Neptune Bank Power Station

Last updated

Neptune Bank Power Station
Neptune Bank Power Station
CountryUnited Kingdom
Location Wallsend
Coordinates 54°59′06″N1°32′10″W / 54.985°N 1.536°W / 54.985; -1.536 Coordinates: 54°59′06″N1°32′10″W / 54.985°N 1.536°W / 54.985; -1.536
StatusDecommissioned
Construction began1900
Commission date 18 June 1901 (1901-06-18)
Decommission date1915 (1915)
Owner(s) Newcastle upon Tyne Electric Supply Company
Thermal power station
Primary fuel Coal
Power generation
Make and model Parsons
Units decommissioned9
Nameplate capacity 2,800 kW (1901)
3,000 kW (1902)

grid reference NZ299655

Neptune Bank Power Station was a coal-fired power station situated on the River Tyne at Wallsend near Newcastle upon Tyne. Commissioned in 1901 by the Newcastle upon Tyne Electric Supply Company, the station was the first in the world to provide electricity for purposes other than domestic and street lighting. It was also the first in the world to generate electricity using three-phase electrical power distribution at a voltage of 5,500  volts.

Contents

The station had an initial generating capacity of 2,800 kW, which was increased to 3,000 kW a year after the station opened, with the introduction of two 1,500 kW Parsons turbo alternators, the largest ever built at that time. The station closed in 1915, following the completion of an extension to Carville Power Station and the opening of Dunston Power Station.

History

At the beginning of the twentieth century, the use of electricity for general purposes began to be considered, and the Newcastle upon Tyne Electric Supply Company (NESCo) realised the potential it offered for development. [1] In June 1899, the Walker and Wallsend Union Gas Company (WWUGC) acquired parliamentary powers for the supply of electricity to the area around Wallsend. In January 1900 they erected Neptune Bank power station near the North Eastern Railway's (NER) North Tyneside Loop, midway between Wallsend and Walker. In October 1900, NESCo acquired the entire power station from the WWUGC, with the exception of the cables and sub-station machinery installed for the purpose of supplying the works in the area in which the WWUGC had obtained parliamentary powers. the WWUGC continued to buy electricity in bulk from NESCo. [2]

The station was officially opened on 18 June 1901 by Lord Kelvin. At the opening he said:

We have seen at work what many have not seen before – a system realised in which a central station generates power by steam engines and delivers electricity to consumers at distances varying, I think, from a quarter of a mile to over three and a half miles... A larger station is in prospect, larger work is contemplated. This admirable but comparatively small station at Neptune Bank makes a splendid beginning... What I am seeing today is the dream of my life realised. I do not know the limits of electricity, but it will go beyond anything we can conceive of today. [1] [3]

The station was the first power station to generate electricity for industrial purposes, rather than just for domestic and street lighting, and this led to a rapid expansion of NESCo. [4]

NESCo laid high-tension cables from the power station to various substations in Newcastle upon Tyne. The company changed their system of supply, from 2,000 volt (V) single phase alternating current which had been used to distribute power from their Pandon Dene Power Station, to three phase current at 5,500 V. [2] This made NESCo the first statutory authority to supply in such a way. The scientific journal, The Electrician congratulated NESCo in June 1901, stating that "not merely electric power supply on Tyneside was formally inaugurated last Tuesday, but the era of electric power utilisation all over the kingdom." [1]

A year after the station came into operation, NESCo's original power station at Pandon Dene was closed and converted into a substation. The Pandon Dene station had originally supplied Newcastle city centre with electricity, but the new Neptune Bank station took over this supply, transmitting using high voltage cables laid in ducts, rendering the older station obsolete. [1]

Design and specification

The station was the first major design project of Charles Merz, of the Merz & McLellan consulting partnership, and the first power station Merz & McLellan designed in the Newcastle area. [5] [6]

The station's buildings were built from corrugated iron, and the boiler house adjoined the engine room on its south facing side. Each of these two buildings measured 100 ft (30 m) by 52 ft (16 m). To the north east of the main station buildings lay the station's cooling pond, where the station's circulating water was cooled by means of spray nozzles, capable of cooling 4,000,000 pounds of water per hour. This cooling system was adopted as it was cheaper than pumping water up from the nearby River Tyne which was 60 ft (18 m) below the level of the station. The station was also equipped with a testing pond, capable of absorbing up to 1,500 kW. [2]

