Port Talbot Railway and Docks Company

Last updated

The Port Talbot Railway and Docks Company (PTR&D) was formed in 1894 to secure the means of bringing minerals, chiefly coal, to the harbour in South Wales. It took over the docks at Port Talbot that had been operated by the Port Talbot Company. It opened its main line in 1897 and reached a connection with the Great Western Railway Garw Valley line the following year. A branch line to collieries near Tonmawr also opened in 1898. The lines were extremely steeply graded and operation was difficult and expensive, but the company was successful. Passenger operation on the main line started in 1898, but this was never a principal part of the business. For some time most of the passenger train service was operated by a railmotor that was the largest ever to work in the United Kingdom. Also in 1898 the Ogmore Valleys Extension (OVE) line, a part of the PTR&D, was opened. It had been projected as a defensive measure against competitive incursion, and it led from Margam Junction towards Tondu.

Contents

When the mineral activity in the area declined after 1960, so did the PTR&D system, and the OVE lines (dormant in 2017) and the dock lines at Port Talbot are the only remaining tracks in use.

The controlling shareholder in the company for many years was Emily Charlotte Talbot, an unusually powerful woman for the times.

Port Talbot Dock Company

System map of the Port Talbot Railways and Docks Ptr&d.png
System map of the Port Talbot Railways and Docks

Christopher Rice Mansel Talbot inherited the Penrice and Margam estates in West Glamorgan in 1813. The Margam estate straddled the outcrop of the South Wales Coalfield, and had considerable mineral potential.

Transport of coal and other minerals away to market was hampered by the poor conditions at the nearby Aberavon harbour, and after a false start, a Parliamentary Act was obtained in 1836 to carry out improvements, and to call the harbour Port Talbot. The works included straightening out the course of the River Avon towards the sea. In fact the scheme was grossly undercapitalised and there appear in addition to have been financial irregularities; the Port Talbot company went into receivership in 1858, which lasted until matters were regularised in 1863.

In that year, a railway connection to the South Wales Railway was constructed, and improved appliances for the loading of coal to ships were installed. The branch line opened formally on 1 September 1864. [1]

As time went, on Christopher Talbot became a major creditor of the company, as it failed to honour rent and debenture payments. When the company proposed improvements to the harbour in 1876 he obstructed most elements of the scheme, especially those involving major expenditure, and continued in that attitude to most proposals. The Rhondda and Swansea Bay Railway was building its line, destined to connect the Rhondda Fawr with Swansea Bay; the R&SBR wanted to develop Aberavon but Talbot resisted that. The matter continued without any progress, and as Talbot became older, he became even more difficult to negotiate with. Meanwhile the condition of the harbour deteriorated and ships' masters were unwilling to trade there because of the poor conditions. [1]

In frustration, the R&SBR obtained an authorising Act in 1890 permitting development of the harbour. Naturally the Port Talbot Company, as owners who were against the improvements, were given what amounted to a veto. However Talbot had died on 17 January 1890 at the age of 86, and his unmarried [note 1] daughter Emily Charlotte Talbot (1840 – 1918) inherited his considerable wealth, nearly £6 million.

From this time, two major attempts were made to achieve a negotiated working arrangement between industrial promoters and Emily Talbot. The second would have involved the formation of a Port Talbot Docks and Railway company (as opposed to the actual, later Port Talbot Railway and Docks company). Neither of the schemes came to reality. [1]

Formation of the Port Talbot Railway and Dock Company

The mineral development of the area above Port Talbot demanded action of some kind, and in the 1894 session of Parliament, opposing Bills were considered. One was by the Great Western Railway, and one was by the Port Talbot Company. They were for railways from Port Talbot to Maesteg, and improvements of the harbour at Port Talbot, and they were clearly mutually exclusive. The PT scheme was to extend its railway beyond Maesteg to join the GWR Blaengarw branch at Pontyrhyll, and to acquire running powers over the Blaengarw line and also the GWR main line from Port Talbot into Swansea. It was this scheme that was approved, gaining the Royal Assent on 31 July 1894, but the running powers into Swansea were not included. The Port Talbot company was restructured into the Port Talbot Railway and Docks company. The authorised capital was £600,000, of which Emily Talbot was entitled to over 20% by virtue of shares, and money owed to her by the old company. [1] [2] A contract for the work was let to S Pearson and Son in the amount of £527,000. The firm had been selected in advance, and no competing tenders were sought; this fact led to some controversy at a Board meeting, and the resignation of a director. [1]

