Cornwall Electric

Last updated

Cornwall Street Railway Light and Power Company Limited
Cornwall Electric
Company typeSubsidiary
Industry Electricity distribution
Predecessors
  • Cornwall Electric Street Railway Company Limited
  • Cornwall Street Railway Company
  • Stormont Electric Light and Power Company
Founded1887;137 years ago (1887) in Cornwall, Ontario
FounderWilbur Reuben Hitchcock
Headquarters
Cornwall, Ontario
Areas served
Key people
Jacqueline Baird (Regional, Manager)
Services Electric power distribution
Owner Fortis Inc.
Number of employees
50 full-time [1]  (2022)
Parent FortisOntario Inc.
Website cornwallelectric.com

Cornwall Street Railway Light and Power Company Limited, operating as Cornwall Electric, is an electricity transmission and distribution utility, licensed by the Ontario Energy Board (OEB) to operate in Cornwall, Ontario, Canada. Originally established in 1887 as the Stormont Electric Light and Power Company and merged with the Cornwall Electric Street Railway Company in 1905, it is one of the oldest utilities in Canada.

Contents

The company supplies electricity to approximately 25,365 [2] customers in the city of Cornwall, the townships of South Glengarry and South Stormont, and on a portion of the Mohawk people's territory of Akwesasne, all located in Eastern Ontario. It crosses provincial boundaries to obtain the bulk of the power it requires directly from Hydro-Québec, while generating a small amount of its own, using a cogeneration system, a first such use in Canada.

Thomas Edison visited Cornwall in 1883 to see his electric incandescent light system illuminate a local factory. The incorporation of the Stormont Electric Light and Power Company followed in 1887. Since then, the company has undergone several ownership changes during its history, transitioning from a private company to a municipally owned utility to one that is owned and operated by a multinational publicly traded company.

History

Name

Cornwall Electric is the amalgamation of two companies that were first established in the late 19th century in Cornwall, Ontario, Canada. Stormont Electric Light & Power Company, which was formed in 1887 to supply Cornwall with electric light, [3] :V and the Cornwall Electric Street Railway Company, which incorporated in 1896 after receiving a franchise to operate a street car service in Cornwall. [4]

In 1905, the two businesses merged under the name Cornwall Street Railway Light and Power Company Limited, which was a combination of the two original business names. Even though the company eventually divested itself of all of its railroad operations, it has retained its full corporate name. [3] :V

In 1972, the company branded itself with the orange "CE" logo and continued doing business as Cornwall Electric. While the company was attempting to incorporate provincially using the name Cornwall Electric, a newer company which manufactured small electric appliances, was also incorporating federally with the same name. Executives from both companies held meetings and made arrangements that allowed the utility, which had proceeded further in obtaining the name, to continue operating as Cornwall Electric. It agreed to provide the other firm with compensation for any problems that arose after it decided to forgo the use of the name Cornwall Electric in lieu of another. [3] :89–90,254

Early years

Edison lights in weave shed in 1883 Canada Mills Weave Shed.png
Edison lights in weave shed in 1883

In the early 1880s, the owners of the Canada Cotton Manufacturing Company invited employees of Thomas Edison to Cornwall, to install the inventor's direct current (DC) system of incandescent lights, to illuminate their new weaving shed. [5] H.M. Billsby, director of the project, hired local Cornwall workers, including John MacMillan and Wilbur Reuben (W.R.) Hitchcock, who installed six boilers, six generators, and one hundred carbon filament bulbs connected in series and suspended from the shed's ceiling. [3] :9 Edison himself went to Cornwall on April 4, 1883 for the weaving shed's opening, as did politicians, scientists, industrial leaders, and dignitaries. [6] He activated the system and saw for the first time in Canada, [7] factory illumination using his patented invention of electric incandescent lights. [8] This was a significant development in the utilisation of electricity in industrial and commercial applications. [3] :9

John MacMillan was placed in charge of the generators at the textile mill by H.M. Billsby, and after two years there, he went on to install generators at various locations for the Edison Company, which became part of the General Electric Company. He returned to Cornwall to work for Stormont Electric before purchasing his own electric shop. [3] :9

W.R. Hitchcock, who in 1883 at the age of twenty-one, moved to Cornwall from Massena, New York, worked as an electrician for the Edison Company for a few years, and later joined Billsby who became the first manager of the Westinghouse Electric Company. He became a partner at the construction firm Glover, Davis and Hitchcock of New York, installing plants for Westinghouse that produced electricity using an alternating current (AC), which allowed it to travel longer distances, compared to Edison's DC system. [3] :10

During a visit to his Cornwall home, Hitchcock convinced a group of local businessmen and the directors of Stormont Electric to invest in an electric company that made use of the Westinghouse system. His company reached a formal agreement with them on April 19, 1887 to install 650 incandescent electric lamps on the streets of Cornwall. The directors of Stormont Electric had agreed to use their influence to secure tax exemptions for the power plant, a right-of-way for Hitchcock's company to string wires on poles throughout the town, and to obtain a right-of-way from the federal government to lay wires across the Cornwall Canal. [3] :11

Incorporation

Cornwall Canal circa 1904 A lock on the Cornwall Canal, circa 1904.jpg
Cornwall Canal circa 1904

As requested by Stormont Electric, the town council passed a by-law on April 22, 1887, to give the company the exclusive right to erect poles and string wires for the distribution of electricity across the town for fifteen years and a tax exemption on the personal and real property of the company for a period of ten years. Stormont Electric then filed for incorporation with the provincial government as a joint-stock company, valued at $25,000. Company solicitors also prepared a deed of purchase for the use of the water-power plant in a building on land used for a gristmill, controlled by David Hodge. It was passed on to him by his father Andrew Hodge, who years earlier, purchased the mill, which included federal water rights on the Cornwall Canal. [3] :2,13

