Muskrat Falls Generation Station | |
---|---|
Location of Muskrat Falls in Newfoundland and Labrador | |
Location | Labrador, Newfoundland and Labrador, Canada |
Coordinates | 53°14′44″N60°46′22″W / 53.24556°N 60.77278°W |
Construction began | 2013 [1] |
Opening date | September 23, 2020 |
Construction cost | $12.7 billion |
Owner(s) | Newfoundland and Labrador Hydro |
Dam and spillways | |
Type of dam | Roller compacted concrete |
Impounds | Churchill River |
Elevation at crest | 39.5 m [2] |
Spillways | 2 |
Spillway type | 1 overflow spillway and 1 spillway with submerged radial gates [3] : 87–88 |
Spillway capacity | 5930 m3/s [2] : 21 |
Reservoir | |
Normal elevation | 39 m [2] : 20 |
Power Station | |
Turbines | 4 x 206 MW Kaplan turbines [2] : 23 |
Installed capacity | 824 MW [3] : 86 |
Capacity factor | 62.3% |
Annual generation | 4.5 TWh [3] : 86 |
The Muskrat Falls Generating Station is a hydroelectric generating station in the Labrador region of Newfoundland and Labrador, Canada. It comprises part of the remaining 35 per cent of the Churchill River that was not developed by the Churchill Falls Generating Station. The station at Muskrat Falls has a capacity of over 824 MW and provides 4.5 TWh of electricity per year. [4]
A $6.2 billion deal between Newfoundland and Labrador's Nalcor Energy and Halifax, Nova Scotia-based Emera to develop the project was announced in November 2010. [5] On November 30, 2012, a federal loan guarantee deal for financing of the project was signed by Prime Minister Stephen Harper, Newfoundland and Labrador Premier Kathy Dunderdale and Nova Scotia Premier Darrell Dexter. [6] [7] [8] [9] On December 17, 2012, the provincial government announced project sanction. [10] [11] Emera received approval to proceed with the Maritime Link from the Nova Scotia Utility and Review Board in 2013. [12] Financial close for the loan guarantee occurred in late 2013. [13] On September 23, 2020, the first unit at Muskrat Falls was synced to the electricity grid in Labrador. Power from the remaining three units was originally expected to come online in the fall of 2021. [14] However, there were delays in construction, including on the corresponding Labrador–Island Link which will transmit generated power to a converter outside St. John's. [15]
On June 23, 2021, Premier Andrew Furey announced Nalcor Energy would be dismantled and folded into Newfoundland and Labrador Hydro. [16]
In April 2023, Jennifer Williams, CEO of Newfoundland and Labrador Hydro, announced the completion of the final successful test of the 1100 km transmission link to Newfoundland. Commissioning by the federal government will be announced following the completion of paperwork. Originally approved in 2012 with an anticipated price tag of around $7.4 billion, the costs of the project increased to more than $13 billion. [17]
Reservoir impoundment was completed in 2019 with the flooding of 41 km2 of land to create the 101 km2 reservoir. Containment is by a two-part concrete dam totalling 757 metres long. This will power an 834 MW generating station. [18]
Power is transmitted to Newfoundland via a 350 kV high-voltage direct current line with a capacity of 900 MW. The total length is 1,100 km, of which 30 km are submarine power cables under the Strait of Belle Isle. [18] Construction began in 2014 and ended in 2018. [19]
Power is transmitted from Stephenville on Newfoundland to Nova Scotia via a 200 kV 180 km sub-sea line to Point Aconi on Cape Breton Island with a capacity of 500 MW. Construction was a 1.2 billion dollar joint venture between Nalcor and Emera. [18] The link came online in December 2017. [20]
Once on Newfoundland and the mainland of the Maritimes, power is distributed via the existing grid. Emera hopes to sell surplus power via a proposed 563 km underwater transmission line from New Brunswick to Massachusetts. [21]
In late 2006, Nalcor registered the generation components of the Lower Churchill Project, including both Gull Island and Muskrat Falls, for environmental assessment with the provincial and federal governments. The provincial and federal government agreed to a combined review process that would fulfill the requirements of both levels of government, resulting in the formation of a Joint Review Panel. In 2010, the focus shifted to Muskrat Falls only. The environmental assessment for the transmission lines was done separately and was conducted in 2013. Many Indigenous peoples had serious concerns about how the land and wildlife would be changed by the development. Negotiations between the Innu Nation and the provincial government began in 2006, resulting in the New Dawn (Tshash Petapen) Agreement, finalized in 2011. [22] This agreement included an Impacts and Benefits Agreement (IBA), a Redress Agreement related to damage caused by the Churchill Falls development, and an agreement in principle about the Innu Nation’s land claim. Upon the ratification of the New Dawn Agreement, the Innu Nation indicated that the project was acceptable to them.
