Kursk Nuclear Power Plant

Last updated

Kursk Nuclear Power Plant
Kurskaia AES.JPG
Kursk I RBMK with the incomplete blocks 5 and 6 in the foreground in 2010
Kursk Nuclear Power Plant
Official name
  • Курская АЭС
CountryRussia
Coordinates 51°40′35″N35°36′23″E / 51.67639°N 35.60639°E / 51.67639; 35.60639
StatusOperational
Construction began1 June 1972
Commission date 12 October 1977
Owner Rosatom
Operator Rosenergoatom
Nuclear power station
Reactor typeRBMK-1000
Power generation
Units operational2 × 1,000 MW
Units decommissioned2 × 1,000 MW
Nameplate capacity 2,000 MW
External links
Website Kursk NPP
Commons Related media on Commons

The Kursk Nuclear Power Plant [a] is one of the three biggest nuclear power plants (NPPs) in Russia and one of the four biggest electricity producers in the country. It is located on the bank of the Seym River about 40 kilometers west of the city of Kursk, midway between it and the town of Lgov, in western Russia. The nearby city of Kurchatov was founded when construction of the plant began. The plant feeds the grid for Kursk Oblast and 19 other regions. As of 2024, the site houses two active reactors and two decommissioned older units. It also houses the partially built Kursk 5 and Kursk 6 units which had construction halted, and two new VVER designs (Kursk II-1 and Kursk II-2) are under construction.

Contents

The International Atomic Energy Agency's Director General Rafael Grossi urged both Russia and Ukraine to exercise "maximum restraint" to avoid an accident at the plant during the August 2024 Kursk Oblast incursion following reports of "significant military activity" near the facility. [1]

Kursk I

Planning and construction

The decision to build the Kursk NPP was made in the mid-1960s by Soviet authorities. The plant was intended to supply the growing energy demands of the quickly developing industrial complex of the Kursk Magnetic Anomaly (Stary-Oskol and Mikhaylovsk ore mining and processing factories and other manufacturing companies). The general designer of Kursk I was Atomenergoproject (Moscow), the general contractor was the Research and Development Institute of Power Engineering (Moscow) and the research manager was the Kurchatov Institute. It was built by the Department for the Construction of Kursk NPP (now Kurskatomenergostroy Ltd). On-site construction began in 1971. [2]

The structure of the Kursk I plant is almost identical to Chernobyl's structure having two first-generation RBMK blocks followed by two second-generation blocks. The 1991 American television movie Chernobyl: The Final Warning used the Kursk plant and the neighbouring town of Kurchatov to stand in for the Chernobyl Nuclear Power Plant and Pripyat respectively.[ citation needed ] The Kursk I plant and Kurchatov would play as the Chernobyl nuclear power plant and Pripyat once again in the 2021 Russian film Chernobyl: Abyss .

Specifications

Kursk I is a one-circuit plant: the steam supplied to the turbines is produced inside the reactor by the boiling coolant (ordinary demineralized water circulating inside a circuit). To condense the steam the plant uses water from a 21.5 sq km cooling pond. [2] It has four RBMK-1000 reactors (1000 MW each). The first unit was launched in 1976, the second in 1979, the third in 1983 and the fourth in 1985. [2] [3] Kursk NPP is one of the three biggest NPPs in Russia and one of the four biggest electricity producers in the country (along with Balakovo and Leningrad NPPs and Sayano-Shushink WPP). [2]

Kursk NPP is an important part of the Unified Power System of Russia. Its key consumer is the ECO Center energy system covering 19 regions of the Central Federal District. Kursk NPP produces 52% of the total output of all electric power plants of Chernozemye (Black Earth Belt). It is the key energy supplier of Central Chernozemye, a region that produces 48% of iron ore, 13.5% of steel, 19% of ferrous metals, 9.6% of meat, 19.5% of sugar in Russia. [2] The development of that region is largely credited to the Kursk NPP as it provides power and a stable source of both employment and income for the communities around it.[ citation needed ] Kursk NPP feeds 90% of the industry of the Kursk region. It also supplies electricity to northern and north-eastern Ukraine. [2] [ needs update ]

As of the beginning of 2006, the plant had generated 560 billion kWh. [2] In total Kursk's four RBMK-1000 units have generated 987 billion kWh of electricity while simultaneously providing district heating to nearby towns and process heat to industry. [4]

