Biomass Energy Centre

Last updated

Biomass Energy Centre
Chilton Biomass Energy Centre County Durham - geograph.org.uk - 2430058.jpg
Biomass Energy Centre, May 2011
Biomass Energy Centre
CountryEngland
Location Chilton
Coordinates 54°39′57″N1°33′48″W / 54.66583°N 1.56333°W / 54.66583; -1.56333 Coordinates: 54°39′57″N1°33′48″W / 54.66583°N 1.56333°W / 54.66583; -1.56333
StatusOperational
Construction began2010
Commission date 2011
Construction cost£40 million
Owner(s) Veolia Energy-Dalkia
Thermal power station
Primary fuel Biomass
Power generation
Nameplate capacity 17.5 MW
External links
Website www.dalkia.co.uk

Biomass Energy Centre is a biomass fired CHP power station located in the town of Chilton in County Durham. Opened in 2011, the plant was developed, and then owned and operated by Veolia Energy-Dalkia.

Contents

Development

In May 2009, Veolia Energy-Dalkia, who had a base in nearby Cramlington, Northumberland and had previously provided cogeneration (CHP) plants for the Newcastle General, Freeman and Royal Victoria Infirmary hospitals in Newcastle, announced their plans to build a biomass fueled CHP power station in the County Durham town of Chilton. The site chosen had previously been occupied by a feed mill and silo, which had been highly visible throughout the town and had come to be known locally as Chilton Cathedral. The new plant was expected to cost £40 million, half of which was to be spent within the North East region, on materials and components for the plant, aiding the local economy. [1]

Chilton Town Council voted unanimously in support of the plant, saying it would be a catalyst for the regeneration of the area, and this was supported by a 340 name petition from the local people. [1] Planning permission was granted later that June and construction commenced in January 2010. [2] 50 jobs were created during the construction of the plant, with 17 permanent jobs created following completion. [1] Commissioning of the plant began in June 2011, taking three to four weeks to complete. [2]

Operations

115,000 to 120,000 tonnes of wood are burned in the station per year, providing electricity for up to 20,000 homes through the National Grid. The plant is one of the first in the UK to burn domestic waste wood to provide electricity for the National Grid, rather than for an industrial site. It is the first of a number of similar sites which Dalkia are planning in the UK. [2]

The feedstock for the plant is wood which has reached the end of its useful life such as old shipping pallets, manufacturing offcuts, wood from the construction and demolition industries, and material from civic amenity sites. This wood is collected through a network set up by Dalkia [2] The fuel would other wise be sent to landfill. [1]

50,000 tonnes of wood pellets are produced on site each year, for use elsewhere. [1]

Design and specification

The plant has a generating capacity of 17.5 megawatts. [2]

Related Research Articles

Gasification Form of energy conversion

Gasification is a process that converts biomass- or fossil fuel-based carbonaceous materials into gases, including as the largest fractions: nitrogen (N2), carbon monoxide (CO), hydrogen (H2), and carbon dioxide (CO2). This is achieved by reacting the feedstock material at high temperatures (typically >700 °C), without combustion, via controlling the amount of oxygen and/or steam present in the reaction. The resulting gas mixture is called syngas (from synthesis gas) or producer gas and is itself a fuel due to the flammability of the H2 and CO of which the gas is largely composed. Power can be derived from the subsequent combustion of the resultant gas, and is considered to be a source of renewable energy if the gasified compounds were obtained from biomass feedstock.

Drax Power Station Biomass power station in North Yorkshire

Drax power station is a large biomass power station in North Yorkshire, England, capable of co-firing petroleum coke. It has a 2.6 GW capacity for biomass and 1.29 GW capacity for coal. Its name comes from the nearby village of Drax. It is situated on the River Ouse between Selby and Goole. Its generating capacity of 3,906 megawatts (MW) is the highest of any power station in the United Kingdom, providing about 6% of the United Kingdom's electricity supply.

Cogeneration Simultaneous generation of electricity, and/or heating, or cooling, or industrial chemicals

Cogeneration or combined heat and power (CHP) is the use of a heat engine or power station to generate electricity and useful heat at the same time.

Redbank Power Station is a biomass power station located in Warkworth, within the Hunter Region of New South Wales, Australia. The station is currently awaiting a restart of operations after converting from its original use as a coal-fired power station. Redbank is unique for its utilisation of circulating fluidised bed technology, the only generator of its kind in Australia. Upon re-fire, the station will operate using 100% biomass at a capacity of 151MW of electricity.

A bio-energy village is a regionally oriented concept for the use of renewable energy sources in rural areas. The system uses biomass from local agriculture and forestry in a biogas powerplant to meet the complete energy requirements of a village, such as electricity and district heating.

Electricity sector in Ghana

Ghana generates electric power from hydropower, fossil-fuel, and renewable energy sources. Electricity generation is one of the key factors in order to achieve the development of the Ghanaian national economy, with aggressive and rapid industrialisation; Ghana's national electric energy consumption was 265 kilowatt hours per capita in 2009.

Lynemouth power station Biomass Power station in Northumberland, England

Lynemouth Power Station is a biomass power plant which provides electricity for the UK National Grid. Until March 2012, it was the main source of electricity for the nearby Alcan Lynemouth Aluminium Smelter. It is located on the coast of Northumberland, north east of the town of Ashington in north east England. The station has stood as a landmark on the Northumberland coast since it opened in 1972, and had been privately owned by aluminium company Rio Tinto Alcan throughout its operation until December 2013, when RWE npower took over. In January 2016 it was acquired by Energetický a průmyslový holding.

