Budd Silverliner

Last updated
PRR MP85B / Silverliner (II)
SEPTA Silverliner II.jpg
Train led by the first Silverliner II #201 entering the Temple University Station in May 2006.
In service19632012
Manufacturer Budd Company
Built atRed Lion Plant, Philadelphia
Family namePioneer III
ReplacedPRR MP54

Reading electric multiple units

Pioneer III
Entered service1963
Number built59
Number preserved1
PredecessorPioneer III
SuccessorGE Silverliner IV
FormationSingle unit
Fleet numbersPRR cars: 201-219, 251-269
Reading cars: 9001-9017
USDOT cars: T1-T4
Capacity124 w/ bathroom, 127 w/o
Operators Pennsylvania Railroad
Reading Railroad
Penn Central Railroad
Conrail
SEPTA
Specifications
Car body construction Stainless steel
Car length85 ft (25.91 m)
Width9 ft 11+12 in (3.035 m)
Doors2 end doors w/ traps
Maximum speed100 mph (160 km/h) design
85 mph (137 km/h) service
Weight101,400 lb (46,000 kg)
Traction systemTransformed line current fed through 4 mercury arc Ignitron rectifiers to a phase angle motor controller. All commuter cars later converted to silicon rectifier.
Power output550 hp (410 kW)
Electric system(s) 11-13.5 kV 25 Hz AC
Current collector(s) Pantograph
Braking system(s) Pneumatic
Coupling system Hybrid multi-function AAR tightlock later converted to WABCO Model N-2
Track gauge 4 ft 8+12 in (1,435 mm) standard gauge

The Budd Silverliner was a model of electric multiple unit railcar designed and built by the Budd Company with 59 examples being delivered starting in 1963. Fifty-five of the cars were purchased for the Reading and Pennsylvania Railroads with public funds for use in Philadelphia, Pennsylvania, area commuter rail service with the remaining 4 cars being purchased by USDOT for use in high-speed rail experiments in 1965. Based on a series of 6 prototype Pioneer III cars built in 1958, the Silverliners represented the first production order of "modern" commuter MU equipment purchased by either railroad and earned their name from their unpainted stainless steel construction which contrasted with the painted carbon steel bodies of the pre-war MU fleets. [1] The cars became a fixture of SEPTA Regional Rail service providing the name to their entire series of EMU railcars before finally being retired in 2012 after 49 years in service.

Contents

History

Penn Central operated Silverliner II outbound at Chelten Avenue in 1974. SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY (SEPTA) TRAIN ENROUTE TO NORTH PHILADELPHIA. THE SYSTEM... - NARA - 556759.jpg
Penn Central operated Silverliner II outbound at Chelten Avenue in 1974.

In 1963 the financial condition of the Pennsylvania and Reading Railroads was such that neither was able to upgrade their money-losing commuter operations on their own. As a result, state and local government stepped in to purchase new cars that would be in turn used by the private railroads to run the required commuter operations through an entity known as the Passenger Service Improvement Corporation. [2] The new cars would be a production order based on 6 1958 Pioneer III type cars with improvements based on the lessons learned from the earlier design. [1] A total of 38 cars were purchased for the PRR with the remaining 17 going to the Reading. While some referred to the new vehicles as "PSIC Cars", the modern stainless steel body shells quickly defined the fleet and the name "Silverliner" was soon adopted. [2] In addition to their looks, the cars introduced many other modern innovations to the Philadelphia commuter rail network, including air conditioning, greater interior space (12 feet (3.66 m) longer than the PRR MP54) seating up to 127 persons, high acceleration with a greater top speed and near silent operation.