Opening

Construction was fairly straightforward, and the first revenue traffic was conveyed on 30 August 1897, entering the Port Talbot North Dock lines via Copper Works Junction, that is, the southern route. The line opened as far as Lletty Brongu for mineral traffic the following day, 31 August 1897. In the middle of January 1898 the mineral working was extended to the Garw at Pontyrhyll Junction. [1] [2] [3]

Whitworth and Blaenavon

Even as the PTR&D main line was under construction, controversy had arisen over access to pits further north, in the vicinity of Tonmawr. The South Wales Mineral Railway had been built, passing the area since 1863, but connected collieries complained that the inconvenience of the rope worked Ynysmaerdy incline on that line limited their trade. In 1885 the Rhondda and Swansea Bay Railway opened its main line up the Cwmavon valley, but passed some distance to the south of the pits. Nonetheless the R&SBR became involved in discussions about connections to the pits, but in the end declined to assist.

After considerable negotiation, the PTR&D agreed to build a line up Cwmavon from Tonygroes, paralleling much of the R&SBR line, but then turning north to run parallel to the South Wales Mineral Railway. At what became Blaenavon Junction the new line forked, continuing on one arm to Blaenavon (Glamorgan) where there were pits. The other arm continued a short distance to Tonmawr, making a junction there with the SWMR. By this time the Tonmawr Colliery branch of the SWMR (from the site of the junction running back to Tonmawr Colliery) had closed. A short distance further on along the SWMR line a new PTR&D branch to Whitworth Colliery was made, taking over the existing private railway of the Whitworth Colliery estate as part of the scheme.

All of this, after much argumentation in Parliament, received the Royal Assent on 7 August 1896 and probably opened in June 1898, [1] and the line opened on 14 November 1898.

Passengers

The company wanted to start passenger operation and Lieutenant Colonel Yorke made the Board of Trade inspection in January 1898 and sanctioned the running of passenger trains on the main line. They started running on 14 February 1898. [1] [4]

A portion of line at Port Talbot between Duffryn Junction and Copper Works Junction in the new dock area was opened on 10 August 1898. This gave the PTR&D access to the docks without running over R&SBR tracks.

From 1 June 1898, the PTR&D passenger trains started running to the disused R&SBR Aberavon station. There were four return services a day, with an additional Saturday afternoon return trip, and from 5 March 1898 a Saturday evening return trip as well. [4]

Ogmore Valleys Extension Railway

In 1895, promoters associated with the Barry Railway proposed a London and South Wales Railway. This was to by-pass the Great Western Railway by building a new line from Cogan, near Cardiff, to the Metropolitan Railway north of London. The motivation in this was dissatisfaction with the Great Western Railway, which had a monopoly of rail transport from South Wales to London and Salisbury.

Swansea was not to be left out: the Vale of Glamorgan Railway, controlled by the Barry Railway, proposed a westward extension from their line, through Porthcawl to join the Rhondda and Swansea Bay Railway. Together the two schemes would provide a new line from Swansea to London. The VoGR part would bisect Emily Talbot's lands and put the PTR&D at a disadvantage. [1] [5]

Accordingly, a defensive scheme was proposed by her advisers. A railway (it became the Ogmore Valleys Extension Railway) was designed to traverse her lands broadly giving the alignment sought by the VoGR scheme, and running powers on it would be offered to them, enabling the PTR&D to retain control locally. The proposal extended to building as far as Tondu, and after negotiation the GWR agreed to facilitate traffic from its L&OR lines to the OVE route.

This plan was submitted for the 1896 session of Parliament in parallel with the London and South Wales Railway scheme. The London and South Wales Railway proposal was withdrawn when the GWR gave certain undertakings, but the OVE was considered to be worthwhile in its own right, and it was authorised on 20 July 1896. [1] [2] As well as the new construction the powers included acquisition of the Cefn and Pyle Railway, a horse tramroad leading from ironworks at Cefn to Pyle GWR station. This was to be converted to main line standards as a locomotive line.

