Edinburgh Water Company

Last updated

Edinburgh Water Company
IndustryWater
Founded1819
Defunct1870
FateTaken over
SuccessorEdinburgh Water Trust
Headquarters Edinburgh, Scotland

Edinburgh Water Company and its successors have provided a public water supply and latterly sewerage and sewage treatment services to the Scottish capital of Edinburgh since 1819. The original company was established to supply drinking water and did so until 1870, when it was taken over by a public Water Trust, with representatives from Edinburgh, Leith and Portobello. That in turn was taken over by Edinburgh Corporation and in 1975, responsibility passed to the Lothian Regional Council, as did the duty to provide sewerage and sewage treatment services. Both services were moved out of local authority control, and taken over by the East of Scotland Water Authority in 1996. The three Scottish regional water authorities were merged to form Scottish Water in 2002.

Contents

During the time of the Edinburgh Water Company and the Edinburgh Water Trust, major projects were carried out to construct reservoirs, some for the impounding of water supplies, and others to provide compensation water, to ensure that rivers could still provide water power to mills, when some of their sources had been tapped to supply Edinburgh. James Jardine was the company's first engineer, and was succeeded by James Leslie, who became part of J & A Leslie and Reid, when he entered into partnership with his son Alexander Leslie and son-in-law Robert Reid in the early 1870s. The last major project of this early period was Talla Reservoir, completed in 1905, but there were further civil engineering projects in the 1960s and 1980s. Alexander Leslie compiled a dosier of photographs, showing the construction of some of the later Victorian reservoirs, which has recently been rediscovered in the archives of Edinburgh Library.

With the population growing rapidly, a major project to divert sewage away from the Water of Leith, the main river through the city, took place in 1864, probably with Napier Bell as the engineer. A new sewer intercepted the existing sewers and drains, and carried the raw sewage to the sea. Edinburgh did not have a sewage treatment works until 1978, when construction of Seafield Treatment Works on reclaimed land near Leith Docks was completed. It now produces 2.3 MW of electric power, generated from the gas which is a product of the sludge digesters which treat the effluent, and it is expected to become self-sufficient for power in the near future.

History

The City of Edinburgh had a number of wells, from which water could be obtained, and Nor Loch also acted as a source for water. Water was first brought in from outside the city in 1676, when a 3-inch (7.6 cm) lead pipe was installed from springs at Comiston, now a suburb to the south of the city. As more water was required, additional springs in Comiston were tapped, and the pipe was progressively replaced by a 5-inch (13 cm) lead pipe between 1704 and 1720. Iron pipework replaced the lead in 1820. The network was extended in 1760, when wooden pipes were laid into the city from springs near Swanston, a little further to the south, but now also a suburb. 7-inch (18 cm) iron pipes replaced the wooden pipes around 1790, but there was then a lull in development due to the Napoleonic wars. The piped water reached a fairly limited number of dwellings, and many people had to buy water from water porters, called 'caddies' locally, who were registered by the Magistrates, and sold water for one penny for a barrel containing 5 to 6 imperial gallons (23 to 27 L). [1]

There was general disquiet that the supply of water was "extremely deficient both in quantity and quality," and the editor of the Edinburgh Review, Francis Jeffrey, convened a public meeting, at which a committee was formed to take the matter forwards. The committee included two prominent authors, Henry Mackenzie and Henry Cockburn. The Edinburgh Water Company was formed, and obtained an Act of Parliament in July 1819. This authorised several schemes, including obtaining water from the Crawley springs, some 6 miles (9.7 km) to the south of Edinburgh in the Pentland Hills, an idea that had first been suggested by Thomas Telford in 1811. They could also take water from the Glencorse Burn, and in order to maintain supplies to mill owners on the River Esk, the Glencorse Reservoir was to be built, as a source of compensation water. [2]

James Jardine was appointed as the company's first engineer, who had been involved in the construction of the Union Canal, and who had also been the first person to work out the mean level of the sea. He was responsible for the pipeline from Crawley springs, which was 8.5 miles (13.7 km) long, as it followed the contours, and acted as resident engineer for the Glencorse dam, with Telford acting as the chief designer. The water pipeline, which varied in diameter from 15 to 20 inches (38 to 51 cm), was completed in August 1823, and delivered 1,500,000 imperial gallons (6.8 Ml) per day to the city. [2] The Glencorse dam, which impounded 368 million imperial gallons (1,670 Ml) of water, [3] was one of the tallest earth dams at the time it was built, with the crest around 120 feet (37 m) above ground level. The total cost of these projects was around £145,000, and they received high praise from The Scotsman newspaper. Jardine had originally calculated water levels and potential yields from the springs in the Pentland Hills in 1810, while working for Telford. [4]

