Tees Renewable Energy Plant

Last updated

Tees Renewable Energy Plant
Tees Renewable Energy Plant
Official nameTees Renewable Energy Plant
CountryEngland, United Kingdom
Location North Yorkshire, North East England
Coordinates 54°35′51″N1°10′13″W / 54.5975°N 1.1703°W / 54.5975; -1.1703 Coordinates: 54°35′51″N1°10′13″W / 54.5975°N 1.1703°W / 54.5975; -1.1703
StatusProposed
Commission date 2020 (expected)
Construction cost£650 million
Owner(s)MGT Teesside
Thermal power station
Primary fuel Biomass
Power generation
Nameplate capacity 299 MW
External links
Website www.mgtteesside.co.uk

Tees Renewable Energy Plant is a proposed biomass fueled power station situated on the River Tees at Teesport in Redcar and Cleveland, North East England. The plant will operate alongside other renewable energy units and industrial processes operating in the Northeast of England Process Industry Cluster (NEPIC)

Contents

Development

The station would burn 1,100,000 tonnes (1,200,000 tons) of woodpellets per year, sustainably sourced and primarily imported from Europe and America. This would generate 299  megawatts of electricity, enough to power 600,000 homes. [1] If constructed the plant would be one of the largest dedicated wood pellet biomass power station in the United Kingdom, and one of the largest ever biomass-fueled power stations in the world. [2] It is expected to save 1.2 million tonnes of carbon dioxide per year, accounting for 5.5% of the UK's renewables target. [1]

Redcar and Cleveland borough council approved the scheme in November 2008, before the government gave their consent in July 2009. [1] [2] The station is expected to cost £650 million to construct, employing 600 people during its three-year construction period. [2] The station is planned to be opened for commercial operation in 2020. [1]

MGT sold the plant to Macquarie Group and Danish pension fund PKA in 2016, and construction started, with expected completion in 2020. [3] [4]

At 299 MW this is the world's biggest purpose-built biomass power station. It burns up to 1.5 million tonnes of pellets per year, made from around 3 million tonnes of green wood: wood that has been recently cut and therefore has not had an opportunity to dry by evaporation of the internal moisture. Wood is sourced from the USA. [5]

See also

Related Research Articles

River Tees East coast river of Northern England

The River Tees, in Northern England, rises on the eastern slope of Cross Fell in the North Pennines and flows eastwards for 85 miles (137 km) to reach the North Sea between Hartlepool and Redcar near Middlesbrough. The modern day history of the river has been tied with the industries on Teesside in its lower reaches, where it has provided the means of import and export of goods to and from the North East England. The need for water further downstream also meant that reservoirs were built in the extreme upper reaches, such as Cow Green.

Drax Power Station Biomass power station in North Yorkshire

Drax power station is a large biomass power station in North Yorkshire, England, capable of co-firing petcoke. It has a 2.6 GW capacity for biomass and 1.29 GW capacity for coal. Its name comes from the nearby village of Drax. It is situated on the River Ouse between Selby and Goole. Its generating capacity of 3,906 megawatts (MW) is the highest of any power station in the United Kingdom, providing about 6% of the United Kingdom's electricity supply.

Redcar and Cleveland Borough in North Yorkshire, England

Redcar and Cleveland is a borough with unitary authority status in North Yorkshire, England. Its main settlements are Redcar, Brotton, Guisborough, the Greater Eston part of Middlesbrough, Loftus, Saltburn and Skelton. The borough had a resident population of 135,200 in 2011.

Teesside Conurbation in northern England

Teesside is a built-up area around the River Tees in the north of England, split between County Durham and North Yorkshire. The name was initially used as a county borough in the North Riding of Yorkshire.

Tees Valley Mayorality for areas near the River Tees in Northern England

Tees Valley is a combined authority area in the north of England around the River Tees. The combined authority was established in 2016, after public consultation in 2015. The area is not a geographical valley.

Pellet fuel

Pellet fuels are biofuels made from compressed organic matter or biomass. Pellets can be made from any one of five general categories of biomass: industrial waste and co-products, food waste, agricultural residues, energy crops, and untreated lumber. Wood pellets are the most common type of pellet fuel and are generally made from compacted sawdust and related industrial wastes from the milling of lumber, manufacture of wood products and furniture, and construction. Other industrial waste sources include empty fruit bunches, palm kernel shells, coconut shells, and tree tops and branches discarded during logging operations. So-called "black pellets" are made of biomass, refined to resemble hard coal and were developed to be used in existing coal-fired power plants. Pellets are categorized by their heating value, moisture and ash content, and dimensions. They can be used as fuels for power generation, commercial or residential heating, and cooking. Pellets are extremely dense and can be produced with a low moisture content that allows them to be burned with a very high combustion efficiency.

Teesport Port in United Kingdom

Teesport is a large sea port located in the unitary authority of Redcar and Cleveland, in the ceremonial county of North Yorkshire, Northern England.

Seal Sands is a 294.37 hectare biological Site of Special Scientific Interest in County Durham, England, notified in 1966.

Biomass Biological material used as a renewable energy source

Biomass is plant-based material used as fuel to produce heat or electricity. Examples are wood and wood residues, energy crops, agricultural residues, and waste from industry, farms and households. Since biomass can be used as a fuel directly, some people use the words biomass and biofuel interchangeably. Others subsume one term under the other. Government authorities in the US and the EU define biofuel as a liquid or gaseous fuel, used for transportation. The European Union's Joint Research Centre use the concept solid biofuel and define it as raw or processed organic matter of biological origin used for energy, for instance firewood, wood chips and wood pellets.