The 38 PRR cars were numbered in two series, 201-219 and 250-269 and given PRR classification MP85B and MP85C respectively, [1] while the 17 Reading cars were numbered 9001-9017 and given Reading classification REB-13. [3] [ page needed ] With the delivery of the second set of "Silverliners" in 1967, the original Budd Silverliners were renamed "Silverliner II" with the Pioneer III cars becoming Silverliner I. [2] In 1968 the Pennsylvania Railroad was merged into the new Penn Central and although funding for the commuter rail services were being provided by the newly formed SEPTA, from 1963 until the formation of Conrail in 1976, the Silverliners were operated by and wore the livery of their respective railroads, the PRR Keystone being replaced by the Penn Central "Worms" after the merger and the Reading diamond throughout. After 1976 the service continued to be operated under Conrail, but the cars were fully branded as SEPTA and would operate as such until the end of their careers.

Former Reading class car #9001 seen at Wayne Junction in 2010. SEPTA-SII-Trip-9001-Wayne-Jct.jpg
Former Reading class car #9001 seen at Wayne Junction in 2010.

In late 1984 the Center City Commuter Connection opened allowing the Reading and PRR cars to mix and roam about either "side" of the system. In 1989 the entire fleet was sent to the Morrison-Knudsen plant in Hornell, New York, for a mid-life overhaul. [4] [ failed verification ] In addition to this all of the cars eventually received upgrades to their propulsion system to increase reliability and remove PCBs from their transformers, upgraded HVAC systems to eliminate CFCs. In the 1990s the cars received SEPTA's standard full length Red and Blue window decal wrapping and some of the cars had a minor interior upgrade with the original "ketchup and mustard" seats being converted to a padded brown leather appearance. By 2000 the cars' age was becoming apparent with decreasing reliability and lack of ADA compliance which included the manually operated doors which were becoming a hindrance at SEPTA's increasing number of stations equipped with high level platforms. However design delays and a contract bidding dispute delayed the order of their 120 replacement Silverliner V cars until past 2005 and then problems with the builder, Hyundai Rotem, setting up a production facility in South Philadelphia, further delayed deliveries until 2010. [5] During this period an increasing number of Silverliner II cars began to be sidelined with serious mechanical problems with a few even catching fire in service. [6] Due to the lack of a public address system the Silverliner IIs were operating under an ADA waiver set to expire on July 1, 2012, and with deliveries of Silverliner V cars accelerating SEPTA began to retire cars as their FRA 92-day inspections ran out. By May 2012 most Silverliner IIs had been retired and in their final week of service the last operating Silverliner II, #9010, was sent to run on the Cynwyd Line with the final run taking place on June 29. [7] Ex-RDG car numbered 9010 survives, and is due to go to the Reading Railroad Heritage Museum.

Design

Interior of a Budd Silverliner showing the leatherette decor applied to cars 259, 269, 9012 and 9015 in place of the standard "Ketchup and Mustard" styling. SEPTA-269-inside-smooth.jpg
Interior of a Budd Silverliner showing the leatherette decor applied to cars 259, 269, 9012 and 9015 in place of the standard "Ketchup and Mustard" styling.

The design of the Budd Silverliner was based on a lightweight stainless steel body and frame coupled to an advanced AC/DC rectifier propulsion system and new lightweight, high-speed trucks. While largely identical to the earlier Pioneer IIIs, differences included a single-arm Faiveley pantograph, a state-of-the-art propulsion system that made use of solid-state phase angle controllers coupled to mercury arc ignitron rectifiers, higher-powered motors, a higher-capacity main transformer, multi-function couplers and disc brakes. One result of these upgrades was that the Silverliners were incompatible with the six Pioneer prototypes. Passenger amenities were also identical to the Pioneer III cars offering riders air cushion suspension, air conditioning, electric train heat and a nearly silent acceleration and braking. With 150 hp (110 kW) more than the Pioneer III cars (550 hp or 410 kW total), the Silverliners could achieve a 1.7 mph/s (2.7 km/(h⋅s)) acceleration rate, which was far higher than the older MP54s [1] and a top speed of 85–100 mph (137–161 km/h) compared with the 55–65 mph (89–105 km/h) of the MP54 fleet (which was not often reached in service). [1] Inside, the cars were equipped with 25 rows of 3+2 reversible (flipover) bench seating with 124 usable seats and either a bathroom or an additional 3-person bench seat. The seats were initially furnished in a dark gray diamond-patterned foam rubber "plush", which began to wear out by the mid-1970s. Four cars (#259, #269, #9012 and #9015) were experimentally retrofitted with brown vinyl leatherette seats. However, the balance of the fleet was redone in the SEPTA/Conrail era with canvas-textured padded covering in a so-called "Ketchup and Mustard" theme, with the three-person seats upholstered in mustard yellow and the two-person seats done in a dark ketchup red.