In September 1887, Hitchcock obtained title to his company's electric plant and agreed to operate it for one year and to give the directors of Stormont Electric options to purchase the operation before being free to sell it to anyone else. In October of that year, Hitchcock borrowed $5,000 from them to pay his bills, and unable to repay the ten-month loan, he forfeited ownership of his power plant to Stormont Electric. [3] :19

Expansion and control

On December 1, 1893, the directors of Stormont Electric decided to operate the Cornwall Gas Works Company, when the shareholders, seeing it as a potential rival, had agreed to purchase the company. After being in abeyance for several years, the High Court of Justice for Ontario issued a final order of foreclosure on April 13, 1890. Once the terms and conditions of the purchase were finalized, Stormont Electric purchased the company in 1895, for $13,000. An Act that passed in the provincial legislature of Ontario provided Stormont Electric with the necessary permission to operate Cornwall Gas Works, allowing it to manufacture and sell gas for light, power, and heat in the town and township of Cornwall and to increase the value of its capital stock by $50,000. [3] :26–27,93

Facing an increasing demand for electricity, the directors of Stormont Electric decided to build a new coal-powered steam plant to supply power when the Cornwall Canal had an insufficient amount of water to turn the water wheels fast enough to generate electricity. To finance the project, which included a new boiler, engine house, and approximately 150 tons of soft coal to power the steam engines, the directors secured a $10,000 loan against the company's property and equipment from James N. Stuart, an investment agent from Montreal, Quebec. [3] :22

During the 1896 yearly municipal elections, the incumbent mayoral candidate M. M. Mulhern had proposed expropriation of the water and electric utilities. Stormont Electric was able to escape the idea of expropriation, which had been deemed inappropriate at the time by William Hodge, a candidate for Reeve and a former director of Stormont Electric. [3] :30

Five years later, in 1901, Cornwall had assumed control of the waterworks and formed a special investigative committee to determine whether it would be more economical to build a new electric plant or acquire the gas and electric plants operated by Stormont Electric. After receiving the committee's report, which favoured purchasing the two plants, the town council provided Stormont Electric with a formal offer to purchase the plants and related assets for $50,000 on November 27, 1901, giving the directors one month to decide before withdrawing the offer. The offer was declined, and to show its displeasure, the town council decided not to renew the agreement it already had with Stormont Electric and instead placed the street lighting services it provided up for tender. [3] :33

To help with the planning, specifications, and bid proposals, the town council enlisted the services of W.R. Hitchcock. [3] :34 Cornwall Electric Street Railway, which also produced electricity, did not bid on the tender. It was reorganizing itself and facing a corporate takeover by the Sun Life Assurance Company of Canada, which did not want to participate in the tendering process. [3] :36 The remaining bids were from Stormont Electric and St. Lawrence Power Company, with the latter having strong connections with the federal Conservative government, which had awarded it lucrative contracts, including one to bring power to the Cornwall Canal to operate the locks and to furnish it with lights. After much deliberation and finding the St. Lawrence bid too high and reluctant to build a new plant, the town council reversed itself by signing a ten-year contract with Cornwall Electric on June 4, 1902. [3] :40

To support its growth, Stormont Electric also signed a contract to purchase additional power from St. Lawrence Power on October 26, 1903, which included an agreement to build a power step-down transformer station on its property south of the Cornwall Canal and a commitment from St. Lawrence Power that it would not supply power to individuals or corporations in Cornwall, excluding the Canadian Coloured Cotton Mills, and to not supply power to villages surrounding Cornwall. [3] :41

Railway operations

Cornwall Street Railway Company

The Cornwall Street Railway Company was the first attempt at providing Cornwall with public transportation when it was incorporated by letters patent on November 11, 1885, [3] :46 and received a charter from the town to build tram lines for horse-drawn streetcars, [9] however no evidence could be found to indicate that the company had ever started offering its railway service. [3] :47

Cornwall Electric Street Railway Company Limited

Cornwall Electric Street Railway car Cornwall Electric Street Railway Company car No. 10, G.T.R. & Water Street, Ontario Voiture no 10 de la Cornwall Electric Street Railway Company, Grand Trunk Railway et rue Water (Ontario) (36520200630) (cropped).jpg
Cornwall Electric Street Railway car

On January 22, 1894, W.R. Hitchcock took the initial steps to bring to Cornwall an electric street railway for which he received franchises from the town and township of Cornwall. Inexperienced in the matters of building a railway, Hitchcock signed an agreement with the firm Hooper and Starr to build it. The contractors became principal stockholders and directors of the railway, after Hitchcock transferred his franchise rights in January 1896, to the newly formed Cornwall Electric Street Railway Company Limited, where he became superintendent. [3] :49–52

Cornwall Electric started its passenger streetcar service on July 1, 1896, using an electric locomotive to pull four cars travelling on approximately 4.8 kilometres (3.0 mi) of track, and purchased two additional cars in 1897. [10]

In need of additional revenues, Cornwall Electric started a freight service, for which it purchased two new freight locomotives in 1899. [10] The service moved freight from the Grand Trunk Railway yards and from the New York and Ottawa Railway to the Toronto Paper Company, Canadian Coloured Cottons, and other businesses, including moving mail for the town's post office. [10] It ended its streetcar service, switching instead to trolleybus service in 1949. [11]

