Triangle Parkway Western Wake Expressway Southern Wake Expressway | |
Route information | |
Maintained by NCDOT | |
Length | 32.4 mi [1] (52.1 km) |
Existed | 2011–present |
Component highways | |
Major junctions | |
East end | I-40 / I-42 near Garner |
North end | I-40 / I-885 in RTP |
Location | |
Country | United States |
State | North Carolina |
Counties | Durham, Wake |
Highway system | |
The Triangle Expressway (TriEx) is the first modern toll road built in North Carolina, and one of the first toll roads in the United States built to use only electronic toll collection instead of toll booths. The overall freeway consists of three segments called the Triangle Parkway, the Western Wake Expressway, and the Southern Wake Expressway, totalling up to 32.4 miles (52.1 km) long. The six-lane Triangle Parkway extends Interstate 885 (I-885) 3.5 miles (5.6 km) via North Carolina Highway 885 (NC 885) in Durham County to meet North Carolina Highway 540 (NC 540) in Morrisville in Wake County. The Western Wake Expressway extends 12.4 miles (20.0 km) long, extending NC 540 to meet NC 55 in Apex. The Southern Wake Expressway extends 16.5 miles (26.6 km) long, extending NC 540 to meet I-40 and I-42 southeast of Garner.
The money for the project comes from $625 million in bonds and a $387 million loan from the federal government. The North Carolina Turnpike Authority deposited this money on July 29, 2009, and on the same day the agency's executive director David W. Joyner signed contracts to pay $584 million of that money to three companies to build the road over the next 42 months, creating 13,800 jobs.[ citation needed ]
S. T. Wooten Corp. of Wilson, North Carolina built the 3.4-mile (5.5 km) northern section, an extension of NC 147, called the Triangle Parkway, at a cost of $137.5 million, including an electronic toll plaza on I-540. The new road opened for traffic on December 8, 2011 and extends from the previously existing section of NC 147 (now I-885) south from I-40 to an 2.8-mile (4.5 km) section of the Northern Wake Expressway. Completed in 2007, the existing section became part of the toll road on August 2, 2012. [2] [3] [4] Originally envisioned as part of I-540, because of rules against tolls on Interstate Highways, this section is now called NC 540. [5] When Research Triangle Park (RTP) was created in the late 1950s, a corridor of land was preserved to be available for the Triangle Parkway's eventual construction. Another $230 million was spent on 525 acres (2.12 km2) of additional right-of-way for the entire road.
Actual tolling of the new section of road began January 3, 2012. [2] [6]
Granite Construction of Watsonville, California, and Archer Western Contractors of Atlanta worked together as Raleigh Durham Roadbuilders to complete the 12.6-mile (20.3 km) Western Wake Freeway at a cost of $446.5 million. This section of the Triangle Expressway, which extends from NC 55 at RTP to NC 55 at Holly Springs, will become part of NC 540. [4] In summer 2009, work began on the freeway. [7] On August 1, 2012, the 6.6-mile (10.6 km) second section from NC 55 to US 64 opened, [3] with the remaining six miles south of US 64 to NC 55 in Holly Springs opening December 20, 2012. [8] [9] [6] [10] Tolls and $25 million a year from the North Carolina legislature will finance the project. [4]
The Triangle Expressway is built as an all-electronic toll road with billing by license plate, [4] similar to Maryland's Route 200 (InterCounty Connector, largely opened to traffic in 2011).
Drivers can open an account and use a North Carolina Quick Pass transponder, which results in a lower rate. Other drivers will have their license plates photographed, and they will receive a bill. [4] The expected rates are 15 cents per mile (9.3 ¢/km) for those with transponders, and 24 cents per mile (15 ¢/km) for others. [2] [11]
On May 4, 2010, the Turnpike Authority signed a contract with TransCore to provide transponders. [12] Drivers can, however, use their existing accounts; North Carolina becomes the only state to offer this option. 350,000 new transponders are expected to be issued in the first five years. [13] Transponder sales began October 11, 2011. [14] In later years, interoperability was established with the following ETC systems: E-ZPass, Peach Pass and SunPass.
