Bunnerong Power Station | |
---|---|
Country | Australia |
Location | Matraville, New South Wales |
Coordinates | 33°58′17″S151°13′38″E / 33.971389°S 151.227222°E |
Status | Demolished 1987 |
Commission date | 1929 |
Decommission date | 1975 |
Owners | Municipal Council of Sydney, Electricity Department Sydney County Council Electricity Commission of NSW |
Thermal power station | |
Primary fuel | High-grade, solid black coal |
Turbine technology | Steam turbine |
Power generation | |
Units operational |
|
Nameplate capacity | 375 MW |
External links | |
Commons | Related media on Commons |
Bunnerong Power Station was a coal-fired power station in the south-eastern Sydney suburb of Matraville, New South Wales, Australia that was decommissioned by 1975 and subsequently demolished. When the last generating units were commissioned, it was the largest power station in the southern hemisphere, with a capacity of 375 megawatts (MW) from eleven turbo-alternators. It was able to supply up to one third of the state's electricity needs at the time. It remained the most powerful until the completion of Vales Point Power Station in 1966.
In 1924, the 117-acre site for the power station was chosen. [1] The station was located on Bunnerong Road in Matraville.
Bunnerong was originally built with eighteen cross drum boilers from Babcock & Wilcox Ltd (UK), supplying steam at 350 psi (2,400 kPa) and 700 °F (371 °C), with each boiler producing 100,000 lb/h (45,000 kg/h) of steam. [2] Six 25 megawatt (MW) Metropolitan-Vickers two-cylinder turbo-alternators were built between 1926 and 1930 by the Electricity Department of the Municipal Council of Sydney, one of the two main authorities responsible for electricity generation at the time. The first turbo-alternator commenced operation in January 1929, and the sixth in January 1930. Current was generated at 11 kilovolts (kV) and stepped up to 33 kV for transmission. With a capacity of 150 MW, Bunnerong was the largest power station in New South Wales. A seventh 25 MW unit was brought into use in September 1937, expanding capacity to 175 MW. This original installation was later known as Bunnerong 'A' Station.
Bunnerong 'B' Station began operation in 1939, with the commissioning of a 3-stage 50 MW turbo-alternator (Number 8) supplied by C.A. Parsons and Company. A second 50 MW turbine (Number 9) followed in 1941, bringing the capacity of Bunnerong to 275 MW. Bunnerong 'B' Boilerhouse had four Babcock & Wilcox pulverized fuel boilers, each produced 300,000lbs/hr of steam at 600psi. In 1949, two oil fired, Velox boilers from Gibson, Battle & Co Pty Ltd of Sydney were added. Each could produce an additional 165,000lbs/hr of steam at 600PSI and 825°F. Being a range type station these Velox boilers could supply steam to either A or B stations.
The boilers of 'A' Station suffered from reduced efficiency and clinker-related shutdowns owing to shortages of high grade hand-selected coal after the mechanization of mining began. The more modern 'B' Station was designed to handle the lower quality, impure coal extracted in mechanized mining, but supply difficulties meant that it often received the high grade product intended for 'A' Station. In 1946, supplementary oil burners were fitted to every boiler, to mitigate the consequences of coal shortages and quality issues.
A third 50 MW Parsons turbo-alternator was commissioned in 1947, followed by a fourth identical unit. These final two machines were fed by four Simon-Carves pulverized fuel boilers rated at 300,000lb/hour, exhausting to a large concrete chimney. The completion of Bunnerong 'B' Station increased the total capacity to a continuously-rated 375 MW, making Bunnerong the largest power station in the southern hemisphere. During overload testing in 1958, a maximum of 382 MW was achieved.
After the completion of 'B' Station, more than 1,600 people were employed on the site. A number of industrial disputes relating to unsatisfactory working conditions resulted in reduced power output, sometimes for weeks on end.
