Keadby Power Station | |
---|---|
Country | England |
Location | North Lincolnshire, Yorkshire and the Humber |
Coordinates | 53°35′40″N0°45′02″W / 53.594444°N 0.750442°W |
Construction began | Coal-fired: 1948 |
Commission date | Coal-fired: 1952 Gas-fired: 1996 |
Decommission date | Coal-fired: 1984 |
Owner | SSE plc |
Operator | SSE Thermal |
Thermal power station | |
Primary fuel | Natural gas |
Tertiary fuel | Coal |
External links | |
Commons | Related media on Commons |
grid reference SE828116 |
Keadby Power Stations are a pair of natural gas-fired power stations near Scunthorpe in North Lincolnshire, built on the site of an older coal power station. The site lies near the B1392 and the River Trent, and the Scunthorpe-Grimsby railway. Also nearby is the Stainforth and Keadby Canal, which is part of the Sheffield and South Yorkshire Navigation. The current stations are operated by SSE Thermal.
SSE also owns a 68 MWe capacity wind farm, Keadby Wind Farm, nearby. This was England's largest onshore wind farm, and started operating in July 2014. [1] [2]
Keadby Gas Power Station was commissioned on 22 January 1996, and was opened by Scottish Hydro Electric and NORWEB when the site was in South Humberside. Scottish Hydro bought the 50% share of Keadby Generation Ltd, then owned by United Utilities, in March 1997 for £253 million. It is now owned by Scottish and Southern Energy.
In March 2013 the power station was 'deep mothballed' in response to adverse market conditions; it reopened in December 2015 after winning a stand-by contract to provide 734 MWe of capacity. [3] [4] [5]
It is a CCGT type power station running on natural gas. There are two General Electric Frame 9FA gas turbines each rated at 250 MWe. The total thermal input is 1329 MW. Each gas turbine is connected to a heat recovery steam generator which connect to one steam turbine which has an output of 260 MWe. Steam is condensed using water from the River Trent. There is a 25 MWe 11 kV gas turbine available for black starts when there is no power to start producing electricity. The station connects to the National Grid at 400 kV, being used for baseload.
In 1999, Scottish Hydro applied to add another 710 MWe of capacity at Keadby, and a variation to this consent was granted in November 2016. The project, called 'Keadby 2', was announced in May 2018. [6] It uses a single Siemens Energy SGT5-9000HL turbine.
Construction on the plant, now rated at 893 MWe, began in August 2018. [7] The station was planned to come online in October 2022, but this date was missed, with the plant coming online in February 2023. [8] As of 2024 [update] , Keadby 2 at 849 MW is the biggest single-turbine combined cycle powerplant in the world, and the most efficient at 64%. [9] [10]
In December 2022, development consent was obtained for a third plant on the Keadby site. Keadby Three is planned to be a 910 MWe plant with carbon capture and storage, with opening planned as soon as 2027. [11]
The first power station on the site was authorised in 1947 and work on the foundations began in July 1948. It was designed to have a total capacity of 360 MW. [12]
The plant comprised six Stirling radiant type, pulverised fuel, twin furnace boilers. Each boiler had an evaporation capacity of 550,000 lb/hr (69.3 kg/s) of steam, the total evaporative capacity of the completed station was 3,300,000 lb/hr (415.8 kg/s). Steam conditions were 925 psi and 915 °F (63.8 bar and 490.6 °C). [12]
There were six Parsons 60 MW hydrogen cooled turbo-alternators, generating at 11 kV. The first set was commissioned in April 1952, followed by the other sets in November 1952, June 1953, June 1954, December 1954 and December 1955. [12] In 1952 the boiler associated with the first set was the largest yet commissioned in the UK. [13]
The generating capacity and electricity output from Keadby power station is given in the following table. [12] [14] [15] [16]
1954 | 1955 | 1956 | 1957 | 1958 | 1961 | 1962 | 1963 | 1967 | 1971 | 1979 | 1982 | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Installed capacity, MW | 168 | 280 | 336 | 336 | 336 | 378 | 378 | 378 | 360 | 360 | 360 | 360 |
Electricity output, GWh | 771.61 | 1330.66 | 1990.75 | 2144.09 | 2258.40 | 2369.13 | 2252.196 | 2052.925 | 2031.0 | 1186.19 | 970.29 | 431.18 |
The coal-fired station closed in 1984.
A power station, also referred to as a power plant and sometimes generating station or generating plant, is an industrial facility for the generation of electric power. Power stations are generally connected to an electrical grid.
The Ferrybridge power stations were a series of three coal-fired power stations on the River Aire near Ferrybridge in West Yorkshire, England, in operation from 1927 to 2016 on a site next to the junction of the M62 and A1(M) motorways.
The United Kingdom is the best location for wind power in Europe and one of the best in the world. The combination of long coastline, shallow water and strong winds make offshore wind unusually effective.
Rye House Power Station is a 715 MW combined cycle gas turbine (CCGT) power station located near Rye House railway station in Hoddesdon, Hertfordshire.
Greater Gabbard is a 504 MW wind farm, built on sandbanks 23 kilometres (14 mi) off the coast of Suffolk in England at a cost of £1.5 billion. It was completed on 7 September 2012 with all of the Siemens SWT3.6–107 turbines connected. Developed as a joint venture between Airtricity and Fluor, it is now jointly owned by SSE Renewables and RWE.