At the time of its opening, residents in the area have complained about the tolls, considering that the new highway is the only toll road in North Carolina, and especially since other large sections of 540 have been completed without tolls. Business people who plan to use the highway, however, claim that the time savings will more than balance out the cost. [15]
In 2018, the total trip rate was $3.25 with the North Carolina Quick Pass and $5.00 via bill-by-mail. [16] In 2022, the total trip rate was raised to $3.71 with the North Carolina Quick Pass and $5.68 via bill-by-mail. [17] As of January 1, 2024, the total trip rate is now $3.94 with the North Carolina Quick Pass and $6.06 via bill-by-mail. Listed below are the 2024 toll rates, starting at I-885 / Toll N.C. 885 / I-40: [18]
Exit | Axles | Quick Pass | Bill by mail |
---|---|---|---|
Exit 3/2 - Hopson Rd. / Davis Dr. | 2 | $0.45 | $0.69 |
3 | $0.90 | $1.38 | |
4 | $1.80 | $2.77 | |
Exit 69 - Chapel Hill Rd. / N.C. 54 | 2 | $0.99 | $1.52 |
3 | $1.98 | $3.05 | |
4 | $3.96 | $6.09 | |
Exit 66 - N.C. 55 | 2 | $1.23 | $1.89 |
3 | $2.46 | $3.78 | |
4 | $2.46 | $3.78 | |
Exit 64 - Morrisville Parkway | 2 | $1.77 | $2.72 |
3 | $3.54 | $5.45 | |
4 | $7.08 | $10.89 | |
Exit 62 - Green Level West Rd. | 2 | $2.22 | $3.42 |
3 | $4.44 | $6.83 | |
4 | $8.88 | $13.66 | |
Exit 59: U.S. 64 | 2 | $2.76 | $4.25 |
3 | $5.52 | $8.49 | |
4 | $11.04 | $16.98 | |
Exit 57 - Old U.S. Hwy 1 / S. Salem St. | 2 | $3.43 | $5.28 |
3 | $6.86 | $10.55 | |
4 | $13.72 | $21.11 | |
Exit 56 - U.S. 1 | 2 | $3.43 | $5.28 |
3 | $6.86 | $10.55 | |
4 | $13.72 | $21.11 | |
Exit 55 - Veridea Parkway | 2 | $3.77 | $5.80 |
3 | $7.54 | $11.60 | |
4 | $15.08 | $23.20 | |
Exit 54 - N.C. 55 | 2 | $3.94 | $6.06 |
3 | $7.88 | $12.12 | |
4 | $15.76 | $24.25 | |
Exit 50 - Holly Springs Road | 2 | $4.66 | $7.15 |
3 | $9.32 | $14.30 | |
4 | $18.64 | $28.60 | |
Exit 47 - Bells Lake Road | 2 | $5.32 | $8.17 |
3 | $10.64 | $16.34 | |
4 | $21.28 | $32.68 | |
Exit 45 - U.S. 401 | 2 | $5.95 | $9.14 |
3 | $11.90 | $18.28 | |
4 | $23.80 | $36.56 | |
Exit 43 - Old Stage Road | 2 | $6.46 | $9.93 |
3 | $12.92 | $19.86 | |
4 | $25.84 | $39.72 | |
Exit 39 - N.C. 50 | 2 | $7.43 | $11.42 |
3 | $14.86 | $22.84 | |
4 | $29.72 | $45.68 | |
Exit 36 - I-40/I-42 | 2 | $8.01 | $12.31 |
3 | $16.02 | $24.62 | |
4 | $32.04 | $49.24 | |
The "Triangle Parkway" was first proposed in 1958, as part of Research Triangle Park. On February 16, 2005, it was one of four roads selected by the Turnpike Authority to be built as toll roads in North Carolina. The estimated cost was $69 million for 3.2 miles (5.1 km) between Davis Drive and NC 54. An additional $29 million could be spent extending that highway 1.3 miles (2.1 km) to McCrimmon Parkway in Morrisville, whose leaders opposed the idea. The original parkway route, however, had no real opponents. [19]
At the groundbreaking ceremony in 2009, Representative David Price pointed out that using tolls to finance this road "was not our first choice." Instead, area governments concluded the road would have taken 15 more years to complete any other way, so the decision to charge tolls came in 2005. [20] The 12.5-mile (20.1 km) Western Wake Expressway from RTP to Holly Springs had been delayed earlier in the year, and the legislature had increased the number of toll projects allowed from four to nine. [21]
In July 2006, the legislature decided to allow the section of I-540 connecting the Triangle Parkway and Western Wake Expressway to be a toll road if the other two roads were also toll roads, even though the road was already being built. [22]
Federal approval for the use of tolls came in January 2007. The Turnpike Authority asked that the new section of road not be called an Interstate.