The council operated its own private railway which connected the power station with Botany Goods Yard. [3] The railway continued to operate as a private line when the power station was taken over by the Electricity Commission, including the shunting of a siding to the Boral plant. On 19 November 1966, there was a fatal accident when a train ran away down the steep grade of this siding. [4]
The Electricity Commission of New South Wales was formed in 1950, and assumed control of the generating assets of the Sydney County Council (which had taken over the Municipal Council of Sydney's power stations in 1936), including Bunnerong and Pyrmont in 1952.
With the completion of newer power stations, Bunnerong 'A' was out of use by 1973, 'B' Station was relegated to emergency supply duties, and the entire installation was finally decommissioned in 1975. The removal of equipment began in 1978 and was largely completed by 1981. Peak load gas turbines were in use on the site from 1982 to 1984, but demolition commenced after their removal. The 112 metre-high concrete emission stack of Bunnerong 'B' boilerhouse was demolished in December 1986, and the majority of the huge structures of 'A' and 'B' Stations were razed by 28 June 1987. Demolition was largely undertaken by the American company, Controlled Demolition Incorporated. The large switch house dating from 1926 remained in place until its levelling in March 1994. Few traces of the power station remain. [1]
The Balmain Power Station was located at Iron Cove, 4 km (2 mi) from Sydney in New South Wales, Australia. The station no longer exists and residential properties now occupy the site. This plant is often confused with the White Bay Power Station, the remains of which are still standing in Rozelle.
The White Bay Power Station is a heritage listed former coal-fired power station on a 38,000 m2 (410,000 sq ft) site in White Bay, in the suburb of Rozelle, 3 km (2 mi) from Sydney in New South Wales, Australia.
Munmorah Power Station is a demolished coal-fired power station with four 350 MW English Electric steam driven turbo-alternators for a combined capacity of 1,400 MW. The station was located near Doyalson, on the shores of Lake Munmorah, New South Wales, Australia and was owned and operated by Delta Electricity, a company owned by the New South Wales Government.
Wangi Power Station is a heritage-listed former coal-fired power station at Wangi Wangi, City of Lake Macquarie, New South Wales on Lake Macquarie. The power station operated between 1956 and 1986 and supplied electricity to New South Wales. It was once the largest in the state. The 12,000-square-metre (130,000 sq ft) building was listed on the New South Wales State Heritage Register on 2 April 1999.
Spencer Street Power Station was a Victorian era coal and (later) oil-fired power station which operated on Spencer Street in central Melbourne, Victoria, Australia. The station was opened in 1894 in order to power electric street lights, then supplied power to the city's residents, as well as being a wholesale supplier to other municipal distributors. It came under the management of the State Electricity Commission of Victoria in 1941. By the 1960s the capacity of the station reached 109 MW, but was used only for peak load. The station was closed in 1982 after becoming redundant. Eventually deemed an eyesore, demolition commenced in 2006 and was completed in 2008, and a large residential and retail development called Upper West Wide was completed by 2016.
The Newport Power Station was a complex of power stations located on the west bank of the Yarra River, approximately 6 km south-west of Melbourne, Victoria, Australia, in the suburb of Newport. Newport A, B, and C were coal-fired plants which operated at the site between 1919 and the 1980s, and were claimed to be the largest power station in the southern hemisphere in 1953 with 42 boilers and 14 turbo-alternators producing 327 megawatts (439,000 hp).
Cockle Creek Power Station was located in Teralba, New South Wales, Australia, on the banks of Cockle Creek. The power stationed operated from 11 March 1927 until March 1976.
Chadderton Power Station refers to a series of two coal-fired power stations, which were situated at Chadderton, Greater Manchester in North West England.
Meaford Power Station was a coal-fired power station situated on the River Trent at Meaford near Stone in Staffordshire.
Bold Power Station refers to a series of two coal-fired power stations in Bold near St Helens, Merseyside, North West England. They were closed, decommissioned and demolished between 1981 and 1992, and a housing estate now occupies the site.
