Red Line (Namma Metro)

Last updated

Red Line
Overview
StatusApproved from Karnataka Cabinet and waiting from Union Cabinet
OwnerBangalore Metro Rail Corporation Limited (BMRCL)
Locale Bangalore, Karnataka, India
Termini
Connecting linesOperational (1) Purple Line
Upcoming (3):
Blue Line Orange Line Pink Line
Stations28
Website bmrc.co.in
Service
Type Metro
System Namma Metro
Depot(s)Sarjapur Depot [1]
History
Planned opening2030;5 years' time (2030)(TBC)
Technical
Line length37 km (23 mi)
Number of tracks2
Character(TBC)
Track gauge 1,435 mm (4 ft 8+12 in) standard gauge
Electrification 750 V DC third rail
Red Line map (TBC)

Contents

BSicon exhCONTg denim.svg
BSicon exhSTRl denim.svg
BSicon exhKINTa red.svg
BSicon exhSTRq red.svg
BSicon exhCONTfq orange.svg
Hebbala
BSicon CONTgq.svg
BSicon exhSTR red.svg
BSicon STRq.svg
BSicon CONT1+r.svg
Indian Railways Towards
Arrow Blue Left 001.svg Yesvantpur Jn or SMVT Bengaluru Arrow Blue UpperRight 001.svg
BSicon exhBHF red.svg
Ganga Nagar
BSicon exhtSTRa red.svg
BSicon extBHF red.svg
Veterinary College
BSicon extBHF red.svg
Mekhri Circle
BSicon extBHF red.svg
Guttahalli Palace
BSicon extBHF red.svg
Bengaluru Golf Course
BSicon extBHF red.svg
Basaveshwara Circle
BSicon extBHF red.svg
KR Circle
BSicon extBHF red.svg
Town Hall
BSicon extBHF red.svg
Shanthinagar
BSicon extBHF red.svg
NIMHANS
BSicon extCONTgq pink.svg
BSicon extINT red.svg
BSicon extSTRq pink.svg
BSicon extCONTfq pink.svg
Dairy Circle
Pink Line
Under construction
BSicon extBHF red.svg
Koramangala II Block
BSicon exhtSTRe red.svg
BSicon exhBHF red.svg
Koramangala III Block
BSicon exhBHF red.svg
Jakkasandra
BSicon exhCONTgq denim.svg
BSicon exhSTR+r denim.svg
BSicon exhSTR red.svg
BSicon exhINT-L denim.svg
BSicon exhINT-R red.svg
Agara
Blue Line
Under construction
BSicon exhINT-L denim.svg
BSicon exhINT-R red.svg
Ibbaluru
Blue Line
Under construction
BSicon exhSTRl denim.svg
BSicon exhSTR red.svg
BSicon exhSTRq denim.svg
BSicon exhCONTfq denim.svg
BSicon exhBHF red.svg
Bellandur Gate
BSicon exhBHF red.svg
Kaikondrahalli
BSicon exhBHF red.svg
Doddakannelli
BSicon CONTgq.svg
BSicon exhSTR red.svg
BSicon STRq.svg
BSicon CONTfq.svg
Indian Railways Towards
Arrow Blue Left 001.svg Hosur or Baiyyappanahalli Arrow Blue Right 001.svg
BSicon exhBHF red.svg
Carmelaram
BSicon exhBHF red.svg
Ambedkar Nagar
BSicon exhBHF red.svg
Kodathi Gate
BSicon exhBHF red.svg
Muthanalluru Cross
BSicon exhBHF red.svg
Dommasandra
BSicon exhBHF red.svg
Sompura
BSicon exhBHF red.svg
Kada Agrahara Road
BSicon exhKDSTaq red.svg
BSicon exhABZg+r red.svg
Aiga railtransportation 25.svgSarjapura Depot (TBC)
BSicon exhKBHFe red.svg
Sarjapura

The Red Line or Hebbal-Sarjapura Line is a proposed metro rail line that will become part of Namma Metro's network in the city of Bangalore, Karnataka, India. Phase-3A of Namma Metro has been planned to become operational around the year 2030. [2] [3] [4]

As per latest news updates, the Karnataka Cabinet had approved the Phase 3A of this metro line, linking Sarjapur in southeastern Bengaluru with Hebbal in the north on December 6, 2024. The approval from the Union Cabinet is awaited, as the Centre holds a 50% equity stake in Namma Metro. [5] [6]

Funding

Estimated at Rs 16,543 crore, including land acquisition charges, the 37-km line is outlined in the Comprehensive Mobility Plan 2020. This proposed metro line is expected to ease travel for public commuting to and from tech zones. [7] The alignment involves an elevated corridor near the IT corridor in Sarjapur, transitioning underground at Koramangala, traversing the central business district through tunnels, and emerging on Ballari Road with elevated stations at Ganganagar and Hebbal.

