Type | Besloten Vennootschap |
---|---|
Industry | Rail transportation |
Founded | 1999 |
Founder | Fluor Infrastructure BV Siemens Nederland NV Royal BAM Group NV |
Services | HSL-Zuid infrastructure maintenance |
Website | www |
Infraspeed is the builder and infrastructure maintenance company of the HSL-Zuid high-speed line in the Netherlands.
The company was created in 1999 with the express purpose of pursuing the construction and maintenance of the then-proposed HSL-Zuid. On 11 May 2001, Infraspeed was awarded several public-private partnership (PPP) contracts by the Dutch government; it was the biggest PPP initiative for the construction of a high-speed line in Europe at that time. In addition to financing, designing and constructing the line over a five year period, from 2001 to 2006, Infraspeed was also contract to provide maintenance of HSL-Zuid over a 25 year period, from 2006 to 2031. On 28 July 2006, the southern section of HSL-Zuid was formally delivered by Infraspeed. On 21 December 2006, the consortium handed over the northern section of the line to the customer, officially ending the construction phase as per schedule.
Infraspeed BV was established during 1999 by a consortium of Fluor Infrastructure (a division of Fluor Corporation), Siemens Nederland (a partly-owned subsidiary of Siemens) and Royal BAM Group. One year later, the financial investors Innisfree and Charterhouse Project Equity (renamed HSBC infrastructure Ltd in 2002 after becoming a subsidiary of HSBC) acquired a 49% shareholding in Infraspeed and playing an active role in its operations. [1] [2]
Infraspeed was founded with the goal of securing a major contract from the Dutch government to construct and maintain HSL-Zuid, a then-proposed 100 km high-speed line that runs from Amsterdam to the Belgian border. At the time, the project was the biggest PPP initiative for the construction of a high-speed line in Europe as well as being the most extensive PPP contract that the Dutch government has ever been involved in. [3] The tendering process for the concession was organised by the Dutch Ministry of Transport. Stated advantages of the PPP approach was the reduced burden on government budgets and the ideal that inclusion of the private sector would bring about efficiency gains and increased innovation in its delivery. [3]
On 11 May 2001, Infraspeed was awarded several public-private partnership (PPP) contracts by the Dutch government covering the construction and maintenance of HSL-Zuid. [4] [5] Specifically, the arrangements included the financing and designing of the line, as well as its construction over a five year period, from 2001 to 2006; furthermore, Infraspeed were also contracted to provide maintenance of HSL-Zuid over a 25 year period, from 2006 to 2031. The various consortium members performed various aspects of the programme; Fluor provided project management, Royal BAM Group was responsible for constructing the track infrastructure, while Siemens Nederland provided much of the lineside equipment, such as the electrical power supply system (25 kV AC), and signalling system, including European Train Control System (ETCS) and GSM-R communication apparatus. [3] Under the terms of the contract, the Netherlands paid €4.2 billion to cover the costs of constructing the infrastructure, while Infraspeed B.V. will receive income for its work totalling €2.5 billion to provide said infrastructure and to account for the costs of investment, maintenance, capital and depreciation; however, this income was conditional on the basis of specified availability levels of 99 percent being attained by the completed line. [3] [6]
Considerable planning was required in the delivery of HSL-Zuid; in excess of 100,000 documents were produced for the customer during the project implementation phase alone. [3] RAMS management was practiced extensively, searching for potential problems, possible improvements, hidden risks, and unobserved costs and errors. [3] The programme needed to adhere to various requirements; not only the specific stipulations of the contract, relevant legislation and standards were also applied, such as the Technical Specifications for Interoperability and EN 50126. [3] Furthermore, defined safety objectives for the line were created for the Integral Safety Plan. [6] Full compliance had to be comprehensively demonstrated and validated. [3]
