| R-2 regional road | ||||
|---|---|---|---|---|
| Regionalni put R-2 | ||||
|   | ||||
| Route information | ||||
| Length | 54.5 km (33.9 mi) | |||
| Major junctions | ||||
| North end |  M-5 in Berane | |||
| South end |  SH20 in Grnčar | |||
| Location | ||||
| Country | Montenegro | |||
| Municipalities | Berane, Andrijevica, Plav, Gusinje | |||
| Highway system | ||||
| 
 | ||||
R-2 regional road (Montenegrin : Regionalni put R-2) is a Montenegrin roadway. [1]
It serves as major connection between four eastern municipalities of Berane, Andrijevica, Plav, Gusinje. Section between Andrijevica and Berane will be a parallel road to section of Bar–Boljare motorway. As of 2017, no work has been done on this section of motorway.
Section from Andrijevica to Murino was part of M-9 highway which was officially opened for traffic in 1984. [2] It was built as part of the larger M-9 highway within the Yugoslav highway network, spanning Montenegro, Kosovo and Serbia. It connected Kolašin and Andrijevica with Peć and Priština in Kosovo, and Leskovac and Pirot in Serbia. [3]
In January 2016, the Ministry of Transport and Maritime Affairs published bylaw on categorisation of state roads. [1] With new categorisation, R-2 regional road was lengthened, and now it includes part of previous M-9 highway and complete previous R-9 regional road. M-9 highway was downgraded and split to several regional roads.
| Municipality | Location | km | mi | Destinations | Notes | 
|---|---|---|---|---|---|
| Berane | Berane | 0.0 | 0.0 |  M-5  – Bijelo Polje, Rožaje | |
| Buča | 3.2 | 2.0 |  R-24  – Lubnice | ||
| Andrijevica | Andrijevica | 16.1 | 10.0 |  R-19  – Mateševo, Podgorica, Kolašin | |
| Plav | Murino, Plav | 31 | 19 |  R-9  – Peć (Kosovo) | |
| Plav Municipality | 39.7 | 24.7 | Road passes by Lake Plav  | ||
| Gusinje | Gusinje | 49 | 30 | No major intersections | |
| Grnčar | 54.5 | 33.9 |  SH20  – Koplik (Albania) | ||
| 1.000 mi = 1.609 km; 1.000 km = 0.621 mi | |||||
Put Kоlаšin – Mаtеšеvо – Аndriјеvicа, diо је magistralnog puta M-9 kојi prоlаzi krоz tеritоriјu Crnе Gоrе, Kоsоvа i Srbiје. Crnоgоrski diо оvоg puta dugаčаk је 96,72 km. Na njеmu su vršеnе brојnе rеkоnstrukciје, а kоnаčnо је dоbiо dоzvоlu za upоtrеbu 1984. gоdinе..
9. put Kolašin - Andrijevica - Peć - Dolac - Priština - Leskovac - Vlasotince - Pirot[...]