This article needs to be updated.(January 2017) |
Velocity Tower | |
---|---|
General information | |
Status | Completed |
Type | Residential |
Location | The Moor Gateway, Sheffield, South Yorkshire |
Coordinates | 53°22′27″N1°28′41″W / 53.374164°N 1.478037°W |
Construction started | 2006 |
Completed | 2009-2010 |
Opening | December 2008 |
Cost | Unknown to date |
Owner | Velocity Tower |
Management | Velocity Management |
Height | |
Roof | 92 m (302 ft) (Estimate) |
Top floor | 88 m (289 ft) (Estimate) |
Technical details | |
Floor count | 30 (22 currently erected) |
Design and construction | |
Architect(s) | AXIS Architecture |
Developer | Velocity Living |
Velocity Tower is a mixed use development next to the Inner Ring Road in Sheffield City Centre, South Yorkshire, England, overlooking Ecclesall Road. The build is a continuation of a previous design to be built by Cala, titled 'Eclipse'.
The original plans for the site were for a single tower named Eclipse, the result of a project by Cala Developments and initially designed by Broadway Malyan. These designs called for a charcoal-grey cladded 22-story tower with a 12-story brickwork skin wing that was to provide 263 new apartments.
After successfully selling most of the apartments before construction began - Cala decided that the economic conditions were unfavourable and abandoned the scheme in 2005, causing concern among early investors by putting the land up for sale without a public announcement. [1]
In 2007 it was eventually confirmed that Velocity Estates were to take over the project with some design changes from Sheffield-based architects AXIS Architecture. [2] The altered design included a high-quality glass cladding façade to replace the previously proposed brickwork skin. A taller ground floor was also introduced, and a rooftop wind turbine array was added to improve the building's green credentials.
Construction started in 2007 under the agreed planning permission of the previous Eclipse building while a further application was submitted to alter the appearance of the tower and meet the City Council's design standards.
An application for the tower to go up to 36 storeys was submitted on 6 March 2008, but this was ultimately rejected by Sheffield Council stating that a 33-36 storey tower "would unacceptably break the city's skyline in important distant views". [3]
A further revision to the plans was submitted limiting the building to a 30-storey tower and also lowering the west-facing wing of the building to 5 floors. To compensate for this reduction, however, the plans included the design of a second smaller tower at the far end of the wing, which would climb to 17 storeys. These plans were accepted by the council on 9 September 2008. [4]
On 23 November 2008, the construction crane was removed from the Velocity Tower site and structural work was halted. The tower now stands at 22 storeys of the 30 storeys planned, with, as of August 2009, the second tower and wing an unfinished concrete frame of two storeys, and the grounds fenced off.
In December 2008, Velocity Tower - although unfinished - opened its doors to potential tenants. [5]
Brindleyplace is a large mixed-use canalside development, in the Westside district of Birmingham, England. It was named after Brindley Place, the name of the street around which it is built. It was developed by the Argent Group from 1993 onwards.
The Rotunda is a cylindrical highrise building in Birmingham, England. The Grade II listed building is 81 metres (266 ft) tall and was completed in 1965. Originally designed to be an office block, by architect James A. Roberts A.R.I.B.A., it was refurbished between 2004 and 2008 by Urban Splash with Glenn Howells who turned it into a residential building, with serviced apartments on 19th and 20th floors. The building was officially reopened on 13 May 2008.
The Big City Plan is a major development plan for the city centre of Birmingham, England.
10 Holloway Circus is a 400-foot (122 m) tall mixed-use skyscraper in Birmingham city centre, England. It was originally named after the developers, Beetham Organisation, and was designed by Ian Simpson and built by Laing O'Rourke. The entire development covers an area of 7,000 square feet (650 m2). It is the second tallest building in Birmingham and the 74th tallest building in the United Kingdom.
The V Building was a proposed 51-storey residential skyscraper approved for construction on Broad Street on the Westside of the city centre of Birmingham, England. The tower was part of the larger Arena Central development scheme on the former ATV / Central Television Studios, closed in 1997. The entire development site covered an area of 7.6 acres (31,000 m2). On completion the development was set to include offices, shops, restaurants, cafes, leisure/entertainment, fitness centre and hotel. It was to have been built on the site of a multi-level underground car park next to Alpha Tower, one of the tallest buildings in Birmingham. The total cost of the entire scheme was expected to be £400 million and of the tower, £150 million.
