| History | |
|---|---|
| Name | GO 59 |
| Builder | Cantiere Navale Giacalone di Mazara del Vallo (Trapani) |
| Cost | € 7 million [1] |
| Laid down | 2013 |
| Launched | 2014 |
| Acquired | 2011 |
| Commissioned | march 2014 |
| In service | 1 |
| Homeport | Brindisi [2] |
| General characteristics | |
| Type | Floating dry dock |
| Length | |
| Beam |
|
| Draught | 8.0 m (26 ft 3 in) (max) |
| Draft | 9.5 m (31 ft 2 in) (max) |
| Propulsion |
|
| Notes | lifting capability 1.000 t (0.984 long tons) |
GO 59 is a Floating dry dock of the Marina Militare. [4]
Delivered to Arsenale Militare Marittimo di Augusta on 26 March 2014, [5] [6] it was transferred to Stazione Navale di Brindisi on 24 February 2016. [7]
These are the technical specifications of MM for its realization.