In 2016, researchers from Harvard University suggested that methylmercury levels in fish would rise as a result of the project. [23] [24] After protests led by Indigenous groups in Central Labrador in 2016, an agreement was reached by Labrador’s three Indigenous groups (Nunatsiavut Government, Innu Nation and the NunatuKavut Community Council) and the Government of Newfoundland and Labrador outlining the establishment of an independent committee to make recommendations on mitigating potential impacts of methylmercury on human health from the Lower Churchill Project at Muskrat Falls, Labrador. [25] In 2018, the committee recommended –among other things –wetland capping to stem the release of methylmercury. [26] [27] [28]
During the Muskrat Falls inquiry in 2019, it was revealed the provincial government wouldn’t be completing wetland capping at the Muskrat Falls reservoir as previously planned. [29] [30] The $30 million designated for the capping was split up and offered to all three Indigenous governments, with the Innu Nation and NunatuKavut accepting. [31] [32] [33] Nalcor had applied for a permit in July 2018 to carry out the approximately 13 hectares of wetland capping –essentially pouring sand and stone over a small area of wetland near the reservoir –but the permit was never approved by the Department of Municipal Affairs and Environment. [34] Premier Dwight Ball later said wetland capping would have only decreased methylmercury levels by two per cent. [35] [36]
The project is more than $6 billion over budget, [37] and five years late as of 2022 [update] . Projected cost overruns exceeding 70% from $7.4 billion to $12.7 billion due to poor planning, lack of engineering experience, and related assumptions that were invalid, misleading or later turned out to be incorrect led Nalcor CEO Stan Marshall to say that the project was a boondoggle. [38] [39]
In 2017, Premier Dwight Ball called a public inquiry into the project, [40] which took place between 2018 and 2020. [41] In the inquiry report, Commissioner Richard LeBlanc concluded the government failed its duty to residents by predetermining that the megaproject would proceed no matter what. In his report, LeBlanc concluded that the business case, which assumed the Muskrat Falls project was the lowest-cost power option, was “questionable.” LeBlanc said that the project’s economics were not sufficiently tested and that Nalcor failed to consider all potentially viable power options. LeBlanc said that Nalcor concealed information that could have undermined the business case for the project from the public and government. [42]
In July 2021, Prime Minister Justin Trudeau announced that the Government of Canada would provide the project with $5.2 billion of financial support to compensate for its large cost overrun (from $6.2 billion to over $13 billion) and to enable the province to maintain the price of power at a competitive rate (14.7 cents per kilowatt-hour). [43] [44] The government of Quebec and Bloc Québécois Members of Parliament protested against this subsidy, which they claimed provided unfair competition to their own Hydro Québec power company. [45] The Innu Nation protested the decision stating they had not been consulted. [46] The Innu Nation also raised concerns about the compensation claimed by the Innu and how cost overruns may reduce the amount of Innu royalties received under the 2011 impact and benefits agreement. [47]
Labrador is a geographic and cultural region within the Canadian province of Newfoundland and Labrador. It is the primarily continental portion of the province and constitutes 71% of the province's area but is home to only 6% of its population. It is separated from the island of Newfoundland by the Strait of Belle Isle. It is the largest and northernmost geographical region in the four Atlantic provinces.
Daniel E. Williams is a Canadian politician, businessman, and lawyer who served as the ninth premier of Newfoundland and Labrador between November 6, 2003, and December 3, 2010.
Roger D. Grimes is a Canadian politician from Newfoundland and Labrador. Grimes was born and raised in the central Newfoundland town of Grand Falls-Windsor.