The new scheme worked well until 1842, when there was a severe drought, resulting in many of the smaller streams and brooks drying up completely. Less than 12 inches (300 mm) of rain fell between April and October, and the Glencorse Reservoir emptied. Millers on the River Esk demanded that water from the Crawley springs should be diverted into the Glencorse Burn, and this was only avoided by paying them an indemnity of between £4,000 and £5,000. The Company rushed through an Act of Parliament in 1843 to allow them to abstract water from streams at Listonshiels, Bavelaw and Black Springs, all of which are on the north side of the Pentland Hills. Two more reservoirs were required to provide compensation water, at Threipmuir and Harlaw, and despite difficulties in buying the required land, Jardine pressed on with the project. However, he retired in 1846 before either reservoir had been finished, having reached the age of 70, and it was James Leslie who took over and saw them completed. [5]

James Leslie

Leslie had previously worked with Jardine on a report about a water supply scheme for Dundee, for which an Act of Parliament was obtained in 1837, but no work was undertaken at the time. [6] Construction of the dam for the Threipmuir Reservoir may have been completed before Jardine retired, but the Harlaw dam was definitely Leslie's work. The main outlet for the reservoir was through a cast iron pipe sitting on the foundations for the dam. A masonry tower was built at the inner end of the pipeline, near the upstream toe of the dam, and a rod passing up the tower enabled the sluice to be controlled. To enable the outlet valve to be inspected or maintained, a sluice made of oak could be lowered in guides, cutting off the incoming water and allowing the pipeline to drain. A second similar structure allowed water to be taken from about 40 feet (12 m) above the bottom of the reservoir. When the dam was nearly completed, there was evidence of slippage on the upstream face, which displaced the tower slightly. Leslie put this down to the dam being built too quickly, with insufficient attention being paid to consolidating the hard boulder clay from which much of the dam was constructed, and all his subsequent dams were constructed in layers less than 1 foot (300 mm) thick, to mitigate such problems. Despite the movement of the tower, no remedial work was undertaken, and it has remained standing ever since. Leslie completed the work specified by the 1843 Act in 1848. [7]

A plaque to celebrate the construction of Torduff Reservoir in 1848 The Edinburgh Water Company - 1848 - geograph.org.uk - 1181312.jpg
A plaque to celebrate the construction of Torduff Reservoir in 1848

Before the two reservoirs had been completed, Leslie could see that they would still not be sufficient to provide the water that Edinburgh needed, and so in 1847 the Company applied for another Act of Parliament. This made provision for the construction of three more reservoirs, at Clubbiedean, Torduff and Bonaly on the northern parts of the Pentland Hills, while on the southern side of the hills they could raise the dam at Glencorse Reservoir, to increase the amount of water impounded, and build a reservoir at Loganlea, above that at Glencorse. The three northern reservoirs were designed to store up spring water, so that supplies to the city of Edinburgh could be maintained even if there were future droughts. The Loganlea Reservoir and the improvements to Glencorse were to ensure that the statutory compensation water could always be supplied for the mills on the River Esk, while allowing the Water Company to always keep the pipeline from Crawley Springs full. The 1847 Act was innovative, in that it contained a clause requiring the company to provide a constant water supply to homes, a concept that had been championed by the sanitary reformer Edwin Chadwick. [7]

Two other engineers, James Rendel and Nathaniel Beardmore worked on the proposals, and the setting out of the works once the Act was obtained, [8] but it was Leslie who supervised the construction. The northern reservoirs were constructed with earth dams, with a 3 to 1 slope on the upstream side of the central clay puddle wall, and a 2.5 to 1 slope on the downstream side. The outlet arrangements for Torduff and Loganlea were similar to those at Harlaw, with two outlets, although the bottom outlets fed into tunnels cut through solid rock, but at Clubbiedean, the outlet was a single cast iron pipe buried beneath the dam. Leslie's regime of compacting thin layers worked well, and it was not until the 1970s that some remedial work was required at Clubbiedean to grout the embankment and foundations, as the underlying limestone had gradually dissolved, creating some leakage through the dam. Remedial work was also required at Torduff after some leakage was discovered in the 1980s. [9]

