations so the 2013 film had to be filmed on a special train running early on a Sunday morning. All the same, the fastest scheduled journey time had been reduced from 60 minutes to 47 minutes with the maximum train speed being increased from 75 miles per hour (121 km/h) to 90 miles per hour (140 km/h). Ticket inspectors had been replaced by automatic barriers and by 2013 the railway staff were no longer nearly all men. [note 7] In 1953 there were still steam trains running on the line although the Brighton Belle itself was electric. The number of railway branch lines had been reduced so there were fewer points and sidings but the number of trains had doubled and there were more than twice as many passengers. The railway line and train operators had both been privatised and the trains had become air-conditioned. In 1953 the return fare was 15/- (75 pence), that is to say £18.75 by 2013 allowing for inflation, while in 2013 the fare was actually £28.80 ($45.02 in 2013). [12] [13]

Route taken

The Brighton Main Line runs from London Victoria and terminates at Brighton. An animated map of the route, synchronised with the 2013 film of the journey has been produced on an external website using innovative software. A map showing the position of the train as it travels is displayed along with the film of the 2013 journey. [14] [note 4]

Selected locations on route London to Brighton Main Line locations.svg
Selected locations on route
Video times in minutes and seconds at selected locations
LocationAnimated map
with 2013

time [14]

1953, 1983, 2013
side-by-side
time [10]
Distance [28]
Victoria station 0:170:290  miles 0  chains (0 km) [note 8]
Victoria Railway Bridge
(River Thames)
0:200:340 miles 57 chains (1.1 km)
Battersea Park 0:230:361 mile 15 chains (1.9 km)
Clapham Junction 0:310:452 miles 49 chains (4.2 km)
Balham 0:390:524 miles 44 chains (7.3 km)
Norbury 0:491:027 miles 28 chains (11.8 km)
East Croydon 1:021:1610 miles 30 chains (16.7 km) [note 9]
Quarry Tunnel
M23/M25
1:331:4618 miles 42 chains (29.8 km)
Redhill Tunnel 1:421:5421 miles 74 chains (35.3 km)
Gatwick Airport 1:582:1126 miles 55 chains (42.9 km) [note 10]
Three Bridges 2:062:1929 miles 29 chains (47.3 km)
M23 2:122:2531 miles 2 chains (49.9 km)
Balcombe tunnel 2:162:3032 miles 62 chains (52.7 km)
Ouse Valley Viaduct 2:292:4235 miles 67 chains (57.7 km)
Haywards Heath 2:382:5237 miles 67 chains (60.9 km)
Haywards Heath Tunnel 2:402:5338 miles 25 chains (61.7 km)
Burgess Hill 2:543:0741 miles 47 chains (66.9 km)
Hassocks 3:023:1643 miles 50 chains (70.2 km)
Clayton Tunnel/A23 3:073:2245 miles 74 chains (73.9 km)
Patcham Tunnel/A27 3:223:3647 miles 73 chains (77.1 km)
Brighton railway station 3:353:4850 miles 57 chains (81.6 km)

See also

Notes

  1. Sources differ – the BBC and the British Film Institute give 1953 [1] [2] whereas IMDb and some other sources give 1952. [3] [4] [5]
  2. The driver was at the front of the first carriage – the train was an electric multiple unit with no separate locomotive. [6]
  3. See also on BBC News. [11]
  4. 1 2 The active map is similar to the display on a GPS device.
  5. David Hart is a pseudonym of William Granville Chapman. [15]
  6. The three films are 1953, [1] 1983 [8] and 2013. [9]
  7. The 2013 reports variously say "In 1953 almost all rail workers were men. Today, the train dispatcher is a woman." [12] and "In 1953 every railway worker was male. Today, many of the platform staff are women." [13] Comment: in 2018 16% of the UK's Network Rail staff were women, [26] and in 2019 5% of train drivers were women. [27]
  8. 8 chains subtracted because the buffer stops at Victoria are not the zero point
  9. 10 chains added to account for the difference between Victoria and London Bridge mileages
  10. 6 chains added to account for the difference between Quarry and Redhill routes

Related Research Articles

<span class="mw-page-title-main">Gatwick Express</span> British high-frequency rail passenger service

Gatwick Express is an express rail passenger service between ‹See TfM›London Victoria, Gatwick Airport, Haywards Heath and Brighton in South East England. It is the brand name used by the Govia Thameslink Railway train operating company on the Gatwick Express route of the Thameslink, Southern and Great Northern franchise.

<span class="mw-page-title-main">Southern (Govia Thameslink Railway)</span> British train operating company

Southern is the brand name used by the Govia Thameslink Railway (GTR) train operating company on the Southern routes of the Thameslink, Southern and Great Northern franchise in England. It is a subsidiary of Govia, a joint venture between transport groups Go-Ahead and Keolis, and has operated the South Central franchise since August 2001 and the Gatwick Express service since June 2008. When the passenger rail franchise was subsumed into GTR, Southern was split from Gatwick Express and the two became separate brands, alongside the Thameslink and Great Northern brands.