Stations

The Red Line (Hebbal-Sarjapura Line) is planned to have 28 stations. [7] [8] [9]

Interchanges

Passenger interchange facilities, connecting to other metro and railway lines, will be provided at the following stations:

Red Line
#Station nameConnectionsStation layout
(TBC) [10]
English Kannada
1 Hebbala ಹೆಬ್ಬಾಳ Namma Metro Logo.png Blue Line
Orange Line
  Mallige   (Under Construction)
Elevated
2Ganganagarವೆಟರ್ನರಿ ಕಾಲೇಜುElevated
3Veterinary Collegeಗಂಗೇನಹಳ್ಳಿUnderground
4Mekhri Circleಮೇಖ್ರಿ ಸರ್ಕಲ್Underground
5Palace Guttahalliಗುಟ್ಟಹಳ್ಳಿ ಅರಮನೆ Bangalore Palace Underground
6Bengaluru Golf Courseಬೆಂಗಳೂರು ಗಾಲ್ಫ್ ಕೋರ್ಸ್Underground
7Basaveshwara Circleಬಸವೇಶ್ವರ ವೃತ್ತUnderground
8Krishna Rajendra circleಕೃಷ್ಣ ರಾಜೇಂದ್ರ ವೃತ್ತ Namma Metro Logo.png Purple Line Underground
9Town Hallಟೌನ್ ಹಾಲ್Underground
10Shanthinagaraಶಾಂತಿನಗರ Shanthinagar Bus TTMC Underground
11NIMHANSನಿಮ್ಹಾನ್ಸ್Underground
12 Dairy Circle ಡೈರಿ ಸರ್ಕಲ್ Namma Metro Logo.png Pink Line (under construction)Underground
13Koramangala II Blockಕೋರಮಂಗಲ II ಬ್ಲಾಕ್Underground
14Koramangala III Blockಕೋರಮಂಗಲ III ಬ್ಲಾಕ್Elevated
15Jakkasandraಜಕ್ಕಸಂದ್ರElevated
16 Agara ಅಗರ Namma Metro Logo.png Blue Line (under construction)Elevated
17 Ibbaluru ಇಬ್ಬಲೂರು Namma Metro Logo.png Blue Line (under construction)Elevated
18Bellanduru Gateಬೆಳ್ಳಂದೂರು ಗೇಟ್Elevated
19Kaikondrahalliಕೈಕೊಂಡ್ರಹಳ್ಳಿElevated
20Doddakannelliದೊಡ್ಡಕನ್ನೆಲ್ಲಿElevated
21Carmelaramಕಾರ್ಮೆಲರಾಮ್  Kanaka   (Under Construction)Elevated
22Ambedkar Nagaraಅಂಬೇಡ್ಕರ್ ನಗರElevated
23Kodathi Circleಕೋಡತಿ ವೃತ್ತElevated
24Muthanalluru Crossಮುತ್ತನಲ್ಲೂರು ಕ್ರಾಸ್Elevated
25Dommasandraದೊಮ್ಮಸಂದ್ರElevated
26SompuraಸೋಂಪುರElevated
27Kada Agrahara Roadಕಡ ಅಗ್ರಹಾರ ರಸ್ತೆElevated
28Sarjapuraಸರ್ಜಾಪುರElevated


See also

References

  1. "Namma Metro identifies land in Sarjapur to build depot". Deccan Herald. 16 January 2025. Retrieved 16 January 2025.
  2. H.S, Shreyas (7 July 2023). "Karnataka Budget proposes new 37 km of Namma Metro line from Hebbal to Sarjapur in Bengaluru". The Hindu. ISSN   0971-751X . Retrieved 2 April 2024.
  3. "Bengaluru Metro: Sarjapur To Hebbal 37-km Line is Ready, Set to Reduce City's Traffic". News18. 17 January 2024. Retrieved 2 April 2024.
  4. "Namma Metro: Phase 3-A Gets Green Light, Full Details Inside". News18. 11 October 2024. Retrieved 15 October 2024.
  5. "Bengaluru's Metro Phase 3A gets Cabinet nod". The Hindu. 6 December 2024. ISSN   0971-751X . Retrieved 7 December 2024.
  6. "Cabinet approval for Metro's Rs28k-cr Sarjapur-Hebbal line". The Times of India. 6 December 2024. ISSN   0971-8257 . Retrieved 7 December 2024.
  7. 1 2 "DPR ready for Sarjapur-Hebbal line". The Times of India. 14 January 2024. ISSN   0971-8257 . Retrieved 2 April 2024.
  8. "Bangalore Metro readies DPR of ₹16,543 crore Sarjapur-Hebbal Metro Corridor | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 2 April 2024.
  9. "UDD approves Namma Metro's Phase 3A project, from Hebbal to Sarjapura". moneycontrol through X (formerly Twitter). 11 October 2024. Retrieved 13 October 2024.
  10. Vivan, Sridhar (15 October 2024). "Green signal for Namma Metro phase 3A project". Bangalore Mirror. Retrieved 15 October 2024.