During the time Stormont Electric was planning to expand its operation, Cornwall Electric Street Railway included in its charter the right to generate electricity for heating, lighting and power. The company was looking for ways to turn its financial difficulties around. Although it was not in a position to compete against Stormont Electric, its general manager David Starr was contemplating purchasing the company, in order to power its streetcar service with electricity that was not being used during the day. [3] :32

In a 1970 Act of the Legislative Assembly of the Province of Ontario, Cornwall Electric received authorization to sell the railway freight operations, including equipment, buildings, tracks, and lands with rights-of-way. [12] The Canadian National Railway purchased the freight operations on April 1, 1971 for $430,000. [13] The passenger service was contracted out to A.J. McDonald Limited. [14]

Power sources and growth

Ontario Hydro

Like many municipalities in Ontario, Cornwall was tempted in 1912 to join the new provincial publicly-owned Ontario Hydro. Enticed by the promise of lower rates and "people's power" to join the public utility, residents were unswayed. Between 1919 and 1920, pro-Hydro and anti-Hydro forces engaged in many heated discussions. Some had seen Ontario Hydro as becoming a huge monopoly, initially offering lower rates, but not maintaining them. [15] The debates culminated into a referendum, whereby the ratepayers of Cornwall in a 799 to 540 vote, enacted a by-law to renew the company's franchise, keeping the utility under local control and in private hands for another ten years. [16] This provided Cornwall with stable rates, while all the Hydro-towns were subjected to rate increases. Unlike Cornwall, they were unable to choose another provider of electricity once connected to the public grid. [3] :123,144

It was later revealed that Adam Beck, former chairman of the Hydro-Electric Power Commission (HEPC), who had unsuccessfully tried to convince the citizens of Cornwall to switch to Ontario Hydro, used his influence and the strength of his position to offer the Eugene Phillips Electric Company a more favourable electricity rate if it relocated to the public-Hydro town of Brockville, Ontario, instead of Cornwall, during the time the company was negotiating with Cornwall's Board of Trade and town council. Cornwall Mayor Chisholm and council were outraged and appealed to the provincial government, which, after receiving other complaints, established the Gregory Royal Commission to investigate the HEPC. In this regard, the Commission found that HEPC had improperly contributed $805 of public funds to the pro-Hydro Citizens League, had discriminated against Cornwall, and had made arrangements to shut Cornwall out of getting an independent source of power, which it deemed to be "coercion of a character seldom adopted by a public body". [3] :143

Cornwall Electric aggressively promoted its electrical businesses. In 1920, Cornwall had only four electric ranges, and by 1930, ownership had increased to 800 electric ranges. Similar electric appliance initiatives raised resentment from private appliance dealers in places that were connected to the publicly-owned Ontario Hydro. [15] It also sold electric hot water heaters with off-meter electricity, paid for using a flat-rate system that it could turn on and off remotely during peak hours. The sale of hot water heaters and electric appliances were eventually abandoned, and the flat-rate system discontinued. [3] :224–225

St. Lawrence Power

The St. Lawrence Power Company was established by Michael Patrick Davis of Ottawa, Ontario. It was granted a federal charter and given broad powers in an Act of Parliament which received Royal Assent on May 23, 1901. In early 1907, Davis sold the company to the Pittsburgh Reduction Company in Philadelphia, which later became the Aluminum Company of America (ALCOA). It established an aluminum plant and formed the St. Lawrence River Power Company of New York State to build a power house for it in Massena. A few years later, the company directors who saw the potential of the St. Lawrence River and the Long Sault Rapids, formed the Long Sault Development Company and expanded its holdings by acquiring large sections of land in Canada to further their interest in the electricity business, which they believed could rival Niagara Falls. [3] :261–270

As opposition to all developments in the St. Lawrence grew stronger, the Government of Canada formed in 1912 a Commission of Conservation to review the Long Sault Rapids, the St. Lawrence River, and all that it entailed. In its report, it stated, "That it is the plain duty of Canada... to maintain her rights of ownership and jurisdiction absolutely unimpaired and untrammelled." It became clear that private corporations would not be permitted to control the development of the St. Lawrence River. [3] :272–273

By the 1920s, Stormont Electric had become more dependent on the power it purchased from St. Lawrence Power, and eventually relegated its own power house to backup service only, which it operated on its property located on the south side of the Cornwall Canal and where St. Lawrence Power had installed a step-down substation. Cornwall Electric later decided to move its power house to the north side of the canal on the railway car barn property it expanded with the 1934 purchase of the adjacent lot, eliminating the need of stringing and maintaining wires across the canal bed. [3] :145–146

Aluminum Company of America

Unlike most towns during the depression years of the 1930s, Cornwall was facing industrial expansion and population growth, increasing the demand for more power by 300 percent. Cornwall Electric obtained all its power from St. Lawrence Power, which received its power from the Cedars Rapids Transmission Co. Ltd., which primarily supplied power to its then parent company ALCOA which operated the aluminum smelter located in Massena. [3] :164 Under an 85-year contract that extended to the year 2000, Cedar Rapids agreed to purchase 56,000 kW of power from Hydro-Québec, and if available, could purchase an additional 50,000 kW. It also had a license from the Government of Canada to export 75,000 kW of surplus power at the entry point of Massena, for its aluminum plant. The Niagara Mohawk Power Corporation, also based out of New York State, and by then owners of St. Lawrence Power, had agreed to provide up to 56,000 kW of power at Massena, if Cedar Rapids, fulfilling purchases made by St. Lawrence Power to service the Cornwall area, was unable to meet the power needed at the ALCOA plant. [3] :212

Saint Lawrence Seaway

Moses-Saunders Power Dam Panorama Moses Saunders Dam.jpg
Moses-Saunders Power Dam