The OVE line, the property of the PTR&D, was probably opened on 19 December 1898, for goods and mineral traffic only. [1] [2] [3]

Worked by the Great Western Railway

Notwithstanding the wording of the Company title, Railway and Docks, the dock activity was clearly more important and more demanding of directorial time, and in 1902 the Great Western Railway had enquired whether the PTR&D would wish the GWR to work the railway for them. This was not considered appropriate at the time, but towards the end of 1907 the idea found more favour.

Running powers and the working arrangements were agreed on 24 January 1908, but for financial calculation were considered to have been operative from 1 January 1907. At first the railway operation in the immediate docks area at Port Talbot was excluded, but this proved to raise practical difficulties and on 9 August 1911 it was agreed that the GWR would work all the railways activity; the agreement was backdated to 1 January 1911. [1] [2]

From the GWR's point of view, this was advantageous because of the rival Barry Railway's ambitions to expand to the west; the GWR's domination west of Porthcawl effectively suppressed that intention. [6] [3]

Elder Dempster bunkering

In 1906, Elder Dempster Shipping Limited (later restructured into Elder Dempster Lines), adopted Port Talbot docks for bunkering coal worldwide, loading there and shipping the coal to remote locations for its vessels. [2] [7]

0-8-2T locomotives

The PTR&D main line was very steeply graded, and some of the gradient was against the load. Assistant engines were universally used on heavy mineral trains, and for braking purposes had to be switched from rear to front when descending. The whole process was expensive and caused delays.

In April 1899, the Board decided to ask locomotive manufacturers to propose locomotive designs that might work the trains alone. At the time the UK locomotive building industry was overloaded with work, and the PT&RD wanted quick supply, so American manufacturers were included. The specification was to haul a trailing load of 300 tons, up a gradient of 1 in 40 for 4 miles at a speed of 12 miles per hour.

Several suppliers provided quotes, and the offer from the American company of Cooke Locomotive and Machine Co through their London agents was accepted on 17 May 1899, on the basis of extremely limited information. Two locomotives were to be delivered in July 1899, with an option for three or five more for delivery in September. [1] However the sketchy contractual details—the wheel arrangement was changed and vacuum brake equipment added after acceptance of the offer—and the remarkably short building period led to grave difficulty.

The engines, which became nos. 2492 and 2493, arrived early in 1900. Of the 0-8-2T wheel arrangement, they had flangeless wheels on the central two axles with only an inch clearance, probably due to difficulty in inserting the changed wheel arrangement into a standard frame design. They had a tractive effort of 25,490 lb. At the end of January 1900 a joint test of the engines with thirty loaded wagons and a 20-ton brake van was undertaken (The existing limit was 24 loaded wagons), It was immediately clear that performance was far below that specified.

Some faults were corrected, after which they were able to take thirty loaded wagons plus van, about 500 tons, up a 1 in 75 gradient, but this was still far short of that specified. Notwithstanding the shortfall in performance the directors resolved to keep the engines in use and to record their performance, and negotiations over the supply contract followed. [1]

In March 1900, the Directors were still in need of additional locomotive power and were considering whether to exercise the option for 3 or 5 more of the US engines, this time with performance specifications properly fixed. While the Board were considering the matter, in May it was reported that the locomotives had materially reduced operating cost, coal consumption being much less than with double-headed trains quite apart from the crew cost. It was decided to retender the whole process and later Sharp, Stewart and Company were given an order for two large locomotives, soon increased to three. The supplier proved much more responsive to the PTR&D requirements, and this time delivery was to be in a more realistic fourteen months. They were delivered in November 1901, and were given numbers 17 to 19; they had a boiler pressure of 180 psi and a tractive effort of 31,200 lb. These locomotives were much more reliable.

By February 1906, it had become clear that the boilers and fireboxes were constantly troublesome in the American engines. In 1908 they went to Swindon and were fitted with Standard No. 4 Belpaire firebox boilers with modified fireboxes and boiler pressure raised to 200 psi; these modifications improved their reliability. [1] [2] [3]

Death of Emily Talbot

Emily Charlotte Talbot died on 21 September 1918; her fortune passed to her nephew Andrew Fletcher and her niece Eveline Fletcher. [1]

Steam Railmotor

In the first decade of the twentieth century, steam railmotors came into use on certain railways. They were passenger vehicles with a small steam engine integrated into it. Their advantage was as a cheap way of serving passenger stopping points in lightly used areas, although they required a crew of three like a conventional train. The GWR adopted the system enthusiastically, and the PTR&D were persuaded to try the system. On 26 July 1905, the directors agreed to invite tenders for a "steam motor car".

