Trowse Bridge | |
---|---|
Coordinates | 52°37′12″N1°18′57″E / 52.62°N 1.3157°E |
Carries | Great Eastern Main Line |
Crosses | River Wensum |
Owner | Network Rail |
Characteristics | |
Width | 30 feet (9.1 m) [1] |
Clearance below | 9 feet (2.74 m) [1] |
Rail characteristics | |
No. of tracks | 1 |
Track gauge | 1,435 mm (56.5 in) |
History | |
Constructed by | May Gurney |
Opened | May 1987 |
Location | |
Trowse Bridge is a single-track railway bridge which carries the Great Eastern Main Line over the River Wensum just outside Norwich in England at grid reference TG245076 .
The bridge was originally built in 1845 by George Parker Bidder, was rebuilt in 1905 [2] and again in 1987. Like many swing bridges, the structure first lifts on hydraulic jacks before swinging open to allow the passage of water traffic. [3] The bridge has frequently caused problems with navigation on the river due to its unreliability, leaving it unable to open. [4]
It is notable for being the only swing bridge in the United Kingdom to carry an overhead electrified railway track (25 kV 50 Hz). Other examples can be found along the Northeast Corridor in the United States; see for instance Portal Bridge, and the Galata Bridge over the Golden Horn in Istanbul. The power supply to trains is provided by an overhead conductor rail instead of a wire, and there are short lengths of overhead conductor rail either side of the bridge on the fixed approaches. There is a 40 mph (64 km/h) speed limit over the bridge in both directions as trains are about to arrive at, or have just departed from, Norwich Station.
The bridge is also the home of Trowse Signal Box, which controls most of the Bittern Line from Whitlingham Junction to Sheringham. The line was resignalled in 2000, leading to the closure of a number of mechanical signal boxes with control moving to Trowse. The resignalling saw the end of one of the few remaining sections of single track main line controlled by tokens.
The current single track rail bridge on the electrified railway line in to Norwich was designed by the British Rail' Eastern Region based in York. The main contractor was May Gurney of Norwich and they were also the civil works contractor. The Butterley Engineering Company were the fabricators, mechanical contractor and electrical contractor.
The bridge was fabricated and fully trial erected, including a slewing motion trial, inside the Butterley Engineering Company's workshops known as "The Bridge Yard" at Butterley Hill, Ripley in Derbyshire during 1986 and was delivered to site and installed during the winter months of November 1986 to January 1987.
The swing bridge section is approximately 26 metres (85 ft) long, with an off-centre slewing bearing and an underslung counterweight box. The total slew bridge weight was 354 long tons (360 tonnes; 396 short tons), including the counterweight. The counterweight was made from almost 90 long tons (91 t; 100 short tons) of cut up railway track used to precisely balance the structure during the commissioning works. It was necessary for the swing bridge to be balanced about the centre of slew to give equal loading of the 4 main lifting jacks and the span was accurately weighed by 4 x 100 long tons (100 t; 110 short tons) electronic load cells (certified to ±0.5%) February 1987, during the bridge's final installation and commissioning trials.
There are three fixed approach spans at the Norwich city end and the main swing bridge section. The swing bridge raises some 300 millimetres (12 in) on 4 main jacks, mounted on to substantial sub-frame in the turning pit. The swing bridge raises to clear the fixed span and land abutment's scarfed rail joints and to also clear the fixed overhead conductor rails, which are gantry mounted to the swing bridge and the approach spans. The bridge "slew" is provided by 2 hydraulic motors driving against the main slewing ring bearing, manufactured by Robello. The swing bridge section is constructed to be a flat span in the open to rail/service position and not cambered, as are many other bridges.
The old twin-track centre-slew bridge remained in service during the installation and trials of the new bridge until the date the live rail was diverted over the new bridge. The closure and removal of the old bridge in end of February 1987, was during the river's closure to navigation for the bridge replacement, provided for under a specific act of UK Parliament. [5]
An overhead line or overhead wire is an electrical cable that is used to transmit electrical energy to electric locomotives, trolleybuses or trams. The generic term used by the International Union of Railways for the technology is overhead line. It is known variously as overhead catenary, overhead contact line (OCL), overhead contact system (OCS), overhead equipment (OHE), overhead line equipment, overhead lines (OHL), overhead wiring (OHW), traction wire, and trolley wire.
A crane is a type of machine, generally equipped with a hoist rope, wire ropes or chains, and sheaves, that can be used both to lift and lower materials and to move them horizontally. It is mainly used for lifting heavy objects and transporting them to other places. The device uses one or more simple machines to create mechanical advantage and thus move loads beyond the normal capability of a human. Cranes are commonly employed in transportation for the loading and unloading of freight, in construction for the movement of materials, and in manufacturing for the assembling of heavy equipment.
A swing bridge is a movable bridge that has as its primary structural support a vertical locating pin and support ring, usually at or near to its center of gravity, about which the swing span can then pivot horizontally as shown in the animated illustration to the right. Small swing bridges as found over canals may be pivoted only at one end, opening as would a gate, but require substantial underground structure to support the pivot.