Coal was delivered to the station via the NER's North Tyneside Loop. An electric locomotive was used to convey the coal from the railway to the boiler house. The station's boiler house was equipped with four batteries of two Babcock & Wilcox boilers. Each boiler had a capacity of 1,000 horsepower and a working pressure of 200 psi. Each was fitted with superheaters and mechanical stokers and had a heating surface of 4,020 sq ft (373 m2), with a superheat of 100–120 °F (38–49 °C). Each could evaporate 14,000 pounds of water per hour. Ash waste from the boilers was discharged into trucks. [2]

The station initially generated electricity using four 700 kilowatt (kW) alternators, each driven by a slow-speed triple expansion marine type reciprocating engine, built by Wigham Richardson & Co. and the Wallsend Slipway & Engineering Company. [1] [6] [7] [8] The station was the first in the world to generate electricity using three-phase electrical power distribution at a voltage of 5,500 V, and the first to generate direct current at different voltages. [5] [6] After the opening of Carville Power Station in 1904, the voltage of transmission was raised to 6,000 V.

In 1902, two 1,500-kW Parsons steam turbine driven turbo-alternators were added to the initial equipment at the station. [1] [6] At the time, these were the largest three-phase steam turbine driven alternators in the world, as well as being the first of the barrel type rotary design. Results gained from the turbines influenced the Cunard Steamship Company to install steam turbines on the Mauretania . [6] The turbines drove 6,000 V three-phase alternators, supplying current to motor-generators and transformers in the substations attached to the distribution network. [7] The motor-generators in the substations provided DC from the supplied AC and the transformers stepped-down the 6,000 V supply to 200 V for lighting use and 400 V for industrial use. [9]

By 1904, there were a total of nine different generating sets operating at the power station. Sets No. 1 and 2 were DC generators driven by 300 HP two-crank compound engines running at 380 RPM, power from which supplied DC network in Wallsend and Walker. Set No. 3 was a 50 kW set used for exciting purposes only. Sets No. 4 and 5 were used as balancers and motor generators and had a combined capacity of 150 kW. Sets No. 6, 7, 8 and 9 were each driven by 1,400 HP engines and in turn each drove a 750 kW alternator. [2] The two Parsons sets worked alongside these.

By 1912, the NESCo system, which the station was part of, was the largest integrated power system in Europe. [9]

Operations

Coal was delivered to Neptune Bank from the Riverside Branch of the North Eastern Railway at Tyne Pontoons signal box, about halfway between Walker and Carville stations. It was taken to the station's railway sidings using a small electric locomotive and unloaded in front of the boiler house. It was then hand-loaded into automatic stokers which fired the boilers. Removal of ash from the boilers was performed by machine. The station was badly located for sources of cooling and boiler water – it was some 60 ft (18 m) above the level of the nearby River Tyne, which was also 200 feet away. The concept of a cooling tower had not yet been invented and a large but inefficient brick-built cooling pond was used. [7]

Closure

Following Neptune Bank's commissioning there was a rapid increase in the demand for electricity, which couldn't be met by the station, and so in 1904 NESCo commissioned Carville Power Station. Fitted entirely with steam turbine generating equipment, Carville quickly superseded Neptune Bank. [1] Neptune Bank power station was largely out of use by 1909 after the extension of the Carville station, along with the opening of Dunston Power Station. It was decommissioned in 1915. [10] The building was later acquired by the company Thermal Syndicate who used it as a glass blowing factory known as the Vitreosil Works. [11]

Related Research Articles

North Eastern Electric Supply Company

The North Eastern Electric Supply Company was responsible for the supply of electricity to a large amount of North East England, prior to the nationalisation of the British electricity industry with the Electricity Act 1947. The company was established as the Newcastle upon Tyne Electric Supply Company in 1889, but was renamed the North Eastern Electricity Supply company as it expanded to supply the North East region.

Agecroft Power Station Series of three now demolished coal-fired power stations near Manchester, North West England

Agecroft power station was a coal-fired power station between the eastern bank of the Manchester, Bolton and Bury Canal and the western bank of the River Irwell at Pendlebury, near Manchester, England. It operated between 1925 and 1993, and was demolished in 1994. HM Prison Forest Bank has since been built on the site.