Fifteen tenders were received, and a joint tender from Hurst, Nelson & Co. Ltd and R & W Hawthorn, Leslie & Co. Ltd was accepted and the vehicle was delivered in early 1907. This was the largest steam rail motor ever to run in the UK. it was 76 ft 10 in long, and the bodywork was metal, that covering the engine fashioned to match the carriage. Retractable steps were fitted under each of the four recessed passenger doors, although the steps were later fixed in position. [1]

The locomotive was six-coupled with 3 ft diameter wheels; it had a conventional boiler with the firebox leading, 12 by 16 inch cylinders and a boiler pressure of 170 psi and a tractive effort of 9,792 lbs. A trailing load was contemplated. It was given the number 1.

The long wheelbase meant that the facing point locking bars on the line had to be lengthened. [note 2] It went into service in April or May 1907, and the rail motor gradually took up the majority of the passenger traffic, and by July 1907 was working the ordinary passenger trains four days per week, at a daily saving of £3 6s 6d.

The rail motor was moved to Swindon Works in 1915, and never returned to South Wales; the train service was operated by conventional trains from this time. It ended its working life on the Millwall Extension Railway in 1926. [1] [4] [8]

Workmen's trains on the OVE

In 1915, the Baldwin company asked the GWR to operate workmen's trains from Margam steelworks to the Newlands and Cribbwr Fawr collieries. This was not agreed to at the time, but from 6 May 1918 such a service started operation. It was discontinued by July 1928. [4]

Grouping

Following World War I, the railways were seriously run down, and the Government decided to restructure most of the railways of Great Britain. Four new larger companies would be created, the so-called "groups". The legislation was the Railways Act 1921. The western group was to be called the Great Western Railway, and the old GWR was naturally the largest component of it. The Port Talbot Railway and Docks was to be a subsidiary.

Negotiations proceeded on the terms, in fact before the structure of the legislation had been determined. The PTR&D was financially successful, and demanded a good price for its company; the agreed terms included £81 of 5% GWR Guaranteed Stock for every £10 PTR&D ordinary stock. Delayed by the need to wait for the Act, the terms were finalised for absorption in January 1923, but the transfer was considered to have been effected on 1 January 1922. [4] By this process, the GWR acquired the docks at Port Talbot.

Statistics for the final full year of PT&RD independence included the capital issued at £1.69 million and income for 1921 at £121,737; the final year dividend had been 9%. There were 22 route miles of network, and 22 locomotives were absorbed into the Western Group (the new GWR). There were 738 staff, reflecting the dominance of the dockside activity. [9]

Duffryn Mills Halt

Duffryn Mills Halt was opened a short distance up the line from Duffryn Junction on 14 February 1931. It was provided to serve Goitre cemetery and stops, in the down direction only, were made on request. [4]

Port Talbot Steelworks

As early as 1902, the Port Talbot Steelworks entered production, and its location alongside both the PTR&D and the Great Western Railway encouraged a symbiotic relationship. The steelworks grew in importance and size, becoming Margam Steelworks in the 1920s. The Abbey Steelworks followed in 1952, becoming the largest steelworks in Europe. [10]

In 1960, connections were installed between the OVE lines and the former GWR main line where they intersected at Newlands, south-east of Port Talbot, and Margam Marshalling Yard was built between there and Port Talbot itself. This became the main staging point for general freight in West Wales. [11]

Closures

The reduced use of the passenger service in the face of economic decline resulted in withdrawal beyond Maesteg on 12 September 1932, and between Port Talbot and Maesteg from 11 September 1933. [2]

The reduced use applied to the mineral traffic as well and the line between Lletty Brongu and Celtic Colliery was closed to revenue traffic from March 1939; traffic from Celtic Colliery was worked out via Pontyrhyll until it closed in 1942.

