Modern (Seattle building)

Last updated
Third and Lenora
Third and Lenora (Selig) under construction, Oct 2019.jpg
Under construction in October 2019
Modern (Seattle building)
Former namesThird and Lenora
General information
StatusCompleted
TypeMixed use
Location2031 3rd Avenue
Seattle, Washington, US
Coordinates 47°36′46″N122°20′32″W / 47.61278°N 122.34222°W / 47.61278; -122.34222
Construction startedSeptember 2017
Topped-outAugust 2019
Completed2020
Height
Architectural440 ft (130 m)
Top floor440 ft (130 m)
Technical details
Floor count38
Floor area700,000 square feet (65,000 m2)
Design and construction
Architecture firm Perkins and Will
Developer Martin Selig Real Estate
Civil engineerKPFF Consulting Engineers
Main contractor Lease Crutcher Lewis
Other information
Number of units222 apartments
Parking221 spaces
Website
3rdandlenora.com
References
[1]

The Modern (formerly Third and Lenora) is a mixed-use high-rise building in the Belltown neighborhood of Seattle, Washington, United States. The 38-story tower, developed by Martin Selig, includes offices, retail, and 222 residential units. Construction began in September 2017 and was completed in 2020. It was originally leased to The We Company for use by their WeWork co-working and WeLive co-living ventures until the company ran into financial issues and the lease was terminated after the building was topped out. [2]

Contents

History

Martin Selig Real Estate announced its intention to build a 36-story residential and office tower in October 2014, shortly after purchasing three buildings on 3rd Avenue near Lenora Street for a total of $16.9 million. [3] One of the block's buildings housed the Jewish Federation of Greater Seattle and was the site of a shooting in 2006. [4] [5]

The mixed-use project initially had 140 luxury apartments and 13 floors of office space, but was changed to 384 market-rate apartments and 9 floors of offices during design review. [6] The downtown design review board approved the revised design in March 2016. [7] Co-working company WeWork was announced as the building's main tenant in September by Selig, and confirmed in August 2017. [8] WeWork was planned to occupy 200,000 square feet (19,000 m2) of office space on the lower nine floors, while the upper 23 floors would have 384 co-living residential units under the WeLive brand. [9]

The city government approved the design of Selig's Third and Lenora project in April 2017, with no major conditions or changes. [10] The owner of a nearby printing shop filed an appeal of the city's design approval over the width of the tower, measuring 178 feet (54 m) facing 3rd Avenue, but the hearing examiner declined to take action. [11] [12] The three buildings on the site were demolished in August 2017 and construction of the Third and Lenora building began a month later under the direction of general contractor Lease Crutcher Lewis. [13] [14]

The building was topped out in August 2019 with the completion of steel framing for the two-story penthouse and amenities center. [15] In October 2019, Martin Selig Real Estate announced that its lease with WeWork would be terminated by mutual agreement amid the latter's financial situation following its cancelled initial public offering. [16] [17] Selig stated that he would continue to work on the near-complete building, which was originally scheduled to open in late 2020. [2] The opening was pushed back to late 2021 due to the COVID-19 pandemic and additional work required to convert the WeLive units to 222 apartments. A children's play area is planned for the 12th floor as part of the conversion to larger apartments for families. The project was renamed the "Modern" in late 2020. [18]

Leasing of the residential units began in 2022 while the office portion remained vacant. A proposal to convert the office portion into 160 residential units on eight floors was filed by Selig in January 2024. [19]

Design

The Modern was designed as a mixed-use development with 38 stories and a total of 700,000 square feet (65,000 m2) of space. It has 5,500 square feet (510 m2) of retail space, 176,500 square feet (16,400 m2) of offices on nine floors, and 222 residential units. [18] The building has a five-level underground parking garage with 221 spaces. [15] The top two floors of the building are an amenity space for residents with a gym and a "conservatory". [6] The project was designed by Perkins and Will and features a large setback above the 12th floor and a mid-level terrace to separate the office and residential floors. [11] [20]

Related Research Articles

<span class="mw-page-title-main">F5 Tower</span> 660-foot-tall skyscraper in Downtown Seattle, Washington

F5 Tower is a 660-foot-tall (200 m) skyscraper in Downtown Seattle, Washington. It consists of 44 floors and is the sixth-tallest building in Seattle.

