Dunston power station | |
---|---|
Official name | Dunston A and B power stations |
Country | England |
Location | Dunston |
Coordinates | 54°57′37″N1°39′32″W / 54.96028°N 1.65889°W |
Status | Demolished |
Construction began | 1908 (A station) 1930 (B station) 1947 (Gas turbine) |
Commission date | 1910 (A station) 1933-51 (B station) 1955 (Gas turbine) |
Decommission date | 1975-81 |
Owners | Newcastle-upon-Tyne Electric Supply Company (1910–1947) British Electricity Authority (1948–1954) Central Electricity Authority (1954–1957) Central Electricity Generating Board (1957–1981) |
Thermal power station | |
Primary fuel | Coal |
Secondary fuel | Natural gas |
Power generation | |
Units operational | A station: Two 7.2 MW AEG, one 6.25 MW Brown Boveri, one 13.2 MW Brown Boveri and later one 15 MW C. A. Parsons and Company gas turbine B station: Six 50 MW C. A. Parsons and Company |
Nameplate capacity | 1910: 33.85 MW 1951: 333.85 MW 1955: 348.85 MW 1981: 98 MW |
External links | |
Commons | Related media on Commons |
Dunston Power Station refers to a pair of adjacent coal-fired power stations in the North East of England, now demolished. They were built on the south bank of the River Tyne, in the western outskirts of Dunston in Gateshead. The two stations were built on a site which is now occupied by the MetroCentre. The first power station built on the site was known as Dunston A Power Station, and the second, which gradually replaced it between 1933 and 1950, was known as Dunston B Power Station. The A Station was, in its time, one of the largest in the country, and as well as burning coal had early open cycle gas turbine units. The B Station was the first of a new power station design, and stood as a landmark on the Tyne for over 50 years. From the A Station's opening in 1910 until the B Station's demolition in 1986, they collectively operated from the early days of electricity generation in the United Kingdom, through the industry's nationalisation, and until a decade before its privatisation.
Dunston A had a generating capacity of 48.85 megawatts (MW) in 1955, and Dunston B had a generating capacity of 300 MW. Electricity from the stations powered an area covering Northumberland, County Durham, Cumberland, Yorkshire and as far north as Galashiels in Scotland. [1]
With the expansion of the electric supply industry in the early 1900s, power stations were built to supply homes with electric lighting. Around Newcastle upon Tyne this led to the construction of power stations at Lemington, The Close and Carville. Two supply companies built the stations, the Newcastle-upon-Tyne Electric Supply Company (NESCo) to the east of Newcastle, and the Newcastle and District Electric Lighting Company (DisCo) to the west. [2] To meet an increasing demand for electricity, NESCo commissioned Dunston Power Station (later Dunston A Power Station) on the Derwent Haugh, a large flood plain to the west of Gateshead, to balance the supply of the Newcastle area with the Carville station. [3] [4] Construction of the new station began in 1908, the work undertaken by the company of Sir Robert McAlpine. They completed the construction in the short time of 20 months, and this was to be their first in a large number of power station constructions, following the decline of the railway industry. [5] [6] In 1910, the station was opened and began generating electricity. [4] [7]
The station was of a similar design to other local power stations at Carville and Lemington, and was a large triple-gabled brick building. [3] [8] However Dunston A was built several years after the other local stations, and so because of advances in power station design, was larger and was able to produce more electricity than the others. The station was originally equipped with two turbo-alternators rated at 7.2 megawatts (MW), made by AEG of Germany, and two turbo alternators rated at 6.25 MW and 13.2 MW, made by Brown Boveri of Switzerland, for a total generating capacity of 33.85 MW. [3] [9] The turbo alternators were supplied with steam from 24 coal burning Babcock & Wilcox marine water-tube boilers.
