History | |
---|---|
United States | |
Name | McKee |
Namesake | Lieutenant Hugh W. McKee |
Ordered | 10 June 1896 (authorised) |
Builder | Columbian Iron Works, Baltimore, MD |
Laid down | 11 September 1897 |
Launched | 5 March 1898 |
Sponsored by | Mrs. William H. Humrichouse |
Commissioned | 16 May 1898 |
Decommissioned | 29 January 1912 |
Stricken | 6 April 1912 |
Identification | TB-18 |
Fate | Sunk as target ship, fall 1920 |
General characteristics [1] | |
Class and type | MacKenzie-class torpedo boat |
Displacement | 65 long tons (66 t) [2] |
Length | 99 ft 3 in (30.25 m) |
Beam | 12 ft 9 in (3.89 m) |
Draft | 4 ft 3 in (1.30 m) (mean) [2] |
Installed power |
|
Propulsion |
|
Speed | |
Complement | 12 officers and enlisted |
Armament |
|
The first USS McKee (Torpedo Boat No. 18/TB-18) was laid down on 11 September 1897 by Columbian Iron Works, Baltimore, Maryland, United States, launched 5 March 1898; sponsored by Mrs. William H. Humrichouse; and commissioned 16 May 1898.
McKee underwent sea trials in Chesapeake Bay and then sailed to New York to assume coastal defense duties during Spanish–American War. Reassigned to Torpedo Station Newport, R.I., the coal‑burning torpedo boat operated along the New England coast until returning to New York 13 December 1903, where she decommissioned 22 December 1903.
Eight months later, 6 August 1904, she recommissioned and steamed back to Newport. From 1907 to 1910 she operated from New York, then was assigned special duty in the reserve at Newport. On 29 January 1912 she arrived New York and decommissioned. Struck from the Navy list 6 April 1912, McKee was towed to Norfolk, Virginia and used as a target. On 24 September 1920 she was ordered sunk near Craney Island, an order carried out later that fall.
USS Adder, later renamed A-2, was one of seven Plunger-class submarines built for the United States Navy (USN) in the first decade of the 20th century.
USS Cushing was a torpedo boat in the United States Navy during the Spanish–American War. She was named for William B. Cushing.
The first USS Rowan was a torpedo boat in the United States Navy during the Spanish–American War. She was named for Vice Admiral Stephen Rowan.
The first USS Farragut was a torpedo boat in the United States Navy. She was named for David Farragut, commander-in-chief of the U.S. Navy during the American Civil War.
The first USS Talbot was a torpedo boat in the United States Navy.
The first USS Biddle was a torpedo boat in the United States Navy. She was named for Captain Nicholas Biddle.
USS Porter was a torpedo boat, the first of her class, launched in 1896, served during the Spanish–American War, and struck in 1912. She was the first Navy ship named for Commodore David Porter, and his son, Admiral David Dixon Porter.
USS Winslow was a United States Navy torpedo boat noted for its involvement at the First and Second Battle of Cardenas during the Spanish–American War. She was named for Rear Admiral John Ancrum Winslow.
The first USS Ericsson was the second torpedo boat built for the United States Navy. The first,Cushing, had been built seven years earlier.
USS Foote was launched 1 October 1896 by Columbian Iron Works and Dry Dock Co., Baltimore, Md.; sponsored by Miss Laura Price; and commissioned 7 August 1897, Lieutenant W. L. Rodgers in command.
The second USS Rodgers was a United States Navy torpedo boat, laid down by the Columbian Iron Works & Dry Dock Co., Baltimore, Maryland, on 6 May 1896; launched on 10 November 1896; and commissioned on 2 April 1898, Lt. Joseph Lee Jayne in command. It was named after John Rodgers as well as John Rodgers.
The first USS Du Pont was launched 30 March 1897 by Herreshoff Manufacturing Co., Bristol, R.I.; sponsored by Miss L. Converse; and commissioned 23 September 1897, Lieutenant Spencer S. Wood in command.
USS Dahlgren, was a Torpedo Boat ine the United States Navy.
The first USS Craven, was launched 25 September 1899 by Bath Iron Works, Bath, Maine; sponsored by Miss A. Craven, granddaughter of Commander Craven; and commissioned 9 June 1900.
The first USS Gwin, was launched 15 November 1897 by the Herreshoff Manufacturing Co., Bristol, Rhode Island, and commissioned at Newport 4 April 1898, Lt, (j.g.) C. S. Williams in command.
The first USS MacKenzie, was laid down by Charles Hillman Ship & Engine Building Company, Philadelphia, 15 April 1897; launched 19 February 1898; sponsored by Master Charles Hillman; and commissioned 1 May 1899.
The third USS Somers, a steel torpedo boat built as a private speculation by Friedrich Schichau, Elbing, Germany, was launched in 1897 as yard No. 450; purchased for the United States Navy on 25 March 1898; commissioned on 28 March 1898 and named Somers the next day.
USS Bagley was a torpedo boat in service with the US Navy between 1898 and 1919, named after Ensign Worth Bagley.
The first USS Barney was laid down on 3 January 1900 at Bath, Maine, by the Bath Iron Works; launched on 28 July 1900 and sponsored by Miss Esther Nicholson Barney, great-granddaughter of Commodore Joshua Barney; and placed in commission at the Naval Torpedo Station, Newport, Rhode Island, on 21 October 1901.