The volume of water needed to supply the residents of Edinburgh continued to increase, and in 1856 a further Act of Parliament was obtained, allowing the company to take water from the Colzium springs. To maintain flows in the Water of Leith, a compensation reservoir was required at Harperrig. Leslie refined his designs for the outlets of the reservoir, with both the upper and lower outlets feeding into a culvert which ran beneath the bottom of the dam, and had been used to channel the river while the dam was being constructed. This project was completed in 1859, but was still not sufficient, so an Act of Parliament was obtained in 1863 to enable exploitation of the Crosswood springs, with a compensation reservoir at Crosswood to feed the Crosswood Burn. The dam that Leslie designed was similar to that at Harperrig, and the work was completed in 1868. [10] Leslie had improved his designs in other respects, and after the catastrophic failure of the Bilberry Dam in 1852, had insisted that dams should be built up in layers not more than 6 inches (15 cm) thick, to ensure adequate consolidation. He also specified that where excavated material was used to build the dams, clay and earth should be used against the central puddle wall, particularly on the upstream side, and that stones, gravel and sandy material should only be used for the slopes, and restricted to the downstream side if possible. These latter requirements were probably influenced by the findings of the inquest into the Bilberry disaster, but Leslie's insights meant that the Harperrig and Crosswood dams were among the best-designed earth dams at the time of their construction. [11] Although less details are available, Leslie was also responsible for construction of water mains and treatment works. [12]

Takeover

By 1868, the Pentland Hills were yielding some 6.3 million imperial gallons (29 Ml) of water per day, of which three-quarters comprised spring water from the north side of the hills, with the rest coming from the south side. The Crosswood scheme was the last to exploit water from the hills. [11] Serious debate took place, with the Corporations of Edinburgh, Leith and Portobello complaining that the existing Water Company was not bold enough in their actions, as each new scheme seemed to deliver less water than was needed. They looked for where additional supplies could be obtained, and in 1869 obtained an Act of Parliament to create a public Water Trust. This would include representatives from the three Corporations, and its powers included taking over the Edinburgh Water Company, which it did on 15 May 1870. Leslie was retained as a consulting engineer, but they also appointed James W Stewart to manage the immediate issues. In this he was assisted by John Frederick Bateman. [13] [11]

Prior to the takeover, Leslie had suggested a scheme to exploit the waters of the Moorfoot Hills in 1866 as a way to obtain extra supplies for the people of Edinburgh, Leith and Portobello. [12] The three burghs had appointed Stewart to look at alternative supplies, and he and Bateman had proposed obtaining water from St Mary's Loch, some 33 miles (53 km) to the south of Edinburgh. Bateman recognised that this would be more expensive than the Moorfoot Hills scheme, but it had the potential to yield three times as much water in the longer term, and so ultimately would prove to be cheaper. This scheme had been included in the bill for the 1870 Act, but had been rejected by the House of Lords because of a minor technical error. After the takeover had occurred, the burghs put the scheme before Parliament again, but local opposition was stirred up, particularly about the alleged problems of water fleas when using lake water, and they managed to persuade the House of Lords to reject the scheme for a second time. [14] There were local elections in 1872, which resulted in the personnel of the Trust changing, and Leslie effectively regained control as engineer. [12] He advised the Trust to proceed with the Moorfoot Hills scheme, using the catchment of the River South Esk to supply drinking water and the Fullerton Burn to supply compensation water. [15]

The Edgelaw Reservoir on the Fullerton Burn had a valve well located near to the puddle corewall, rather than Leslie's previous siting of the well at the toe of the upstream embankment. This was a retrograde step, but may have been influenced by Thomas Hawksley, who had been asked by the Trust to assist Leslie in finding a suitable site. Trial boring for the Gladhouse Reservoir was thorough, and paid dividends when what was initially thought to be solid rock turned out to be a large boulder. No suitable bedrock could be found below it, and the dam was eventually sited 1 mile (1.6 km) further downstream. The scheme was completed in 1880, [16] and yielded 8.69 million imperial gallons (39.5 Ml) per day, very similar to the amount that Bateman had suggested it would yield when arguing against it. [17] Leslie later built Rosebery Reservoir, also on the South Esk about 1 mile (1.6 km) below Gladhouse Reservoir, which was completed in 1885. [18]

James Leslie took his son Alexander into partnership in 1871, becoming J & A Leslie, and his son-in-law Robert Reid joined about two years later, when the enterprise became J & A Leslie and Reid. [19] Leslie designed the Alnwickhill water treatment works, although the contractors were James Young & Son. It consisted on reservoir holding 15 million imperial gallons (68 Ml) of raw water and two slow sand filter settling tanks. Work started on the first phase in 1875, and the works opened in 1879, with a second phase being completed in 1888. The two outlet houses were built in a classical Roman style. [20] Alexander Leslie collected dozens of photographs, showing the construction of some of the later projects, including the dams and filtration plants, workmen, architects and engineers, which he mounted in a book. The book was lost from view, but was found in the archives of the Edinburgh Library, and in 2014 the images were compiled to form an online exhibition. [21]