In 1925, NESCo set up separate plant at the power station for the low temperature carbonisation treatment of coal, before being burned in boilers and the steam used for electricity generation. The treatment plant was manufactured by Babcock & Wilcox, and set up in a self-contained boiler house which contained four boilers, four retorts and pulverising mills. The building was also fitted with gas-stripping and by-product plants. The carbonising plant could handle up to 100 tonnes of coal per day, while its boilers produced 78,000 lb of steam per hour. [10] This plant was extended in 1931. [11]
Between 1947 [3] and November 1955, [12] the station was extended, and a 15 MW Parsons gas turbine turbo alternator was installed, bringing the capacity of the station up to 48.85 MW. [3] [13] [14] The gas was supplied by pipe line from the Norwood Coke Works, 1.5 mi (2.4 km) away in the Team Valley. [3] [15]
The electricity output from the A station was as follows. [16]
Year | 1954 | 1955 | 1956 | 1957 |
---|---|---|---|---|
Electricity output, GWh | 53.032 | 56.967 | 46.991 | 25.461 |
As part of a transition from the 40 Hertz (Hz) system, used by the Newcastle-upon-Tyne Electric Supply Company, to the 50 Hz system, used by the new UK National Grid, which took place in 1932, a new power station was built to replace the A power station. [17]
The new Dunston B Power Station was designed by consulting engineers Merz & McLellan. [18] Its design was different from the design of other power stations at the time because it enclosed the machinery in a steel frame clad with glass. [1] This was a departure from the usual power station designs, which normally enclosed the machinery in a concrete or brick wall. Dunston B is thought to be the first power station in the UK and possibly even the world to be built in this way. [4] The station was also the first in the world to use metal clad switchgear at a voltage as high as 66,000 V. [19]
Construction of the new power station started in 1930, but the Second World War delayed its full completion until 1951. The station was opened in stages throughout its construction, as generating units were able to be put into production while the other sections were still under construction. The first units were commissioned in January 1933. [7] [14]
The new station had a capacity of 300 megawatts (MW), produced by six 50 MW generating sets. These were made by C. A. Parsons and Company and were the largest machines ever constructed under Charles Algernon Parsons' supervision. [14] [20]
The station's units were the first application of reheated steam in steam turbines in the world, an improvement which gave them a heat consumption of only 9,280 BTU per kilowatt hour, the most efficient system in the UK. In 1939 the station was said to be "at the head of all the Power Stations in Great Britain as regards thermal efficiency." [21] The station remained one of Britain's most efficient systems until the 1950s. [1] [14]
The stations' buildings were around 100 ft (30 m) tall. Flue gas was discharged through six 250 ft (76 m) tall chimneys, one for each of the station's six generating units. [22] The station was fitted with two electrostatic precipitators in 1953, one completed in June that year and the other in September. They were fitted to reduce smoke and pollution from the station. [23]
The plant's water system was cooled by using the nearby River Tyne, rather than using a cooling tower system. [1] Coal for the station was supplied from various coal mines in the North Durham coalfields, and was brought to the station by train, on what was a freight only line. Since the station's closure, this line has been upgraded for use by passenger trains and is now used as part of the Newcastle & Carlisle Railway. [1] Once delivered to the station, coal was shunted by CEGB No. 15 "Eustace Forth", which was built by Robert Stephenson & Hawthorns in 1942, and No. 13 "The Barra", which was built by Hawthorn Leslie & Company in 1928. These two engines are now stored at National Railway Museum Shildon and Tanfield Railway respectively. [24] [25]
Various ships disposed of the station's ash waste, by carrying the fly ash down the river and dumping it in the North Sea. These vessels included "Bobby Shaftoe", "Bessie Surtees" and "Hexhamshire Lass", which were also used by the nearby Stella power stations; as well as a number of tugs towing hopper barges, including "Mildred". [26] [27]
In 1971 the station had an installed capacity of 282.5 MW comprising two 52 MW and four 44 MW generator sets. [28] The boilers had an output capacity of 2,250,000 pounds per hour (283.4 kg/s) of steam at 600 psi (41.4 bar) and 427/454 °C. In 1971 the station delivered 508.83 GWh of electricity. [28]
The electricity generating capacity and output of Dunston B power station are shown in the tables. Separate figures are given for the Part I plant (1933–39) and the part II plant (1949–50). [16] [29] [30]
Year | 1954 | 1955 | 1956 | 1957 | 1958 |
---|---|---|---|---|---|
Installed capacity, MW | 184 | 184 | 184 | 184 | 184 |
Electricity output, GWh | 1,057.600 | 1,014.282 | 872.428 | 695.021 | 583.341 |
Year | 1954 | 1955 | 1956 | 1957 | 1958 | 1967 | 1971 | 1979 |
---|---|---|---|---|---|---|---|---|
Installed capacity, MW | 96 | 96 | 96 | 96 | 96 | 282.5 (total I & II) | 282 (total I & II) | 104 |
Electricity output, GWh | 743.548 | 725.263 | 672.284 | 495.410 | 632.392 | 576.899 | 508.831 | 117.145 |
In its time, Dunston B Power Station ranked consistently in England's leading stations, both in terms of thermal efficiency and cost per unit of electricity. [14] However, the station eventually became outdated, and notification of its partial closure was given in October 1975, with some units being closed the following October. [31] It was then only used as a stand-by station, operating only at peak electrical demand times. Finally, after some units having been in operation for about 40 years, the station ceased to generate electricity on 26 October 1981. At the time of closure, only 98 MW of the station's capacity was in use. [32]
The station was demolished in 1986 to make way for the MetroCentre, which became Europe's largest shopping and leisure centre. [33] The land on which the MetroCentre was built was bought for only £100,000, because the site was water-logged and had been used for dumping ash produced by the power station. American warehouse club chain Costco have since built a store on the actual site of the power station. [34] The power station's large indoor sub-station still stands alongside it, as the only trace of the site's former use.