A further steep drop in mineral activity resulted in all of the remaining network except for short stubs at Port Talbot and the dock lines being closed between 1964 and 1967. The Great Western Railway had been taken into nationalised ownership at the beginning of 1948. [4]

Margam Hump Marshalling Yard closed on 31 October 1987. [3]

Topography

Port Talbot Railway and Docks Company
North Bank (Goods)
BSicon exKDST2.svg
BSicon excSTRc3.svg
BSicon excSTRc2.svg
BSicon exKDST3.svg
Wharf (Old Dock)
Morfa Copper Works Sidings
BSicon exKBSTa.svg
BSicon excSTRc1.svg
BSicon exdSTR+4.svg
BSicon exdSTR+1.svg
BSicon excSTRc4.svg
BSicon exCONT1+f.svg
Port Talbot Steelworks
BSicon KDSTa.svg
BSicon exSTR.svg
BSicon exKRWl.svg
BSicon exkSTR3.svg
BSicon exKRWg+r.svg
Burrows Junction
Copper Works Junction
BSicon STRc2.svg
BSicon ABZ3+gxl.svg
BSicon exABZqr+l.svg
BSicon exkSTRr+1.svg
BSicon exSHI4rq.svg
BSicon exkSTRc4.svg
BSicon exLSTR.svg
Old Dock Junction
BSicon STR+1.svg
BSicon STRc4.svg
BSicon kSTRc2.svg
BSicon xkKRZ3+lo.svg
BSicon eSHI4g+lq.svg
BSicon CONTfq.svg
BSicon exLSTR.svg
Junction (Mean)
BSicon KRWgl.svg
BSicon kSTR+1.svg
BSicon KRW+r.svg
BSicon exSTR.svg
BSicon exLSTR.svg
Margam Knuckle Yard
BSicon DST.svg
BSicon STR.svg
BSicon exSTR.svg
BSicon exSTR+l.svg
BSicon exABZg+r.svg
Aberavon Junction
BSicon STR2.svg
BSicon STR3u.svg
BSicon exSTR.svg
BSicon exSTR.svg
BSicon exCONTf.svg
BSicon UWu1.svg
BSicon CONT3+1.svg
BSicon STR+4.svg
BSicon exSTR.svg
BSicon exKBHFa.svg
BSicon exdSTR.svg
Port Talbot Central
Dyffryn Junction
BSicon STR.svg
BSicon exABZgl+l.svg
BSicon excSTRq.svg
BSicon exSTRr.svg
BSicon excdSTRq.svg
BSicon exABZg+r.svg
Tan-y-groes
North Junction │ South Junction
Bryn (Glamorgan)
BSicon STR.svg
BSicon exHST.svg
BSicon exhSTRae.svg
Pontrhydyfen Viaduct
BSicon exCONT2.svg
BSicon eSTR+c3.svg
BSicon exTUNNEL1.svg
BSicon exSTR.svg
Cwmcerwyn Tunnel (
1012 yd
925 m
)
Waterhall Junction
BSicon exSTRc1.svg
BSicon eABZg+4.svg
BSicon exSTR.svg
BSicon exkABZg3.svg
Tonmawr Junction
Waterhall Coal Depot
BSicon eBST.svg
BSicon exSTR.svg
BSicon exkSTRc2.svg
BSicon exkkSTR+1.svg
BSicon exkSTRc4.svg
BSicon exkKRZ3+lu.svg
BSicon exCONTfq.svg
Aberbaiden Colliery
BSicon eDST.svg
BSicon exSTR.svg
BSicon exkABZg+1.svg
BSicon exKDSTe.svg
Tonmawr Colliery
Cefn Low Level Sidings
BSicon eBST.svg
BSicon exSTR.svg
BSicon exKDSTe.svg
Cwm Pelenna Colliery
Cefn Colliery
BSicon eDST.svg
BSicon exBHF.svg
Maesteg Neath Road
BSicon exCONT2.svg
BSicon eSTR+c3.svg
BSicon exkABZg2.svg
Cefn Junction
BSicon STRc2x1.svg
BSicon STR3.svg
BSicon exSTRc2.svg
BSicon exSTR3+4.svg
BSicon exkSTRc1.svg
BSicon exKRZ3+lo.svg
BSicon exkABZq+4.svg
BSicon exCONTfq.svg
BSicon CONT1.svg
BSicon STRc4.svg
BSicon exCONT1.svg
BSicon exSTRc4.svg
BSicon exHST.svg
Cwmdu
BSicon exhSTRae.svg
Lletty-Brongu Viaduct
BSicon exCONT2.svg
BSicon exSTRc3.svg
BSicon exHST.svg
Lletty Brongu
BSicon exSTRc1.svg
BSicon exABZ2+4g.svg
BSicon exSTRc3.svg
Pontyrhyl Junction
BSicon exSTRc1.svg
BSicon exBHF2+4.svg
BSicon exSTRc3.svg
Pontyrhyl
BSicon exSTRc1.svg
BSicon exCONT4.svg