<span class="mw-page-title-main">Clapham Junction railway station</span> Major railway station in London, England

Clapham Junction is a major railway station near St John's Hill in south-west Battersea in the London Borough of Wandsworth, England, 2 miles 57 chains from ‹See TfM›London Victoria and 3 miles 74 chains from ‹See TfM›London Waterloo. Despite its name, Clapham Junction is not in Clapham, a district 1 mile (1.6 km) to the south-east.

<span class="mw-page-title-main">London Victoria station</span> London Underground and railway station

Victoria station, also known as London Victoria, is a central London railway terminus and connected London Underground station in Victoria, in the City of Westminster, managed by Network Rail. Named after the nearby Victoria Street, the main line station is a terminus of the Brighton Main Line to Gatwick Airport and Brighton and the Chatham Main Line to Ramsgate and Dover via Chatham. From the main lines, trains can connect to the Catford Loop Line, the Dartford Loop Line, and the Oxted line to East Grinstead and Uckfield. Southern operates most commuter and regional services to south London, Sussex and parts of east Surrey, while Southeastern operates trains to south-east London and Kent, alongside limited services operated by Thameslink. Gatwick Express trains run direct to Gatwick. The London Underground station is on the Circle and District lines between Sloane Square and St James's Park stations, and on the Victoria line between Pimlico and Green Park stations. The area around the station is an important interchange for other forms of transport: a local bus station is in the forecourt and Victoria Coach Station is nearby.

<span class="mw-page-title-main">Brighton railway station</span> Railway station in Brighton, East Sussex, England

Brighton railway station is the southern terminus of the Brighton Main Line, the western terminus of the East Coastway Line and the eastern terminus of the West Coastway Line in England, and the principal station serving the city of Brighton, East Sussex. It is 50 miles 49 chains from ‹See TfM›London Bridge via Redhill.

<span class="mw-page-title-main">Gatwick Airport railway station</span> Railway station in West Sussex, England

Gatwick Airport railway station is on the Brighton Main Line in West Sussex, England. It serves Gatwick Airport, 26 miles 47 chains (42.8 km) down the line from ‹See TfM›London Bridge via Redhill. The platforms are about 70 metres (230 ft) to the east of the airport's South Terminal, with the ticket office above the platforms and station entrances and exits directly connected to the terminal. The station is also connected to the airport's North Terminal by the Airport Shuttle people-mover. Gatwick Airport was the busiest station in South East England region from 2017 to 2018. There have been two stations at Gatwick, sited about 0.85 miles (1.37 km) from each other. It is the busiest station in both West Sussex and South East England, and the sixth busiest station in the UK outside of London.

<span class="mw-page-title-main">British Rail Class 460</span> Class of British electric multiple-unit trains built in 1999-2001

The British Rail Class 460 Juniper (8-GAT) was a class of electric multiple-unit passenger trains built by Alstom at Washwood Heath between 1999 and 2001. They were part of Alstom's Coradia Juniper family, which also includes Classes 334 and 458.

<span class="mw-page-title-main">British Rail Class 442</span> British Electric passenger trains

The British Rail Class 442 (5-WES) Wessex Electrics were electric multiple unit passenger trains introduced in 1988 by Network SouthEast on the South West Main Line from London Waterloo to Weymouth to coincide with the electrification of the line from Bournemouth. Twenty-four five-car units were built by British Rail Engineering Limited's Derby Litchurch Lane Works.

<span class="mw-page-title-main">Brighton Main Line</span> Railway line between London and Brighton

The Brighton Main Line is a railway line in southern England linking London to Brighton. It starts at two termini in the capital, London Victoria and London Bridge, and the branches from each meet at East Croydon, from where the route continues southwards via Gatwick Airport to the coast. The line serves the suburbs of South London, as well as the towns of Redhill, Horley, Crawley, Haywards Heath and Burgess Hill.

<span class="mw-page-title-main">Arun Valley line</span> Railway line in the UK

The Arun Valley line, also known as the Mid Sussex line, is part of the Southern- and Thameslink-operated railway services. For the initial part of the route trains follow the Brighton Main Line, and at a junction south of Three Bridges the route turns westwards. It then runs via Crawley, Horsham and Arundel, before meeting the West Coastway line at Arundel Junction. Trains on the Arun Valley line then proceed to either Bognor Regis or Portsmouth Harbour.