Just before the July 2007 opening of the 4.5-mile (7.2 km) I-540 section between I-40 and NC 55, I-540 signs came down, replaced with NC 540 signs. Using the designation NC 540, a decision made in May 2007, was less confusing than giving the road an entirely new number. [5]
The name "Triangle Expressway" became official in May 2007, and turnpike board member Perry R. Safran said the committee also wanted the nickname "TriEx". [23]
On November 14, 2007, the board decided toll booths would not be used, [24] and on June 5, 2008, the State House voted to approve $25 million a year for 39 years for the project. This would cover the difference between expected toll collections and actual costs. [25]
Groundbreaking was held on August 12, 2009 at the west end of Interstate 540 (I-540). "A dozen dignitaries" used shovels painted gold as 150 watched. [20]
On December 8, 2011, the first leg of the Triangle Expressway opened to traffic. Toll collection began January 3, 2012. [2] [26]
On August 1, 2012, the second section of the Triangle Expressway, from Research Triangle Park to U.S. 64, opened. Toll collection began the following day. [3]
On December 20, 2012, the section from U.S. 64 to NC 55 in Holly Springs opened with toll collection beginning in January. [8]
Toll rates change almost annually as required by the bond covenant created for the funding of the Expressway. Since its initial rate set at 2012, it has increased in 2013, 2015 and 2016. [27] [28]
On January 20, 2017, the expressway was chosen as one of 10 testing locations for driverless cars. [29]
On June 30, 2022, Toll NC 147 was re-designated as Toll NC 885 as a part of the opening of the East End Connector Project. [30]
On September 26, 2024, the section from NC 55 in Holly Springs to the I-40/US 70 Interchange in Garner was opened to traffic. [31]
Planned as the next phase of the Triangle Expressway and the final segment of the Raleigh Beltway, the Triangle Expressway Southeast Extension (also known as the Southern and Eastern Wake Freeways) will traverse 30 miles (48 km) linking NC 540 and I-540, just south of Knightdale. Planning for the route started in 2010, but was put on hold in March 2011 by the enactment of North Carolina Session Law 2011-7 (N.C. S.L. 2011-7). This law stated routes to study "shall not be located north of" the Orange Route, shown on maps for 20 years, potentially impacting wetlands and endangered mollusks. [32] [33] [34] [35] The U.S. Army Corps of Engineers opposed the Orange Route unless other potential routes could be found. A map unveiled August 22, 2012 shows the Lilac Route and the Plum Route, which would result in less environmental impact but would cause the loss of more homes. Planners hoped for a final route by 2014. [36] On December 7, 2012, the Federal Highway Administration and the U.S. Army Corps of Engineers replied to NCDOT saying they could not legally evaluate the Orange Route without comparing it to another route expected to cause less environmental harm. Since there was an impasse between the Federal government and the state regarding the issue, the federal funds for the project were cut, putting the Southeast Extension on hiatus. [37]
A Draft Environmental Impact Statement released in late 2015 included 17 options, the Red Route included. Construction west of Interstate 40 would start in 2018 or later. The Lilac Route avoided the environmental problems of the Orange Route but like the Red Route would result in many homes being lost, and the Raleigh water treatment plant would also be affected. The Blue Route and Purple Route to the south of the others would cause the loss of even more homes. East of Interstate 40, there was no preferred route, and all of the options had problems. [38]
In April 2016, NCDOT announced that Detailed Study Alternative [39] was selected as the preferred alternative for the project. The route goes from west to east and combines the proposed orange, green (southern portion), mint, and green (northern portion) corridor segments. The Federal Highway Administration then approved the final environmental impact study for the roadway, which was published in December 2017. [40]
