This article needs additional citations for verification .(July 2017) |
Company type | Government agency |
---|---|
Industry | Railway infrastructure |
Predecessor | Jernbaneverket |
Founded | 5 February 2016 |
Headquarters | Oslo, Norway [1] |
Area served | Norway |
Key people | |
Number of employees | 3,468 (2019) |
Parent | Norwegian Ministry of Transport and Communications |
Subsidiaries | Spordrift [4] Bane NOR Eiendom |
Website | www.banenor.no |
Bane NOR SF is the Norwegian government agency responsible for owning, maintaining, operating and developing the Norwegian railway network, including the track, stations, and the majority of other infrastructure assets. [5] It took over the operations of Jernbaneverket (railway administration) on 31 December 2016.
Since its official launch on 2 January 2017, Bane NOR has pursued the modernisation and expansion of the rail network; various contracts and partnerships were issued between 2017 and 2020 covering technical cooperation, component supply, design services, civil engineering works, and replacement of obsolete infrastructure. Capacity expansion efforts include the doubling of sections of the Bergen-Fløen and Vestfoldbanen lines, while the comprehensive replacement of over a dozen different signalling systems with the European Rail Traffic Management System (ERTMS) has also commenced. During the early 2020s, Bane NOR has encountered considerable difficulty in the delivery of the new Follo Line, which has suffered both delays and technical mishaps.
The agency was created during the 2010s as a consequence of reforms of the railway sector enacted by the Conservative-led coalition government. Specifically, Bane NOR and the Norwegian Railway Directorate (Jernbanedirektoratet), were both created to replace the former agency, Jernbaneverket. [6] The organisation also took over the management and development of railway properties following the acquisition and incorporation of ROM Eiendom from the Norwegian State Railways. On 2 January 2017, the agency, which is organised as a state enterprise, officially launched during a ceremony held at Oslo Central Station. [7] [8]
Bane NOR has sought to incorporate technologies and lessons from various other organisations and authorities; in early 2017, the agency renewed its cooperation agreement with the neghbouring infrastructure agency Swedish Transport Administration. [9] In October 2019, Bane NOR and the Spanish railway infrastructure manager Administrador de Infraestructuras Ferroviarias signed a Memorandum of Understanding to cooperate on training, information exchange technical assistance; the agency highlighted the latter's expertise in European Rail Traffic Management System (ERTMS) operations in particular. [10] The 15 different signaling systems in use across Norway are to be progressively replaced by ERTMS; Bane NOR is to be responsible for this. For this purpose, it has operated an ERTMS Pilot Line between Ski and Sarpsborg in eastern Norway, which achieved a relatively high punctuality rate of 94 per cent in 2019. [11] Bane NOR hopes intelligent digital railway infrastructure will help cut construction costs via better modeling, improve safety margins and minimise service disruptions via real-time monitoring, and increase capacity via automatic train operation. [12] [13]
Various expansion and improvement efforts were able to be launched using funds provided by the Norwegian government. [14] In October 2019, a contract between Bane NOR and the engineering consultancy firm COWI was signed for the development of a new double-track section of Bergen-Fløen line, which was the busiest single-track route in Northern Europe, to better serve the freight terminal at Nydårdstangen. [15] That same month, two contracts were awarded for the civil engineering works to provide continuous double tracks along the Vestfoldbanen between Drammen and Tønsberg, enabling capacity to be more than doubled and for increased service efficiency. [16] During August 2021, the German railway supplier Vossloh, was awarded a major comprehensive framework contract to provide switches and crossings for both conventional and heavy-haulage lines across the Norwegian railway network. [17]
The delivery of the new Follo Line has been a particular source of difficulties for the agency; originally planned to be opened in December 2021, the bankruptcy of contractors, Condotte, not only delayed the opening date by one year but also reportedly cost Bane NOR 1.6 billion Norwegian kroner. [18] Despite accepting the transferrance of much of the Blix Tunnel from contractor Acciona Ghella in October 2022, [19] the tunnel was quickly found to require remedial work to repair damaged power cabling and seal multiple leaks, leading to an independent investigation into the tunnel's problems and may also be connected to the sudden resignations of Bane NOR's former CEO Gorm Frimannslund and executive development director Stine Undru. [20] [21]
ProRail is a Dutch government organisation responsible for the maintenance and extension of the national railway network infrastructure, the allocation of rail capacity, and controlling rail traffic. Prorail is a part of NS Railinfratrust, the Dutch railway infrastructure owner.
The Norwegian railway system comprises 4,109 km of 1,435 mm track of which 2,644 km is electrified and 274 km double track. There are 697 tunnels and 2,760 bridges.
Vygruppen, branded as Vy, formerly the Norwegian State Railways, is a government-owned railway company which operates most passenger train services and many bus services in Norway. The company is owned by the Norwegian Ministry of Transport. Its sub-brands include Vy Buss coach services, CargoNet freight trains and the Swedish train transport company Tågkompaniet. In 2009, NSB carried 52 million train passengers and 104 million bus passengers. On 24 April 2019, passenger train and bus services were rebranded as Vy.
The Bergen Line, or the Bergen Railway, is a 371-kilometre (231 mi) long scenic standard gauge railway line between Bergen and Hønefoss, Norway. The name is often applied for the entire route from Bergen via Drammen to Oslo, where the passenger trains go, a distance of 496 kilometres (308 mi). It is the highest mainline railway line in Northern Europe, crossing the Hardangervidda plateau at 1,237 metres (4,058 ft) above sea level.
