Armenia Mountain Wind Farm

Last updated
A view of the Armenia Mountain Wind Farm in 2011. Armenia Mountain Wind Farm 3 (5910118228).jpg
A view of the Armenia Mountain Wind Farm in 2011.

Armenia Mountain Wind Farm is a wind farm in Tioga County and Armenia Township [1] in Bradford County in the Northern Tier region of Pennsylvania. The wind farm has 67 GE 1.5 MW Wind Turbines that began commercial operation in January 2010. [2] Armenia Mountain has a combined total nameplate capacity of 101 megawatts and produces enough electricity to power over 40,000 homes. [1] Power produced by the wind farm is sold to Old Dominion Electric Cooperative and to Delmarva Power & Light Company. [2]

See also

Related Research Articles

<span class="mw-page-title-main">Armenia Township, Pennsylvania</span> Township in Pennsylvania, United States

Armenia Township is a township in Bradford County, Pennsylvania, United States. It is part of Northeastern Pennsylvania. The population was 205 at the 2020 census.

Waymart Wind Farm is the second largest wind farm in Pennsylvania, United States. It consists of 43 GE 1.5 MW wind turbines, with a total net capacity of 64.5 MW, "which is enough renewable energy to power more than 21,000 Pennsylvania homes." The project is located in Wayne County, Pennsylvania. The wind farm was developed by Atlantic Renewable Energy and constructed by NextEra Energy Resources. In January 2018 the project was sold to Huntsman Wind LLC. Energy from the wind farm is sold to Exelon for distribution in the Mid-Atlantic region.

The Somerset Wind Farm is a wind farm in Somerset County, Pennsylvania with six GE 1.5 MW Wind Turbines that began commercial operation in October 2001. The wind farm has a combined total nameplate capacity of 9 MW, and produces about 25,000 megawatt-hours of electricity annually, which is roughly a 30% capacity factor. The wind farm was constructed by NextEra Energy Resources, based in Florida.

Wind power in Ohio has a long history, and as of 2016, Ohio had 545 megawatts (MW) of utility-scale wind power installations installed, responsible for 1.1% of in-state electricity generated. Over 1000 MW more were under construction or pending approval. Some installations have become tourist attractions. There has been a sudden increase in generating capacity, as total wind power capacity in the state was just 9.7 MW in 2010. By 2019, there were 738 MW of capacity, which generated 1.71% of Ohio's electricity.

There are a number of wind power projects in the state of Maine, totaling more than 900 megawatts (MW) in capacity. In 2020 they were responsible for 24% of in-state electricity production. In 2019, Maine had more wind capacity than the other five New England states combined, at 923 MW.

<span class="mw-page-title-main">Wind power in Wyoming</span> Electricity from wind in U.S. state

Wyoming has one of the highest wind power potentials of any state in the United States. In 2019, Wyoming had wind powered electricity generating capacity of 1,589 MW, which produced 9.85% of its electric generation, with an additional 3,753 MW under construction. However, the wind generation in that year was Wyoming's third-lowest in the 2010s. By 2020, wind capacity increased to 2738 MW and 8448 gigawatt-hours of electricity were produced from wind in 2021, more than double 2019 production. Additional wind capacity and needed transmission lines are under construction or planned, despite political headwinds from Wyoming's strong coal and oil sectors.

<span class="mw-page-title-main">Wind power in New Hampshire</span> Electricity from wind in one U.S. state

Wind power in New Hampshire began in 1980, with the installation of the world's first wind farm at Crotched Mountain, consisting of 20 30 kW wind turbines, although it closed decades ago. As of 2020, five wind power projects are operating in the state of New Hampshire – Lempster Mountain, which opened in 2008, Granite Reliable Wind Farm, which opened in late 2011, Groton Wind, which opened in 2012, Jericho Mountain, which opened in 2015, and Antrim Wind, which opened in 2020.

The Locust Ridge Wind Farm is a large wind farm located near Mahanoy City in Schuylkill County, Pennsylvania, United States. The first phase, Locust Ridge I, has 13 Gamesa 2MW Wind Turbines that began commercial operation in 2006. The wind farm has a combined total nameplate capacity of 26 MW, producing about 68,328 megawatt-hours of electricity annually, which is enough to power 24,000 homes.

<span class="mw-page-title-main">Wind power in Pennsylvania</span> Electricity from wind in one U.S. state

Wind Power in Pennsylvania, one of the major source of renewable energy, it accounts for over one third of the renewable energy production of Pennsylvania. There are more than 27 wind farms currently installed in the commonwealth of Pennsylvania. These 27 farms on average could provide power for nearly 350,000 homes or 1,300 megawatts. A majority of these wind farms are located in the southwest-central and northeastern regions of the state. Pennsylvania is an East Coast leader in wind energy due to its natural wind resources and governmental incentives brought on by the state. There is a lot of potential for growth within the wind power industry in Pennsylvania and the Northeast. Pennsylvania is close to several offshore sites along the coast of the Atlantic Ocean.