Shutdown

Although the Kursk I plant has been a major success for the local area, as the reactors age they begin to require much longer and more costly maintenance outages compared to modern reactor types with greater efficiency. In 2015, Rosenergoatom proposed that Unit 1 RBMK would be shut down in 2023, followed by Unit 2 in 2027. On December 19, 2021, exactly 45 years to the day since it began operation, Unit 1 RBMK shut down. Unit 2 shut down in January 2024. [5] The third and fourth units were scheduled to close in 2029 and 2031, but now they are due to close in 2033 and 2035 respectively. [3]

Kursk II VVER

Kursk II Nuclear Power Plant
RIAN archive 341199 Kursk Nuclear Power Plant.jpg
Power plant blocks 1 and 2
Kursk Nuclear Power Plant
Official name
  • Курская АЭС
CountryRussia
Coordinates 51°41′18″N35°34′24″E / 51.68833°N 35.57333°E / 51.68833; 35.57333
StatusUnder construction
Construction began29 April 2018
Commission date (2025)
Owner Rosatom
Operator Rosenergoatom
Nuclear power station
Reactor typeVVER-TOI
Power generation
Units under const.2 × 1,300 MW
Nameplate capacity 2,600 MW
External links
Website Kursk NPP
Commons Related media on Commons

Planning and construction

With the RBMK reactors of Kursk I reaching end-of-life, and because of how heavily the surrounding area relies on this site, a replacement was necessary. The new VVER-TOI reactor was chosen, and this site would be the pioneering power station with this reactor type.

Civil construction of Kursk II began in 2017 with the excavation of an estimated 1.2 million cubic meters of soil, as part of the work for the two new units. More than 800,000m³ of sand and gravel mixture was laid at the base of the buildings and structures. The formation of the sand and gravel coating of unit one was completed in October 2017, while the first concrete layer (concrete bedding) under the foundation plate was assembled in November 2017. The first 16t reinforced concrete block was installed on the rebar of the lower foundation belt in December 2017. The foundation will comprise 105 reinforced concrete blocks with a total weight of 1,600t. More than 16,000m³ of self-compacting concrete mix was proposed to be laid in the foundation slab of the reactor building, and the works were expected to be completed by June 2018. The construction work also included the engineering networks – steam pipelines, hot water supply pipelines for the construction base, and heating networks.

Five 40t GIRAFFE TDK-40.1100 pillar cranes will be used for constructing the internal and boundary walls of the reactor unit of the first power unit. DEMAG CC 6800, a heavy-duty crane, will also be used for constructing the building structures at the reactor buildings.

The first concrete was poured in April 2018, marking the start of construction of the nuclear island building foundations. The first VVER-TOI reactors Kursk-II-1 and II-2 were to replace Kursk 1 and 2 RBMK, which were approaching end-of-life. [6] [7] With two more VVER-TOI units planned, they will eventually replace all four RBMK reactors. The first Kursk RBMK reactor shut down in December 2021, while the first Kursk II unit was expected to be commissioned by the end of 2022, and the second unit in 2023.

In January 2023, the 235-tonne steel dome was set on the unit 1 containment building, where it will serve as a key barrier between the reactor and the environment. This lift raised the overall height of the reactor building to its final height of 64.5 meters (211 feet). The steel dome will be covered in a thick layer of reinforced concrete forming the containment building. [8]

Specifications

The two 3+ generation reactors of Kursk NPP II will be the pilot units of the VVER-TOI project and include a turbine plant featuring a low-speed turbine-generator, manufactured by Power Machines PJSC. The new design will increase the reactor capacity by an additional 25% over conventional VVER-1000 reactors. A PS330/10kV substation will provide electric energy for the construction works and for the site’s facilities. The new substation will be connected from a 330kV operating outdoor switchgear to a 330kV overhead power line. [9] [10]

Reactor data

Kursk I consists of six RBMK design reactors, four of which were completed, and two of which remain in operation. Kursk II is under construction and will contain VVER design reactors.

