Sırımtaş Dam

Last updated
Sırımtaş Dam
Turkey relief location map.jpg
Red pog.svg
Location of Sırımtaş Dam in Turkey
Official name Sırımtaş Baraji
Location Alancık, Adıyaman Province, Turkey
Coordinates 38°01′48.3″N38°33′23.3″E / 38.030083°N 38.556472°E / 38.030083; 38.556472 Coordinates: 38°01′48.3″N38°33′23.3″E / 38.030083°N 38.556472°E / 38.030083; 38.556472
Purpose Power
Status Operational
Construction began 2009
Opening date 2013
Dam and spillways
Type of dam Gravity, roller-compacted concrete
Impounds Birimşe River
Height 92 m (302 ft)
Reservoir
Creates Sırımtaş Reservoir
Sırımtaş HES
Coordinates 37°59′50.3″N38°32′43.1″E / 37.997306°N 38.545306°E / 37.997306; 38.545306
Operator(s) Tektuğ Electric Manufacturing Co., Ltd
Installed capacity 28 MW
Annual generation 87 GWh

The Sırımtaş Dam is a gravity dam and one of the 22 dams of the Southeastern Anatolia Project. It is located on the Birimşe River near the town of Alancık in Adıyaman Province, Turkey. Construction on the 92 m (302 ft) tall dam began in 2009 and was completed in May 2013. The primary purpose of the dam is hydroelectric power production and its power station has a 28 MW installed capacity. [1] [2] [3]

Gravity dam

A gravity dam is a dam constructed from concrete or stone masonry and designed to hold back water by primarily using the weight of the material alone to resist the horizontal pressure of water pushing against it. Gravity dams are designed so that each section of the dam is stable, independent of any other dam section.

The Southeastern Anatolia Project is a multi-sector integrated regional development project based on the concept of sustainable development for the 9 million people (2005) living in the Southeastern Anatolia region of Turkey. GAP's basic aim is to eliminate regional development disparities by raising incomes and living standards and to contribute to the national development targets of social stability and economic growth by enhancing the productive and employment generating capacity of the rural sector. The total cost of the project is over 100 billion Turkish lira (TL), of which 30.6 billion TL of this investment was realized at the end of 2010. The real investment was 72.6% for the end of 2010. The project area covers nine provinces which are located in the basins of the Euphrates and Tigris and in Upper Mesopotamia.

Alancık is a village in the District of Sincik, Adıyaman Province, Turkey.

Related Research Articles

Atatürk Dam dam

The Atatürk Dam, originally the Karababa Dam, is a zoned rock-fill dam with a central core on the Euphrates River on the border of Adıyaman Province and Şanlıurfa Province in the Southeastern Anatolia Region of Turkey. Built both to generate electricity and to irrigate the plains in the region, it was renamed in honour of Mustafa Kemal Atatürk (1881–1938), the founder of the Turkish Republic. The construction began in 1983 and was completed in 1990. The dam and the hydroelectric power plant, which went into service after the upfilling of the reservoir was completed in 1992, are operated by the State Hydraulic Works (DSİ). The reservoir created behind the dam, called Lake Atatürk Dam, is the third largest in the world.

State Hydraulic Works government agency

The State Hydraulic Works is a state agency organized under the Ministry of Environment and Forestry of Turkey responsible for the utilization of all the country's water resources. The institution's four major functions are energy, agriculture, services and environment.

Kığı Dam

Kığı Dam is a rock-fill embankment dam on the Peri River in Bingöl Province, Turkey. Its primary purpose is hydroelectric power generation and is the first dam in the Peri River cascade, serving as the headwaters. Construction began in 1998 and is backed by the Turkish State Hydraulic Works. When commissioned, it will support a 180 MW power station. Water from the reservoir will be diverted to an underground power station downstream via an 8.5 km (5.3 mi) long tunnel. In August 2015, suspected Kurdistan Workers' Party militants set fire to three cement trucks associated with the dam construction site. In January 2016, the dam was completed and the reservoir began to impound water.

Uzunçayır Dam

The Uzunçayır Dam is an embankment dam on the Munzur River, located 14 km (9 mi) south of Tunceli in Tunceli Province, Turkey. Constructed between 1994 and 2009, the development was backed by the Turkish State Hydraulic Works. The primary purpose of the dam is hydroelectric power generation and it supports an 84 MW power station.