Due to the closure of Dunston power station, along with the later closures of the power stations at Stella and Blyth, the northern part of North East England has become heavily dependent upon the National Grid for electrical supply. However, in the south of the region there are still two large power stations at Hartlepool and Teesside, meaning that the south of the region does not depend upon the National Grid for electrical supply as much as the north of the region. [35]
The power station's six chimneys were a prominent local landmark, visible from along a 8.6-mile (13.8 km) stretch of the Tyne valley running from Bensham in Gateshead to Heddon-on-the-Wall in Northumberland. [36]
When in operation, the B station briefly featured in Get Carter , a 1971 crime film starring Michael Caine. Dunston B appears as part of the film's backdrop, viewed from the now demolished Frank Street in Benwell, as the funeral cortège of the main character's brother Frank leaves a house on the street. [34] [37]
The station was also a popular subject for photographers. It featured in the work of documentary and press photographer Bert Hardy, who photographed it from Benwell, using it as a backdrop whilst photographing a mother and child. [38] It was also photographed by Welsh documentary photographer Jimmy Forsyth (photographer) as part of his Scotswood Road collection. [39]
The Littlebrook Power Station were a series of four oil and coal-fired power stations situated on the south bank of the River Thames, next to the Queen Elizabeth 2 Bridge and the Dartford Tunnel in Dartford, Kent. The final power station, Littlebrook D, ceased operating in March 2015, and has now been demolished.
West Ham Power Station was a coal-fired power station on Bow Creek at Canning Town, in east London. It was often referred to informally as Canning Town Power Station.
Lemington Power Station was a small, now demolished coal-fired power station, located in North East England. It was situated on the Lemington Gut, a backwater of the River Tyne, at Lemington, 3.5 mi (5.6 km) west of Newcastle upon Tyne. The station's main building stood until 2017 as a rare example of an early power station, dating from before the nationalisation of the United Kingdom's electrical supply industry.
Roosecote Power Station was a gas-fired, originally coal-fired power station, situated in the Roosecote district of Barrow-in-Furness in Cumbria, North West England. The gas-fired station opened in 1991 and was the first CCGT power station to supply electricity to the United Kingdom's National Grid, but was mothballed in 2012 after a proposed biomass power station was cancelled. It was situated directly adjacent to Rampside Gas Terminal. The plant was demolished between 2014 and 2015. The site is now a 49 MW battery storage facility.
Staythorpe C Power Station is a 1,735 MWe gas-fired power station at Staythorpe between Southwell and Newark-on-Trent in Nottinghamshire, England, between the River Trent and Nottingham to Lincoln railway line. The station was handed over to the owner RWE from Alstom Power with full commercial operation being achieved in December 2010. The official opening ceremony attended by Charles Hendry, Minister of State took place on 9 May 2011.
Carville Power Station refers to a pair of now partially demolished coal-fired power stations, situated in North East England on the north bank of the River Tyne at Wallsend. The two stations were built alongside each other on a riverside site about 5 mi (8.0 km) downstream of Newcastle upon Tyne. Carville A Power Station, the first station on the site was opened in 1904, and Carville B Power Station was opened in 1916 to its south.
Neptune Bank Power Station was a coal-fired power station situated on the River Tyne at Wallsend near Newcastle upon Tyne. Commissioned in 1901 by the Newcastle upon Tyne Electric Supply Company, the station was the first in the world to provide electricity for purposes other than domestic and street lighting. It was also the first in the world to generate electricity using three-phase electrical power distribution at a voltage of 5,500 volts.