Unit [11] Reactor typeNet
capacity
Gross
capacity
Construction
started
Electricity
grid
Commercial
operation
Shutdown
Kursk 1RBMK-1000925  MW 1,000 MW1972-06-011976-12-191977-10-12Shutdown 2021-12-19
Kursk 2RBMK-1000925 MW1,000 MW1973-01-011979-01-281979-08-17Shutdown 2024-01-31
Kursk 3RBMK-1000925 MW1,000 MW1978-04-011983-10-171984-03-30(2033, planned)
Kursk 4RBMK-1000925 MW1,000 MW1981-05-011985-12-021986-02-05(2035, planned)
Kursk 5 (Incomplete)RBMK-1000925 MW1,000 MW1985-12-011992 (planned)Construction stopped 1989, cancelled 2012-08-15
Kursk 6 (Incomplete) [12] RBMK-1000925 MW1,000 MW1986-08-01Construction cancelled 1993-12-01
Kursk II-1 [13] VVER-1300/510 1,115 MW1,255 MW2018-04-29 [14]
Kursk II-2 VVER-1300/510 1,115 MW1,255 MW2019-04-15

Russo-Ukrainian War

The International Atomic Energy Agency's Director General Rafael Grossi urged both Russia and Ukraine to exercise "maximum restraint" to avoid an accident at the plant during the August 2024 Kursk Oblast incursion following reports of "significant military activity" near the facility. [15] On 11 August 2024, it was reported that Russia had been constructing defensive trench lines near the power plant and up to 8 km away, [16] with additional National Guard of Russia (Rosgvardiya) forces. Fighting occurred 20 miles (35 km) from the plant. [17]

See also

Notes

  1. Russian: Курская АЭС, romanized: Kurskaya AES pronunciation

Related Research Articles

<span class="mw-page-title-main">RBMK</span> Type of Soviet nuclear power reactor

The RBMK is a class of graphite-moderated nuclear power reactor designed and built by the Soviet Union. It is somewhat like a boiling water reactor as water boils in the pressure tubes. It is one of two power reactor types to enter serial production in the Soviet Union during the 1970s, the other being the VVER reactor. The name refers to its design where instead of a large steel pressure vessel surrounding the entire core, the core is surrounded by a cylindrical annular steel tank inside a concrete vault and each fuel assembly is enclosed in an individual 8 cm (inner) diameter pipe. The channels also contain the coolant, and are surrounded by graphite.

<span class="mw-page-title-main">Chernobyl Nuclear Power Plant</span> Decommissioned nuclear power plant in Ukraine

The Chernobyl Nuclear Power Plant (ChNPP) is a nuclear power plant undergoing decommissioning. ChNPP is located near the abandoned city of Pripyat in northern Ukraine, 16.5 kilometers (10 mi) northwest of the city of Chernobyl, 16 kilometers (10 mi) from the Belarus–Ukraine border, and about 100 kilometers (62 mi) north of Kyiv. The plant was cooled by an engineered pond, fed by the Pripyat River about 5 kilometers (3 mi) northwest from its juncture with the Dnieper River.

<span class="mw-page-title-main">Rosatom</span> Russian state-owned nuclear technologies company

State Atomic Energy Corporation Rosatom, also known as Rosatom State Nuclear Energy Corporation,, or Rosatom State Corporation, is a Russian state corporation headquartered in Moscow that specializes in nuclear energy, nuclear non-energy goods and high-tech products. It was established in 2007 and comprises more than 350 enterprises, including scientific research organizations, a nuclear weapons complex, and the world's only nuclear icebreaker fleet.

<span class="mw-page-title-main">Kola Nuclear Power Plant</span>

The Kola Nuclear Power Plant, also known as Kolsk NPP or Kolskaya NPP, is a nuclear power plant located 12 km away from Polyarnye Zori, Murmansk Oblast in north-western Russia. If the floating nuclear power plant Akademik Lomonosov is excluded, it is the northernmost nuclear power plant housed in a fixed location structure.

<span class="mw-page-title-main">VVER</span> Soviet / Russian nuclear reactor type

The water-water energetic reactor (WWER), or VVER is a series of pressurized water reactor designs originally developed in the Soviet Union, and now Russia, by OKB Gidropress. The idea of such a reactor was proposed at the Kurchatov Institute by Savely Moiseevich Feinberg. VVER were originally developed before the 1970s, and have been continually updated. They were one of the initial reactors developed by the USSR, the other being the infamous RBMK. As a result, the name VVER is associated with a wide variety of reactor designs spanning from generation I reactors to modern generation III+ reactor designs. Power output ranges from 70 to 1300 MWe, with designs of up to 1700 MWe in development. The first prototype VVER-210 was built at the Novovoronezh Nuclear Power Plant.