A railroad crane is a type of crane used on a railroad for one of three primary purposes: freight handling in goods yards, permanent way (PW) maintenance, and accident recovery work. Although the design differs according to the type of work, the basic configuration is similar in all cases: a rotating crane body is mounted on a sturdy chassis fitted with flanged wheels. The body supports the jib and provides all the lifting and operating mechanisms; on larger cranes, an operator's cabin is usually provided. The chassis is fitted with buffing (UK) and/or coupling gear to allow the crane to be moved by a locomotive, although many are also self-propelled to allow limited movement about a work site.
The Liverpool Overhead Railway was an overhead railway in Liverpool which operated along the Liverpool Docks and opened in 1893 with lightweight electric multiple units. The railway had a number of world firsts: it was the first electric elevated railway, the first to use automatic signalling, electric colour light signals and electric multiple units, and was home to one of the first passenger escalators at a railway station. It was the second oldest electric metro in the world, being preceded by the 1890 City and South London Railway.
The Bittern Line is a railway branch line in Norfolk, England, that links Norwich to Sheringham. It passes through the Broads on its route to an Area of Outstanding Natural Beauty on the north Norfolk coast. It is named after the bittern, a rare bird found in the reedy wetlands of Norfolk.
The Breckland line is a secondary railway line in the east of England that links Cambridge in the west to Norwich in the east. The line runs through three counties: Cambridgeshire, Suffolk and Norfolk. It takes its name from the Breckland region of Norfolk, and passes through Thetford Forest.
The Bridgewater Bridge is a road and rail bridge that carries the Midland Highway and South Railway Line across the Derwent River in Hobart, Tasmania, Australia. The steel truss vertical lift bridge and specially-built causeway connect the Hobart suburbs of Bridgewater and Granton. The bridge was completed in 1946 and accommodates a two-lane highway, a single track railway and a grade-separated footpath.
Wymondham railway station is on the Breckland Line in the East of England, serving the town of Wymondham, Norfolk. The line runs between Cambridge in the west and Norwich in the east. It is situated between Spooner Row and Norwich, 113 miles 72 chains (183.3 km) from London Liverpool Street via Ely.
Pannal railway station serves the villages of Pannal and Spacey Houses in the southern suburbs of Harrogate, North Yorkshire, England, equidistant from both. It also serves the village of Burn Bridge, on the opposite side of Pannal. It is located on the Harrogate Line 15 miles (24 km) north of Leeds and operated by Northern who provide all passenger train services.
The Loughor railway viaduct carries the West Wales Line across the River Loughor. It is adjacent, and runs parallel to, the Loughor road bridge. The 1880 viaduct was granted Grade II listed building status. Before it was demolished in early 2013, the viaduct was the last remaining timber viaduct designed by Isambard Kingdom Brunel.
The King Frederick IX bridge is a combined road and railway bridge carrying the Danish national road 9 as well as Sydbanen and Lollandsbanen railway lines across the Guldborgsund strait between the islands of Falster and Lolland in Denmark. It joins the larger part of the city of Nykøbing on Falster with the smaller part of the town on Lolland. The rail link is a part of the railway section of the Fugleflugtslinjen transport corridor between Copenhagen, Denmark and Hamburg, Germany.
The Hull and Selby Railway is a railway line between Kingston upon Hull and Selby in the United Kingdom which was authorised by an act of 1836 and opened in 1840. As built the line connected with the Leeds and Selby Railway at Selby, with a Hull terminus adjacent to the Humber Dock.
The Oregon Trunk Rail Bridge or Celilo Bridge is a single-track railroad bridge opened in 1912 over the Columbia River in the Pacific Northwest of the United States. It consists of eight steel truss spans and several deck girder spans, and since 1957 it has included a vertical-lift section. The bridge was designed by engineer Ralph Modjeski and erected by the Missouri Valley Bridge & Iron Co., of Leavenworth, Kansas.
Trowse was a station on the Great Eastern Main Line just south of Norwich. It was opened around the same time as Norwich Thorpe, and was intended to provide a short commute from the outer suburbs of Norwich.
In the 2010s Network Rail modernised the Great Western Main Line, the South Wales Main Line, and other associated lines. The modernisation plans were announced at separate times but their implementation overlapped in the 2010s.
The Bessbrook and Newry Tramway operated a 3 ft narrow gauge, hydro-electrically powered tramway transporting passengers and freight between Bessbrook and Newry in Northern Ireland between 1885 and 1948.
The Skelton Viaduct, also known as the Hook bridge or Goole railway swing bridge, is a large viaducted hogback plate girder bridge with swing span over the River Ouse, Yorkshire near Goole, East Riding of Yorkshire, England. The bridge was designed by Thomas Elliot Harrison for the Hull and Doncaster Branch of the North Eastern Railway and opened in 1869.
The Ashton Avenue Bridge is a pedestrian, cycling and busway bridge in Bristol, England. Grade II listed, it was constructed as a road-rail bridge as part of the Bristol Harbour Railway. It now carries a Bristol MetroBus guided busway route and National Cycle Network cycle routes.
The Victoria Swing Bridge is a swing bridge in Leith, Edinburgh.
It weighs around 350 tonnes and works on a system of computer controlled jacks and hydraulic pumps that raise the structure and rotate it to allow river traffic to pass through. It is locked back into place to rejoin the track.
From October 2003 to February 2013 Trowse Bridge has been operational 1591 days and has failed 1852 days.