West Ham Power Station Former coal-fired power station in London, England

West Ham Power Station was a coal-fired power station on Bow Creek at Canning Town, in east London. It was often referred to informally as Canning Town Power Station.

Deptford Power Station

Three distinct coal-fired power stations were built at Deptford on the south bank of the River Thames, the first of which is regarded as the first central high-voltage power station in the world.

Dunston Power Station Coal-fired power station in England

Dunston Power Station refers to a pair of adjacent coal-fired power stations in the North East of England, now demolished. They were built on the south bank of the River Tyne, in the western outskirts of Dunston in Gateshead. The two stations were built on a site which is now occupied by the MetroCentre. The first power station built on the site was known as Dunston A Power Station, and the second, which gradually replaced it between 1933 and 1950, was known as Dunston B Power Station. The A Station was, in its time, one of the largest in the country, and as well as burning coal had early open cycle gas turbine units. The B Station was the first of a new power station design, and stood as a landmark in the Tyne for over 50 years. From the A Station's opening in 1910 until the B Station's demolition in 1986, they collectively operated from the early days of electricity generation in the United Kingdom, through the industry's nationalisation, and until a decade before its privatisation.

Lemington Power Station Power station in North East England, UK

Lemington Power Station was a small, now demolished coal-fired power station, located in North East England. It was situated on the Lemington Gut, a backwater of the River Tyne, at Lemington, 3.5 mi (5.6 km) west of Newcastle upon Tyne. The station's main building stood until 2017 as a rare example of an early power station, dating from before the nationalisation of the United Kingdom's electrical supply industry.

Great Yarmouth Power Station Gas power station in Norfolk, England

Great Yarmouth Power Station is combined cycle gas turbine power station on South Denes Road in Great Yarmouth in Norfolk, England, with a maximum output of 420 MW electricity, opened in 2001. It is built on the site of an oil-fired power station, built in 1958 and closed and demolished in the 1990s. A coal-fired power station was built in Great Yarmouth in 1894 and operated until 1961.

Shoreham Power Station Gas-fired power station

Shoreham Power Station is a 420MWe combined cycle gas-fired power station in Southwick, West Sussex. It was built on the site of the Brighton B Power Station. Predating both the former Brighton A & B stations, the town of Brighton has a long history of association with the electricity supply industry.

Carville power stations

Carville Power Station refers to a pair of now partially demolished coal-fired power stations, situated in North East England on the north bank of the River Tyne at Wallsend. The two stations were built alongside each other on a riverside site about 5 mi (8.0 km) downstream of Newcastle upon Tyne. Carville A Power Station, the first station on the site was opened in 1904, and Carville B Power Station was opened in 1916 to its south.

Forth Banks Power Station

Forth Banks Power Station refers to a now-demolished coal-fired power station in North East England. It was situated in the city centre of Newcastle upon Tyne on Forth Banks, a street to the rear of Newcastle Central station. Put up in a disused factory building in 1890 by the Newcastle and District Electric Lighting Company (DisCo), it is notable as the first power station in the world to use turbo alternators, as well as being one of the first municipal power stations in the United Kingdom.

The Newcastle and District Electric Lighting Company was a pre-nationalisation, private electricity supply company, based in Newcastle upon Tyne in North East England. The company was set up in 1889 by Charles Algernon Parsons. The company built a number of small coal-fired power stations in the west end of Newcastle upon Tyne, initially to supply homes and streets with electric lighting. They also provided power for an electrified tram line in the western part of the city.

Tilbury power stations

The Tilbury power stations were two thermal power stations on the north bank of the River Thames at Tilbury in Essex. The 360 MW dual coal- and oil-fired Tilbury A Power Station operated from 1956 until 1981 when it was mothballed, prior to demolition in 1999. The 1,428 MW Tilbury B Power Station operated between 1968 and 2013 and was fueled by coal, as well as co-firing with oil and, from 2011, biomass. Tilbury B was demolished in 2016–19. Since 2013 three other power stations have been proposed or constructed in Tilbury.

North Tees Power Station

North Tees Power Station refers to a series of three coal-fired power stations on the River Tees at Billingham in County Durham. Overall, they operated from 1921 until 1983, and the C station, the last on the site, was demolished in 1987. Billingham Biomass Power Station is to be built on their site.