<span class="mw-page-title-main">North Downs Line</span> Railway line in southern England

The North Downs Line is a railway line in South East England. It runs for 45 miles 40 chains (73.2 km) from Reading in Berkshire to Redhill in Surrey. It is named after the North Downs, a range of chalk hills that runs parallel to the eastern part of the route. The name was introduced in 1989 by Network SouthEast, the then operator. The North Downs Line serves the settlements in the Blackwater Valley as well as the towns of Guildford, Dorking and Reigate. It acts as an orbital route around the south and southwest of London and has direct connections to the Great Western Main Line at Reading, the Waterloo-Reading line at Wokingham, the Alton line at Ash, the Portsmouth Direct Line at Guildford and the Brighton Main Line at Redhill.

<span class="mw-page-title-main">Salfords railway station</span> Railway station in Surrey, England

Salfords railway station serves the village of Salfords in Surrey, England. The station is sometimes shown as Salfords (Surrey) in timetables to differentiate it from the two stations in Salford, Greater Manchester. It is on the Brighton Main Line, 23 miles 37 chains (37.8 km) down the line from ‹See TfM›London Bridge via Redhill and is managed by Southern. Train services are provided by Thameslink and Southern.

<span class="mw-page-title-main">Luton Airport Parkway station</span> Railway station in Bedfordshire, England

Luton Airport Parkway station is on the Midland Main Line in England, serving south Luton and Luton Airport in Bedfordshire. The station is situated in Luton's Park Town district, being 29.27 miles (47.11 km) from London St Pancras between Harpenden to the south and Luton to the north. Its three-letter station code is LTN, also the IATA code for the airport.

<span class="mw-page-title-main">Redhill–Tonbridge line</span> Railway line in South East England

The Redhill–Tonbridge line is a 19-mile-56-chain (31.7 km) railway line in South East England. It runs from the Brighton Main Line at Redhill in Surrey to the South Eastern Main Line at Tonbridge in Kent. There are five intermediate stations: Nutfield, Godstone, Edenbridge, Penshurst and Leigh. All passenger services run as all-stations shuttles between Redhill and Tonbridge, and are operated by Southern using Class 377 electric multiple units.

<span class="mw-page-title-main">Transport in London</span> Transport network serving London and surrounding regions

London has an extensive and developed transport network which includes both public and private services. Journeys made on its integrated transport network account for 37% of London's journeys while private services accounted for 36% of journeys, walking 24% and cycling 2%, according to numbers from 2017. London's public transport network serves as the central hub for the United Kingdom in rail, air and road transport.

<i>Brighton Belle</i> British luxury train between Brighton and London

The Brighton Belle was a named train which was operated by the Southern Railway and subsequently by British Rail from Victoria Station in London to Brighton, on the Sussex coast. Commissioned as the flagship of the Southern Railway's mass electrification project, which commenced in January 1931, the world's only electric all-Pullman service ran daily between London Victoria and Brighton from 1 January 1933 until 30 April 1972.

<i>Top Gear</i> Race to the North Race held in 2009

The Race to the North is an episode of Top Gear that featured a three-way race held in 2009 between a Jaguar XK120 car, a Vincent Black Shadow motorcycle, and railway locomotive 60163 Tornado – a brand new mainline steam engine completed in Britain in 2008. The race saw the car, bike and locomotive, race from London, England, to Edinburgh, Scotland, a journey of around 400 miles (640 km). Eighteen months in the planning, the race was filmed in secret on 25 April 2009, and shown on 21 June 2009 as the first episode of the thirteenth series of Top Gear

<span class="mw-page-title-main">Govia Thameslink Railway</span> British train operating company

Govia Thameslink Railway (GTR) is a British train operating company that operates the TSGN rail franchise. Within the franchise, GTR runs trains under the sub-brands: Thameslink, Great Northern, Southern, and Gatwick Express. GTR is a subsidiary of Govia, which is itself a joint venture between the British Go-Ahead Group (65%) and French company Keolis (35%).

<span class="mw-page-title-main">Luton DART</span> Automated train to Luton Airport in England

The Luton DART is an airport rail link in Luton, Bedfordshire, England, which connects Luton Airport Parkway station and Luton Airport using a Cable Liner automated people mover system. DART is an acronym for Direct Air–Rail Transit. The line, which opened in March 2023, replaces the shuttle bus service, with the aim of reducing road congestion and reducing journey times from London St Pancras to the airport terminal to 32 minutes.

<span class="mw-page-title-main">Heathrow Airport transport proposals</span>

Over the years, a number of transport proposals have been made to improve public access to Heathrow Airport, near London in the United Kingdom.