In June 2018, the federal government approved the entire 28.4 mile (45.71 km) extension of NC-540 which would complete the southern loop of NC-540 around Raleigh from the current terminus in Holly Springs to the Interstate 540 terminus in Knightdale; the project was estimated to cost approximately $2.24 billion. [41]
However, in May 2018, a collective of environmental groups represented by Southern Environmental Law Center in Chapel Hill sued NCDOT. They claimed that the U.S. Fish and Wildlife Service did not properly analyze the project's environmental impacts, noting two species of endangered freshwater mussels that could be at risk. [42] This delayed progress until August 2019, when the group agreed to drop the lawsuit in exchange for a number of concessions from NCDOT, including roughly $5 million in spending on "high quality land" within the Neuse and Tar-Pamlico river watersheds, and $4.6 million for studies on the propagation and restoration of endangered freshwater animals. [43]
With this settled, construction began in mid-November 2019. [44] The first portion of NC 540 from NC 55 to I-40 was scheduled to be open to traffic in 2023, but was later pushed out to Spring 2024. [45] [46] After further delays, the extension was set to have its official ribbon-cutting and opening on August 27, 2024. However, Tropical Storm Debby, reportedly, caused significant erosion along the unopened portion of the expressway further delaying the opening to vehicles. [47] NCDOT later announced on September 4, 2024 a revised opening date of September 25, 2024. [48] The extension opened to traffic at 6 a.m. that day. [48] The extension opened to traffic at 6 a.m. that day. [48] The extension opened to traffic at 6 a.m. that day. [49]
By August 21, 2021, the final segment closing the loop to I-87/US 64/US 264 was scheduled to begin the bidding process in 2025 with construction not beginning until at least 2029. Public input over the growth and development of a 15,000-acre area of eastern Wake County along the lower Neuse River as well as the future southern loop of NC 540 was requested on June 23, 2023. [50] [51]
The process of completing the final segment was sped up after the N.C. Turnpike Authority (NCTA) was able to get a single environmental permit, allowing for utility work to begin. That coupled with strong local support and expected toll revenues moved the project up NCDOT’s list of priorities and the bidding process for the segment began much earlier than anticipated in Summer 2023. [52] The work was to be done in two sections; the first one would be from south of Rock Quarry Road northward to the I-540/I-87/US 64/US 264 interchange while the second one would be from I-40/US 70 (future I-42) to south of Rock Quarry Road. [53] In September 2023, it was announced that Flatiron-Fred Smith Company Joint Venture had been awarded a $450 million contract to complete the first segment; [52] [53] [54] S.T. Wooten-Branch Civil joint venture was awarded a $287 million contract for the second segment in October 2023. [53] [55] In December 2023, the Local Government Commission (LGC) approved an application by the NCTA for revenue bonds and a Transportation Infrastructure Finance & Innovation Act (TIFIA) loan through US-DOT to start construction. [56] Construction is now expected to start once the southern extension is opened. Completion of the final segment is expected in 2028. [53] [57] [58]
County | Location | mi [1] | km | Exit | Destinations | Notes |
---|---|---|---|---|---|---|
Wake | Knightdale | 0.0 | 0.0 | 26 | I-87 / US 64 / US 264 (Knightdale Bypass) – Raleigh, Wilson, Rocky Mount | Future interchanges (proposed); estimated completion 2028 [53] |
1.8 | 2.9 | 27 | Poole Road | |||
| 3.7 | 6.0 | 29 | Auburn Knightdale Road | ||
| 6.0 | 9.7 | 32 | Rock Quarry Road | ||
| 7.3 | 11.7 | 33 | US 70 | ||
| 9.2 | 14.8 | 35 | White Oak Road | ||
Johnston | | 11.1 | 17.9 | 36 | I-40 / I-42 east – Raleigh, Goldsboro, Wilmington | |
Wake | | 13.5 | 21.7 | 39 | NC 50 (Benson Road) | |
| 17.5 | 28.2 | 43 | Old Stage Road | Exit under construction. Expected completion in November 2024 [49] | |
| 19.6 | 31.5 | 45 | US 401 (Fayetteville Road) – Fuquay-Varina, Garner | Signed as Fuquay-Varina (west) and Garner (east) | |