Side view of the Budd Pioneer III truck on Silverliner II No. 9009 showing the suspension elements and cowcatcher applied to the Reading cars. SEPTA-9009-Lansdale-Pioneer-III-truck+cowcatcher.jpg
Side view of the Budd Pioneer III truck on Silverliner II No. 9009 showing the suspension elements and cowcatcher applied to the Reading cars.

Despite both Reading and PRR cars being paid for in part by the PSIC, each railroad was allowed to put their own stamp on the design. These differences included the PRR units being fitted with only one overhead luggage rack, a bar pilot, a metal-framed engineer's window and position-light cab signals, with the Reading cars being fitted with a cowcatcher, twin overhead luggage racks, and color light (though PRR-compatible) cab signals; the latter were removed after the RDG discontinued its 1928 cab signal installation on the Bethlehem Branch between Jenkintown and Lansdale in 1967, and 9001–9017 would have to be re-equipped with cab signal equipment in 1983–84 in preparation for operation through the Center City Commuter Connection and former PRR lines. The first group of PRR cars (201–219) were intended by be used on longer distance runs to places like Harrisburg, PA and New York City and were equipped with a bathroom on the "F" end to facilitate this. The second set of PRR cars, along with all of the Reading cars, were not equipped with comfort facilities, substituting a 3-person bench seat is its place. While all of the Silverliner cars were delivered with disc brakes, the PRR disliked this feature as it required trains to be placed over a drop pit for routine brake work, and all of their 38 cars were converted to conventional tread brakes by 1968. [1] The Reading cars were not converted to tread braking until rebuilding in the SEPTA era in 1989. In addition to the disc brakes, all classes of Budd Silverliner were delivered with an early multi-function coupler design that consisted of an AAR "tightlock" knuckle coupler mounted above a separate automatic coupler for air and electrical connections. This design allowed the new MU cars to be attached (in emergencies or planned shop moves) for towing behind locomotives, conventional passenger and heavyweight MU cars, or in freight trains; the outer ends of the stepboxes were lettered with detailed instructions to train crews for doing so. However, the newer fleet of 232 Silverliner IVs were delivered with Budd's new "pin and cup" coupler and both the Silverliner II and III fleets were modified to both couple to and MU with the IVs, as opposed to the older cars the IVs were replacing. When this change was carried out the Penn Central fitted its cars with a welded bar pilot to protect the leading wheels from debris impact. All cars were equipped with WABCO AA2 horns.

Notable cars and incidents

Silverliner II No. 269 still carrying "PENNSYLVANIA" name boards. Septa269.jpg
Silverliner II No. 269 still carrying "PENNSYLVANIA" name boards.

Experimental Silverliners

T-3 at 16th Street Station in Oakland, California in 1981 DOT T-3 in Oakland, August 1981.jpg
T-3 at 16th Street Station in Oakland, California in 1981

As part of the High Speed Ground Transportation Act of 1965 the United States Department of Transportation placed an order for 4 additional Silverliners for use as test vehicles to explore the feasibility of a high-speed rail line in the United States. Numbered T-1 through T-4, the cars were modified for operation up to speeds of 150 mph and were outfitted with various instrumentation to document the effects of rail travel at such speeds including CCTV cameras to monitor the wheels and pantograph. [8] The most visible change was a slightly streamlined slab end applied to the T-1 car to reduce drag at high speed after the 4-car trainset was unable to reach the 150 mph (241 km/h) speed target with the stock end. With the new streamlining in place the train was able to reach a top speed of 156 mph (251 km/h) on the straight track between Trenton and New Brunswick, New Jersey. [1] As a result, this same level of deflection was applied to the front ends of the production high-speed MU Budd Metroliners. During the tests the cars were based at the PRR's Morrisville Yard engine facility, and after the tests were completed at least one of the cars was de-powered and used as a USDOT rail testing vehicle for some years afterward, and one was used by the U.S. Army at Fort Eustis. [9]

T-1 was purchased by a private buyer in 2015 and moved to the South Carolina Railway Museum, to be converted into a lounge car. T-2 exists as an office for the AAFES warehouse in Lee Hall, VA. T-3 and T-4 are presumed scrapped, but T-4 is unaccounted for. Its whereabouts are unknown.