Amongst the more significant civil engineering works that were constructed for HSL-Zuid include a 6km-long viaduct outside Bleiswijk, a 2km-long bridge crossing the Hollandsch Diep waterway, and four tunnels of various lengths, the longest of which being just short of 8km. [3] [6] Due to the requirement for trains to traverse these tunnels at a maximum speed of 300km/h, it was necessary to develop and install specialised equipment that would be capable of operating under any foreseeable emergency situations that may arise during the line's operating life, including lighting, escape routes, fire detection and fire fighting systems, ventilation, drainage, flood protection measures, heating, and access elevators. Power for the line was provided via seven purpose-built autotransformer substations; the overhead contact system comprised, amongst other elements, 2,507 pylons, 4,038 brackets, 180km of negative feeders and 180km of return conductors. [3] [7]
Construction of HSL-Zuid proceeded at a rapid pace. [8] During summer 2005, testing commenced on the southern section, between Rotterdam and the Belgian border, of the line; a similar period of testing started on the northern section in early 2006. [6] Limited residual work, such as to address unstable subsoils and tunnel lining weaknesses, was carried out. [6] On 28 July 2006, the southern section of HSL-Zuid was formally delivered by Infraspeed. On 21 December 2006, the consortium handed over the northern section of the line to the customer, officially ending the construction phase as per schedule. [6] [9]
Maintenance activities on HSL-Zuid performed by Infraspeed are structured and recorded along with general status data through an asset management system; this approach supports the generation and provision of appropriate documented information that, amongst other functions, is the basis of payment to the consortium of income for the work performed. [3] Data is gathered from various sources, including intelligent trackside sensors. [10] Infraspeed has alleged that conventional rolling stock is responsible for excessive wearing upon the infrastructure. [11]
In 2011, Siemens announced that it had sold its stake in Infraspeed to HSBC and Innisfree, resulting in these two companies controlling ~86% of the shares. [2]
Thalys was, until September 2023, the commercial name of certain high-speed train services in western Europe, operated by the Eurostar Group from April 2022, and by Thalys International before that. The services connect Paris and Brussels, and extend to either Amsterdam or to German cities in the Rhein-Ruhr, including Aachen, Cologne, Düsseldorf, Duisburg, Essen and Dortmund. Since 29 September 2023 the services have used the common brand name "Eurostar", and are sometimes referred to as Eurostar Red, the colour of the trains.
ProRail is a Dutch government organisation responsible for the maintenance and extension of the national railway network infrastructure, the allocation of rail capacity, and controlling rail traffic. Prorail is a part of NS Railinfratrust, the Dutch railway infrastructure owner.
Nederlandse Spoorwegen is the principal passenger railway operator in the Netherlands. It is a Dutch state-owned company founded in 1938. The Dutch rail network is the busiest in the European Union, and the third busiest in the world after Switzerland and Japan.
The HSL-Zuid, is a 125 kilometre-long Dutch high-speed railway line running between the Amsterdam metropolitan area and the Belgian border, with a branch to Breda, North Brabant. Together with the Belgian HSL 4 it forms the Schiphol–Antwerp high-speed railway. Originally scheduled to be in service by 2007, the first public operations began on 7 September 2009, after a ceremony on 6 September.
Amsterdam Zuid is a railway station situated in the borough of Amsterdam-Zuid in Amsterdam, Netherlands. For a number of years, it was named Amsterdam Zuid WTC, in reference to the neighbouring World Trade Center Amsterdam. During 2006, in conjunction with the rapid development of the area surrounding the station, the station was enlarged and the reference to the WTC was formally dropped from the name.
The LGV Bretagne-Pays de la Loire is a French high-speed rail line running between Connerré, Sarthe near Le Mans and Cesson-Sévigné, Ille-et-Vilaine near Rennes.
PKP Polskie Linie Kolejowe S.A. is the Polish railway infrastructure manager, responsible for maintenance of rail tracks, conducting the trains across the country, scheduling train timetables, and management of railway land.