Teesside power station

Teesside Power Station is a former gas-fired power station, in Redcar & Cleveland, England. Situated near the Wilton chemical complex, the station had combined cycle gas turbines (CCGTs) and open cycle gas turbines (OCGTs), however in 2011 the operation of the CCGT part of the station was suspended, and in 2013 the owners announced its closure and plans to demolish it. Prior to the suspension, the station had a generating capacity of 1875 megawatts (MW), making it the largest of any CCGT power station in Europe. The station could meet almost 3% of the electricity demand for England, Wales and Scotland. Opened in 1993, the station was initially operated by Enron but moved into the hands of PX Ltd after the Enron scandal of 2001, before being bought by Gaz de France and Suez in 2008. The station also worked as a cogeneration plant, providing steam for the Wilton complex.

Renewable energy in Finland Overview of renewable energy in Finland

Renewable energy in Finland grew to 38.7% of total final energy consumption by year end 2014, achieving joint second position with Latvia in terms of renewable energy consumption by share amongst the EU-28 countries, behind its neighbour Sweden in first position on a 52.6% share. The 2014 share in Finland breaks down as renewable energy providing 52% of the heating and cooling sector, 31.4% of the electricity sector and 21.6% of the transport sector. By 2014, Finland had already exceeded its 2020 target for renewable energy use under the EU renewable energy directive as shown in the table of country targets.

Wilton power stations Series of coal, oil, gas and biomass fired CHP power stations

The Wilton power station refers to a series of coal, oil, gas and biomass fired CHP power stations which provide electricity and heat for the Wilton International Complex, with excess electricity being sold to the National Grid. It is located on the Wilton site in Redcar and Cleveland, south of the town of Middlesbrough in North East England. The station has provided for the site since opening in 1952, when it was operated by ICI. The station is currently owned and operated by SembCorp Industries.

Teesside EfW Power station in Billingham, UK

Teesside Energy from Waste plant is a municipal waste incinerator and waste-to-energy power station, which provides 29.2 megawatts (MW) of electricity for the National Grid by burning 390,000 tonnes of household and commercial waste a year. It is located on the River Tees at Haverton Hill, east of Billingham in North East England. Developed and built by NEM, a subsidiary of Northumbrian Water, the initial plant replaced the Portrack Incinerator and opened in 1998. Subsequently, the facility became part of SITA, now Suez.

North Blyth Biomass Project

The North Blyth Biomass Project was a proposed biomass-fired power station planned to be located at North Blyth, Northumberland on the north bank of the River Blyth near its tidal estuary. When commissioned it would have had a generating capacity of 100 megawatts, enough electricity to provide for 170,000 homes. Renewable Energy Systems, the station's developer, was granted government consent on 24 July 2013 to build the £250m project.

Tyne Renewable Energy Plant is a proposed biomass power station, to be built on the north bank of the River Tyne at North Shields. The plant has been developed by MGT Power, along with their similar project, the Teesport Renewable Energy Plant on Teesside. It is expected to have a generating capacity of 295 megawatts, enough to power around 600,000 homes, making it one of the biggest of its kind in Europe. It is hoped the plant will be opened in 2014, costing £400 million.

BEI-Teesside

BEI-Teesside is a planned biomass power station, expected to be built on the River Tees at Port Clarence.

The North East of England Process Industry Cluster (NEPIC) is an economic cluster created following the industrial cluster ideas and strategy of Michael Porter. This Process Industry Cluster has been created by the chemistry using industries based in North East England where more than 1,400 companies are based in the supply chain of the sector. The sector has over 35,000 direct employees and some 190,000 indirect employees in the northeast of England and together they represent over one third of the industrial economy of the region. Companies in the Cluster manufacture 50% of the UK's Petrochemicals and 35% of the UK's Pharmaceuticals and they significantly contribute towards making the region the only net exporting region of the UK. The region has over £13 billion of exports.

Denmark is a leading country in wind energy production and wind turbine production. Wind power alone produced 47% of Denmark's electricity consumption in 2017, and is expected to increase its production by nearly 80% in the years to 2024.

Templeborough Power Station is a biomass power station situated in Templeborough on the River Don in Rotherham England. Operated by Copenhagen Infrastructure Partners, it opened in 2018 with an operating capacity of 44 megawatts.

Redcar Bulk Terminal Deep sea East Coast port in Redcar and Cleveland, Northern England

Redcar Bulk Terminal (RBT), also known as Redcar Ore Terminal, is a privately run dock at the mouth of the Tees Estuary in North Yorkshire, England. The port is used for the transhipment of coal and coke and for many years was the import dock for iron ore destined for Redcar Steelworks under British Steel Corporation, British Steel plc, Corus, Tata Steel Europe and Sahaviriya Steel Industries.

References

  1. 1 2 3 4 "Tees Renewable Energy Plant". MGT Teesside. Retrieved 17 October 2016.
  2. 1 2 3 "Green light for £500m Teesport biomass plant". builderandengineer.co.uk. 15 July 2009. Retrieved 10 August 2011.
  3. "MGT Power: Work on Tees Renewable Energy Plant creating 600 jobs to start 'within weeks'". gazettelive. 12 August 2016. Retrieved 16 August 2016.
  4. "The Chemical Engineer - News - Work to begin on Tees Renewable Energy Plant" . Retrieved 16 August 2016.
  5. "MGT Teesside biomass power station United Kingdom". banktrack.org. Retrieved 29 March 2022.