Development

The next development was to exploit the headwaters of the River Tweed. Talla Reservoir was part of the New Water Supply project adopted by the Edinburgh and District Water Trust on 11 October 1894, and authorised by Act of Parliament on 30 May 1895. The reservoir is about 1 mile (1.6 km) from the village of Tweedsmuir, and lies in the valley of the Talla Water. The scheme also included a service reservoir and filter, main and branch aqueducts to carry the water towards Edinburgh, and a 10-mile (16 km) railway, [22] known as the Talla Railway was built from the Peebles to Symington branch of the Caledonian Railway to the construction site, for the transport of materials. The dam was formally opened on 20 May 1905, after which the Talla Water was diverted into it and it began to fill. The railway was sold off afterwards, and had been lifted by 1912. [23] The Talla Aqueduct carries water 35 miles (56 km) from the reservoir to Alnwickhill Filters. There are 21 tunnels with a total length of 9 miles (14 km), ranging in length from 133 yards (122 m) to 1.33 miles (2.14 km). 12 miles (19 km) were built by cut-and-cover methods, and the remainder if formed of bridges and syphons. The syphons consist of cast iron pipes which cross valleys, and each is fitted with an automatic valve at the upstream end, which is designed to close if a burst occurs. The aqueduct falls at a gradient of 1 in 4000. [24]

J & A Leslie and Reid were the engineers for the water treatment works at Fairmilehead, completed in 1910, which consisted of a filter house, containing 12 pressure filters capable of treating 4 million imperial gallons (18 Ml) or water per day, and the Hillend pump house. The buildings are of an Edwardian Baroque style, rather than the classical Roman style that Leslie had used on earlier works. [25]

Near to Talla Reservoir is the Fruid Reservoir, built to impound the waters of the next upstream tributary of the Tweed, the Fruid Water. The top water level is 1,024 feet (312 m) above sea level, [26] and it covers an area of 344 acres (139 ha). [27] Construction started in 1967, and surplus water is used to top up Talla Reservoir. [28] In 2014, a survey of the Talla aqueduct, which now carries water from Fruid and Talla to a new water treatments works at Glencorse, was undertaken, after which 1,150 feet (350 m) of the tunnels were refurbished. In addition, new valves were fitted to the valve chambers. Jacobs were the consulting engineers for the £2.6 million project, and the contractor was George Leslie. [29]

Bateman's scheme to abstract water from St Mary's Loch was revisited in the 1980s, when the Megget Reservoir was completed in 1983. It dams the Megget River, which flows into the loch, and impounds water from around half of the St Mary's Loch catchment. Aqueducts and pipelines convey the water to Glencorse Reservoir, dating from 1822, to Gladhouse Reservoir, dating from 1879, and to Rosebery Treatment Works, which was built in 1953. A second phase involved pumping water from St Mary's Lock into the Megget Reservoir, and controlling the outflow from the loch by the use of sluices. [15]

By 2008, there were 13 service reservoirs supplying Edinburgh, at Fairmilehead, Alnwickhill, Marchbank, Firrhill, Humbie, Hillend, Torduff, Clermiston, Harlaw, Kinleith, Langloan, Dunsapie, and Craig Park, [30] which were supplied from four water treatment works, at Rosebery, Fairmilehead, Alnwickhill and Marchbank. [31] In 2006, Scottish Water considered ways to improve the city's water supply, and particularly the Alnwickhill works, dating from 1885, and that at Fairmilehead, dating from 1909. The solution adopted was to build a new treatment works at Glencorse, to replace both of them. One of the factors affecting the choice of site was that raw water could reach it from the main reservoirs at Talla, Fruid and Megget by gravity, using the existing Victorian pipeline, and it was at a sufficient elevation that the treated water could reach Edinburgh by gravity, removing the need for pumping, with its associated costs. The incoming raw water is used to power a Gilkes water turbine, which generates 230 kW, around one-third of the power requirements of the plant. The new works can deliver 38 million imperial gallons (170 Ml) per day, and the total cost, which included the construction of over 4.5 miles (7 km) of twin 4-foot (1.2 m) diameter pipeline to link the works to the existing distribution network at Fairmilehead and Alnwickhill, was £130 million. [32] The work was completed in March 2012, and the plant was officially opened in June 2012. [33]