References

Citations

  1. 1 2 3 4 5 "London to Brighton Train Journey: 1953". Film produced by BBC Film Unit. BBC South Today. 1953. Archived from the original on 2 September 2013. Retrieved 14 August 2019.{{cite web}}: CS1 maint: others (link)
  2. "London to Brighton in Four Minutes (1953)". British Film Institute. Archived from the original on 14 August 2019. Retrieved 14 August 2019.
  3. "London to Brighton in Four Minutes". Internet Movie Database. Archived from the original on 10 February 2017. Retrieved 14 August 2019.
  4. 1 2 3 4 5 6 Dungate, Arthur. "BBC TV from AP – TV Newsreels". www.bbctv-ap.co.uk. Archived from the original on 14 August 2019. Retrieved 14 August 2019.
  5. 1 2 3 Emmerson, Andy. "405 Alive – Information – Interludes". www.bvws.org.uk. Archived from the original on 13 February 2012. Retrieved 14 August 2019.
  6. 1 2 Jeffs (2013), pp. 10–11.
  7. 1 2 3 4 "An experiment in slow speed camera work by director Don Smith". Huntley Film Archives. Archived from the original on 14 August 2019. Retrieved 14 August 2019.
  8. 1 2 Haunch, Nigel (27 August 2013). "London to Brighton Train Journey: 1983". Film produced by BBC. BBC South Today . Retrieved 14 August 2019.
  9. 1 2 "London to Brighton Train Journey: 2013". BBC South Today. 27 August 2013. Retrieved 14 August 2019.
  10. 1 2 3 "London to Brighton Train Journey: 1953–2013 side by side". BBC Productions South. 27 August 2013. Retrieved 14 August 2019.
  11. Clifton, Paul (28 August 2016). "How the London to Brighton train ride has changed in 60 years". BBC News. Archived from the original on 15 August 2019. Retrieved 15 August 2019.
  12. 1 2 3 4 Clifton, Paul (27 August 2013). "London to Brighton Train Journey: 1953 - 2013". BBC South Today . Retrieved 14 August 2019.
  13. 1 2 3 4 5 Clifton, Paul (28 August 2013). "London to Brighton non-stop: Tracking the changes to a seaside rail journey". BBC South Today. Archived from the original on 8 November 2017. Retrieved 15 August 2019.
  14. 1 2 3 Clarke, Keir (2 October 2018). "Maps Mania: London to Brighton in Four Minutes". Maps Mania. Archived from the original on 7 December 2018. Retrieved 16 August 2019. fails to link to the synchronised map and video which is now at "WebVMT linked to an embedded YouTube video". webvmt.org. Video produced by BBC South. Away Team Software Limited. Retrieved 16 August 2019.{{cite web}}: CS1 maint: others (link)
  15. "David Hart (3)". Discogs. Archived from the original on 14 August 2019. Retrieved 14 August 2019.
  16. Ades, David (27 May 2014). "Robert Farnon Society – Highdays and Holidays". www.robertfarnonsociety.org.uk. Archived from the original on 14 August 2019. Retrieved 14 August 2019.
  17. Craven, John (25 July 2019). Headlines and Hedgerows: A Memoir. Penguin Books Limited. pp. 113–114. ISBN   978-1-4059-3268-4. One of its films ... became part of television history
  18. Redmond, Phil (15 August 2013). Mid-Term Report: From Grange Hill to Hollyoaks, Via Brookside. Penguin Random House. p. 16. ISBN   978-0-09-956916-9.
  19. Dungate, Arthur. "BbC Television from Alexandra Palace – Interludes". www.bbctv-ap.co.uk. Archived from the original on 22 March 2016. Retrieved 14 August 2019.
  20. Martin, Andrew (4 September 2014). Belles and Whistles: Journeys Through Time on Britain's Trains. Profile Books. pp. 89–90. ISBN   978-1-78283-025-2.
  21. "BBC Two – London to Brighton in Four Minutes". BBC. Archived from the original on 14 March 2010. Retrieved 14 August 2019.
  22. Cade, D.L. (29 August 2013). "Time-Lapse Captures the Train Ride from London to Brighton in 1953, '83 and 2013". petapixel.com. Archived from the original on 5 March 2017. Retrieved 15 August 2019.
  23. Jeffs (2013), p. 11.
  24. "Bringing Back the Brighton Belle". Brighton Belle: iconic 1930s all-electric Pullman Train. 5BEL Trust. Archived from the original on 18 June 2019. Retrieved 18 August 2019.
  25. 1 2 Jeffs (2013), pp. 12–13.
  26. "A woman's place". Network Rail. Archived from the original on 17 August 2019. Retrieved 17 August 2019.
  27. "Only five percent of UK train drivers are women". theHRDIRECTOR. 7 March 2019. Archived from the original on 17 August 2019. Retrieved 17 August 2019.
  28. Yonge, John (November 2008) [1994]. Jacobs, Gerald (ed.). Railway Track Diagrams 5: Southern & TfL (3rd ed.). Bradford on Avon: Trackmaps. maps 2, 4, 14C, 15, 16. ISBN   978-0-9549866-4-3.

Works cited