Köprü Dam

The Köprü Dam is an under construction gravity dam on the Göksu, the main tributary of the Seyhan River about 25 km (16 mi) northwest of Kozan in Adana Province, Turkey. Its primary purpose will be hydroelectric power generation. Construction began in 2009 and was complete in 2012. On 24 February 2012, the dam's diversion tunnel seal broke while the dam was impounding the river for the first time. This resulted in 97,000,000 m3 (78,639 acre⋅ft) of water flooding the downstream area of the dam. The accident and subsequent flood killed 10 workers. Downstream communities received proper warning and no one was killed.

Artvin Dam

The Artvin Dam an arch-gravity dam on the Çoruh River in Artvin Province, Turkey. Preliminary construction on the dam began in December 2010 and the river diversion tunnels were complete in July 2012 at which time construction on the dam foundation started. The purpose of the dam is hydroelectric power generation and its power station has an installed capacity of 340 MW when completed. The dam is part of the Çoruh Development Plan and its construction was supervised by Turkey's State Hydraulic Works. The dam began to impound its reservoir in October 2015 and the power station was commissioned beginning in January 2016.

Arkun Dam

The Arkun Dam an embankment dam on the Çoruh River near İspir in Erzurum Province, Turkey. Construction began in 2011 and the primary purpose of the dam is hydroelectric power generation. It is part of the Çoruh Development Plan and its construction is being supervised by Turkey's State Hydraulic Works. The dam and power plant were completed early, in June 2014. Water from the dam's reservoir supplies two power stations; one at the dam's toe (base) and the other downstream in Artvin Province.

Garzan Dam

Garzan Dam is an embankment dam on the Garzan River 9 km (5.6 mi) northeast of Kozluk in Batman Province, Turkey. It is part of the Southeastern Anatolia Project and has a primary purpose of hydroelectric power generation and irrigation. Surveys for the dam were completed in 2008, construction began in 2009 and the dam began to impound its reservoir in October 2012. The power plant has an installed capacity of 49 MW. The irrigation works remain under construction and are expected to irrigate an area of 40,000 ha when complete. The dam was awarded to FERNAS Energy Electricity Generation Co. Inc. in 2011 under a build–operate–transfer basis.

Alpaslan-2 Dam

The Alpaslan-2 Dam is an embankment dam currently under construction on the Murat River in Muş Province, Turkey. The dam is located about 32 km (20 mi) north of the provincial capital, Muş. The primary purpose of the dam is hydroelectric power production and irrigation. Its power station will have an installed capacity of 280 MW and the reservoir will help irrigate 78,000 ha of land. Enerjisa Power Generation Inc. acquired the license for the power station from Özışık İnsaat & Enerji in April 2011 and Yenigün Construction started excavating the diversion tunnels May 2012. The diversion tunnels are expected to be complete by the end of 2012. In late May 2013 Pöyry was awarded the detailed design of the dam, power station, spillway and switch yard. Enerjisa expects the project to be complete in 2016.

Yedigöze Dam

The Yedigöze Dam, also known as Sani Bey Dam, is a concrete-face rock-fill dam on the Seyhan River bordering İmamoğlu and Aladağ districts in Adana Province, Turkey. The primary purpose of the dam is hydroelectric power generation and irrigation. The dam's power station has an installed capacity of 320 MW and the reservoir will help irrigate 75,000 ha. Construction began in 2007 and the river was diverted by 2008. In the same year construction on the actual dam began and the reservoir began to fill on 15 June 2010. By November 2010 the remaining construction work was complete and the generators were commissioned in 2011. Construction on the irrigation works is ongoing.

Uludere Dam

The Uludere Dam is a gravity dam under construction on the Ortasu River in Uludere district of Şırnak Province, southeast Turkey. Under contract from Turkey's State Hydraulic Works, Hidrokon began construction on the dam in 2008 and a completion date has not been announced.

Seyrantepe Dam

The Seyrantepe Dam is an earth-fill embankment dam on the Peri River, located 15 km (9 mi) northwest of Karakoçan on the border of Elazığ and Tunceli Provinces, Turkey. Its primary purpose is hydroelectric power generation and is the fifth dam in the Peri River cascade. Construction on the dam began in 2003 and its power station was commissioned in 2008. It contains two 29.39 MW Francis turbine-generators for a total installed capacity of 58.78 MW. It is owned and operated by Limak Energy and Bilgin Energy. The sand and gravel-fill dam is 48.5 m (159 ft) tall.