The Moses-Saunders Power Dam, a part of the Saint Lawrence Seaway which was completed in 1959, [17] and which is situated on the west side of Cornwall on the Saint Lawrence River, supplies water to two adjacent Canada-US hydroelectric power generating stations, operated by Ontario Power Generation (OPG) and the New York Power Authority. Cornwall Electric does not purchase any power generated there, due in part to a long-standing Ontario Hydro policy of not supplying power long-term to privately held companies, [3] :213,215 and the affordability and abundance of power available close by in the neighbouring province of Quebec. [18]

Cedars Rapids Transmission

Hydro-Quebec high tension lines Hydro Quebec 450kv Route 20.jpg
Hydro-Québec high tension lines

In 1980, Cornwall Electric and St. Lawrence Power had approached ALCOA to discuss the possibility of purchasing Cedar Rapids, but after only agreeing to consider the matter, nothing came of it until 1983, when Cedar Rapids decided to terminate the contract it had with St. Lawrence Power to pursue other alternatives. After this, the Cornwall Electric board of directors hired the firm Touche Ross to prepare a feasibility study on purchasing both St. Lawrence Power and Cedar Rapids. After recommending that it should, General Manager Gordon Fairweather and the board of directors once again approached ALCOA in early 1984. This time, a committee was struck which negotiated until early 1985. [3] :292–293

In July 1985, ALCOA announced that it had sold Cedars Rapids Transmission Company Limited to Hydro-Québec for an amount that ranged between 65 and $70 million. Hydro-Québec agreed to honour the contract Cedar Rapids had just renegotiated with St. Lawrence Power. Two years later, after three previous attempts, Cornwall Electric acquired the St. Lawrence Power Company from Niagara Mohawk Power for $13.5 million. [19] [3] :292–293

The Cedars Rapids Transmission line which crosses provincial and international boundaries feeds Cornwall Electric with the power it requires directly from Hydro-Québec. [20] [21] It is a 72-kilometre (45 mi) double-circuit 120-kilovolt (kV), 325-megawatt interconnection line. The line runs along its right-of-way, and links between the Hydro-Québec TransÉnergie grid at the Les Cèdres substation in Quebec, to the National Grid Dennison substation in the state of New York. [22] The line was rebuilt in 2003 and operates at 120 kV. It is capable of operating at 230 kV with a capacity of 1,000 megawatts. [23]

Energy dependence

In 1994, Cornwall Electric, concerned about its energy dependence on just one supplier, awarded a contract to Marsh Energy Inc. to design the first municipally-owned hot water district heating and cogeneration system in Canada. [24] The plant went online in 1995 and is operated by CDH District Heating Limited, a subsidiary of FortisOntario Inc. The system feeds 5 megawatts electric (MWe) [25] of base load electricity into the municipal grid, and provides 7 megawatts thermal heat (MWth) [26] to city buildings, schools, and a hospital via a 4.5-kilometre (2.8 mi) underground distribution network. [27]

Ownership

Sun Life Assurance of Canada

As early as 1898, the Sun Life Assurance Company of Canada had begun to purchase bonds issued to Cornwall Electric Street Railway. Cornwall Electric was in financial trouble and was unable to repay those bonds, giving Sun Life, ownership of the railway company in 1902. [10]

In December 1904, James Leitch, president of Stormont Electric received a letter from Sun Life expressing its desire to purchase the company. The directors, all prominent businessmen and active members of the community, who had previously refused the town's offer of $50,000, accepted in 1905, Sun Life's offer to purchase the company's stock valued at $37,100. [3] :89–90 Sun Life consolidated the two operations, sharing management and overhead costs, and using its electricity to power the streetcar services, and to distribute it to consumers. [10] It made William Hodge, a former director of Stormont Electric, and familiar with the town's people, the first general manager of the combined companies, and who later became the first vice-president. [3] :92,112

Corporation of the City of Cornwall

By the early 1970s, Sun Life began to slowly divest itself of Cornwall Electric's railway assets. [14] In 1972, the Kingston, Ontario firm Klondike and Lemoyne Company Limited showed interest in purchasing Cornwall Electric, and when negotiations took a more serious turn, Sun Life after seventy-five years of ownership and wanting to unload what remained of Cornwall Electric, advised Cornwall city council that it was planning to sell the company. [3] :257

The city council, under the leadership of Mayor Gerald Parisien, announced on June 30, 1977 that it sent Sun Life, a letter of intent to purchase the company with an offer of $4.8 million, under a deadline of July 25, 1977. On the condition that the terms of sale be finalized by that deadline, Sun Life accepted the offer. Later that year, the city of Cornwall appointed members to its first board of directors. They were Mayor Gerald Parisien, who also served as president, Albert Bergeron, owner of Bergeron Electric, Fred Bradley, former comptroller at the local textile plant Courtaulds (Canada) Limited, Neil Burke, President of the local car dealership Brookshell Pontiac Buick, and Douglas Fawthrop, former city alderman. Gordon Fairweather remained as vice-president and general manager. [3] :260

Consumers' Gas Company Ltd.