Gradients

From Pontyrhyll, the line climbed for 11 miles to Cwmcerwen Tunnel; at first undulating with typical gradients of 1 in 75 to Lletty Brongu, the line then climbed steadily at 1 in 90, 1 in 100 and 1 in 75 to the tunnel. After that it descended at 1 in 40 nearly all the way to Duffryn Junction, and still descended from there to Port Talbot. [4]

Locations

Blaenavon line

OVE line

Pyle branch

PTR locomotives

PTR Hudswell Clarke 0-6-0ST No. 26 on the Severn Valley Railway in 2004 PTR (GWR) 0-6-0ST No.813 at Bewdley.jpg
PTR Hudswell Clarke 0-6-0ST No. 26 on the Severn Valley Railway in 2004
Pannier tank banking an empties train at Duffryn Junction in 1949 Duffryn Junction pannier tank Duffryn Junction geograph-2959926-by-Ben-Brooksbank.jpg
Pannier tank banking an empties train at Duffryn Junction in 1949

When it was absorbed by the GWR on 1 January 1922, the PTR operated a total of twenty-two engines of seven different classes, built by four distinct locomotive manufacturers. The last of the ex-PTR locos was withdrawn from service by the GWR in 1948. [15]

GWR 813 (Port Talbot Railway 26) is (2017) operational on the Severn Valley Railway. [16] and is owned by the GWR 813 Preservation Fund [17]

Notes

  1. The significance of this is not sexist, but to indicate that she acted independently, without the supposed "guiding hand" of a husband, at a date when a woman in a business context was a remarkable rarity.
  2. At facing points a locking bar was placed alongside one of the running rails; if the signalman wished to move the points, the locking bar had first to be raised. If a vehicle was passing or standing at the point, the wheel flanges prevented this process, so that the points could not be moved under a train. The locking bar obviously had to be at least as long as the longest spacing of the wheels on any passing vehicle.

Related Research Articles

<span class="mw-page-title-main">Taff Vale Railway</span> Railway company and line in South Wales

The Taff Vale Railway (TVR) was a standard gauge railway in South Wales, built by the Taff Vale Railway Company to serve the iron and coal industries around Merthyr Tydfil and to connect them with docks in Cardiff. It was opened in stages in 1840 and 1841.

<span class="mw-page-title-main">Cardiff Railway</span>

From 1839 the Trustees of the Marquis of Bute, operated a large dock operation in Cardiff, the "Bute Docks". This was very successful, but was overwhelmed by the huge volume of coal exported through Cardiff. At the same time it was seen that railway companies, especially the Taff Vale Railway (TVR), were making money conveying the coal to the docks.

The Rhymney Railway was a railway company in South Wales, founded to transport minerals and materials to and from collieries and ironworks in the Rhymney Valley of South Wales, and to docks in Cardiff. It opened a main line in 1858, and a limited passenger service was operated in addition.

The Brecon and Merthyr Tydfil Junction Railway (B&MR) was a railway company in Wales. It was originally intended to link the towns in its name. Finding its access to Merthyr difficult at first, it acquired the Rumney Railway, an old plateway, and this gave it access to Newport docks. This changed its emphasis from rural line to mineral artery.

The Burry Port and Gwendraeth Valley Railway (BP&GVR) was a mineral railway company that constructed a railway line in Carmarthenshire, Wales, by conversion of a canal, to connect collieries and limestone pits to the sea at Kidwelly. It extended its network to include Burry Port, Trimsaran and a brickworks at Pwll, later extending to Sandy near Llanelli. For a time the company worked the separate Gwendraeth Valleys Railway. The BP&GVR was notable because of the very low height of some overbridges, a legacy of the canal conversion.