Oslo Central Station is the main railway station in Oslo, and the largest railway station within the entire Norwegian railway system. It connects with Jernbanetorget station, which is served by trams and the Oslo Metro. It's the terminus of Drammen Line, Gardermoen Line, Gjøvik Line, Hoved Line, Østfold Line and Follo Line. It serves express, regional and local rail services by four companies. The railway station is operated by Bane NOR while its real estate subsidiary, Bane NOR Eiendom owns the station, and was opened in 1980.
Banverket was a Swedish State administrative authority which acted as owner on behalf of the State and maintained virtually all main railway lines in Sweden; except for short sidings for freight, heritage railways, the Stockholm Metro, local railways in the Stockholm area, and the tramways in Gothenburg, Norrköping and Stockholm. Its headquarters was located in Borlänge.
PKP Polskie Linie Kolejowe S.A. is the Polish railway infrastructure manager, responsible for maintenance of rail tracks, conducting trains across the country, scheduling train timetables, and management of railway land.
The Asker Line is a 9.5-kilometre (5.9 mi) railway line between Asker and Lysaker in Norway. The line runs along the same corridor as the Drammen Line, offering increased capacity, speed and regularity on the rail network west of Oslo. The first part opened in 2005, and in 2011 an extension opened from Sandvika to Lysaker. Original plans called for an extension to Skøyen, but from 2020, new planning is under way for an extension all the way to Oslo Central Station. Most of the railway is in tunnel and is dimensioned for 160 km/h (99 mph) running. The entire railway is electrified at 15 kV 16.7 Hz AC. The first section cost 3.7 billion kr, while the second is budgeted at NOK 2.7 billion.
Opened on the 8th of October 1998, the only high-speed rail in Norway, on the railways of Norway is on Gardermobanen, a 64 kilometer line between Oslo Central Station and Eidsvoll via Oslo Airport. The main service on this route is Flytoget, commuting between Oslo Airport and the metropolitan areas of Oslo at speeds of up to 210 km/h (130 mph). It was extended westwards to include the city of Drammen in 2008, though not at high speed. The high-speed section is also used by express and regional trains between Oslo and Eidsvoll.
Jernbaneverket was a government agency responsible for owning, maintaining, operating and developing the Norwegian railway network, including the track, stations, classification yards, traffic management and timetables. Safety oversight was the duty of the Norwegian Railway Inspectorate, while numerous operating companies run trains on the lines; the largest being the state owned passenger company Vy and the freight company CargoNet.
BaneService is a Norwegian government owned railway construction and maintenance company. It is by far the largest subcontractor for Bane NOR and is owned by the Norwegian Ministry of Transport and Communications.
The Follo Line is a 22-kilometre (14 mi) high-speed railway between Oslo and Ski, Norway.
Ski Station is a railway station located in Ski, Norway. It is located 24 kilometres (15 mi) from Oslo Central Station on the Østfold Line, at the point where the railway splits in two into an eastern and western line. It also serves as the terminal station of the Follo Line.
Bjorli Station is a railway station on the Rauma Line located at Bjorli in Lesja, Norway. The station opened on 19 November 1921 and was the line's terminus until 1923. In addition to a station building, Bjorli had a water tower, roundhouse, turntable and a restaurant seating 700 people, the latter which was bombed to pieces in 1940. The station is served by SJ Norge trains four times per day per direction. In the summer, the station is the terminus of a tourist services from Åndalsnes.
The Ringerike Line is a proposed 40-kilometre (25 mi) extension of the Bergen Line from Jong, Sandvika to Hønefoss, Norway. In 2022, the project was postponed; the government has no commitment to any timeframe.
European Rail Infrastructure Managers (EIM) is a sector association that represents the interests of European rail infrastructure managers. Members consist of owners/managers of infrastructure from most European/EEA countries.
Správa železnic, státní organizace is the national railway infrastructure manager in the Czech Republic. Its main customers include passenger train operator České dráhy and its cargo subsidiary ČD Cargo.
The Jarlsberg Tunnel is a 1,750-meter (1.09 mi) long double track railway tunnel which runs through Frodeåsen in the city of Tønsberg in Tønsberg Municipality, Vestfold county, Norway. Located on the Vestfold Line, the tunnel was built as part of the 7.8-kilometer (4.8 mi) double-track high-speed segment from Barkåker to Tønsberg. It is located just north of Tønsberg Station and runs between Frodegata and Tomsbakken. Most of the tunnel is blasted, although 223 meters (732 ft) is in a concrete culvert. Planning of the tunnel started in the late 1990s. Several railway interest groups advised against building the isolated segment of upgraded track without a complete plan for upgrading the entire line. Construction started in April 2009 and the new section and the tunnel opened on 7 November 2011. It was the fourth segment of the Vestfold Line to be upgraded.
The European Union Agency for Railways (ERA) is an agency of the European Union (EU) that sets mandatory requirements for European railways and manufacturers in the form of Technical Specifications for Interoperability (TSI), which apply to the Trans-European Rail system. The ERA publishes a document summarising the status of the TSIs. The ERA sets common safety targets, common safety methods and common safety indicators, following Directive 2004/49/EC and amendments. The ERA also hosts a number of databases, among which a register of remaining, applicable national rules. One of its primary duties is the development and implementation of the European Rail Traffic Management System (ERTMS).
The European Partnership for Railway Energy Settlement Systems (ERESS) is a partnership of European infrastructure managers that develops, offers and supplies energy settlement system and energy calculation systems for trains.