The HSL 4 is a Belgian high-speed rail line part of the 87 kilometres (54 mi) axis which connects Antwerp to the Dutch border. It is 40 kilometres (25 mi); 36 kilometres (22 mi) of it being dedicated high speed tracks. It was scheduled for completion by 2005 and opened in 2009.
Infrabel is a Belgian government-owned public limited company. It builds, owns, maintains and upgrades the Belgian railway network, makes its capacity available to railway operator companies, and handles train traffic control.
Belgium's high-speed rail network provides mostly international connections from Brussels to France, Germany and The Netherlands. The high-speed network began with the opening of the HSL 1 to France in 1997, and since then high-speed lines have been extended towards Germany with HSL 2 in 2002, HSL 3 from Liège to the German border in 2009, and HSL 4 from Antwerp to the Dutch border in 2009.
In February 2009, the government of Portugal announced plans to build a high-speed rail line from Lisbon to Madrid; this plan was cancelled in March 2012 amidst a bailout programme of financial assistance to the Portuguese Republic. The project was valued at €7.8 billion and the government had claimed it would create 100,000 jobs. The line would link to Spain's Southwest Corridor.
Rail transport in the Netherlands uses a dense railway network which connects nearly all major towns and cities. There are as many train stations as there are municipalities in the Netherlands. The network totals 3,223 route km (2,003 mi) on 6,830 kilometres (4,240 mi) of track; a line may run both ways, or two lines may run on major routes. Three-quarters of the lines have been electrified.
The Norwegian National Rail Administration was a government agency responsible for owning, maintaining, operating and developing the Norwegian railway network, including the track, stations, classification yards, traffic management and timetables. Safety oversight was the duty of the Norwegian Railway Inspectorate, while numerous operating companies run trains on the lines; the largest being the state owned passenger company Vy and the freight company CargoNet.
Rijkswaterstaat, founded in 1798 as the Bureau voor den Waterstaat and formerly translated to Directorate General for Public Works and Water Management, is a Directorate-General of the Ministry of Infrastructure and Water Management of the Netherlands. Its role is the practical execution of the public works and water management, including the construction and maintenance of waterways and roads, and flood protection and prevention. The agency was also involved in the construction of big railway projects such as the Betuweroute and the HSL-Zuid.
Royal BAM Group nv is a Dutch construction-services business with headquarters in Bunnik, Netherlands. It is the largest construction company based on revenue in the Netherlands.
High-speed rail (HSR) has developed in Europe as an increasingly popular and efficient means of transport. The first high-speed rail lines on the continent, built in the 1970s, 1980s, and 1990s, improved travel times on intra-national corridors. Since then, several countries have built extensive high-speed networks, and there are now several cross-border high-speed rail links. Railway operators frequently run international services, and tracks are continuously being built and upgraded to international standards on the emerging European high-speed rail network.
The John Holland Group is an infrastructure, building, rail and transport business operating in Australia and New Zealand. Headquartered in Melbourne, it is a subsidiary of China Communications Construction.
The Trenitalia ETR 700, originally NS Hispeed V250, is a high-speed train designed by Pininfarina and built by AnsaldoBreda originally for NS International and NMBS/SNCB to operate on the Fyra service, a high speed train between Amsterdam and Brussels with a branch to Breda on the newly built HSL-Zuid in the Netherlands and its extension HSL 4 in Belgium.
High-speed rail service in the Netherlands started at 13 December 2009 with the dedicated HSL-Zuid line that connects the Randstad via Brussels to the European high-speed rail network. In later years improved traditional rail sections were added to the high-speed network. Proposals for more dedicated high-speed lines were deemed too costly; plans for the HSL-Oost to Germany were mothballed and instead of the Zuiderzeelijn the less ambitious Hanzelijn was built to enable future high-speed service between the northern provinces and the Randstad.
The National Railway Infrastructure Company is Bulgaria's state railway infrastructure company, established as an entity on 1 January 2002. The company's headquarters are located in the capital city Sofia near Sofia Central Station. It is the owner and operator of most of the country's rail lines.