R. A. Headworks

Last updated
Ramaswamy Aiyer Headworks Ramaswamy Aiyer Headworks.jpg
Ramaswamy Aiyer Headworks

R. A. Headworks or Ramaswamy Aiyar Headworks is a masonry type weir situated in Munnar panchayath of Munnar village in Idukki district of Kerala, India impounding mudirapuzha river. [1] It is also called as Munnar Headworks. It is a part of Pallivasal Hydro Electric Project, the first hydro power project of Kerala State. There are two dams and one diversion weir as part of this project. These are Kundala Dam, Maduppetty Dam and R. A. Head works.

Ramaswamy Aiyer Headworks is located 15 km (9.3 mi) downstream of Maduppetty Dam near Munnar. The water stored in the Kundala reservoir is released through the stream to Maduppetty Dam located downstream. From the Maduppetty reservoir the water is released to downstream through a dam toe power house. The controlled release from Maduppetty Dam reaches the diversion weir named R.A. Head works [2] and from there, the water is diverted through a water conducting system to the power house of Pallivasal HEP located on the right bank of Mudirapuzha river. After generating power, the tail water is pumped to the balancing reservoir of Sengulam Hydro Electric Project and the surplus water from the sump of pumping station is spilled to the Mudirapuzha river itself. [3]

Specifications

The dam and its sluice canal Munnar dam, Munnar.jpg
The dam and its sluice canal

Related Research Articles

<span class="mw-page-title-main">Mattupetty Dam</span> Dam in Kerala, India

Mattupetty Dam, near Munnar in Idukki District, is a storage concrete gravity dam built in the mountains of Kerala, India to conserve water for hydroelectricity. It has been a vital source of power and huge revenue for Idukki District. The large amount of perennially available water allows wild animals and birds to flourish. Construction of the dam was led by E.U. Philipose, Superintending Engineer, Kerala State Electricity Board. The height of the dam is 83.35 metres (273.5 ft) and the length is 237.74 metres (780.0 ft). Taluks through which the release flows are Udumpanchola, Devikulam, Kothamangalam, Muvattupuzha, Kunnathunadu, Aluva, Kodungalloor and Paravur.

<span class="mw-page-title-main">Pambla Dam</span> A dam in Kerala, India

The Lower Periyar Dam is a dam built on the Periyar River as part of the Lower Periyar Hydroelectric Project in Kanjikuzhi Panchayat, Idukki District, Kerala. The dam was built to generate electricity. The lower Periyar dam is at Pambla, five kilometres downstream from where Muthirapuzha merges with main river. This 32.36-metre-high dam made of concrete has a width of 284 meters. The powerhouse is at Karimanal, near Neriamangalam, where three generators are installed with a power production capacity of 60 MW each, or a cumulative 180 MW. The Dam was completed in the year 1998 Taluks through which release flow are Idukki, Kothamangalam, Muvattupuzha, Kunnathunadu, Aluva, Kodungalloor and Paravur.

<span class="mw-page-title-main">Anayirangal Dam</span> Dam in Kerala, India

Anayirangal Dam (Malayalam: ആനയിറങ്കൽ അണക്കെട്ട്) is an earthen dam built on the Panniyar river in Chinnakanal and Santhanpara panchayats, 22 km (14 mi) from Munnar in Idukki district of Kerala, India. The dam is surrounded on one side by forest and on the other by Tata Tea Plantation. The dam is located near the Munnar - Kumily road. The water flowing from the dam reaches Kuthungal and Ponmudi dams through the Panniyar river. Power is generated at Kuthungal and Panniyar powerhouses. The dam stores water from small streams flowing from Bealram and rainwater flowing from the hills on the Tamil Nadu border. The height of the dam is 34.14 metres (112.0 ft) and Length is 326.13 metres (1,070.0 ft). The reservoir usually fills up in June and July.

Azhutha Dam is a small diversion dam built on the Azhutha River which is a tributary of the Pamba River, at Azhutha in Peerumed Grama Panchayat of Idukki District, Kerala, India. It is a small concrete gravity dam that is only 72 metres (236 ft) long and 14 metres (46 ft) high. It acts mainly as a diversion dam to supply water to the Idukki Dam. The Azhutha Dam was constructed as an augmentation dam for the Idukki Hydro Electric Project. Construction of the project started in 1987 and was expected to be commissioned in 1991, but the project overrun and was only partially commissioned in June 1998. The year of completion was 2007. The release of the water from the dam is to Azhutha river and it flows through Ranni and Ayroor taluks.

<span class="mw-page-title-main">Erattayar Dam</span> Diversion dam in Kerala, India

Erattayar Dam is a small, diversion dam built on the Erattayar river in Erattayar grama panchayat near Kattappana town in Idukki district of Kerala, India. It acts mainly as a diversion dam to supply water to the Idukki dam. Diversion of water from Erattayar forebay to Idukki reservoir is through a tunnel called Anchuruli tunnel which is 3.77 km (2.34 mi) long. Construction of the dam was completed in the year 1989.