<span class="mw-page-title-main">Meyersdale Wind Farm</span>

The Meyersdale Wind Farm is a wind farm located in Meyersdale, Somerset County, Pennsylvania with 20 NEG Micon/Vestas 1.5 MW wind turbines that began commercial operation in December 2003. The wind farm has a combined total nameplate capacity of 30 MW, enough to power about 10,000 homes. The project was constructed by NextEra Energy Resources, based in Florida.

<span class="mw-page-title-main">Bear Creek Wind Power Project</span> Wind farm in Pennsylvania, USA

The Bear Creek Wind Power Project is a wind farm located in Bear Creek Township near Wilkes-Barre in Luzerne County, Pennsylvania, USA, with twelve Gamesa 2.0 MW wind turbines that began commercial operation in March 2006. The wind farm has a combined total nameplate capacity of 24 MW, producing about 61.4 gigawatt-hours of electricity annually. Bear Creek usually operates at roughly a 30% capacity factor until the winter months when winds are stronger and it runs near 70 percent capacity.

The Mill Run Wind Energy Center is a wind farm located in Fayette County, Pennsylvania with ten 1.5 MW Enron Wind TZs that began commercial operation in November 2001. The wind farm has a combined total nameplate capacity of 15 MW, but actually produces about 39,420 megawatt-hours of electricity annually. The wind farm was developed by Atlantic Renewable Energy and Horizon Wind Energy, and constructed and operated by NextEra Energy Resources, based in Florida.

The Green Mountain Wind Energy Center was a wind power plant near Garrett, Somerset County, Pennsylvania with eight Nordex 1.3 MW turbines that began commercial operation in May 2000. This was the first commercial wind farm constructed in Pennsylvania. The wind farm had a combined total nameplate capacity of 10.4 MW and the potential to produce about 27,000 megawatt-hours of electricity annually, enough to power 3,300 homes, assuming a 30% capacity factor. The wind farm was developed by National Wind Power of the UK, now part of NPower Renewables, operated by NextEra Energy Resources, based in Florida. Energy from the wind farm was purchased and sold by Green Mountain Energy based in Texas, and was the first commercial wind farm for Green Mountain Energy. In 2016 the wind farm was dismantled and replaced with new battery technology.

<span class="mw-page-title-main">Casselman Wind Power Project</span>

The Casselman Wind Power Project is a wind farm in Somerset County, Pennsylvania with 23 GE 1.5 MW Wind Turbines that began commercial operation in 2007. The wind farm has a combined total nameplate capacity of 34.5 megawatts, but actually produces about 90,666 megawatt-hours of electricity annually. The wind farm was developed by PPM Energy and constructed by Iberdrola, based in Spain. Power produced at the wind farm is distributed by First Energy.

<span class="mw-page-title-main">Meadow Lake Wind Farm</span> Wind farm in Indiana, USA

Meadow Lake Wind Farm is an 801.25 megawatt (MW) wind farm near Brookston and Chalmers, Indiana, spreading over portions of White, Jasper, and Benton Counties. It is owned and operated by EDP Renewables North America. The facility currently has six operational phases, with 414 turbines, and is a prominent feature on both sides of Interstate 65 in western Indiana.

The Broad Mountain Wind Energy Center was a proposed wind farm planned for construction on the slopes of Broad Mountain in West Mahanoy and Butler townships in Schuylkill County, Pennsylvania. The first phase of the project was blocked by legal action in the Courts of the Commonwealth of Pennsylvania, though initial funding was allocated, and would have included 8 Gamesa 2MW Wind Turbines that were planned to have been operational in late 2011. Phase two of the project will include 27 additional 2MW wind turbines.

Bellacorick or Bellacoric is a townland in County Mayo in Ireland. It is in the Electoral Division of Glenco, in Civil Parish of Kilcommon, in the Barony of Erris, in the County of Mayo. Bellacorick has an area of: 2,789,440 m2 / 278.94 hectares / 2.7894 km2. Bellacorick borders the following other townlands: Killsallagh to the west; Moneynierin to the east; Muingaghel to the south; Srahnakilly to the north.

In 2016, Arizona had 268 megawatts (MW) of wind powered electricity generating capacity, producing 0.5% of in-state generated electricity.

<span class="mw-page-title-main">Solar power in Indiana</span> Overview of solar power in the U.S. state of Indiana

Solar power in Indiana has been growing in recent years due to new technological improvements and a variety of regulatory actions and financial incentives, particularly a 30% federal tax credit for any size project.

<span class="mw-page-title-main">South Chestnut Wind Project</span>

The South Chestnut Wind Farm is a wind farm located in Fayette County, Pennsylvania with 23 2.0 MW Gamesa G87s that began commercial operation in 2012. The wind farm has a combined total nameplate capacity of 46 MW. The wind farm was developed by Iberdrola, and power produced by the wind farm is sold to Washington, D.C.

References

  1. 1 2 Wind Farm Project Under Way Archived March 22, 2012, at the Wayback Machine The Daily Review, July 22, 2009. Accessed March 7, 2010.
  2. 1 2 AES Wind Generation Announces Commercial Operation of Armenia Mountain Wind Farm, U.S. Archived 2012-07-11 at archive.today AES press release, January 4, 2010. Accessed March 7, 2010.

41°46′00″N76°51′59″W / 41.766667°N 76.866389°W / 41.766667; -76.866389