In an attempt to lower electricity rates, the Government of Ontario had proposed legislation that would restructure the electricity market in the province. The Cornwall Electric board of directors concerned with the possible adverse impact this could have on the company, presented options to city council. Viewing privatization as the best option, council quietly sought a buyer for the company. After several months of searching, it found one that was eager to be first in the new electricity market and willing to pay twice the company's value to acquire Cornwall Electric. [19]

In 1997, after twenty years of ownership, city council announced that it had made the decision to sell Cornwall Electric to Consumers' Gas Company Ltd. Residents concerned with that decision and who saw Cornwall Electric as the city's "crown jewel", formed an organization called Cornwall Ratepayers Against Panic-selling of Cornwall Electric (CRAP). A proponent of the organization was a former Cornwall mayor, Nick Kaneb. [28] Despite the opposition, city council voted in a 10-1 decision [29] to sign a memorandum of understanding. On behalf of the Corporation for the City of Cornwall, it accepted the offer from Consumers Gas to purchase Cornwall Electric for $68 million. [19]

At a commemoration twenty-one years after the sale, Ernie Jackson, general manager of Cornwall Electric at the time, recollected that the company was entering a time of high risk, and recognized that it was a good idea to put control of Cornwall Electric into private hands, where its mission could be solely on keeping it profitable. [30]

Fortis Inc.

In May 2002, Enbridge Energy Distribution Inc. (formerly Consumers' Gas), announced that it had agreed to sell Cornwall Electric to Fortis Inc. in a cash deal worth $67 million. Both the Canadian Competition Bureau and the Ontario Energy Board approved the sale which Fortis Inc. concluded on October 18, 2002. Fortis has its roots in St. John's, Newfoundland, and is a Canadian multinational publicly traded holding company which operates Cornwall Electric under its Ontario subsidiary, FortisOntario Inc. [31]

In 2016, Cornwall Electric entered into a ten-year agreement, commencing on January 1, 2020, with Hydro-Québec Energy Marketing, to purchase a minimum of 537 gigawatt hours (GWh) per year and up to 145 megawatts of capacity at any one time. [20]

Events

Ice storm

Ice Storm damage in 1998 Ice Storm 98 trees line Noaa6198.jpg
Ice Storm damage in 1998
R.H. Saunders Power Dam OPG RH Saunders Dam-1.jpg
R.H. Saunders Power Dam

The sale of Cornwall Electric was set to occur in February 1998 but was delayed due to the January 1998 North American ice storm. During the prolonged ice storm, much of Eastern Ontario and Western Quebec was without electricity. [32] Cornwall, which is situated on the banks of the Saint Lawrence River, which supplies water to the neighbouring hydroelectric R.H. Saunders Power Generating Station, also had no electricity, until existing wires connecting the Moses-Saunders Power Dam to Cornwall were for the first time energized with electricity generated by the local power plant. Two of the three wires were weighted down by ice and were hazardously close. A Cornwall Electric employee who was also an archer used a bow and arrow to throw a line over the arcing wires. [19] Workers were then able to bounce the wires, causing the ice to fall off and the hydro lines to separate from each other. This provided Cornwall residents with enough power to meet 75% of their electricity needs during the ice storm. [19]

Progress Fund

After paying off the city's debt with the sale of Cornwall Electric, the city of Cornwall created the Progress Fund with the remaining proceeds. [33] It later protected the Fund by passing a by-law equipped with a funding mechanism requiring the fund to hold a minimum balance of $25 million. [34] Originally, it only funded quality of life projects in the city of Cornwall. Interest generated by the Fund has been used in part for the redevelopment of the local Hotel Dieu Hospital, later renamed the Cornwall Community Hospital, the establishment of a hospice, the building of an aquatic centre, and to pay the mortgage on the city's new sports complex, the Benson Centre. [35]

Community involvement

Historically, many of the company's general managers and directors contributed to the future development of Cornwall by working with the local Board of Trade and town council. They encouraged Sun Life to invest in many large companies that would agree to locate to Cornwall. [3] :155 It financed the building of the Water Street Arena to replace the Victoria Rink which was lost in the Cornwall "great fire of 1933". Arrangements were also made to purchase the home of W.R. Hitchcock, founder of the Cornwall electric and railway companies who was at the time facing adversity. This allowed him to continue living there until his death on June 4, 1944. [3] :167

Licensing

Cornwall Street Railway Light and Power Company is registered as an Ontario Business Corporation, and has the Registry ID 752855, issued by the province of Ontario on January 1, 1988. Its Electricity Distribution Licence is ED-2004-0405 which was issued by the Ontario Energy Board on November 10, 2004, last amended on March 17, 2017, and valid until December 31, 2030. [36]

Although licensed by the OEB, Cornwall Electric has been granted legislative exemptions by the provincial regulator under the 1998 Ontario Electricity Act. [37] The company is subject to a 35-year franchise agreement with the city of Cornwall, which dates back to July 31, 1998. It also has franchise agreements with the neighbouring townships. Under the agreements, electricity rates are reset every year, and calculated based on a formula that includes adjustments for inflation, load growth, and customer growth. [38] The company provides its electricity consumers with some of the lowest rates in Ontario. [lower-alpha 1] [39] [40]

See also

Footnotes and charts

  1. As of 2017, the Ontario Energy Board (OEB) no longer includes Cornwall, Ontario in its electricity rate comparison charts.

Related Research Articles

<span class="mw-page-title-main">Cornwall, Ontario</span> City in Ontario, Canada

Cornwall is a city in Eastern Ontario, Canada, situated where the provinces of Ontario and Quebec and the state of New York converge. It is the seat of the United Counties of Stormont, Dundas, and Glengarry and is Ontario's easternmost city.