<span class="mw-page-title-main">West Edge Tower</span> 440-foot-tall residential skyscraper in Seattle, Washington

2nd & Pike, also known as the West Edge Tower, is a 440-foot-tall (130 m) residential skyscraper in Seattle, Washington. The 39-story tower, developed by Urban Visions and designed by Tom Kundig of Olson Kundig Architects, has 339 luxury apartments and several ground-level retail spaces. The 8th floor includes a Medical One primary care clinic.

<span class="mw-page-title-main">Cirrus (Seattle building)</span> Residential skyscraper in Seattle, Washington, US

Cirrus is a 440-foot-tall (130 m) residential skyscraper in the Denny Triangle neighborhood of Seattle, Washington. The building, named after the cirrus cloud, has 41 floors and is located at the intersection of Westlake Avenue, 8th Avenue and Lenora Street. Construction on Cirrus, then known as 2030 8th Avenue, began in May 2013 and opened in 2015. The building was originally designed for condominiums but was reconfigured for smaller apartments by architects Weber Thompson after GID Development desired a move to the rental market.

<span class="mw-page-title-main">4/C</span> Proposed supertall skyscraper in Seattle, Washington

4/C, also known as 4th & Columbia, is a proposed supertall skyscraper in Seattle, Washington, United States. If built, the 1,020-foot-tall (310 m), 91-story tower would be the tallest in Seattle, surpassing the neighboring Columbia Center, and the first supertall in the Pacific Northwest. The project has been under development by Miami-based Crescent Heights since 2015 and undergone several design changes and modifications under three architecture firms. As of 2023, 4/C is expected to have 1,090 residential units—apartments up to the 64th floor and condominiums from the 65th to 90th floor—along with several coworking and retail spaces. The latest version was designed by Skidmore, Owings & Merrill.

<span class="mw-page-title-main">Federal Reserve Bank Building (Seattle)</span> Historic bank building in Seattle, Washington

The Federal Reserve Bank Building, also known as the Federal Reserve Bank of San Francisco, Seattle Branch, served as the offices of the Seattle branch of the Federal Reserve Bank of San Francisco for over 50 years, from 1951 to 2008.

<span class="mw-page-title-main">Arrivé</span> High-rise hotel and residences in Seattle, Washington, US

Arrivé is a 440-foot (130 m), 41-story skyscraper in the Belltown neighborhood of Seattle, Washington. The $190 million project, originally named Potala Tower after the Potala Palace in Tibet, was designed by Weber Thompson and consists of 342 apartments and a 142-room hotel. It was financed partially by Chinese nationals through the EB-5 visa program and began construction in April 2015.

<span class="mw-page-title-main">Helios (building)</span> Residential skyscraper in downtown Seattle, Washington

Helios, also known as 2nd & Pine, is a residential skyscraper in downtown Seattle, Washington. The 40-story tower is 440 feet (130 m) tall with 398 luxury apartments. Plans for the project were first proposed in 2013 and construction began in late 2014. It is located at the intersection of 2nd Avenue and Pine Street near the Pike Place Market and the city's retail core.

<span class="mw-page-title-main">AMLI Arc</span> Skyscraper and mixed-use building complex in Seattle, Washington

AMLI Arc, also known as Tilt 49, is a mixed-use building complex in Seattle, Washington, United States. It consists of two buildings, both facing Boren Avenue between Stewart and Howell streets: a 41-story, 440-foot-tall (130 m) residential skyscraper with 368 apartments to the south; and an 11-story, 307,296-square-foot (28,548.7 m2) office building with retail space to the north. Tilt 49 shares this block with the Kinects residential tower as well as the cancelled Daola Tower.

<span class="mw-page-title-main">Stratus (building)</span> Residential high-rise building in Seattle, Washington

Stratus is a residential high-rise building in Seattle, Washington. The 43-story skyscraper, located in the Denny Triangle neighborhood, was completed in 2017, with 396 apartments and ground-floor retail space.

<span class="mw-page-title-main">Qualtrics Tower</span> High-rise office building in Seattle, Washington, U.S.