| 22.2 | 35.7 | 47 | Bells Lake Road | Eastbound entrance and exit under construction. Expected completion in November 2024 [49] | |
Holly Springs | 24.9 | 40.1 | 50 | Holly Springs Road | ||
Apex | 27.9 | 44.9 | 54 | NC 55 – Apex, Holly Springs, Fuquay-Varina | Signed as exits 54A (west) and 54B (east) [59] | |
28.5 | 45.9 | 55 | Veridea Parkway | |||
| 29.2 | 47.0 | 56 | US 1 – Raleigh, Sanford | To Harris Lake; signed as exits 56A (north) and 56B (south) | |
| 30.2 | 48.6 | 57 | South Salem Street | ||
Apex | 33.0 | 53.1 | 59 | US 64 – Apex, Pittsboro | To Jordan Lake; signed as exits 59A (east) and 59B (west) | |
Cary | 35.5 | 57.1 | 62 | Green Level West Road – Cary | ||
37.2 | 59.9 | 64 | Morrisville Parkway | |||
40.0 | 64.4 | 66 | NC 55 – Cary, Durham | To USA Baseball; signed as exits 66A (east) and 66B (west) | ||
Morrisville | 41.8 | 67.3 | 67 | NC 540 east to I-40 east / I-540 – RDU Airport, Raleigh | NC 885 exit 1 | |
Route transition from NC 540 to NC 885 | ||||||
Durham | Research Triangle Park | 42.5 | 68.4 | 2 / 3 | Davis Drive / Hopson Road | Signed exit 2 northbound, exit 3 southbound |
44.9 | 72.3 | 5 | I-40 to NC 54 – Raleigh, Chapel Hill | Signed as exit 5A (east) and 5B (west), continuation as I-885 | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
Raleigh is the capital city of the U.S. state of North Carolina and the seat of Wake County. It is the second-most populous city in North Carolina, after Charlotte. Raleigh is the tenth-most populous city in the Southeast, the 41st-most populous city in the U.S., and the largest city of the Research Triangle metro area. Raleigh is known as the "City of Oaks" for its many oak trees, which line the streets in the heart of the city. The city covers a land area of 148.54 square miles (384.7 km2). The U.S. Census Bureau counted the city's population as 467,665 at the 2020 census. It is one of the fastest-growing cities in the United States. It is ranked as a sufficiency-level world city by the Globalization and World Cities Research Network. The city of Raleigh is named after Sir Walter Raleigh, who established the now-lost Roanoke Colony in present-day Dare County.
Wake County is a county located in the U.S. state of North Carolina. As of the 2020 census, its population was 1,129,410, making it North Carolina's most populous county. From July 2005 to July 2006, Wake County was the 9th-fastest growing county in the United States, with Cary and Raleigh being the 8th- and 15th-fastest growing communities, respectively.
Apex is a town in Wake County, North Carolina, United States. At its southern border, Apex encompasses the community of Friendship. In 1994, the downtown area was designated a historic district, and the Apex train depot, built in 1867, is designated a Wake County landmark. The depot location marks the highest point on the old Chatham Railroad, hence the town's name. The town motto is "The Peak of Good Living".
The Research Triangle, or simply The Triangle, are both common nicknames for a metropolitan area in the Piedmont region of the U.S. state of North Carolina. Anchored by the cities of Raleigh and Durham and the town of Chapel Hill, the region is home to three major research universities: North Carolina State University, Duke University, and the University of North Carolina at Chapel Hill, respectively. The "Triangle" name originated in the 1950s with the creation of Research Triangle Park located between the three anchor cities, which is the largest research park in the United States and home to numerous high tech companies.
Interstate 295 (I-295), also known as the Fayetteville Outer Loop, is a partially completed Interstate-grade planned 34-mile-long (55 km) bypass around the western side of Fayetteville, North Carolina, United States. As of July 2024, it stretches for 22 miles (35 km) from US Highway 401 (US 401) in western Fayetteville to I-95 and US 13 near Eastover. The final section between US 401 and I-95 near Parkton is being constructed in segments and is expected to be completed around 2026. A 6.3-mile-long (10.1 km) segment from I-95 east of Parkton to Camden Road west of Hope Mills is signed as North Carolina Highway 295 (NC 295). NC 295 was also used as temporary designations for the highway before I-295 was signed.
