Stephenson Avenue | |||
---|---|---|---|
General information | |||
Type | Road | ||
Length | 2.7 km (1.7 mi) [1] [2] | ||
Route number(s) | State Route 64 (Osborne Park section) State Route 65 (Mount Claremont section) | ||
Major junctions | |||
| |||
North end | Flax Way | ||
| |||
South end |
| ||
| |||
North end |
| ||
| |||
South end | Rochdale Road (State Route 65) | ||
Stephenson Avenue refers to two separate sections of road in the western suburbs of Perth, Western Australia.
The first section is a 1.2-kilometre (0.75 mi) section of two-lane dual carriageway linking Flax Way to Pearson Street and Jon Sanders Drive in Osborne Park via Scarborough Beach Road. The second, longer section is a 1.5-kilometre (0.93 mi) two-lane single carriageway in Mount Claremont used to link central Perth to West Coast Highway via Hay Street, Underwood Avenue and Rochdale Road.
The two sections of road are to date the only evidence of the originally proposed Stephenson Highway, a controversial highway that was proposed to connect Swanbourne to Innaloo. [3] Evidence of previous attempts to extend the section north of Flax Way to the Mitchell Freeway can be seen on Landgate aerial photos from 1985, however only the section south to Jon Sanders Drive has been completed to date. [4]
The two roads are named after Gordon Stephenson, an influential person in the development and expansion of Perth through the Metropolitan Region Scheme during the 20th century.
An arterial road [note 1] branching north from what was then West Coast Highway (now Rochdale Road), through Bold Park, past the edge of Herdsman Lake, and then continuing north to Hamersley, was included in the 1955 Stephenson-Hepburn Report. [6] [5] : 125 The 1962 preliminary edition of the Metropolitan Region Scheme, which was derived from the report, included a controlled-access highway [7] on a similar alignment, with the addition of what is now the Mitchell Freeway terminating at it while it continued north. [8] The 1963 first gazetted edition of the Metropolitan Region Scheme retained virtually the same route from West Coast Highway, but amended the northern part to terminate at what is now the Mitchell Freeway, while the Mitchell Freeway would extend north instead. [9]
In 1962, the Mount Claremont section from Rochdale Road (then West Coast Highway) to Underwood Avenue was completed to provide access to Perry Lakes Stadium and other facilities constructed for the 1962 British Empire and Commonwealth Games. [10]
In the early 1990s, as part of the Northern Suburbs Transit System project, Stirling railway station was constructed in the median strip of the Mitchell Freeway immediately south of Cedric Street, ultimately opening in 1993. The station's location had presented some interesting design challenges for the future extension of Stephenson Highway over the Mitchell Freeway as the road reserve for the future highway initially ran directly over the station at the southern end of its platforms. During the design of the station and its approach roads, the engineering firm Ove Arup & Partners was tasked with investigating and designing road layouts to accommodate for both future and current needs. [11] Due to the nature of the future Stephenson Highway, a number of road layout options were considered including: [11]
All of the above designs involved significantly complex road layouts which amongst others included partial cloverleaf interchanges, and the construction of new bridges connecting the future highway to Cedric Street. [11]
In 1994, the Osborne Park section from Scarborough Beach Road to Jon Sanders Drive was completed as the Stirling Link Road. [12] [13] While it was designed with providing the connection between the Mitchell Freeway and a potential future Stephenson Highway in mind, its primary purpose was to act as a feeder from the Mitchell Freeway to Innaloo. [12]
In October 2011, the Metropolitan Region Scheme was amended to rezone the Stephenson Highway road reserve north of Jon Sanders Drive to the Mitchell Freeway to "City Centre". [14] This was desired by the City of Stirling on the basis that the reserve prevented it from developing into a true city centre. [15] While an extension of Stephenson Avenue to the Mitchell Freeway would continue, it would be as a "low key road" with on-street parking, while Stephenson Highway's intended freight functions would be adopted by an extended Hutton Street. [15]
Currently underway as of January 2023 is the extension of Stephenson Avenue northwards from Scarborough Beach Road, to connect to Cedric Street and the Mitchell Freeway. [16] [17]
The first phase of construction was by the City of Stirling, and extended the road approximately 500 metres (1,600 ft) to an intersection with the new road of Howe Street. It is two lanes in each direction, with on street parking. This is unlike the previously existing section of Stephenson Avenue to the south, which is a controlled access road. There is also an intersection with Oswald Street, which was extended to the east of its previous intersection with Ellen Stirling Boulevard. Both intersections have traffic lights. This phase began construction in August 2020 and aimed to be completed by September 2021. [18] [16] It opened for traffic on 11 February 2022. [17]