North Tees Power Station refers to a series of three coal-fired power stations on the River Tees at Billingham in County Durham. Overall, they operated from 1921 until 1983, and the C station, the last on the site, was demolished in 1987. Billingham Biomass Power Station is to be built on their site.
Hams Hall Power Station refers to a series of three, now demolished coal-fired power stations, situated in Warwickshire in the West Midlands of England, 9 miles (14 km) northwest of Birmingham city centre.
Doncaster Power Station refers to two coal-fired electricity generating stations situated in the centre of Doncaster in South Yorkshire, England. Doncaster A provided electricity to the town from 1900 to 1958, and the B station from 1953 to 1983.
Bold Power Station refers to a series of two coal-fired power stations in Bold near St Helens, Merseyside, North West England. They were closed, decommissioned and demolished between 1981 and 1992, and a housing estate now occupies the site.
Padiham Power Station was a coal-fired power station in Padiham, east Lancashire, England, which began operation in 1926 and generated power from 1927 until it was closed in 1993.
Cliff Quay Power Station was a coal-fired power station situated to the south of Ipswich, Suffolk in the East of England. The station was designed by Sir Alexander Gibb & Partners and built by the Cleveland Bridge Company.
Watford Power Station was a coal-fired power station situated in Watford's Riverside area. The station was built by the Watford Corporation Electricity Department starting with the installation of cables in 1899 with completion around 1900, near the banks of the River Colne. A gas turbine power station was commissioned in 1980.
Ribble Power Station was a coal-fired electricity generating station on the River Ribble in Penwortham near Preston, Lancashire, England. The station was built by the Corporation of Preston to replace a small privately-run generating station in the town. It supplied electricity to Preston and the surrounding area from 1923 until 1976. The station was expanded with new equipment in 1943–47 which remained in operation until the power station was closed in 1976 and was subsequently demolished.
Blackburn power stations are a series of electricity generating stations that have provided electric power to the town of Blackburn and the wider area from 1895 to the present. The first station in Jubilee Street, Blackburn began operating in 1895. A new larger station known as Blackburn East or Whitebirk power station was commissioned in 1921 and was rebuilt in stages over the period 1942 to 1955. Whitebirk station closed in 1976. The 60 MW Blackburn Mill Combined Cycle Gas Turbine (CCGT) power station has generated electricity since 2002. The Blackburn energy from waste (EfW) plant is currently (2020) being planned.
Leicester power stations are a series of electricity generating stations that have provided electric power to the City of Leicester and the wider area from 1894. The first station, located within Aylestone gas works, supplied electricity for street lighting. The city's new electric tram system was supplied from 1904 by a station at Lero which operated until 1930. A large coal-fired power station was constructed at Freemans Meadow in 1922 and was operational until 1976. Finally a gas turbine power plant was commissioned in 1976.
Bromborough power stations are three electricity generating stations that supplied power to industrial and domestic users in Bromborough, Port Sunlight and the wider Wirral area from 1918 until 1998. Bromborough power station provided public electricity supplies from 1951 to 1980. Central power station Bromborough (1918–1998) was originally owned by Lever Brothers and supplied electricity to domestic users in Port Sunlight as well as electricity and steam to industrial users. Merseyside power station Bromborough (1958–1998) was also owned by Unilever and provided electricity and steam at a range of pressures to industrial users in the locality. All three power stations at Bromborough have been demolished.
Stourport power stations were two electricity generating stations that supplied electricity to Stourport-on-Severn, Worcestershire and to the wider West Midlands area from 1927 to 1984. The two stations, A (1927–78) and B (1950–84), were collocated on a joint site adjacent to the River Severn south of Stourport-on-Severn.
Wolverhampton power station, also known as Commercial Road power station, supplied electricity to the Borough of Wolverhampton, England and the surrounding area from 1895 to 1976. It was redeveloped in several stages to meet growing demand for electricity: including the addition of new plant in 1902 to 1908, 1925 and 1942. The power station was initially owned and operated by Wolverhampton Corporation, but was transferred to the West Midlands Joint Electricity Authority in 1928. The British Electricity Authority assumed ownership at nationalisation in 1948. Wolverhampton power station was decommissioned in 1976.
{{cite journal}}
: Cite journal requires |journal=
(help){{cite journal}}
: Cite journal requires |journal=
(help)