<span class="mw-page-title-main">Pontyclun railway station</span> Railway station in Rhonda Cynon Taff, Wales

Pontyclun railway station is an unstaffed, minor railway station in Pontyclun, in the County Borough of Rhondda Cynon Taf, South Wales. The station is at street level, on Station Approach, Pontyclun. It is a stop on the South Wales Main Line, served by trains on the Maesteg Line, and occasionally by the Swanline Cardiff to Swansea regional services, as well as one early-morning daily service to Manchester and a late-night daily service to Carmarthen. The station and all trains are operated by Transport for Wales Rail.

The Garw Valley Railway is the trading name of the Bridgend Valleys Railway Company Limited. It operates a short section of 4 ft 8+12 instandard gauge railway located in South Wales, which is being recreated as a heritage railway. Formerly part of the Llynvi and Ogmore Railway (L&OR) and built by the Great Western Railway (GWR), the line was used for freight and passenger services, with most of the track still in place between Brynmenyn and Pontycymer. The project currently has a train shed at Pontycymer, and hopes to initially offer brake van rides between Pontycymer and Pant-y-Gog, a distance of 0.5 miles (0.8 km).

<span class="mw-page-title-main">Tondu railway station</span> Railway station in Bridgend, Wales

Tondu railway station is a railway station serving the village of Tondu, Bridgend county borough, South Wales. It is located on the Maesteg Line from Cardiff via Bridgend.

<span class="mw-page-title-main">Bryn, Neath Port Talbot</span> Human settlement in Wales

Bryn(English: Hill) is a village and community in Neath Port Talbot County Borough in Wales. It has a population of 913. The village is located in the hills between Cwmafan, in the Afan Valley, and Maesteg in the Llynfi Valley, approximately 6 miles (9.7 km) from Port Talbot and 2 miles (3.2 km) from Maesteg. The name of the village now familiarly 'Bryn', is Bryntroedygam. So wrote the first vicar of St Theodore's in Port Talbot. There was a farm situated above Meadow Row named Bryn-Troed-y-Garn as shown on the 1876 OS map, as many more immigrants came to 'Bryntroedygam' it seemed the name of the village was to be shorted to Bryn. 12% of the village speak Welsh. The population rose to 923 by 2011.

<span class="mw-page-title-main">Barry Railway Company</span> Former railway and docks company in South Wales

The Barry Railway Company was a railway and docks company in South Wales, first incorporated as the Barry Dock and Railway Company in 1884. It arose out of frustration among Rhondda coal owners at congestion and high charges at Cardiff Docks as well the monopoly held by the Taff Vale Railway in transporting coal from the Rhondda. In addition, the Taff Vale did not have the required capacity for the mineral traffic using the route, leading to lengthy delays in getting to Cardiff.

The Llanelly Railway and Dock Company was an early Welsh railway system. It opened its first short line and a wet dock at Llanelly in 1834, and soon went on to build a longer line from Llanelly to serve pits in the Amman Valley, and then on to Llandilo, reached in 1857. The Llanelly company leased and worked the Vale of Towy Railway on to Llandovery, from 1858.

The Vale of Neath Railway (VoNR) was a broad gauge railway company, that built a line from Merthyr Tydfil and Aberdare to Neath, in Wales, chiefly to transport the products of the Merthyr iron industries to ports on Swansea Bay.

The South Wales Mineral Railway was a railway built to serve collieries in the upper Afan Valley, and bring their output to a dock at Briton Ferry, in South Wales. It opened in stages, in 1861 and 1863. It was built on the broad gauge and had steep gradients, including a rope worked incline near Briton Ferry.

In 1861 the Llynvi Valley Railway was opened in Glamorganshire, Wales, to convey mineral products to the Bristol Channel at Porthcawl. It adopted an earlier tramroad, the Duffryn Llynvi and Porthcawl Railway. The Llynvi and Ogmore Railway was opened in 1865, and the two companies amalgamated to form the Llynvi and Ogmore Railway in 1866. At first Porthcawl harbour was an important destination for onward transport, but this soon declined.