The Churchill River, formerly known by other names, is a river in Newfoundland and Labrador, Canada. It flows east from the Smallwood Reservoir into the Atlantic Ocean via Lake Melville. The river is 856 km (532 mi) long and drains an area of 79,800 km2 (30,800 sq mi), making it the longest river in Atlantic Canada.
Newfoundland and Labrador Hydro, commonly known as Hydro, is a provincial Crown corporation that generates and delivers electricity for Newfoundland and Labrador, as well as portions of Quebec and the north-eastern areas of the United States. Between 2007 and 2021, NL Hydro was a subsidiary of the provincial Crown-owned energy holding company Nalcor Energy.
Churchill Falls (Labrador) Corporation Limited, also known as CF(L)Co or CFLco is a Canadian electric company. The company was founded in 1961 and is based in St. John's, Newfoundland and Labrador. Churchill Falls (Labrador) Corporation Limited operates as a subsidiary of Newfoundland and Labrador Hydro.
Nova Scotia Power Inc. is a vertically integrated electric utility in Nova Scotia, Canada. It is privately owned by Emera and regulated by the provincial government via the Nova Scotia Utility and Review Board (NSUARB). Nova Scotia Power Inc provides electricity to 520,000 residential, commercial and industrial customers in Nova Scotia.
Muskrat Falls was a natural 15-metre (49 ft) waterfall located on the Churchill River about 25 kilometres (16 mi) west of Happy Valley-Goose Bay, Labrador.
Dwight Ball is a Canadian politician who was the 13th premier of Newfoundland and Labrador from 14 December 2015, to 19 August 2020, and an MHA. He represented the electoral district of Humber Valley in the Newfoundland and Labrador House of Assembly, and was the leader of the Liberal Party from 17 November 2013 to 3 August 2020.
Nalcor Energy was an energy corporation which headquartered in St. John's, Newfoundland and Labrador. A provincial Crown corporation under the Government of Newfoundland and Labrador, Nalcor Energy was created in 2007 to manage the province's energy resources.
The Churchill Falls Generating Station is a hydroelectric underground power station in Labrador. At 5,428 MW, it is the sixteenth largest in the world, and the second-largest in Canada, after the Robert-Bourassa generating station in northwestern Quebec.
NunatuKavut is an Inuit territory in Labrador. It is unrecognized by other Indigenous groups in Canada, including the Innu Nation, the Nunatsiavut government, and the Inuit Tapiriit Kanatami. The NunatuKavummiut claim to be the direct descendants of the Inuit that lived south of the Churchill or Grand River prior to European contact, with recent European admixture primarily from English settlers. Despite claims of Inuit heritage, according to recent censuses completed by Statistics Canada, the vast majority of individuals living in communities that NunatuKavut claims are within its region continue to identify as Métis as opposed to 'Inuit'.
Central Labrador is the most populous region of Labrador, Canada, that extends from the shores of Lake Melville into the interior. It is also home to Happy Valley – Goose Bay, the largest community in Labrador.
The 2016 Newfoundland and Labrador budget protests were a series of protests in the Canadian province of Newfoundland and Labrador. The protests were in opposition to the provincial budget proposed by Finance Minister Cathy Bennett which will implement tax-hikes and cuts to many public service jobs. The protests were a major part of the financial crisis in Newfoundland and Labrador.
Lela Margaret Ann Evans is a Canadian politician, who was elected to the Newfoundland and Labrador House of Assembly in the 2019 provincial election. She represents the electoral district of Torngat Mountains as a Progressive Conservative. Having been elected as a PC MHA, she left the party in 2021 and joined the New Democratic Party in 2022. She returned to the PCs in 2024. She was first elected in the 2019 provincial election and was re-elected in 2021.
John Hogan is a Canadian politician, who was elected to the Newfoundland and Labrador House of Assembly in the 2021 provincial election. He represents the electoral district of Windsor Lake as a member of the Liberal Party of Newfoundland and Labrador.
Diem Saunders was an Inuk writer and activist from Newfoundland and Labrador, Canada, who advocated for missing and murdered Indigenous women and girls.