Qualtrics Tower, formerly known as 2+U and 2&U, is a high-rise office building in Downtown Seattle, Washington. The 500-foot-tall (150 m), 38-story tower is located at 2nd Avenue and University Street and was completed in 2020. The building has 725,000 square feet (67,400 m2) of leasable space, including retail and public spaces on the lower levels. The largest office tenant is Qualtrics, who also hold the naming rights to the building.

<span class="mw-page-title-main">McGuire Apartments</span> Demolished high-rise building in Seattle, Washington

The McGuire Apartments was a 25-story apartment building in the Belltown neighborhood of Seattle, Washington. The $32 million, 272-unit building opened in 2001, but was closed in 2010 after the discovery of major structural flaws and corrosion that forced evacuation and demolition. The building was demolished in 2011 using heavy machinery and filled with dirt. The site was re-excavated in 2017 for a new residential building that opened in 2019.

<span class="mw-page-title-main">Rainier Square Tower</span> High-rise office and residential building in Seattle, Washington, United States

Rainier Square Tower is a mixed-use skyscraper in the Metropolitan Tract of downtown Seattle, Washington. The 850-foot (260 m) tall, 58-story tower is located at Union Street between 4th and 5th Avenues adjacent to the existing Rainier Tower; it is the second-tallest building in Seattle. The $600 million project was completed in 2020, and is the tallest building constructed in the city since the construction of the Columbia Center in 1985.

<span class="mw-page-title-main">Onni South Lake Union</span> Complex of two high-rise residential buildings under construction in Lake Union, Seattle

Onni South Lake Union, also known as 1120 Denny Way, is a complex of two high-rise residential buildings and a hotel in South Lake Union, Seattle, Washington, United States. The residential buildings—both be 41 stories tall—comprise a total of 827 apartments. They are connected by a 12-story hotel with retail and amenity space. 1120 Denny Way was developed by Onni Group, which is also redeveloping the adjacent Seattle Times Building site. The project began construction in 2017 and was completed in 2022.

<span class="mw-page-title-main">The Emerald (building)</span> Skyscraper in Seattle, Washington, U.S.

The Emerald is a mixed-use 40-story skyscraper in downtown Seattle, Washington, United States. The tower includes 262 luxury condominiums, retail space, and amenity spaces on outdoor terraces. It began construction in July 2017 and was completed in October 2020.

<span class="mw-page-title-main">Spire (Seattle building)</span> Residential skyscraper in Seattle, Washington

Spire is a 41-story residential skyscraper in the Belltown neighborhood of Seattle, Washington, United States. The 440-foot (130 m) building sits in a triangular block adjacent to the intersection of Denny Way and Wall Street, roughly between the Belltown and Denny Triangle neighborhoods. It has 343 condominiums, retail space, and a rooftop terrace. The building has an automated parking system in its underground garage with capacity for 266 vehicles.

<span class="mw-page-title-main">Bellevue 600</span> Proposed high-rise office building in Bellevue, Washington, United States

Bellevue 600 is a future high-rise office building developed by Amazon in Bellevue, Washington, United States. It began construction in 2021 and is scheduled to be completed in 2024. The 43-story, 600-foot-tall (180 m) building would join 555 Tower as the tallest building in Bellevue. The project is located in Downtown Bellevue at the intersection of Northeast 6th Street and 110th Avenue Northeast, adjacent to the Bellevue Transit Center and a future Link light rail station. A second phase would construct a 27-story tower to the west, replacing an existing office building.

<span class="mw-page-title-main">WB1200</span> Future twin skyscraper complex in Seattle, Washington

WB1200, also known as 1200 Stewart, is a future twin skyscraper complex in the Denny Triangle neighborhood of Seattle, Washington, United States. The project is located at the intersection of Stewart Street and Denny Way and comprises 1,014 apartments and retail space in two 48-story buildings. The retail space, housed in a three-story podium with an indoor galleria, is planned to feature a music venue and a Boeing 747-400 fuselage. It began construction in 2018 and is scheduled to be completed in 2024.

<span class="mw-page-title-main">Ren (building)</span> Future high-rise building in Seattle, Washington

Ren, stylized as REN and also known as Denny Centre, is a residential high-rise building in the Denny Triangle neighborhood of Seattle, Washington, United States. The 42-story tower has 440 apartments and is located on a triangular lot at the intersection of Denny Way and Fairview Avenue. Construction began in 2018 and was completed in early 2022.