Rosebery Water Treatment Works was originally built in the 1940s, close to Rosebury Reservoir, and was extended in 1965 and 1989. [34] In 2006 a major upgrade was completed, to increase its output from 40 Ml per day to 60 Ml per day, by replacing the existing slow sand filters and bell pressure filters, which had reached the end of their lives, by dissolved air flotation rapid gravity filters. The works were phased to ensure that the existing throughput could be maintained during the new construction, and the £8.6-million project took two and a half years to complete from a start date in January 2004. [35] The Marchbank Water Treatment Works was also upgraded with new dissolved air flotation filters, in a £10-million project completed in 2009, which enabled it to deliver 62 Ml of water per day to Edinburgh consumers. [36]

Sewerage

When there was no effective way of disposing of human waste, those who lived on the upper storeys of Edinburgh's tenement blocks could empty pails and chamber pots into the street below. They were required to shout "Gardez l'eau!", meaning "watch the water", which became corrupted to "gardyloo". The hazards to pedestrians were reduced a little by the passing of the Nastiness Act 1749, which restricted such activity to the hours between 10 pm and 7 am. [37]

Edinburgh experienced rapid growth in the second half of the 19th century, with the population nearly doubling between 1851 and 1901, from 160,511 to 316,837. The sewerage system was inadequate, and the Water of Leith, the main river through the city, became polluted. In 1864 an Act of Parliament was obtained, to allow the construction of a sewer to intercept the drains and sewers that discharged into the Water of Leith, which would convey the sewage to the sea. [38] The civil engineer Napier Bell, who had spent his early years in Central America with his father James Stanislaus Bell and returned to Scotland in 1857, worked on the Edinburgh sewerage works, but it is unclear in what capacity. [39] The sewer used brickwork sealed with Portland cement and caulked with rope, and was of an egg-shaped section, as pioneered by John Roe, which made them self-cleaning. Ventilators were constructed every 100 yards (90 m) or so, which were covered with metal gratings where the sewer ran beneath streets, and disguised by bushes where it ran through parks. [37] This removed much of the threat of water-borne diseases such as cholera from the poorer areas of Edinburgh, and in 1889, a second, deeper interceptor sewer was constructed. It reached as far as Balerno, some 8 miles (13 km) to the south-west of the city centre, and resulted in the Water of Leith becoming relatively unpolluted again. The network of sewers continued to expand until 1960, but there was never any attempt made to treat it before it poured into the sea. [38] Edinburgh Corporation carried out a feasibility study in 1966, as to how this situation could be improved, and decided to build a new sewage treatment plant on reclaimed land near Leith. [40] The Local Government (Scotland) Act 1973 created new regional councils, resulting in Lothian Regional Council taking over the responsibility for Edinburgh's sewerage and sewage treatment, [41] and it was they who completed the new works, which opened in 1978, having been partially funded by a European Investment Bank preferential loan. [38]

The works initially performed primary treatment only, to remove solids, and the remaining liquid was discharged into the sea through a 1.75-mile (2.8 km) pipeline. After the solids had been treated, they ware loaded onto a sludge disposal ship, the Gardyloo, and dumped at sea. This practice ceased at the end of 1998, when dumping was banned by the EU Urban Waste Water Treatment Directive, and the plant was extended to perform secondary treatment on the sewage, after which it went to a landfill site. [38] In 1999, the running of the plant was taken over from the East of Scotland Water Board by Stirling Water and Veolia, under a Private Finance Initiative. There are six sludge digesters on the site, which occupies 20 acres (8.1 ha), and they produce enough gas to generate 2.3 MW of electricity. It is expected that the site will become self-sufficient for energy within a few years. [40] As part of the Seafield works, another interceptor sewer was constructed, some 11 miles (17.7 km) long and up to 10 feet (3 m) in diameter. Due to the wide variety of ground conditions, some of it was tunnelled, some constructed by cut-and-cover, and in places, the ground had to be frozen before excavation could proceed. [37] In addition to the main treatment works at Seafield, there are smaller works at Newbridge, South Queensferry and Dalmeny. [31]