Interstate 540 (I-540) and North Carolina Highway 540 (NC 540) are part of a partially completed beltway around the city of Raleigh in the US state of North Carolina, forming the Raleigh Outer Loop. When complete, the route will completely encircle the city, meeting its parent route of I-40 in two locations.
Interstate 440 (I-440), also known as the Raleigh Beltline, the Cliff Benson Beltline, or locally as The Beltline, is an Interstate Highway in the US state of North Carolina. I-440 is a 16.4-mile-long (26.4 km) partial beltway that nearly encircles central Raleigh. I-440 begins in west Raleigh at an interchange with I-40 as a continuation of U.S. Highway 64 (US 64)/US 1 and traverses a primarily residential area in west Raleigh. The freeway makes a turn toward the east, crossing US 70, Six Forks Road, and Wake Forest Road. US 1 branches north off I-440 at US 401, becoming US 401/US 1. I-440 turns toward the southeast and follows a brief concurrency with U.S. Highway 64 Business before intersecting I-87/US 64/US 264. US 64 and I-87 are concurrent with I-440 along the remainder of the road's southwesterly routing. Exit 16 is the last exit on I-440, where I-440 splits to join either I-40 eastbound or I-40 westbound.
Interstate 277 (I-277) is an auxiliary Interstate Highway in the US state of North Carolina. It serves as a 4.41-mile (7.10 km) partial loop around Uptown Charlotte.
Interstate 95 (I-95) is a part of the Interstate Highway System that runs along the East Coast of the United States from Miami, Florida, to the Canada–United States border at Houlton, Maine. The total interstate runs for 1,924 miles. In the state of North Carolina, the route runs for 181.36 miles (291.87 km) from the South Carolina border near Rowland to the Virginia border near Pleasant Hill. The highway serves the cities of Lumberton, Fayetteville, Wilson, Rocky Mount, and Roanoke Rapids. The route goes through a mostly rural area of the state, avoiding most of the major metro areas of North Carolina. It forms the informal border between the Piedmont and Atlantic Plain regions of the state.
The North Carolina Highway System consists of a vast network of Interstate, United States, and state highways, managed by the North Carolina Department of Transportation. North Carolina has the second largest state maintained highway network in the United States because all roads in North Carolina are maintained by either municipalities or the state. Since counties do not maintain roads, there is no such thing as a "county road" within the state.
North Carolina Highway 147 (NC 147) is a primary state highway in the U.S. state of North Carolina. The highway is an 8.1-mile-long (13.0 km) freeway through Durham running roughly southeast to northwest; the entire route lies within the city limits. To the southeast, it connects the city to the Research Triangle Park. NC 147 is the northern half of the Durham Freeway, which continues south onto Interstate 885 (I-885). The route is the main arterial through Durham, running alongside its downtown. It begins at a semi-directional T interchange with I-885 southeast of downtown Durham and runs northwest–southeast before merging into I-85 northwest of downtown Durham.
Interstate 40 (I-40) is a part of the Interstate Highway System that travels 2,556.61 miles (4,114.46 km) from Barstow, California, to Wilmington, North Carolina. In North Carolina, I-40 travels 420.21 miles (676.26 km) across the entirety of the state from the Tennessee state line along the Pigeon River Gorge to U.S. Highway 117 (US 117) and North Carolina Highway 132 (NC 132) in Wilmington. I-40 is the longest Interstate Highway in North Carolina and is the only Interstate to completely span the state from west to east.
Raleigh Union Station is an intermodal transit station in Raleigh, North Carolina, United States. Train service began the morning of July 10, 2018. Its main building serves as an Amtrak train station, while a future adjacent building will serve as the bus terminus for GoTriangle. The station is located at the Boylan Wye, a railroad junction used by CSX and Norfolk Southern, and adjacent to the Depot Historic District in downtown Raleigh.