<span class="mw-page-title-main">Nuclear power in Russia</span>

Russia is one of the world's largest producers of nuclear energy. In 2020 total electricity generated in nuclear power plants in Russia was 215.746 TWh, 20.28% of all power generation. The installed gross capacity of Russian nuclear reactors is 29.4 GW in December 2020.

State Enterprise National Nuclear Energy Generating Company "Energoatom", commonly known as just Energoatom, is a state enterprise operating all four nuclear power plants in Ukraine. It is the largest power producer in Ukraine.

<span class="mw-page-title-main">Belene Nuclear Power Plant</span> Abandoned nuclear power plant in northern Bulgaria

The Belene Nuclear Power Plant is an abandoned nuclear power plant 3 km from Belene and 11 km from Svishtov in Pleven Province, northern Bulgaria, near the Danube River. It was intended to substitute four VVER-440 V230 reactors of the Kozloduy Nuclear Power Plant that were decommissioned as a prerequisite for Bulgaria to join the European Union.

<span class="mw-page-title-main">Leningrad Nuclear Power Plant</span> RBMK and VVER nuclear power plant in Sosnovy Bor, Leningrad Oblast, Russia

Leningrad Nuclear Power Plant ) is a nuclear power plant located in the town of Sosnovy Bor in Russia's Leningrad Oblast, on the southern shore of the Gulf of Finland, some 70 kilometres (43 mi) to the west of the city centre of Saint Petersburg.

<span class="mw-page-title-main">Balakovo Nuclear Power Plant</span> Nuclear power plant in Saratov Oblast, Russia

Balakovo nuclear power station is located in the city of Balakovo, Saratov Oblast, Russia, about 900 kilometres (560 mi) south-east of Moscow. It consists of four operational reactors; fifth and sixth unit construction cancelled. Owner and operator of the nuclear power station is Rosenergoatom.

<span class="mw-page-title-main">Kalinin Nuclear Power Plant</span> Nuclear power plant

The Kalinin Nuclear Power Station is located about 200 kilometres (120 mi) north west of Moscow, in Tver Oblast near the town of Udomlya. Owner and operator of the plant is the state enterprise Rosenergoatom. Kalinin Nuclear Power Station supplies the majority of electricity in the Tver region and additionally serves Moscow, Saint Petersburg, and Vladimir. In 2005 the nuclear power station fed 17.3 TWh (62,000 TJ) into the grid. The station's four 150 metres (490 ft) tall cooling towers are local landmarks. They were manufactured in 96 concrete sections each.

Atomstroyexport (ASE) JSC (Russian: Атомстройэкспорт) is the Russian Federation's nuclear power equipment and service exporter. It is a fully owned subsidiary of Rosatom.

<span class="mw-page-title-main">Astravets Nuclear Power Plant</span> Nuclear power plant in Astravyets District, Belarus

The Astravets Nuclear Power Plant is a nuclear power plant located in the Astravyets District, Grodno Region in north-western Belarus. The power plant is built close to the Belarus-Lithuania border, being 40 kilometres (25 mi) east of the Lithuanian capital of Vilnius. The plant is powered by two 1194-MW VVER-1200 units supplied by Atomstroyexport, the nuclear equipment exporter branch of the Russian nuclear corporation Rosatom. The plant is owned by State Enterprise Belarusian NPP, which in turn is owned by the state-owned operator Belenergo.

<span class="mw-page-title-main">Novovoronezh Nuclear Power Plant II</span> Nuclear power plant in Voronezh Oblast, Russia

Novovoronezh Nuclear Power Plant II is a Russian nuclear power plant with two 1200 MW pressurized water reactors (VVER) located in Voronezh Oblast. The power plant is built on the same site as the present Novovoronezh Nuclear Power Plant.

<span class="mw-page-title-main">Khmelnytskyi Nuclear Power Plant</span> Nuclear power plant in Ukraine

The Khmelnytskyi Nuclear Power Plant generates nuclear power in Ukraine. The plant is operated by Energoatom. Two VVER-1000 reactors are operational, each generating 1000 MW (net) of electricity, with two AP1000 reactors under construction.

<span class="mw-page-title-main">Smolensk Nuclear Power Plant</span> Nuclear power plant in Smolensk Oblast, Russia

Smolensk Nuclear Power Plant is a nuclear power station in Russia. It is located in the Smolensk region, in Desnogorsk province, approximately 100 kilometres (62 mi) from Smolensk, 115 kilometres (71 mi) from Bryansk and 320 kilometres (200 mi) from Moscow. Smolensk Nuclear Power Plant is the biggest power generating station in the north-western region of the united energy system of the Russian Federation. Smolensk NPP has an outer appearance similar to that of Chernobyl NPP units 3-4, as both are later generation RBMKs.