See also

Related Research Articles

<span class="mw-page-title-main">Multiple unit</span> Self-propelled train

A multiple-unit train or simply multiple unit (MU) is a self-propelled train composed of one or more carriages joined, which when coupled to another multiple unit can be controlled by a single driver, with multiple-unit train control.

<span class="mw-page-title-main">EMD AEM-7</span> Twin-cab four-axle 7,000 hp (5.2 MW) B-B electric locomotive built by Electro-Motive Division

The EMD AEM-7 is a twin-cab four-axle 7,000 hp (5.2 MW) B-B electric locomotive built by Electro-Motive Division (EMD) and ASEA between 1978 and 1988. The locomotive is a derivative of the Swedish SJ Rc4 designed for passenger service in the United States. The primary customer was Amtrak, which bought 54 for use on the Northeast Corridor and Keystone Corridor. Two commuter operators, MARC and SEPTA, also purchased locomotives, for a total of 65.

<i>Metroliner</i> (train) Former express train between Washington, D.C., and New York City

The Metroliners were extra-fare high-speed trains between Washington, D.C., and New York City which operated from 1969 to 2006. They were briefly first operated by Penn Central Transportation, then by Amtrak for 35 years.

<i>Keystone Service</i> Amtrak service in Pennsylvania

The Keystone Service is a 195 mile regional passenger train service from Amtrak between the Harrisburg Transportation Center in Harrisburg, Pennsylvania, and 30th Street Station in Philadelphia, running along the Philadelphia to Harrisburg Main Line. Most trains continue along the Northeast Corridor (NEC) to Penn Station in New York City.

<span class="mw-page-title-main">PATCO Speedline</span> Rapid transit system in Pennsylvania and New Jersey, United States

The PATCO Speedline, signed in Philadelphia as the Lindenwold Line and also known colloquially as the PATCO High Speed Line, is a rapid transit route operated by the Port Authority Transit Corporation (PATCO), which runs between Philadelphia, Pennsylvania, and Camden County, New Jersey.

<span class="mw-page-title-main">Philadelphia and Western Railroad</span> Former high-speed commuter interurban electric railroad

The Philadelphia and Western Railroad was a high-speed, third rail-equipped, commuter-hauling interurban electric railroad operating in the western suburbs of Philadelphia, Pennsylvania. It is now SEPTA's Norristown High Speed Line, though the Strafford spur has been abandoned. Part of the abandoned line within Radnor Township is now the Radnor Trail, a multi-use path or rail trail.

<span class="mw-page-title-main">Budd Company</span> United States historic place

The Budd Company was a 20th-century metal fabricator, a major supplier of body components to the automobile industry, and a manufacturer of stainless steel passenger rail cars, airframes, missile and space vehicles, and various defense products.

<span class="mw-page-title-main">SEPTA Regional Rail</span> Commuter rail service in Philadelphia, Pennsylvania, US

The SEPTA Regional Rail system is a commuter rail network owned by SEPTA and serving the Philadelphia metropolitan area. The system has 13 branches and more than 150 active stations in Philadelphia, Pennsylvania, its suburbs and satellite towns and cities. It is the sixth-busiest commuter railroad in the United States, and the busiest outside of the New York, Chicago, and Boston metropolitan areas. In 2016, the Regional Rail system had an average of 132,000 daily riders and 118,800 daily riders as of 2019.