<span class="mw-page-title-main">Kallar Dam</span> Diversion dam in Kerala, India

Kallar Dam is a small, diversion dam constructed at Perinjamkutty river in Nedumkandam grama panchayat of Idukki district, Kerala, India. It acts mainly as a diversion dam to supply water to the Idukki dam.

<span class="mw-page-title-main">Pamba Dam</span> Dam in Kerala, India

Pamba Dam is a gravity dam built on the Pamba river in the Ranni forest area of Seethathodu panchayat in Pathanamthitta district of Kerala, India. It was built in 1967 as part of the Sabarigiri Hydroelectric Project. Sabarigiri Hydro Electric Project (IHEP) is the second largest hydro electric project in Kerala. Pamba dam's reservoir is connected to the nearby Kakki dam's reservoir by a 3.21 km (1.99 mi) long underground tunnel. The dam is 281 m (922 ft) long and 57.2 m (188 ft) high and is located at an elevation of 981.45 m (3,220.0 ft) above sea level. The dam is located in a forest area adjacent to the Periyar National Park. The water stored in the Pamba and Kakki dams is conveyed to the Sabarigiri powerhouse through penstock pipes. The dam was commissioned in 1967.

<span class="mw-page-title-main">Kundala Dam</span> Dam in Kerala, India

Kundala Dam, also known as Setuparvatipuram Dam, is a masonry gravity dam built on Muthirapuzha River in Mattupetty panchayat of Idukki district in Kerala, India. It is part of the Pallivasal Hydroelectric Project, the first hydroelectric project in Kerala. The dam is considered to be Asia's first arch dam. It has a height of 46.93 m (154.0 ft) and length of 259.38 m (851.0 ft). Release from dam is to river Palar and taluks through which release flow are Udumbanchola, Devikulam, Kothamangalam, Muvattupuzha, Kunnathunadu, Aluva, Kodungalloor and Paravur.

<span class="mw-page-title-main">Chenkulam Dam</span> Dam in Kerala, India

Chenkulam Dam is a gravity dam located on the Muthirapuzha river in Vellathooval panchayat of Idukki district in the Indian state of Kerala. It spans 144.50 metres (474.1 ft) long and stands 26.82 metres (88.0 ft). It hosts a 48 MW power plant.

<span class="mw-page-title-main">Vellathooval Dam</span> Dam in Kerala, India

Vellathooval Dam is a diversion dam built on the Muthirappuzha river in Vellathooval village in Devikulam taluk of Idukki district in Kerala, India. The height of the dam from the deepest foundation is 16 metres (52 ft) and length is 75 metres (246 ft). Water from the Sengulam Power House and from the Muthirapuzha river gets released to the Vellathooval dam. Water from this dam is diverted through a canal system to the powerhouse near Panniyar After the water flow is used to generate hydroelectricity, the water is released back into the river. The dam is one of the major tourist attractions in the Idukki District, Kerala.

<span class="mw-page-title-main">Parakkadavu Weir</span>

Parakkadavu Weir is a concrete diversion dam constructed across Parakkadavu river in Vellathooval panchayath of Vellathooval village in Idukki district of Kerala, India. Parakkadavu weir is constructed as a part of Panniar Augmentation Scheme. Spill water from R A Headworks in Mudirappuzha river is partly diverted at Ellackal through a tunnel to Parakkadavu weir. From Parakkadavu weir the water is diverted to Mullakkanam weir and from this weir to Ponmudi reservoir.

<span class="mw-page-title-main">Viripara Weir</span> Diversion dam in Kerala, India

Viripara Weir is a Diversion weir constructed across Upper Kallar river which is a tributary of Pooyankutty river in Mankulam village of Idukki district in Kerala, India. The water flows from the dam to Menachery river and flows through the taluk of Devikulam. The Viripara weir is constructed as an augmentation scheme to Neriamangalam Hydro Electric Project. Upper Kallar, a tributary of Pooyankutty river is diverted in to Kallarkutty reservoir by a low diversion weir at Viripara along with a short diversion tunnel.

<span class="mw-page-title-main">Gavi Dam</span> Dam in Kerala

Gavi Dam or Gaviar Dam is a small, gravity dam constructed as a part of Sabarigiri hydro electric project on Gaviyar, which is a tributary of Pamba river at Seethathode village in Pathanamthitta district of Kerala, India. Taluks through which release flow are Ranni, Konni, Kozhencherry, Thiruvalla, Chengannur, Kuttanadu, Mavelikara and Karthikappally.