Legacy

Most of the reservoirs built in the 19th century to supply Edinburgh with water have lasted well. Following the failure of the Dale Dyke Dam in Sheffield in 1864, which resulted in nearly 250 deaths, the jury at the inquest stated that "the Legislature ought to take such action as will result in a government inspection of all works of this character, and that such inspection should be frequent, sufficient and regular." It was not until 66 years later that the Reservoirs (Safety Provisions) Act 1930 was passed. [42] As a result of that Act, standards have been developed, and the size of the spillways on all of the dams have had to be increased, although this is not a feature that is unique to Edinburgh's reservoirs, but has affected most earth dams built in the 19th century. [6] Additionally, the foundations and embankment at Clubbiedean were grouted in the 1970s, and some remedial work to deal with leakage was carried out at Torduff in the 1980s. [10]

In 1974 responsibility for supplying water to Edinburgh, and ownership of the reservoirs passed to Lothian Regional Council. It subsequently passed to the East of Scotland Water Authority in 1996, and in 2002 was transferred to the newly-formed Scottish Water. [43] In 2005, Edinburgh Council agreed to buy Harperrig, Harlaw and Threipmuir reservoirs from Scottish Water, who no longer required them for water supply. They now form a major part of the flood defences for the Water of Leith, allowing water levels to be lowered to give additional storage in times of high rainfall. [44] The three reservoirs were valued at £135,000, but were transferred to the Council for a nominal £1. [45]

Bibliography

Related Research Articles

<span class="mw-page-title-main">Bristol Water</span> British water company

Bristol Water is a British water company which supplies 266 million litres of drinking water daily to over 1.2 million customers in a 2,600 km2 (1,000 sq mi) area centred on Bristol, England. It is regulated under the Water Industry Act 1991. Sewerage services in the Bristol area are provided by Wessex Water.

<span class="mw-page-title-main">Alwen Reservoir</span> Reservoir in Conwy, North Wales

The Alwen Reservoir is a 5 kilometres (3 mi) long reservoir near Pentre-Llyn-Cymmer in Conwy County Borough, Wales.

<span class="mw-page-title-main">Megget Reservoir</span> Reservoir in Scottish Borders

Megget Reservoir is an impounding reservoir in the Megget valley in Ettrick Forest, in the Scottish Borders. The 259 hectares reservoir is held back by the largest earth dam in Scotland. The reservoir collects water from the Tweedsmuir Hills, which is then conveyed 28 miles (45 km) via underground pipelines and tunnels to Edinburgh. The pipelines are routed through the Manor Valley and the Meldon Hills, to Gladhouse Reservoir and Glencorse Reservoir in the Pentland Hills. These two reservoirs store the water until such times as it is required. Excess water which overflows from the reservoir is returned to the Megget Water, and hence into St. Mary's Loch.

<span class="mw-page-title-main">Alnwickhill</span> Human settlement in Scotland

Alnwickhill is a suburb of Edinburgh, the capital of Scotland. It is on the southern edge of the city, approximately 4 miles (6.4 km) from the city centre. It neighbours the areas of Liberton and Kaimes.

Upper Roddlesworth Reservoir is a reservoir on the River Roddlesworth near Abbey Village in Lancashire, England.

<span class="mw-page-title-main">Talla Railway</span> Former railway line in Scotland

The Talla Railway was a privately constructed railway line in southern Scotland. It was built 1895-97 to aid the construction of the Talla Reservoir, to serve the water demand of Edinburgh. The railway was about eight miles (13 km) long, running south from a connection with the Caledonian Railway's Peebles branch at Broughton. A private passenger service was operated for workmen on the reservoir construction.

<span class="mw-page-title-main">Loganlea Reservoir</span> Reservoir in Midlothian, Scotland

Loganlea Reservoir is a small reservoir in the Pentland Hills, Midlothian, Scotland, UK. The Logan Burn connects the reservoir with Glencorse Reservoir.

<span class="mw-page-title-main">Glencorse Reservoir</span> Body of water

Glencorse Reservoir is a reservoir in Midlothian, Scotland, two miles west of Glencorse, in the Pentland Hills.

Public water supply and sanitation in Scotland is characterised by universal access and generally good service quality. Water and sewerage services are provided by a single public company, Scottish Water. The economic water industry regulator is the Water Industry Commission for Scotland. It "promotes the interests of water and sewerage customers in Scotland by making sure that householders and businesses receive a high-quality service and value for money by setting prices, monitoring Scottish Water's performance and facilitating competition in the water industry". The environmental regulator is the Scottish Environment Protection Agency. Drinking water standards and wastewater discharge standards are determined by the EU.