<span class="mw-page-title-main">The Langham, Seattle</span> Future high-rise hotel in Seattle, Washington, U.S.

The Langham, Seattle is a future high-rise luxury hotel in Seattle, Washington, United States. It is scheduled to open in 2026 with 187 rooms and suites operated by the Langham Hospitality Group. The 42-story building will incorporate the facade of the Terminal Sales Annex, a historic landmark on the site at 1931 2nd Avenue. The building was designed by Kengo Kuma & Associates and Ankrom Moisan Architects.

References

  1. "Third and Lenora". Emporis . Archived from the original on January 11, 2020.{{cite web}}: CS1 maint: unfit URL (link)
  2. 1 2 Miller, Brian (October 17, 2019). "Martin Selig scraps deal with WeWork, leaving his Belltown tower up for grabs" . Seattle Daily Journal of Commerce. Retrieved January 29, 2020.
  3. Stiles, Marc (October 28, 2014). "Here's what Martin Selig's latest Seattle high-rise could look like". Puget Sound Business Journal . Retrieved January 29, 2020.
  4. Carter, Mike; Sullivan, Jennifer; Phillips, Cheryl (July 30, 2006). "Community responds with sorrow, unity". The Seattle Times . p. A1. Retrieved January 29, 2020.
  5. Aznoff, Dan (April 21, 2015). "In search of a new home: Agencies scramble to find affordable space". City Living Seattle . Retrieved January 29, 2020.
  6. 1 2 Stiles, Marc (July 27, 2015). "Selig plans 2016 construction start for downtown Seattle high-rise project". Puget Sound Business Journal. Retrieved January 29, 2020.
  7. "Final Recommendation of the Design Review Board for 2031 3rd Avenue" (PDF). Seattle Department of Construction & Inspections. January 17, 2017. Retrieved January 29, 2020.
  8. Soper, Taylor (August 3, 2017). "WeWork inks deal to build 36-floor 'WeLive' mixed-use co-living space in Seattle". GeekWire . Retrieved January 29, 2020.
  9. Stiles, Marc (September 15, 2016). "Developer: WeLive is coming to downtown Seattle high-rise" . Puget Sound Business Journal. Retrieved January 29, 2020.
  10. Miller, Brian (April 17, 2017). "City OKs design for Selig's 2031 Third, which will combine WeWork, WeLive". Seattle Daily Journal of Commerce . Retrieved January 29, 2020.
  11. 1 2 Miller, Brian (May 15, 2017). "A neighboring property owner objects to width of Selig tower". Seattle Daily Journal of Commerce. Retrieved January 29, 2020.
  12. "Order on Motion to Dismiss MUP-17-019 (DR)". Seattle Office of Hearing Examiner. June 23, 2017.
  13. "Third & Lenora is Underway". The Registry . September 26, 2017. Retrieved January 29, 2020.
  14. "Selig starts site work at 3rd and Lenora" . Seattle Daily Journal of Commerce. September 27, 2017. Retrieved January 29, 2020.
  15. 1 2 "Martin Selig to top tower soon at Third & Lenora". Seattle Daily Journal of Commerce. August 21, 2019. Retrieved January 29, 2020.
  16. Khashimova Long, Katherine (October 15, 2019). "Beleaguered WeWork and Martin Selig dissolve deal for Seattle tower". The Seattle Times. p. A1. Retrieved January 29, 2020.
  17. Stiles, Marc (October 14, 2019). "WeWork, WeLive won't move into new Selig tower in Belltown" . Puget Sound Business Journal. Retrieved January 29, 2020.
  18. 1 2 Stiles, Marc (November 10, 2020). "Selig hires outside brokers to help fill three new Seattle buildings". Puget Sound Business Journal. Retrieved February 22, 2021.
  19. Miller, Brian (January 11, 2024). "Selig to convert empty offices at Third & Lenora to more apartments" . Seattle Daily Journal of Commerce. Retrieved January 11, 2024.
  20. "Recommendation of the Downtown Design Review Board for 2031 3rd Avenue" (PDF). Seattle Department of Construction & Inspections. March 29, 2016. Retrieved January 29, 2020.