Ottovale coke works Industrial complex

Ottovale coke works was a large industrial complex situated at Blaydon Burn, near Blaydon-on-Tyne, Gateshead, North East England. The complex comprised a coke works, tar works and a power station. Built on the site of Dockendale Hall in 1904, it was operated by the Priestman Collieries until the 1970s.

Close Power Station was a coal-fired power station situated on Newcastle upon Tyne's Quayside, in modern Tyne and Wear. The station was built by the Newcastle and District Electric Lighting Company in 1902, near their Forth Banks Power Station.

Pandon Dene Power Station Former power station in England

Pandon Dene Power Station was an early coal-fired power station situated on the Pandon Dene, to the east of Newcastle upon Tyne.

Acton Lane Power Station was a power station in London NW10. The station, also known as Willesden power station, was located to the south of the Euston to Birmingham railway on a site bounded by Acton Lane, the Grand Union Canal and the Dudding Hill railway line. In later years the site was extended to the south side of the canal. The entire site is now occupied by Willesden Grid Supply Point buildings.

Ribble Power Station was a coal-fired electricity generating station on the River Ribble in Penwortham near Preston, Lancashire. The station was built by the Corporation of Preston to replace a small privately-run generating station in the town. It supplied electricity to Preston and the surrounding area from 1923 until 1976. The station was expanded with new equipment in 1943–47 which remained in operation until the power station was closed in 1976 and was subsequently demolished.

The Thornhill power station generated and supplied electricity to the town of Dewsbury and the wider regional area from 1902 to 1982, and again from 1998. The first generating station on the site was owned and operated by the Yorkshire Electric Power Company. Following nationalisation of the British electricity supply industry in 1948 Thornhill power station was operated by a succession of state owned bodies. The power station was redeveloped with new plant in 1915, 1925, 1932–37 and 1950–54. The coal-fired steam station was decommissioned in 1982, and was subsequently demolished. A gas turbine power station on the site was commissioned in 1998.

Wolverhampton power station, also known as Commercial Road power station, supplied electricity to the Borough of Wolverhampton, England and the surrounding area from 1895 to 1976. It was redeveloped in several stages to meet growing demand for electricity: including the addition of new plant in 1902 to 1908, 1925 and 1942. The power station was initially owned and operated by Wolverhampton Corporation, but was transferred to the West Midlands Joint Electricity Authority in 1928. The British Electricity Authority assumed ownership at nationalisation in 1948. Wolverhampton power station was decommissioned in 1976.

References

  1. 1 2 3 4 5 6 7 North-Eastern Electric Supply Company Limited 1889–1948. Newcastle upon Tyne: T.M. Grierson Ltd. March 1948.
  2. 1 2 3 4 5 "Full text of "The Mining engineer"". archive.org. 1960. Retrieved 9 August 2011.
  3. "We were all off-grid once". off-grid. Retrieved 3 September 2008.
  4. "North Eastern Electricity Board". The National Archives. Retrieved 3 September 2008.
  5. 1 2 Mr Alan Shaw (29 September 2005). "Kelvin to Weir, and on to GB SYS 2005" (PDF). Royal Society of Edinburgh. Archived from the original (PDF) on 4 March 2009. Retrieved 4 September 2008.
  6. 1 2 3 4 5 Parke Hughes, Thomas (1993). Networks of Power. JHU Press. p. 456. ISBN   0-8018-4614-5 . Retrieved 8 February 2009.
  7. 1 2 3 National civic federation Commission on public ownership and operation, ed. (1907). Municipal and Private Operation of Public Utilities. 2. National civic federation. p. 301. Retrieved 2 February 2009.
  8. "Full text of "Transactions of the North-east coast institution of engineers and shipbuilders.."". archive.org. Retrieved 22 March 2011.
  9. 1 2 "Survey of Belford 1995". North Northumberland Online. Retrieved 3 September 2008.
  10. Davies, Katie (20 August 2015). "Wallsend's historic former power station brought back to life by Freddy Shepherd". ChronicleLive.
  11. "Historic former power plant bought by Shepherd Offshore set to create 150 skilled jobs". 6 August 2014.
Preceded by Largest Power Station in the UK
1901-1904
Succeeded by