The second phase of construction is by Main Roads Western Australia, and extends the road further, over the Mitchell Freeway to connect to Cedric Street. Stephenson Avenue will have a diamond interchange with the freeway, intended to supersede the current diamond interchange with Cedric Street, which will be demolished. A new access road will be provided from Stephenson Avenue to the Stirling railway station carpark. As part of the same project, the Stirling station bus interchange will have a new bridge added to it, increasing the number of bus stands from 9 to 30. [16] This phase began construction in March 2022 and originally aimed to be completed by late 2023. [17]
In November 2022, the second phase completion date was delayed to February 2024 and then September 2024 after design disagreements between stakeholders. [19] Further disruption was caused by the collapse of Clough, which had been contracted to deliver the project in a joint venture with Acciona and WSP, though the government denied further delays were anticipated. [20]
LGA | Location [1] | km | mi | Destinations | Notes |
---|---|---|---|---|---|
Stirling | Stirling | 0 | 0.0 | Cedric Street (State Route 64) | Traffic light controlled intersection; under construction |
Stirling–Innaloo–Osborne Park tripoint | 0.4 | 0.25 | Mitchell Freeway (State Route 2) | Diamond interchange; under construction | |
Innaloo–Osborne Park boundary | 0.7 | 0.43 | Sarich Court | Traffic light controlled T-junction; no right turn onto Stephenson Avenue; under construction | |
0.85 | 0.53 | Flax Way | Traffic light controlled T-junction | ||
1.13 | 0.70 | Oswald Street | Traffic light controlled T-junction | ||
1.42 | 0.88 | Scarborough Beach Road (State Route 75) | Traffic light controlled intersection | ||
Woodlands–Osborne Park–Herdsman tripoint | 2.04 | 1.27 | Pearson Street (State Route 64) / Jon Sanders Drive | Traffic light controlled T-junction; State Route 64 concurrency terminus | |
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
LGA | Location [2] | km | mi | Destinations | Notes |
---|---|---|---|---|---|
Cambridge | City Beach–Floreat boundary | 0 | 0.0 | Underwood Avenue (State Route 65) / Perry Lakes Drive | Give way sign controlled T-junction; Stephenson Avenue continues east as Underwood Avenue; State Route 65 concurrency terminus |
Nedlands | Mount Claremont | 0.5 | 0.31 | Herb Elliot Drive | Stop sign controlled T-junction |
Cambridge–Nedlands boundary | Mount Claremont–City Beach boundary | 1.2 | 0.75 | Montgomery Avenue | Give way sign controlled seagull intersection |
Cambridge | 1.5 | 0.93 | Rochdale Road (State Route 65) | Give way sign controlled seagull intersection; State Route 65 concurrency terminus | |
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
Gwelup is a suburb of Perth, the capital city of Western Australia 12 km north of Perth's central business district (CBD) along the Mitchell Freeway. Its local government area is the City of Stirling.
Hamersley is a residential suburb 14 kilometres north-northwest of the central business district of Perth, the capital of Western Australia, and six kilometres (4 mi) from the Indian Ocean. The suburb adjoins two major arterial roads—Mitchell Freeway to the west and Reid Highway to the south—and is within the City of Stirling local government area. It was built during the late 1960s and 1970s as part of the Government of Western Australia's response to rapidly increasing land prices across the metropolitan area.
Innaloo is a suburb of Perth, the capital city of Western Australia, 9 km (5.6 mi) from Perth's central business district in the local government area of the City of Stirling.
Great Eastern Highway is a 590-kilometre-long (370 mi) road that links the Western Australian capital of Perth with the city of Kalgoorlie. A key route for road vehicles accessing the eastern Wheatbelt and the Goldfields, it is the western portion of the main road link between Perth and the eastern states of Australia. The highway forms the majority of National Highway 94, although the alignment through the Perth suburbs of Guildford and Midland, and the eastern section between Coolgardie and Kalgoorlie are not included. Various segments form parts of other road routes, including National Route 1, Alternative National Route 94, and State Route 51.
The Kwinana Freeway is a 72-kilometre (45 mi) freeway in and beyond the southern suburbs of Perth, Western Australia, linking central Perth with Mandurah to the south. It is the central section of State Route 2, which continues north as Mitchell Freeway to Clarkson, and south as Forrest Highway towards Bunbury. A 4-kilometre (2.5 mi) section between Canning and Leach highways is also part of National Route 1. Along its route are interchanges with several major roads, including Roe Highway and Mandjoogoordap Drive. The northern terminus of the Kwinana Freeway is at the Narrows Bridge, which crosses the Swan River, and the southern terminus is at Pinjarra Road, east of Mandurah.
The Yanchep line is a suburban railway line and service in Perth, Western Australia, linking the city's central business district (CBD) with its northern suburbs. Operated by the Public Transport Authority as part of the Transperth system, the Yanchep line is 54.5 kilometres (33.9 mi) long and has sixteen stations. It commences in a tunnel under the Perth CBD as a through service with the Mandurah line. North from there, the line enters the median strip of the Mitchell Freeway, where nine of the line's stations are. The Yanchep line diverges from the freeway to serve the centre of Joondalup and permanently leaves the freeway north of Butler for the northernmost four stations to Yanchep.