<span class="mw-page-title-main">Nuclear power in Ukraine</span>

Ukraine operates four nuclear power plants with 15 reactors located in Volhynia and South Ukraine. The total installed nuclear power capacity is over 13 GWe, ranking 7th in the world in 2020. Energoatom, a Ukrainian state enterprise, operates all four active nuclear power stations in Ukraine. In 2019, nuclear power supplied over 20% of Ukraine's energy.

The VVER-TOI or WWER-TOI is a generation III+ nuclear power reactor based on VVER technology developed by Rosatom. The VVER-TOI design is intended to improve the competitiveness of Russian VVER technology in international markets. It would use VVER-1300/510 water pressurized reactors constructed to meet modern nuclear and radiation safety requirements.

<span class="mw-page-title-main">Rooppur Nuclear Power Plant</span> Under-construction nuclear power plant in Bangladesh

The Rooppur Nuclear Power Plant (Bengali: রূপপুর পারমাণবিক বিদ্যুৎকেন্দ্র) is a 2.4 GWe nuclear power plant project in Bangladesh. The nuclear power plant is being constructed at Rooppur of Ishwardi Upazila on the bank of the river Padma, about 160 km northwest of Dhaka. It will be the country's first nuclear power plant, and the first of the two units is expected to go into operation in 2025.

References

  1. "UN urges restraint to avoid Russia nuclear plant disaster". RTÉ News. 9 August 2024. Retrieved 9 August 2024.
  2. 1 2 3 4 5 6 7 "Kursk NPP". Rosenergoatom. Archived from the original on 20 July 2017. Retrieved 7 August 2024.
  3. 1 2 Kalashnikov, Sergey (15 December 2022). "Станки становятся в строй" [The machines are being put into operation]. Kommersant . Retrieved 10 August 2024.
  4. "Kursk 1 retires". World Nuclear News. 21 December 2021. Retrieved 10 August 2024.
  5. "Kursk's second unit retires after 45 years operation". World Nuclear News. 31 January 2024. Retrieved 10 August 2024.
  6. "Russia to start building Kursk-II in first half of 2018". Nuclear Engineering International. 23 January 2018. Archived from the original on 12 November 2020. Retrieved 4 February 2018.
  7. "AEM Technology sees milestone with first VVER-TOI". World Nuclear News. 17 April 2018. Archived from the original on 9 November 2020. Retrieved 18 April 2018.
  8. "Outer containment dome completed at Russia's Kursk-II unit 1". Nuclear Engineering International. Business Trade Media International. 4 January 2023. Archived from the original on 27 January 2023. Retrieved 4 April 2023.
  9. "Kursk II Nuclear Power Project, Kurchatov, Kursk Oblast, Russia". NS Energy. Business Trade Media International. 18 April 2020. Archived from the original on 22 May 2022. Retrieved 12 May 2022.
  10. "Станции и проекты". Archived from the original on 12 May 2022. Retrieved 12 May 2022.
  11. Power Reactor Information System Archived 11 February 2012 at the Wayback Machine of the IAEA: „Russian Federation: Nuclear Power Reactors“ Archived 26 December 2008 at the Wayback Machine
  12. "Kursk-6 on the PRIS of the IAEA". Archived from the original on 4 June 2011. Retrieved 19 July 2008.
  13. "Kursk 2-1 on the PRIS of the IAEA". Archived from the original on 4 June 2011. Retrieved 19 July 2008.
  14. "На Курской АЭС-2 началось сооружение новых блоков". Archived from the original on 11 November 2020. Retrieved 2 August 2018.
  15. "UN urges restraint to avoid Russia nuclear plant disaster". RTÉ News. 9 August 2024. Retrieved 9 August 2024.
  16. Barber, Harriet (11 August 2024). "Ukraine-Russia war live: Russia 'digging trenches' around Kursk nuclear plant". The Telegraph. ISSN   0307-1235 . Retrieved 12 August 2024.
  17. Security, Ellie Cook (12 August 2024). "Russia builds fortifications around Kursk nuclear plant as Ukraine advances". Newsweek.