The British Columbia Hydro and Power Authority, operating as BC Hydro, is a Canadian electric utility in the province of British Columbia. It is the main electricity distributor, serving more than 4 million customers in most areas, with the exception of the City of New Westminster, where the city runs its own electrical department and portions of the West Kootenay, Okanagan, the Boundary Country and Similkameen regions, where FortisBC, a subsidiary of Fortis Inc. directly provides electric service to 213,000 customers and supplies municipally owned utilities in the same area. As a provincial Crown corporation, BC Hydro reports to the BC Ministry of Energy, Mines and Low Carbon Innovation, and is regulated by the British Columbia Utilities Commission (BCUC). Its mandate is to generate, purchase, distribute and sell electricity.

<span class="mw-page-title-main">Hydro-Québec</span> Canadian hydroelectric utility

Hydro-Québec is a Canadian Crown corporation public utility headquartered in Montreal, Quebec. It manages the generation, transmission and distribution of electricity in Quebec, as well as the export of power to portions of the Northeast United States. More than 40 percent of Canada’s water resources are in Quebec and Hydro-Québec is the fourth largest hydropower producer in the world.

<span class="mw-page-title-main">Ontario Hydro</span> Defunct Canadian provincial utility corporation, 1906–2015

Ontario Hydro, established in 1906 as the Hydro-Electric Power Commission of Ontario, was a publicly owned electricity utility in the Province of Ontario. It was formed to build transmission lines to supply municipal utilities with electricity generated by private companies already operating at Niagara Falls, and soon developed its own generation resources by buying private generation stations and becoming a major designer and builder of new stations. As most of the readily developed hydroelectric sites became exploited, the corporation expanded into building coal-fired generation and then nuclear-powered facilities. Renamed as "Ontario Hydro" in 1974, by the 1990s it had become one of the largest, fully integrated electricity corporations in North America.

Fortis Inc. is a St. John's, Newfoundland and Labrador-based international diversified electric utility holding company. It operates in Canada, the United States, Central America, and the Caribbean. In 2015, it earned CA$6.7 billion.

<span class="mw-page-title-main">Manitoba Hydro</span> Electric power and natural gas utility company in Manitoba, Canada

The Manitoba Hydro-Electric Board, operating as Manitoba Hydro, is the electric power and natural gas utility in the province of Manitoba, Canada. Founded in 1961, it is a provincial Crown Corporation, governed by the Manitoba Hydro-Electric Board and the Manitoba Hydro Act. Today the company operates 16 interconnected generating stations. It has more than 527,000 electric power customers and more than 263,000 natural gas customers. Since most of the electrical energy is provided by hydroelectric power, the utility has low electricity rates. Stations in Northern Manitoba are connected by a HVDC system, the Nelson River Bipole, to customers in the south. The internal staff are members of the Canadian Union of Public Employees Local 998 while the outside workers are members of the International Brotherhood of Electrical Workers Local 2034.

<span class="mw-page-title-main">Hydro One</span> Electricity transmission and distribution utility serving in Ontario, Canada

Hydro One Limited is an electricity transmission and distribution utility serving the Canadian province of Ontario. Hydro One traces its history to the early 20th century and the establishment of the Hydro-Electric Power Commission of Ontario. In October 1998, the provincial legislature passed the Energy Competition Act which restructured Ontario Hydro into separate entities responsible for electrical generation, transmission/delivery, and price management with a final goal of total privatization.

<span class="mw-page-title-main">NB Power</span> Electric utility company

New Brunswick Electric Power Corporation, operating as NB Power, is the primary electric utility in the Canadian province of New Brunswick. NB Power is a vertically-integrated Crown corporation by the government of New Brunswick and is responsible for the generation, transmission, and distribution of electricity. NB Power serves all the residential and industrial power consumers in New Brunswick, with the exception of those in Saint John, Edmundston and Perth-Andover who are served by Saint John Energy, Energy Edmundston, and the Perth-Andover Electric Light Commission, respectively.

<span class="mw-page-title-main">Electricity sector in Canada</span>

The electricity sector in Canada has played a significant role in the economic and political life of the country since the late 19th century. The sector is organized along provincial and territorial lines. In a majority of provinces, large government-owned integrated public utilities play a leading role in the generation, transmission, and distribution of electricity. Ontario and Alberta have created electricity markets in the last decade to increase investment and competition in this sector of the economy.

<span class="mw-page-title-main">Energy policy of Canada</span>

Canada has access to all main sources of energy including oil and gas, coal, hydropower, biomass, solar, geothermal, wind, marine and nuclear. It is the world's second largest producer of uranium, third largest producer of hydro-electricity, fourth largest natural gas producer, and the fifth largest producer of crude oil. In 2006, only Russia, the People's Republic of China, the United States and Saudi Arabia produce more total energy than Canada.

Kakabeka Generating Station is a hydroelectric facility operated by Ontario Power Generation on the bank of the Kaministiquia River, 2 km (1.2 mi) downstream from Kakabeka Falls in the community of Kakabeka Falls, Ontario, 30 km (19 mi) west of Thunder Bay. The plant provides energy to the city of Thunder Bay and area. The station is one of ten hydroelectric stations in Ontario Power Generation's Northwest Plant Group, and is remotely operated from Thunder Bay.

<span class="mw-page-title-main">Ontario Power Generation</span> Electric utility company in Canada

Ontario Power Generation Inc. (OPG) is a Crown corporation and "government business enterprise" that is responsible for approximately half of the electricity generation in the province of Ontario, Canada. It is wholly owned by the government of Ontario. Sources of electricity include nuclear, hydroelectric, wind, gas and biomass. Although Ontario has an open electricity market, the provincial government, as OPG's sole shareholder, regulates the price the company receives for its electricity to be less than the market average, in an attempt to stabilize prices. Since 1 April 2008, the company's rates have been regulated by the Ontario Energy Board.