The North Carolina Turnpike Authority was created in 2002 to speed the implementation of needed transportation improvements by funding some projects with tolls. Governed by a nine-member authority board, it is located within the Department of Transportation and under the direct supervision of the Secretary of Transportation. The authority has the power to study, plan, develop and undertake preliminary design work on up to eleven turnpike projects. At the conclusion of these actives, the authority is authorized to design, establish, purchase, construct, operate and maintain toll highways and bridges. The authority is also authorized to designate one or more lanes of any highway, or portion thereof, into a high-occupancy toll lanes or other type of managed lanes; provided that such designation does not reduce the number of existing non-toll general purpose lanes.
U.S. Route 70 (US 70) is a part of the United States Numbered Highway System that runs from Globe, Arizona, to the Crystal Coast of the US state of North Carolina. In North Carolina, it is a major 488-mile-long (785 km) east–west highway that runs from the Tennessee border to the Atlantic Ocean. From the Tennessee state line near Paint Rock to Asheville it follows the historic Dixie Highway, running concurrently with US 25. The highway connects several major cities including Asheville, High Point, Greensboro, Durham, Raleigh, Goldsboro, and New Bern. From Beaufort on east, US 70 shares part of the Outer Banks Scenic Byway, a National Scenic Byway, before ending in the community of Atlantic, located along Core Sound.
U.S. Highway 1 (US 1) is a north–south United States Numbered Highway which runs along the East Coast of the U.S. between Key West, Florida, and the Canada–United States border near Fort Kent, Maine. In North Carolina, US 1 runs for 174.1 miles (280.2 km) across the central region of the state. The highway enters North Carolina from South Carolina, southwest of Rockingham. US 1 runs northeast, passing through or closely bypassing Southern Pines and Sanford in the Sandhills region. It next passes through Cary, the state capital of Raleigh, and Wake Forest. The highway continues north to Henderson, before leaving the state at the Virginia state line, near Wise. The route is mostly a multilane divided arterial road, with several freeway segments. It serves as a strategic highway, connecting the North Carolina Sandhills and Research Triangle regions northward to the Southside region.
Interstate 42 (I-42) is a partially completed Interstate Highway in the US state of North Carolina, currently existing in two separate segments in the eastern part of the state, totaling up to 31.5 miles (50.7 km). Both segments are entirely concurrent with US 70. The completed and signed segments of I-42 currently run from I-40 eastwards along the 9.8-mile (15.8 km) Clayton Bypass to an interchange with Business US 70 southeast of Clayton. The Interstate resumes again along the Goldsboro Bypass, running for 21.7 miles (34.9 km) north of Goldsboro, ending again at US 70. The Interstate eventually will run from I-40 to Morehead City, where it will terminate along the Northern Carteret Bypass, north of Beaufort. I-42 also overlaps the Clayton Bypass Scenic Byway, from I-40 to US 70 Bus.
Interstate 87 (I-87) is a partially completed Interstate Highway in the US state of North Carolina, the shortest designated primary Interstate Highway at 12.90 miles (20.76 km) long. The completed portion is in eastern Wake County, between Raleigh and Wendell; the majority of the completed route is known as the Knightdale Bypass, while the remaining three miles (4.8 km) follows the Raleigh Beltline (I-440). It is planned to continue northeast through Rocky Mount, Williamston, and Elizabeth City, ending in Norfolk, Virginia. It is signed as north–south, in keeping with the sign convention for most odd-numbered interstates, but the route goes primarily east–west, with the eastern direction aligning to the north designation. The entire route is concurrent with U.S Highway 64 (US 64), with portions also concurrent with I-440 and US 264.
The Monroe Expressway, designated U.S. Route 74 Bypass, is a 18.68-mile (30.06 km) controlled-access toll road in Union County in the U.S. state of North Carolina, the first to be completed in the Charlotte area. It serves as a bypass of the communities of Indian Trail, Monroe, and Wingate for U.S. Route 74 (US 74), running generally parallel to the route.
Interstate 885 (I-885) and North Carolina Highway 885 (NC 885) is an 11.5-mile (18.5 km) auxiliary Interstate Highway and state highway in the U.S. state of North Carolina. It links NC 540 and I-40 to I-85 in the Durham area. The route consists of two previously preexisting segments of freeway—NC 147 to the south and US 70 to the north—connected by the East End Connector, which opened to traffic on June 30, 2022.