<span class="mw-page-title-main">Kochu Pamba Weir</span> Diversion dam in Kerala, India

Kochu Pamba Weir is a diversion dam constructed across Pamba river in Seethathode village of Pathanamthitta district in Kerala, India. It is one of the five dams which are parts of Sabarigiri HydroElectric Project. These are Pamba dam, Kakki dam, Anathode dam, Gavi dam and Kochu Pamba weir Sabarigiri Hydro Electric Project is the second largest hydro electric project of Kerala and is located in Pathanamthitta district. This weir is constructed as a part of Sabarigiri Augmentation Scheme. Water from this reservoir is pumped in to the Pamba reservoir through a pump house located at the downstream of Pamba dam. Taluks through which release flow are Ranni, Konni, Kozhencherry, Thiruvalla, Chengannur, Kuttanadu, Mavelikara and Karthikappally.

Adyanpara Weir is a small diversion dam constructed across Kanjirapuzha River at Adyanpara in Chaliyar panchayath of Kurumbalangode village in Malappuram district of Kerala, India. This weir is a part of Adyanpara SHEP, which envisages development of power by utilizing the potential of Kanjirapuzha stream, a tributary of Chaliyar river. It consist of a diversion weir, desilting chamber of splay type, power tunnel of length 968.50m, an underground surge tank in circular shape. The 3.5 megawatt hydroelectric project has been setup as part of the Small Hydro Electric Project. The water from the weir flows to Kanjirapuzha through the Taluk of Nilambur. The dam is a concrete-gravity type dam with a height of 5.56 metres (18.2 ft) and a length of 58 metres (190 ft).

Vazhikadavu Weir is a diversion dam of concrete gravity type constructed across Meenachil River at Teekoy Village in Kottayam District in Kerala, India. The Vazhikkadavu weir is constructed as an augmentation scheme to Idukki HEP. The dam has a height of 10.20 metres (33.5 ft) from the deepest foundation and a length of 58 metres (190 ft).

Narakakkanam Weir is a diversion dam constructed across Narakakkanam River in Mariyapuram panchayath of Thankamani Village in Idukki district in Kerala, India. Narakakkanam weir is an augmentation weir for the Idukki Hydro Electric Project. Narakakkanam, Azhutha, Vazhikkadavu, Vadakkepuzha and Kuttiar diversion schemes were later added to augment the Idukki reservoir. The height of the dam is 11.50 metres (37.7 ft) from the deepest foundation and length is 45.20 metres (148.3 ft).

Vadakkepuzha Weir is a diversion dam of Earthen type constructed across Vadakkepuzha which is a tributary of Muvattupuzha river in Arakkulam village in Idukki district of Kerala, India. Vadakkepuzha weir is a part of an augmentation scheme for the Idukki Hydro Electric Project. Narakakkanam, Azhutha, Vazhikkadavu, Vadakkepuzha and Kuttiar diversion schemes were later added to Idukki HEP to augment the reservoir. Water from the reservoir is pumped in to Idukki reservoir through a pump house with three pumps.

<span class="mw-page-title-main">Urumi 2 Weir</span> Dam in Kerala, India

Urumi 2 Weir' is a small diversion dam constructed across Poyilingalpuzha in Thiruvambady village of Kozhikode district in Kerala, India. The weir is constructed across the Poyilingalpuzha river, downstream of Urumi I power house to divert water to Urumi II power house. This is located in Thiruvambady, 50 km away from Kozhikode town. The water from the reservoir is drawn to the Power House through a power channel 470 m long. The Urumi falls near the dam has become a tourist attraction after the hydro electric project came into existence.

<span class="mw-page-title-main">Pallivasal Hydro Electric Project</span> First Hydro Electric project in Kerala

Pallivasal Hydroelectric Project is the first hydroelectric project in Kerala, India. The project consists of 2 reservoirs, 2 dams, a diversion dam and a power house and is owned by the Kerala State Electricity Board. The power house of the project has been constructed at Chithirapuram in Pallivasal Gram Panchayat, Munnar, Idukki District. The first unit was inaugurated in March 1940 by the Travancore Diwan C. P. Ramaswamy Iyer. The second unit and third unit was commissioned in February 1941 and February 1942 respectively. In 1944, Ramaswamy Iyer constructed the R. A headworks dam on Muthirapuzha, a tributary of Periyar in Munnar to divert the water.

References

  1. https://www.kseb.in/index.php?option=com_jdownloads&task=download.send&id=13995&catid=3&m=0&lang=en [ bare URL PDF ]
  2. JAMES, WILSON (13 August 2018). "Understanding the 42-year-old Idukki dam which is now saving Kerala".
  3. "Diversion Structures in Idukki district – KSEB Limited Dam Safety Organisation" . Retrieved 2021-07-27.
  4. "കളറായി..." Mathrubhumi. Retrieved 2021-07-27.