<span class="mw-page-title-main">Electricity policy of Alberta</span>

The electricity policy of Alberta, enacted through several agencies, is to create an electricity sector with a competitive market that attracts investors, while providing consumers with reliable and affordable electricity, as well as reducing harmful pollution to protect the environment and the health of Albertans, according to their 2022 website.

According to the International Hydropower Association, Canada is the fourth largest producer of hydroelectricity in the world in 2021 after the United States, Brazil, and China. In 2019, Canada produced 632.2 TWh of electricity with 60% of energy coming from Hydroelectric and Tidal Energy Sources).

Vermont electric power needs are served by over twenty utilities. The largest is Green Mountain Power, a subsidiary of Énergir which recently also took over Central Vermont Public Service. Together this single company represents 70% of the retail customers in Vermont. The state is a small electricity consumer compared with other states. Therefore, its electricity sector has the lowest carbon footprint in the country. As of 2010, the state had the lowest wholesale electricity costs in New England. Efficiency Vermont engages in aggressive initiatives to cut residential electricity waste, which often identifies other problems that it claims can save hundreds per household per year. Accordingly, Vermont's overall energy bills are also relatively lower than in the rest of the New England states.

<span class="mw-page-title-main">History of electricity sector in Canada</span>

The history of electricity sector in Canada has played a significant role in the economic and political life of the country since wide-scale industrial and commercial power services spread across the country in the 1880s. The development of hydropower in the early 20th century has profoundly affected the economy and the political life in Canada and has come to symbolize the transition from "old " industrialism of the 19th century to a "new", modern and diversified, Canadian economy.

<span class="mw-page-title-main">Moses-Saunders Power Dam</span> Dam in Massena, New York/Cornwall, Ontario

The Moses-Saunders Power Dam, short for Robert Moses-Robert H. Saunders Power Dam, is a dam on the Saint Lawrence River straddling the border between the United States and Canada. It is located between Massena in New York and Cornwall in Ontario. The dam supplies water to two adjacent hydroelectric power generating stations, the United States' 912 MW St. Lawrence-Franklin D. Roosevelt Power Project and Canada's 1,045 MW R.H. Saunders Generating Station. Constructed between 1954 and 1958 as part of the larger Saint Lawrence Seaway project, the dam created Lake St. Lawrence. Aside from providing significant amounts of renewable power, the dam regulates the St. Lawrence River and affords passage for the navigation of large vessels. Despite the enormous economic advantages to the dam, it required the relocation of 6,500 people and caused harm to the surrounding environment. Efforts have been made over the years to improve shoreline and fish habitats.

<span class="mw-page-title-main">Cornwall Street Railway</span> Electric street railway in Cornwall Ontario

The Cornwall Street Railway was an electric street railway in Cornwall, Ontario, Canada that operated from 1896 until 1949, and then as a trolleybus service until 1971 when it was replaced by a conventional bus service known as Cornwall Transit. For much of its history, the company was owned by Sun Life Assurance.