Pyrmont Power Station was an electricity generating plant located in the Sydney suburb of Pyrmont, New South Wales.
The Ultimo Power Station, or Ultimo Powerhouse, was an electricity generating plant located in the inner-city Sydney suburb of Ultimo, New South Wales. Commissioned in 1899, it was the first major power station in Sydney and was originally built to supply power for the electric tram network. Prior to this, a small installation had existed at Regent Street, which was brought into use on 15 June 1882. Additionally, experimental electric tram operations powered by small generators had been in intermittent use in Sydney since 1890.
Zaara Street Power Station is a former coal-fired power station that was situated on Zaara Street, in the city of Newcastle, in New South Wales, Australia. The power station was built to supply power for the New South Wales Government Railways (NSWGR) in 1915, when the first turbo-alternator of 2.5 megawatts (3,400 hp) was commissioned. The installation of additional plant in 1920 led to a generating capacity of 28.5 megawatts (38,200 hp). The station was decommissioned in 1975 and demolished in 1978.
Ribble Power Station was a coal-fired electricity generating station on the River Ribble in Penwortham near Preston, Lancashire, England. The station was built by the Corporation of Preston to replace a small privately-run generating station in the town. It supplied electricity to Preston and the surrounding area from 1923 until 1976. The station was expanded with new equipment in 1943–47 which remained in operation until the power station was closed in 1976 and was subsequently demolished.
Blackburn power stations are a series of electricity generating stations that have provided electric power to the town of Blackburn and the wider area from 1895 to the present. The first station in Jubilee Street, Blackburn began operating in 1895. A new larger station known as Blackburn East or Whitebirk power station was commissioned in 1921 and was rebuilt in stages over the period 1942 to 1955. Whitebirk station closed in 1976. The 60 MW Blackburn Mill Combined Cycle Gas Turbine (CCGT) power station has generated electricity since 2002. The Blackburn energy from waste (EfW) plant is currently (2020) being planned.
The Percival Lane power station in Runcorn was built and operated by the Mersey Power Company Limited. It comprised two stations A and B commissioned in 1921 and 1941. The station supplied electricity to commercial, industrial and domestic users over a wide area of 95 square miles around the River Mersey including Widnes, Ellesmere Port and Runcorn.
The Thornhill power station generated and supplied electricity to the town of Dewsbury and the wider regional area from 1902 to 1982, and again from 1998. The first generating station on the site was owned and operated by the Yorkshire Electric Power Company. Following nationalisation of the British electricity supply industry in 1948 Thornhill power station was operated by a succession of state owned bodies. The power station was redeveloped with new plant in 1915, 1925, 1932–37 and 1950–54. The coal-fired steam station was decommissioned in 1982, and was subsequently demolished. A gas turbine power station on the site was commissioned in 1998.
Greenhill power station supplied electricity to the town of Oldham, England and the surrounding area from 1921 to 1960. It replaced the older Rhodes Bank generating station and was superseded by Chadderton B power station. Greenhill power station was owned and operated by Oldham Corporation until the nationalisation of the British electricity supply industry in 1948. The power station was built over the period 1921–24 and was decommissioned in 1960.
Llanelly power station, also known as North Dock power station, supplied electricity to the town of Llanelly and the surrounding area from 1910 to the late 1960s. The power station was owned and operated by a succession of companies, including the Llanelly and District Electric Supply Company Limited, prior to the nationalisation of the British electricity supply industry in 1948. The power station was redeveloped in the 1920s to meet the increased demand for electricity.
Neepsend power station supplied electricity to the City of Sheffield and the surrounding area from 1910 to 1976. The power station was owned and operated by the Sheffield Corporation Electricity Department prior to the nationalisation of the British electricity supply industry in 1948. It was operated in conjunction with Blackburn Meadows and Kelham power stations and was closed in 1976.