The Orion Building is a 90-metre (295 ft) tall high rise residential building on Navigation Street, Birmingham 5, England. Construction of the tower began in 2004 with demolition of the previous building on the site, and was completed in 2007. As part of the development, the original façades of some of the previous buildings have been retained and incorporated into the lowrise sections of the complex. The complex consists of a 28-storey tower with five basement floors. It includes the city's first penthouse which was sold for £1.65 million. The fourth and final phase of the building, being marketed as 'Sirius', is nearing completion.
Lumiere was a mixed-use skyscraper development in Leeds, West Yorkshire, England, intended to be completed in 2010. The project was put on hold in 2008 and officially cancelled in 2010.
Criterion Place was a proposed skyscraper development in Leeds, West Yorkshire, England. In July 2008 it was announced that the project is to be cancelled owing to the property market slump.
St Paul's Tower is a skyscraper located on Arundel Gate in Sheffield, South Yorkshire, England. Construction commenced in May 2006 and the building was topped out in August 2010, surpassing Sheffield University's Arts Tower as the tallest building in Sheffield at 101 metres (331 ft) tall. The city's first skyscraper, it was constructed as the centrepiece of the St Paul's Place project as part of the Heart of the City redevelopment of Sheffield city centre.
The Cube is a 24-storey mixed-use development in the centre of Birmingham, England. Designed by Ken Shuttleworth of Make Architects, it contains 135 flats, 111,500 square feet (10,359 m2) of offices, shops, a hotel and a 'skyline' restaurant. It is the final phase of The Mailbox development.
St George Wharf Tower, also known as the Vauxhall Tower, is a residential skyscraper in Vauxhall, London, and part of the St George Wharf development. At 181 metres (594 ft) tall with 50 storeys, it is the 20th-tallest building in London and was the tallest residential building in the United Kingdom on its completion.
Snowhill is a mixed-use development in the Colmore business district, known historically as Snow Hill, in Central Birmingham, England. The area, between Snow Hill Queensway and Birmingham Snow Hill station, is being redeveloped by the Ballymore Group. The £500 million phased scheme has been partly completed on the site of a former surface car park adjacent to the railway station and West Midlands Metro terminus.
Deansgate Square, formerly known as Owen Street, is a skyscraper cluster on the southern edge of Manchester City Centre, England, consisting of four towers, the tallest of which is 201 metres (659 ft). The site is just south of Deansgate railway station and north of the Mancunian Way, bounded by Deansgate, Owen Street and the River Medlock. The towers sit at different angles to each other, with a slight bevel, or 'cut back', on each side of each building which ensures the towers catch the light at different times of day.
AXIS is a residential tower in Manchester city centre, England. The tower has had two iterations, one as a stalled construction project which was cancelled due to the Great Recession in 2008, and the other as residential which was announced in 2014. When completed in 2019, Axis Tower became the seventh-tallest building in Greater Manchester until the completion of the Deansgate Square and Angel Gardens projects. As of July 2023, it is the 21st-tallest.
The 1950s and 1960s saw the construction of numerous brutalist apartment blocks in Sheffield, England. The Sheffield City Council had been clearing inner-city residential slums since the early 1900s. Prior to the 1950s these slums were replaced with low-rise council housing, mostly constructed in new estates on the edge of the city. By the mid-1950s the establishment of a green belt had led to a shortage of available land on the edges of the city, whilst the government increased subsidies for the construction of high-rise apartment towers on former slum land, so the council began to construct high-rise inner city estates, adopting modernist designs and industrialised construction techniques, culminating in the construction of the award-winning Gleadless Valley and Park Hill estates.
River Street Tower is a high-rise residential tower in Manchester, England. The tower is situated immediately north of the Mancunian Way on land which was formerly occupied by a concrete car park frame from 2005 to 2018.
Sky Gardens Nine Elms is a residential and retail tower in Nine Elms, within the borough of Lambeth, London. The scheme has been designed by architects Careyjones Chapmantolcher (CJCT) and developed by Fraser Property Development UK. Its construction was part of a wider regeneration of the Nine Elms area of London. The building is 120 metres (390 ft) in height.
Kings Tower is an approved skyscraper that will be located on Castle Square at the junction of High Street and Angel Street in Sheffield, South Yorkshire. With a planned height of 120 m (390 ft) once completed, Kings Tower will overtake Code Sheffield, and St Pauls Tower as the tallest building in Sheffield and in Yorkshire. Plans for the tower were submitted by architects Hodder + Partners in September 2020, calling initially for a 39-storey tower. Planning permission was granted in December 2020, and construction is planned to complete in 2023. Amended plans were submitted in late 2022, adding a 40th floor to the project.