Beyhan I Dam

The Beyhan I Dam is a gravity dam on the Murat River near the village of Beyhan in Palu district, Elazığ Province, Turkey. The primary purpose of the 97 m (318 ft) tall dam roller-compacted concrete dam is power and it supports a 582 MW hydroelectric power station. Construction on the dam began in 2011 and its first generator was commissioned in March 2015, the other three that same year. It is owned by Kalehan Energy Generation.

Upper Kaleköy Dam

The Upper Kaleköy Dam, also known as the Yukarı Kaleköy Dam, is a gravity dam currently under construction on the Murat River near the town of Kale in Solhan district of Bingöl Province, eastern Turkey. Construction on the dam began in 2012 and it is expected to be completed in 2018. It is one of six major dams planned for the river. Its primary purpose is hydroelectric power generation and it will support a 636.6 MW hydroelectric power station. The 150 m (490 ft) tall dam will withhold a reservoir of 783,800,000 m3 (635,400 acre⋅ft). It is owned by Kalehan Energy Generation.

Bağıştaş 1 Dam

The Bağıştaş 1 Dam is an embankment dam on the Karasu River near Bağıştaş in İliç district of Erzincan Province, eastern Turkey. The primary purpose of the dam is hydroelectric power generation and it supports a 140.4 MW power station. Construction began in 2011 and the generators were commissioned in 2015. It was officially dedicated by President Recep Tayyip Erdogan on 14 January 2016. The dam and power plant are owned and operated by Ictas Enerji Uretim ve Ticaret AS.

Yedisu Dam

The Yedisu Dam is an earth-fill embankment dam on the Peri River, in Kiğı district of Bingöl Province, Turkey. Its primary purpose is hydroelectric power generation and is the second dam in the Peri River cascade. Construction on the dam began in 2009 and its power station was commissioned in 2011. The entire project was inaugurated in 2012. It is owned and operated by Özaltın Energy.

Burç Bendi Dam

The Burç Bendi Dam is a gravity dam on the Göksu River, near the village of Burç in Adıyaman district, Adıyaman Province, Turkey. Its primary purpose is hydroelectric power generation and it supports a 27.9 MW run-of-the-river power station. Construction on the dam began in January 2008 and it was fully operational by 3 November 2010. The 57 m (187 ft) tall concrete dam withholds a reservoir of 26,600,000 m3 (21,600 acre⋅ft). Water is diverted through a 536 m (1,759 ft) long tunnel to the power station downstream which contains three 9.3 vertical Kaplan turbine-generators. It is owned and operated by ČEZ Group.

Beyhan II Dam

The Beyhan I Dam is a gravity dam on the Murat River near the village of Beyhan in Palu district, Elazığ Province, Turkey. The primary purpose of the 62 m (203 ft) tall dam is power and it supports a 264 MW hydroelectric power station. It is owned by Kalehan Energy Generation.

Lower Kaleköy Dam

The Lower Kaleköy Dam, also known as the Aşağı Kaleköy Dam, is a gravity dam planned on the Murat River in Genç district of Bingöl Province, eastern Turkey. Its primary purpose is hydroelectric power generation and it will support a 500 MW hydroelectric power station. The 115 m (377 ft) tall dam will withhold a reservoir of 516,500,000 m3 (418,700 acre⋅ft). It is owned by Kalehan Energy Generation.

Erkenek Dam

Erkenek Dam is a dam and hydroelectric plant in Adıyaman Province, southeastern Turkey.

References

  1. "Sırımtaş Dam and HEPP" (in Turkish). Yolsu. Retrieved 27 May 2013.
  2. "Hydroelectric Power Plants Growing With Sincik" (in Turkish). Sinick Gov't. Retrieved 27 May 2013.
  3. "SIRIMTAŞ DAM AND HEPP - ADIYAMAN" (in Turkish). Sangari. Retrieved 27 May 2013.
Map all coordinates using: OpenStreetMap  ·  Google Maps
Download coordinates as: KML  ·  GPX