Teesside Power Station is a former gas-fired power station, in Redcar & Cleveland, England. Situated near the Wilton chemical complex, the station had combined cycle gas turbines (CCGTs) and open cycle gas turbines (OCGTs), however in 2011 the operation of the CCGT part of the station was suspended, and in 2013 the owners announced its closure and plans to demolish it. Prior to the suspension, the station had a generating capacity of 1875 megawatts (MW), making it the largest of any CCGT power station in Europe. The station could meet almost 3% of the electricity demand for England, Wales and Scotland. Opened in 1993, the station was initially operated by Enron but moved into the hands of PX Ltd after the Enron scandal of 2001, before being bought by Gaz de France and Suez in 2008. The station also worked as a cogeneration plant, providing steam for the Wilton complex.
Peterhead Power Station is a multi-unit station owned and operated by SSE plc, with a capacity of 2,177 MW. It is located near Boddam and the A90, just south of Peterhead, in Aberdeenshire, in the northeast of Scotland. It stands next to Sandford Lodge, a circa-1800-built structure. Initially operating as an oil-fired power station and later transitioning to fossil gas, the plant has also served as a site for experimental hydrogen generation capacity.
Damhead Creek power station is a 792 MWe gas-fired power station in Kent, England, on the Hoo Peninsula, It is near the site of the decommissioned Kingsnorth power station. The plant entered service in February 2001.
King's Lynn Power Station refers to a combined cycle natural gas power station near King's Lynn in Norfolk, commissioned in 1997, and now owned by RWE, and to a coal fired power in King's Lynn in operation from 1899 to 1960. The CCGT station was mothballed on 1 April 2012. It can generate 325 MW of electricity and employed 40 people. The site was reopened on 19 November 2019.
Little Barford Power Station is a gas-fired power station just north of the village of Little Barford in Bedfordshire, England. It lies just south of the A428 St Neots bypass and east of the Wyboston Leisure Park. The River Great Ouse runs alongside. It was formerly the site of two coal-fired power stations, now demolished. The station is operated by RWE.
Seabank Power Station is a 1,140 MW gas-fired power station at Hallen Marsh in Bristol, England. It is situated beside the A403 road and Severn Estuary, just north of Avonmouth and south of Severn Beach, close to the boundary with South Gloucestershire. It is next to the former Terra Nitrogen Severnside fertiliser works, which was closed by Growhow UK in January 2008.
Roosecote Power Station was a gas-fired, originally coal-fired power station, situated in the Roosecote district of Barrow-in-Furness in Cumbria, North West England. The gas-fired station opened in 1991 and was the first CCGT power station to supply electricity to the United Kingdom's National Grid, but was mothballed in 2012 after a proposed biomass power station was cancelled. It was situated directly adjacent to Rampside Gas Terminal. The plant was demolished between 2014 and 2015. The site is now a 49 MW battery storage facility.
Deeside Power Station is a power station on the Deeside Industrial Park to the north of Connah's Quay in Flintshire, Wales. Constructed as a 498 MWe combined-cycle gas plant, it is now used to provide inertial response and reactive power services to the grid.
Staythorpe C Power Station is a 1,735 MWe gas-fired power station at Staythorpe between Southwell and Newark-on-Trent in Nottinghamshire, England, between the River Trent and Nottingham to Lincoln railway line. The station was handed over to the owner RWE from Alstom Power with full commercial operation being achieved in December 2010. The official opening ceremony attended by Charles Hendry, Minister of State took place on 9 May 2011.
Pembroke Power Station is a 2,200 MWe natural gas-fired power station near Pembroke in Wales. The power station was officially opened in September 2012 and is the largest gas-fired power station in Europe. It is also the largest power station to be built in the UK since Drax power station came online in 1986. Pembroke Power Station currently generates enough power to supply 3.5 million homes and businesses. It is operated by RWE.
The Tilbury power stations were two thermal power stations on the north bank of the River Thames at Tilbury in Essex. The 360 MW dual coal- and oil-fired Tilbury A Power Station operated from 1956 until 1981 when it was mothballed, prior to demolition in 1999. The 1,428 MW Tilbury B Power Station operated between 1968 and 2013 and was fueled by coal, as well as co-firing with oil and, from 2011, biomass. Tilbury B was demolished in 2016–19. Since 2013 three other power stations have been proposed or constructed in Tilbury.
The Uskmouth power stations refers to a series of two coal-fired power stations at the mouth of the River Usk in the south-east of Newport, Wales.
Blackburn power stations are a series of electricity generating stations that have provided electric power to the town of Blackburn and the wider area from 1895 to the present. The first station in Jubilee Street, Blackburn began operating in 1895. A new larger station known as Blackburn East or Whitebirk power station was commissioned in 1921 and was rebuilt in stages over the period 1942 to 1955. Whitebirk station closed in 1976. The 60 MW Blackburn Mill Combined Cycle Gas Turbine (CCGT) power station has generated electricity since 2002. The Blackburn energy from waste (EfW) plant is currently (2020) being planned.
The Thornhill power station generated and supplied electricity to the town of Dewsbury and the wider regional area from 1902 to 1982, and again from 1998. The first generating station on the site was owned and operated by the Yorkshire Electric Power Company. Following nationalisation of the British electricity supply industry in 1948 Thornhill power station was operated by a succession of state owned bodies. The power station was redeveloped with new plant in 1915, 1925, 1932–37 and 1950–54. The coal-fired steam station was decommissioned in 1982, and was subsequently demolished. A gas turbine power station on the site was commissioned in 1998.