<span class="mw-page-title-main">City of Nottingham Water Department</span>

The City of Nottingham Water Department (1912–1974), formerly the Nottingham Corporation Water Department (1880–1912), was responsible for the supply of water to Nottingham from 1880 to 1974. The first water supply company in the town was the Nottingham Waterworks Company, established in 1696, which took water from the River Leen, and later from springs at Scotholme, when the river became polluted. Other companies were set up in the late 18th century and in 1824, while in 1826 the Trent Water Company was established. They employed Thomas Hawksley as their engineer, who became one of the great water engineers of the period, and Nottingham had the first constant pressurised water supply system in the country. The various companies amalgamated in 1845, and Hawksley remained as the consulting engineer until 1879.

<span class="mw-page-title-main">James Jardine (engineer)</span> Scottish civil engineer, mathematician and geologist (1776–1858)

James Jardine was a Scottish civil engineer, mathematician and geologist. He was the first person to determine mean sea level. He built tunnels and bridges, including for the Innocent Railway, and built reservoirs including Glencorse, Threipmuir, Harlaw for Edinburgh Water Company, and Cobbinshaw for the Union Canal.

A regional water authority, commonly known as a water board, was one of a group of public bodies that came into existence in England and Wales in April 1974, as a result of the passing of the Water Act 1973. This brought together in ten regional units a diverse range of bodies involved in water treatment and supply, sewage disposal, land drainage, river pollution and fisheries. They lasted until 1989, when the water industry was privatised and the water supply and sewerage and sewage disposal parts became companies and the regulatory arm formed the National Rivers Authority. Regional water authorities were also part of the Scottish water industry when three bodies covering the North, West and East of Scotland were created in 1996, to take over responsibilities for water supply and sewage treatment from the regional councils, but they only lasted until 2002, when they were replaced by the publicly owned Scottish Water.

<span class="mw-page-title-main">Beckton Sewage Treatment Works</span> Sewage treatment plant in Newham, East London

Beckton Sewage Treatment Works, formerly known as Barking Sewage Works, is a large sewage treatment plant in Beckton in the east London Borough of Newham, operated by Thames Water.

Essex and Suffolk Water is a water supply company in the United Kingdom. It operates in two geographically distinct areas, one serving parts of Norfolk and Suffolk, and the other serving parts of Essex and Greater London. The total population served is 1.8 million. Essex and Suffolk is a 'water only' supplier, with sewerage services provided by Anglian Water and Thames Water within its areas of supply. It is part of the Northumbrian Water Group.

James Leslie FRSE was a Scottish civil engineer specialising in docks, harbours bridges and reservoirs, largely on the east coast of Scotland. He was also an amateur meteorologist.

<span class="mw-page-title-main">Glasgow Corporation Water Works</span>

Glasgow Corporation Water Works and its successors have provided a public water supply and sewerage and sewage treatment services to the Scottish city of Glasgow. There were several schemes in the early part of the 1800s, with the Glasgow Company which was established in 1806 pumping filtered water from the River Clyde into the city. The Gorbals Gravitation Water Company was established in 1846, and brought water from reservoirs to the south-west of the city. However, an outbreak of cholera in 1848/1849, in which 4,000 people died, concentrated the minds of Glasgow Council, and in 1855 a scheme to use water from Loch Katrine, 36 miles (58 km) to the north, was authorised. The work required at Loch Katrine was quite modest, and the major construction work was the building of an aqueduct to carry the water to the city by gravity.

<span class="mw-page-title-main">Liverpool Corporation Waterworks</span>

Liverpool Corporation Waterworks and its successors have provided a public water supply and sewerage and sewage treatment services to the city of Liverpool, England. In 1625 water was obtained from a single well and delivered by cart, but as the town grew, companies supplied water to homes through pipes. There were two main companies by the 1840s, but the water supply was intermittent, and there was general dissatisfaction with the service. Liverpool Corporation decided that such an important service should be provided by a public body, and sought to take over the water supply companies.

<span class="mw-page-title-main">Cardiff Corporation Waterworks</span> Defunct UK water and sewerage provider

Cardiff Corporation Waterworks, its predecessors and successors have provided a public water supply and sewerage and sewage treatment services to the Welsh city of Cardiff since 1850.

<span class="mw-page-title-main">Lincoln Corporation Waterworks</span>

Lincoln Corporation Waterworks and its predecessors and successors have provided a public water supply and sewerage and sewage treatment services to the city of Lincoln, England. The Romans are known to have built a conduit from the Roaring Meg stream to a water tower in East Bight. Further development took place in 1846, when the Lincoln Water Company was established, following a national outbreak of cholera in 1831-32. The main source of supply was formed by impounding Prial Drain to form Hartsholme Lake. The water was filtered by sand filters at Boultham, and was pumped to a service reservoir at Westgate. Lincoln Corporation wanted to gain control of their water supply, and bought out the water company in 1871. The enabling Act of Parliament also allowed them to construct a sewerage network, which fed a sewage farm at Canwick, but the Bracebridge area was not connected to the sewers, and waste water polluted local watercourses. There were sporadic outbreaks of typhoid and cholera, although the Corporation argued that these might not be linked to a polluted water supply.