The Mitchell Freeway is a 41.5-kilometre-long (25.8 mi) freeway in the northern suburbs of Perth, Western Australia, linking central Perth with the city of Joondalup. It is the northern section of State Route 2, which continues south as Kwinana Freeway and Forrest Highway. Along its length are interchanges with several major roads, including the Graham Farmer Freeway and Reid Highway. The southern terminus of the Mitchell Freeway is at the Narrows Bridge, which crosses the Swan River, and the northern terminus is at Romeo Road in Alkimos.
Roe Highway is a 35-kilometre-long (22 mi) limited-access highway and partial freeway in Perth, Western Australia, linking Kewdale with the city's north-eastern and south-western suburbs. The northern terminus is at Reid Highway and Great Northern Highway in Middle Swan, and the southern terminus is with Murdoch Drive at the Kwinana Freeway interchange in Bibra Lake. Roe Highway, in addition to Reid Highway, form State Route 3, a partial ring road around the outer suburbs of the Perth metropolitan area. Roe Highway also forms part of National Highway 94 from Great Eastern Highway Bypass to Great Eastern Highway, and National Highway 95 from Great Eastern Highway to Great Northern Highway.
Wanneroo Road is a 44-kilometre (27 mi) arterial highway in the northern suburbs of Perth, Western Australia linking Joondanna and Yokine in the south with Wanneroo and Yanchep in the north. As part of State Route 60, it begins from Charles Street in the inner city and becomes Indian Ocean Drive up to Dongara.
Reid Highway is a 23-kilometre (14 mi) east-west highway and partial freeway in the northern suburbs of Perth, Western Australia, linking North Beach with Middle Swan. As part of State Route 3, it forms half of Perth's outer ring road along with Roe Highway, which it joins onto at its eastern terminus.
Tonkin Highway is an 81-kilometre-long (50 mi) north–south highway and partial freeway in Perth, Western Australia, linking Perth Airport and Kewdale with the city's north-eastern and south-eastern suburbs. As of April 2020, the northern terminus is at the interchange with Brand Highway and Great Northern Highway in Muchea, and the southern terminus is at Thomas Road in Oakford. It forms the entire length of State Route 4, and connects to several major roads. Besides Brand Highway and Great Northern Highway, it also connects to Reid Highway, Great Eastern Highway, Leach Highway, Roe Highway, and Albany Highway.
Marmion Avenue is a 40-kilometre (25 mi) arterial road in the northern coastal suburbs of Perth, Western Australia, linking Trigg in the south with Yanchep in the north. It forms part of State Route 71 along with West Coast Highway, which it joins onto at its southern terminus.
Stirling is a suburb of Perth, the capital city of Western Australia, about 10 km north of Perth's central business district (CBD) along the Mitchell Freeway. Its local government area is the City of Stirling, whose council offices and administration centre are located in the southwest of the mostly residential suburb.
Beach Road is a major east–west road in the northern suburbs of Perth, Western Australia, connecting Perth's inner northern beachside suburbs and inland state housing areas with shopping and public transport facilities at Warwick and the Malaga industrial area. It was mostly built between 1967 and 1974, and is a dual carriageway for most of its length, except for a small western part between Marmion Avenue and the coast, which is a minor residential distributor road and is discontinuous at Marmion Avenue. Beach Road also serves as a local government boundary. From Alexander Drive to Wanneroo Road, Beach Road is the boundary with the City of Wanneroo on the northern side and the City of Stirling on the southern side. From Wanneroo Road to the coast Beach Road is the boundary with the City of Joondalup on the northern side and the City of Stirling on the southern side.
Karrinyup Road is a major east–west arterial road in the inner northern suburbs of Perth, Western Australia, connecting the City of Stirling council offices, Osborne Park Hospital and Karrinyup Shopping Centre with residential estates in Innaloo, Stirling and Balcatta.
Hepburn Avenue is an arterial east–west road in the northern suburbs of Perth, Western Australia. The road links Sorrento in the west with Malaga and Whiteman in the east. It also connects the residential developments that span its length with several local facilities, as well as major road routes into central Perth.
Scarborough Beach Road is an arterial northwest–southeast road located in the inner northern suburbs of Perth, Western Australia. It connects North Perth to Scarborough Beach, and is mostly a single carriageway road, with two or three lanes in each direction. The road is the western section of State Route 75, between Osborne Park and Scarborough, although a short section in Innaloo was also part of State Route 64 until December 2023.
The Northern Suburbs Transit System is the name given to the project initiated and funded by the Government of Western Australia to provide high-speed passenger rail services to the northern corridor of metropolitan Perth, the capital city of Western Australia. The project was commenced by the Dowding Labor government in the late 1980s, and its main feature project was the Yanchep line and linked bus services, which have been a core component of the Transperth transport network since the line's opening to passengers on 21 March 1993.
Charles Street is a major road in the inner northern suburbs of Perth, Western Australia. It runs from Newcastle Street and extends up to London Street, providing a connection between Mitchell Freeway and Wanneroo Road. It is the southern section of part of State Route 60, which continues north along Wanneroo Road.