Tilbury power stations

The Tilbury power stations were two thermal power stations on the north bank of the River Thames at Tilbury in Essex. The 360 MW dual coal- and oil-fired Tilbury A Power Station operated from 1956 until 1981 when it was mothballed, prior to demolition in 1999. The 1,428 MW Tilbury B Power Station operated between 1968 and 2013 and was fueled by coal, as well as co-firing with oil and, from 2011, biomass. Tilbury B was demolished in 2016–19. Since 2013 three other power stations have been proposed or constructed in Tilbury.

North Tees Power Station

North Tees Power Station refers to a series of three coal-fired power stations on the River Tees at Billingham in County Durham. Overall, they operated from 1921 until 1983, and the C station, the last on the site, was demolished in 1987. Billingham Biomass Power Station is to be built on their site.

Wilton power stations Series of coal, oil, gas and biomass fired CHP power stations

The Wilton power station refers to a series of coal, oil, gas and biomass fired CHP power stations which provide electricity and heat for the Wilton International Complex, with excess electricity being sold to the National Grid. It is located on the Wilton site in Redcar and Cleveland, south of the town of Middlesbrough in North East England. The station has provided for the site since opening in 1952, when it was operated by ICI. The station is currently owned and operated by SembCorp Industries.

Teesside EfW Power station in Billingham, UK

Teesside Energy from Waste plant is a municipal waste incinerator and waste-to-energy power station, which provides 29.2 megawatts (MW) of electricity for the National Grid by burning 390,000 tonnes of household and commercial waste a year. It is located on the River Tees at Haverton Hill, east of Billingham in North East England. Developed and built by NEM, a subsidiary of Northumbrian Water, the initial plant replaced the Portrack Incinerator and opened in 1998. Subsequently, the facility became part of SITA, now Suez.

North Blyth Biomass Project

The North Blyth Biomass Project was a proposed biomass-fired power station planned to be located at North Blyth, Northumberland on the north bank of the River Blyth near its tidal estuary. When commissioned it would have had a generating capacity of 100 megawatts, enough electricity to provide for 170,000 homes. Renewable Energy Systems, the station's developer, was granted government consent on 24 July 2013 to build the £250m project.

Tees Renewable Energy Plant is a proposed biomass fueled power station situated on the River Tees at Teesport in Redcar and Cleveland, North East England. The plant will operate alongside other renewable energy units and industrial processes operating in the Northeast of England Process Industry Cluster (NEPIC)

Avedøre Power Station

The Avedøre Power Station is a combined heat and power station, located in Avedøre, Denmark, just south of Copenhagen, and is owned by Ørsted A/S. Avedøre Power Plant is a high-technology facility and one of the world's most efficient of its kind, being able to utilize as much as 94% of the energy in the fuel and convert 49% of the fuel energy into electricity. Apart from using coal, petroleum (oil) and natural gas, the plant runs on a wide variety of biomass fuels such as straw and wood pellets. The plant consists of two units with a total capacity of 793 MW of electricity and 918 MW of heat. The combination of producing electricity and heat for district heating at the same time is widely used in Denmark and the rest of Scandinavia, due to the need of domestic heating together with the Danish energy companies putting a big effort into optimising the energy plants.

Dalkia

Dalkia is an energy service company, subsidiary of the EDF Group. Its two main businesses consist in making the most of local renewables and unlocking energy savings. Dalkia develops alternative renewables, such as biomass, geothermal, biogas and recovered energies.

The T2 Energy Centre is a biomass-fuelled combined heating and power (CHP) station at Heathrow Airport in London which opened in December 2012. It provides heat to half of the active terminals: Terminal 2 and Terminal 5 and electricity into the local grid, similar to some of the airport's operations demands.

Elean power station

Elean power station is a straw-fired biomass power station in Cambridgeshire, England. At a capacity of 38 MW, it was the largest straw-fired power plant in the world at the time of its completion. The power station was constructed between 1998 and 2000 by FLS Miljo and is operated by EPR Ely Ltd. It generates 270 GWh of electricity from 200,000 tonnes of biomass annually, supplied by Anglian Straw Ltd. Straw is the major fuel of the plant, but oilseed rape and the energy crop Miscanthus are also used, as well as some natural gas.

Denmark is a leading country in wind energy production and wind turbine production. Wind power alone produced 47% of Denmark's electricity consumption in 2017, and is expected to increase its production by nearly 80% in the years to 2024.

Biofuels play a major part in the renewable energy strategy of Denmark. Denmark is using biofuel to achieve its target of using 100% renewable energy for all energy uses by 2050. Biofuels provide a large share of energy sources in Denmark when considering all sectors of energy demand. In conjunction with Denmark's highly developed renewable energy resources in other areas, biofuels are helping Denmark meet its ambitious renewable energy targets.

Templeborough Power Station is a biomass power station situated in Templeborough on the River Don in Rotherham England. Operated by Copenhagen Infrastructure Partners, it opened in 2018 with an operating capacity of 44 megawatts.

References

  1. 1 2 3 4 5 Henderson, Tony (20 May 2009). "Dalkia power plant scheme fuels hopes for Chilton". The Journal . Retrieved 19 August 2011.
  2. 1 2 3 4 5 Quinault, Caealia (2 June 2011). "Dalkia's £40m biomass plant nears completion". letsrecycle.com. Retrieved 19 August 2011.