References

  1. "Career Opportunities". cornwallelectric.com. August 25, 2022.
  2. "Cornwall Electric Customers – Inflationary 1.53% rate increase effective July 1, 2022". Cornwall Seaway News . Cornwall, Ontario. August 7, 2022. Archived from the original on May 7, 2022. Retrieved August 25, 2022.
  3. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 Carter-Edwards, Karen (1987). Cornwall Electric, 100 Years of Service. Canada: Cornwall Electric. ISBN   0-9692908-0-2.
  4. "Transit History of Cornwall, Ontario". University of Manitoba. April 2011. Archived from the original on December 9, 2019. Retrieved April 4, 2020.
  5. Richardson, W.G. (February 7, 2006). "Development of Electric Power in Canada | The Canadian Encyclopedia". www.thecanadianencyclopedia.ca. Archived from the original on January 24, 2021. Retrieved December 9, 2021.
  6. "EDISON'S LIGHT IN CANADA" . The New York Times . April 5, 1883. p. 4. Retrieved December 8, 2021.
  7. "Artifact of the Week. The Canada Mill and Thomas Edison, Cornwall". Cornwall Community Museum. October 21, 2015. Archived from the original on December 7, 2021. Retrieved December 7, 2021.
  8. Palermo, Elizabeth (February 17, 2017). "Who Invented the Light Bulb?". Live Science. Archived from the original on June 15, 2020. Retrieved July 18, 2020.
  9. Clegg, Anthony; Lavallée, Omer (2007). Cornwall Street Railway, The Insurance Company's Streetcars (5 September 2014 ed.). Cornwall, Ontario: Railfare DC Books. p. 11. ISBN   978-1-897190-25-8.
  10. 1 2 3 4 5 "Cornwall Street Railway Light & Power Co". Train Web. October 2009. Archived from the original on August 28, 1999. Retrieved April 25, 2020.
  11. Hale, Alan S. (December 2, 2019). "A history of transit in Cornwall". Cornwall Standard-Freeholder. Postmedia. Archived from the original on December 3, 2019. Retrieved April 25, 2020.
  12. "An Act respecting Cornwall Street Railway, Light and Power Company Limited". York University, Osgoode Hall Law School. Queen's Printer for Ontario. 1970. Archived from the original on June 6, 2020. Retrieved June 6, 2020.
  13. "Significant Cornwall Railway Dates – New York Central – Ottawa Division". ottawadivision.com. Archived from the original on May 8, 2019. Retrieved December 5, 2021.
  14. 1 2 "Cornwall Transit - CPTDB Wiki". Canadian Public Transit Discussion Board. January 2020. Archived from the original on June 17, 2009. Retrieved April 25, 2020.
  15. 1 2 "Urban History Review" (PDF). Érudit. February 1988. p. 295. Archived (PDF) from the original on August 14, 2017. Retrieved May 16, 2020.
  16. "Cornwall Street Railway from Canadian Railway and Marine World/Canadian Transportation" (PDF). Colin Churcher's Railway Pages. August 2017. p. 434. Archived (PDF) from the original on May 16, 2020. Retrieved May 16, 2020.
  17. "The Seaway Story". Great Lakes St. Lawrence Seaway System. Archived from the original on June 17, 2020. Retrieved July 25, 2020.
  18. Chung, Andrew (August 20, 2010). "As Quebec bathes in electricity, money goes down the drain". The Star. Toronto Star Newspapers Ltd. Archived from the original on June 9, 2020. Retrieved June 9, 2020.
  19. 1 2 3 4 5 Hale, Alan S. (September 26, 2019). "A look at the history of the privatization of Cornwall Electric, 21 years later". Cornwall Standard-Freeholder. Postmedia. Archived from the original on June 11, 2021. Retrieved December 10, 2021.
  20. 1 2 "Annual information form for the year ended December 31, 2019" (PDF). Fortis. February 12, 2020. p. 23. Archived (PDF) from the original on May 19, 2020. Retrieved May 20, 2020.
  21. "Exchanges with Ontario | International | Hydro-Québec". www.hydroquebec.com. Archived from the original on July 22, 2020. Retrieved July 21, 2020.
  22. "Point of delivery/receipt DEN and point of delivery CORN" (PDF). AATI. April 2014. Archived (PDF) from the original on May 18, 2020. Retrieved May 18, 2020.
  23. "The Cedars Rapids Transmission Co. (CRT)". Hydro-Québec. January 2004. Archived from the original on May 10, 2019. Retrieved May 18, 2020.
  24. "Cornwall Electric District Heating Plant" (PDF). Power Genysys. August 1995. Archived from the original (PDF) on May 15, 2020. Retrieved May 15, 2020.
  25. "Megawatts electric - Energy Education". Energy Education. April 2020. Archived from the original on February 5, 2016. Retrieved May 15, 2020.
  26. "Megawatts thermal - Energy Education". Energy Education. April 2020. Archived from the original on June 23, 2016. Retrieved May 15, 2020.
  27. "Cornwall, Ontario District Heating System" (PDF). Natural Resources Canada. August 2008. Archived (PDF) from the original on July 11, 2017. Retrieved May 15, 2020.
  28. "Omni". Trent University Library and Archives. March 2004. Archived from the original on October 19, 2021. Retrieved May 16, 2020.
  29. "Cornwall City Council Meeting Minutes - No. 27-97" (PDF). City of Cornwall. October 1997. Archived from the original (PDF) on May 17, 2020. Retrieved May 16, 2020.
  30. Hale, Alan S. (September 23, 2019). "Sale of Cornwall Electric commemorated at city hall". Cornwall Standard-Freeholder. Postmedia. Archived from the original on September 26, 2019. Retrieved April 4, 2020.
  31. "Enbridge Sells Cornwall Electric". Oil & Gas Journal. May 17, 2002. Archived from the original on July 11, 2020. Retrieved July 11, 2020.
  32. Pritchard, Trevor (January 4, 2018). "Powerless: 20 years ago, ice storm hammers eastern Ontario". CBC News . Archived from the original on July 12, 2021. Retrieved December 10, 2021.
  33. "City of Cornwall Progress Fund Investment Register" (PDF). City of Cornwall. June 2019. Archived from the original (PDF) on May 15, 2020. Retrieved May 15, 2020.
  34. "City put $25M Progress Fund in jeopardy: auditor – Cornwall Newswatch". Cornwall Newswatch. May 2019. Archived from the original on July 7, 2019. Retrieved April 5, 2020.
  35. "Cornwall hit 'sweet spot' in '98 sale of Cornwall Electric". Cornwall Newswatch. September 2019. Archived from the original on September 26, 2019. Retrieved April 6, 2020.
  36. "Electricity Distribution Licence ED-2004-0405 Cornwall Street Railway Light and Power Company Limited". Ontario Energy Board. March 31, 2017. Archived from the original on June 6, 2020. Retrieved June 6, 2020.
  37. "Report of the Ontario Distribution Sector Review Panel" (PDF). Thinking Power. December 2012. Archived from the original (PDF) on January 5, 2019. Retrieved April 22, 2020.
  38. "Annual information form for the year ended December 31, 2005" (PDF). Fortis. March 29, 2006. p. 26. Archived (PDF) from the original on May 19, 2020. Retrieved May 20, 2020.
  39. Bischoff, Angela (September 20, 2016). "Why do people in Cornwall have lower electricity bills than you? | Ontario Clean Air Alliance". Clean Air Alliance. Archived from the original on August 31, 2019. Retrieved April 3, 2020.
  40. "Electricity Distributor Performance - Rates Comparison - Estimated Total Bills for Ontario Distributors". Ontario Energy Board. November 2016. Archived from the original on June 19, 2019. Retrieved April 4, 2020.
  41. "2017 Electricity Distributor Performance - Rates Comparison - Estimated Total Bills for Ontario Distributors". Ontario Energy Board. November 2017. Archived from the original on January 8, 2020. Retrieved April 22, 2020.
  42. "2016 Electricity Distributor Performance - Rates Comparison - Estimated Total Bills for Ontario Distributors". Ontario Energy Board. November 2016. Archived from the original on January 8, 2020. Retrieved April 24, 2020.

45°01′51″N74°43′59″W / 45.03086°N 74.73309°W / 45.03086; -74.73309