<span class="mw-page-title-main">Port of Port Talbot</span>

The port of Port Talbot is located on the River Afan estuary next to Port Talbot Steelworks in the industrial town of Port Talbot, South Wales. The whole basin complex covers about 500 acres (2.0 km2), consisting of: an inner set of floating docks, developed from 1834 onwards; and an outer tidal basin, completed in 1970. Owned and operated by Associated British Ports, the tidal basin has the deepest berthing facilities in the Severn estuary and is one of only a few harbours in the UK capable of handling Capesize vessels of up to 170,000 tonnes deadweight (DWT), mostly for the import of iron ore and coal for use by nearby Port Talbot Steelworks.

The South Wales Railway was a main line railway which opened in stages from 1850, connecting the Great Western Railway from Gloucester to South Wales. It was constructed on the broad gauge. An original aspiration was to reach Fishguard to engender an Irish ferry transit and transatlantic trade, but the latter did not materialise for many years, and never became an important sector of the business. Neyland was the western terminus of the line until 1906.

The Dulas Valley Mineral Railway was incorporated in 1862 to bring coal from the Onllwyn area north-east of Neath to the quays there, and in the following year was reconstituted as the Neath and Brecon Railway. The line was opened as far as Onllwyn in 1863.

The Rhondda and Swansea Bay Railway was a Welsh railway company formed to connect the upper end of the Rhondda Fawr with Swansea, with the chief objective of transporting coal and other minerals to Swansea docks. It was incorporated in 1882, but at first the connection to Swansea from Briton Ferry was refused.

<span class="mw-page-title-main">Margam Knuckle Yard</span>

Margam Knuckle Yard is a railway yard in Margam, South Wales, on the South Wales Main Line, operated by DB Schenker Rail (UK). The yard is the major freight yard of the region, handling all of the rail freight movements from Port Talbot Steelworks, and most of the railfreight traffic around South Wales.

The Great Western Railway was a railway company that was dominant in West Wales, in the United Kingdom.

References

  1. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Robin G Simmonds, A History of the Port Talbot Railway & Docks Company and the South Wales Mineral Railway Company, volume 1: 1853 – 1907, Lightmoor Press, Lydney, 2012, ISBN   978 189 988966 2
  2. 1 2 3 4 5 6 7 8 H Morgan, South Wales Branch Lines, Ian Allan Limited, Shepperton ,1984, ISBN   0 7110 1321 7
  3. 1 2 3 4 5 D S M Barrie, revised Peter Baughan, A Regional History of the Railways of Great Britain: volume 12: South Wales, David St John Thomas, Nairn, 1994, ISBN   0 946537 69 0
  4. 1 2 3 4 5 6 7 8 Robin G Simmonds, A History of the Port Talbot Railway & Docks Company and the South Wales Mineral Railway Company, volume 2: 1894 – 1971, Lightmoor Press, Lydney, 2012, ISBN   978 189 988966 2
  5. B G Wilson, The London & South Wales Railway, in the Railway Magazine, October 1956
  6. Peter Dale, Glamorgan's Lost Railways, Stenlake Publishing Ltd, 2014, ISBN   978 184 0336 740
  7. J Rees, The Port Talbot Railway, in the Railway Magazine, November 1900
  8. The Port Talbot Railway's New Type of Rail-Motor Car, in the Railway Magazine, November 1907
  9. Peter Semmens, History of the Great Western Railway: 1: Consolidation, 1923 – 1929, George Allen and Unwin, London, 1985, Studio Editions reprint 1990, ISBN   0 04385104 5
  10. The Welsh Academy Encyclopedia of Wales, University of Wales Press, Cardiff, 2008. ISBN   978-0-7083-1953-6
  11. Margam Marshalling Yard in Railway Magazine, August 1960
  12. M E Quick, Railway Passenger Stations in England Scotland and Wales—A Chronology, The Railway and Canal Historical Society, 2002
  13. R A Cooke, Atlas of the Great Western Railway, 1947, Wild Swan Publications Limited, Didcot, 1997 ISBN   1-874103-38-0
  14. Col M H Cobb, The Railways of Great Britain -- A Historical Atlas, Ian Allan Publishing Limited, Shepperton, 2003, ISBN   07110 3003 0
  15. H C Casserley, Locomotives at the Grouping - 4 - Great Western Railway, Ian Allan Limited, 1966, pages 106–109
  16. http://www.svr.co.uk/MeetTheLoco.aspx?id=20 Engine no 26 later GWR 813 on Severn Valley Railway website
  17. http://www.gwr813.org/ GWR 813 Preservation Fund website