<span class="mw-page-title-main">Budd Rail Diesel Car</span> Diesel multiple unit

The Budd Rail Diesel Car (RDC), also known as the Budd car or Buddliner, is a self-propelled diesel multiple unit (DMU) railcar. Between 1949 and 1962, 398 RDCs were built by the Budd Company of Philadelphia, Pennsylvania, United States. The cars were primarily adopted for passenger service in rural areas with low traffic density or in short-haul commuter service, and were less expensive to operate in this context than a traditional diesel locomotive-drawn train with coaches. The cars could be used singly or coupled together in train sets and controlled from the cab of the front unit. The RDC was one of the few DMU trains to achieve commercial success in North America. RDC trains were an early example of self-contained diesel multiple unit trains, an arrangement now in common use by railways all over the world.

<span class="mw-page-title-main">Pioneer III</span>

The Pioneer III railcar was a short/medium-distance coach designed and built by the Budd Company in 1956 with an emphasis on weight savings. A single prototype was built, but declines in rail passenger traffic resulted in a lack of orders so Budd re-designed the concept as an electric multiple unit (m.u.). Six of the EMU coach design were purchased by the Pennsylvania Railroad with the intention of using them as a high-speed self-contained coach that could be used for long-distance commuter or short-distance intercity travel in the Northeast U.S. The 6 production Pioneer III units were the first all-stainless-steel-bodied EMU railcar built in North America and, at 90,000 pounds (41,000 kg), the lightest.

<span class="mw-page-title-main">PRR MP54</span>

The Pennsylvania Railroad's MP54 was a class of electric multiple unit railcars. The class was initially constructed as an unpowered, locomotive hauled coach for suburban operations, but were designed to be rebuilt into self-propelled units as electrification plans were realized. The first of these self-propelled cars were placed in service with the PRR subsidiary Long Island Rail Road with DC propulsion in 1908 and soon spread to the Philadelphia-based network of low frequency AC electrified suburban lines in 1915. Eventually the cars came to be used throughout the railroad's electrified network from Washington, D.C. to New York City and Harrisburg, Pennsylvania.

<span class="mw-page-title-main">Pulse code cab signaling</span> Railway track status technology

Pulse code cab signaling is a form of cab signaling technology developed in the United States by the Union Switch and Signal corporation for the Pennsylvania Railroad in the 1920s. The 4-aspect system widely adopted by the PRR and its successor railroads has become the dominant railroad cab signaling system in North America with versions of the technology also being adopted in Europe and rapid transit systems. In its home territory on former PRR successor Conrail owned lines and on railroads operating under the NORAC Rulebook it is known simply as Cab Signaling System or CSS.

<span class="mw-page-title-main">Budd Metroliner</span> Retired high-speed train

The Budd Metroliner was a class of American electric multiple unit (EMU) railcar designed for first-class, high-speed service between New York City and Washington, D.C., on the Northeast Corridor. They were designed for operation up to 150 miles per hour (240 km/h): what would have been the first high speed rail service in the Western Hemisphere. Although 164 mph (264 km/h) was reached during test runs, track conditions and electrical issues limited top speeds to 120 mph (190 km/h) in revenue service. The single-ended units were designed to be arranged in two-car sets, which were in turn coupled into four to eight-car trains.

<span class="mw-page-title-main">Arrow (railcar)</span>

The Jersey Arrow is a type of electric multiple unit (EMU) railcar developed for the Pennsylvania Railroad, and used through successive commuter operators in New Jersey, through to NJ Transit. Three models were built, but only the third model is in use today. The series is similar to SEPTA's Silverliner series, but include center doors among other differences in details.

<span class="mw-page-title-main">Media/Wawa Line</span> SEPTA Regional Rail line between Center City Philadelphia and Wawa, Delaware County

The Media/Wawa Line is a SEPTA Regional Rail service that runs from Center City Philadelphia west to Wawa in Delaware County. It uses the West Chester Branch, which connects with the SEPTA Main Line at 30th Street Station. Under the Pennsylvania Railroad, service continued to West Chester, Pennsylvania. On September 19, 1986, however, service was truncated to Elwyn.