<span class="mw-page-title-main">Worksop Waterworks Company</span>

Worksop Waterworks Company, its predecessors and successors have provided a public water supply, together with sewerage and sewage treatment facilities to the town of Worksop since the mid-19th century. Unlike many towns, the sewerage network was constructed before the water supply network, and there was official opposition to the idea of providing a water supply network.

References

  1. Binnie 1981, p. 95.
  2. 1 2 Binnie 1981, p. 96.
  3. Binnie 1981, p. 281.
  4. Skempton 2002, p. 359.
  5. Binnie 1981, pp. 96–97.
  6. 1 2 Binnie 1981, p. 106.
  7. 1 2 Binnie 1981, p. 99.
  8. Cross-Rudkin & Chrimes 2008, p. 69.
  9. Binnie 1981, pp. 99, 101.
  10. 1 2 Binnie 1981, p. 101.
  11. 1 2 3 Binnie 1981, p. 102.
  12. 1 2 3 Cross-Rudkin & Chrimes 2008, p. 474.
  13. Cross-Rudkin & Chrimes 2008, pp. 473–474.
  14. Binnie 1981, pp. 103–104.
  15. 1 2 Binnie 1981, p. 105.
  16. Binnie 1981, pp. 105–106.
  17. Binnie 1981, p. 103.
  18. "Rosebery Reservoir". scottish-places.info. Archived from the original on 19 August 2018. Retrieved 18 August 2018.
  19. "James Leslie". Dictionary of Scottish Architects. Archived from the original on 11 August 2018. Retrieved 21 August 2018.
  20. "Liberton Gardens, Alnwickhill Reservoir". British Listed Buildings. Archived from the original on 23 August 2018.
  21. "How mammoth effort brought Edinburgh clean water". Edinburgh Evening News. 15 January 2014. Archived from the original on 22 August 2018. Retrieved 21 August 2018.
  22. "Talla Reservoir". Canmore. Archived from the original on 12 November 2021. Retrieved 19 August 2018.
  23. "Broughton To Talla, Reservoir Railway". Canmore. Archived from the original on 20 August 2018. Retrieved 19 August 2018.
  24. "Talla Reservoir Aqueduct". Canmore. Archived from the original on 20 August 2018. Retrieved 19 August 2018.
  25. "55 Buckstone Terrace, Fairmilehead Water Treatment Works". Historic Environment Scotland. Archived from the original on 23 August 2018.
  26. "Fruid Reservoir". Canmore. Archived from the original on 20 August 2018. Retrieved 20 August 2018.
  27. "Fruid Reservoir". scottish-places.info. Archived from the original on 20 August 2018. Retrieved 20 August 2018.
  28. SoE 2009, p. 1.
  29. "Aqueduct upgrade". Envirotec Magazine. July 2014. Retrieved 20 August 2018.
  30. SoE 2009, p. 2.
  31. 1 2 SoE 2009, p. 6.
  32. WPO 2012, pp. 245, 248.
  33. "Glencorse Water Treatment Works Project". www.water-technology.net. Archived from the original on 23 August 2018. Retrieved 23 August 2018.
  34. "Explore the Esk". Esk Valley Trust. Archived from the original on 6 October 2016.
  35. "Rosebery WTW" (PDF). Water Projects Online. Archived from the original (PDF) on 1 August 2016.
  36. Douglas 2008, p. 1.
  37. 1 2 3 "Edinburgh sewers". Institute of Civil Engineers. Archived from the original on 23 August 2018. Retrieved 23 August 2018.
  38. 1 2 3 4 Lobina & Terhorst 2005, p. 30.
  39. Cross-Rudkin & Chrimes 2008, p. 71.
  40. 1 2 STV 2018, p. 1.
  41. Lobina & Terhorst 2005, p. 7.
  42. Binnie 1981, pp. 67, 269.
  43. "The History of Water". Scottish Water. Archived from the original on 29 August 2018. Retrieved 14 August 2018.
  44. "River Management & Projects". Water of Leith Conservation Trust. Archived from the original on 22 January 2022.
  45. "Water of Leith Flood Prevention Scheme". Edinburgh Council. Retrieved 23 August 2018.