<span class="mw-page-title-main">Silverliner V</span> Electric multiple unit railcar

The Silverliner V is an electric multiple unit railcar designed and built by Hyundai Rotem. It is used by Philadelphia's SEPTA Regional Rail and Denver, Colorado's Regional Transportation District. This is the fifth generation railcar in the Silverliner family of single level EMUs.

<span class="mw-page-title-main">Siemens ACS-64</span> American built electric locomotive

The Siemens ACS-64, or Amtrak Cities Sprinter, is an electric locomotive designed by Siemens Mobility for use on the Northeast Corridor (NEC) and the Keystone Corridor in the northeastern United States. The design was based on locomotives Siemens created for use in Europe and Asia, but with changes to comply with American standards. The ACS-64 is built at the Siemens factory in Florin, California, located outside of Sacramento.

<span class="mw-page-title-main">ACMU</span> Class of American electric multiple unit

The ACMUs were a series of electric multiple unit railcars built for the New York Central Railroad in three orders between 1950 and 1965. The ACMUs were intended to replace/supplement the original fleet of heavyweight MU cars, some of which dated to the start of electric operations on the New York Central. These were the first New York Central units to offer air conditioning, with sealed windows replacing the drop sash and clerestory types found on earlier cars. The initial set of 100 cars was retired in 1970, upon completion of the M1 railcar delivery, while the second and third orders, totaling 87 cars, remained in service until 2004, when they were replaced by the new M7 fleet.

<span class="mw-page-title-main">Silverliner</span> Series of American electric commuter railcars

Silverliner is the name given to a series of electric multiple unit (EMU) railcars in commuter rail service in the Philadelphia area since 1958. As of the introduction of the Silverliner V in 2009–2010, there have been 5 generations of Silverliner cars, identified by the Roman numerals I through V placed after the name Silverliner. The Silverliner name came from the classes' shiny stainless steel body shell, which contrasted with the painted and frequently rusting carbon steel railcars used by the Pennsylvania and Reading Railroads between 1915 and 1936. Applied to the first large production order in 1963, the cars made such an impression that the name has since been applied to all subsequent MU classes purchased by SEPTA for the Regional Rail services.

<span class="mw-page-title-main">Silverliner IV</span> Electric multiple unit railcar

The Silverliner IV is the fourth-generation electric multiple unit railcar in the Silverliner family. It was designed and built by General Electric and was delivered between 1973 and 1976. It operates on the SEPTA Regional Rail network throughout Greater Philadelphia.

References

  1. 1 2 3 4 5 6 7 Staufer, Alvin (1968). Pennsy Power II: Steam Diesel and Electric Locomotives of the Pennsylvania Railroad. Staufer. pp. 168–193. ISBN   0944513050.
  2. 1 2 3 Volkmer, William (1994). PRR: Hudson to Horseshoe. Rising Sun. pp. 60–62. ISBN   1878887335.
  3. Holton, James L. (1992). Reading Railroad History of a Coal Age Empire, Vol. 2: The 20th Century. Garrigues House Pub. ISBN   0962084433.
  4. Williams, Gerry (1998). Trains, Trolleys & Transit: A Guide to Philadelphia Area Rail Transit. Piscataway, New Jersey: Railpace Company. pp. 46–98. ISBN   978-0-9621541-7-1.
  5. Nussbaum, Paul (December 4, 2010). "Another delay for SEPTA's new Silverliner V cars". Philly.com. Archived from the original on April 30, 2014.
  6. Araiza, Karen (November 5, 2009). "SEPTA Train Catches Fire". NBC Philadelphia.
  7. Nussbaum, Paul (June 29, 2012). "SEPTA to scrap the last 'Silverliner II'". The Philadelphia Inquirer.
  8. Trinity Court Studios (May 18, 2011). HIGH-SPEED SILVERLINER TEST TRAIN ON THE NEC!!!!! AMAZING!!!!!. YouTube.
  9. Underwood, Russell. "USAX T1 (photograph)". Archived from the original on 2014-04-22. Retrieved 2014-04-21.