LOXSAT

Last updated

LOXSAT is a NASA funded cryogenic fluid management demonstration satellite mission. [1] Eta Space is building the payload.

Contents

It is scheduled to launch no earlier than July 2024 on a Rocket Lab Electron launch vehicle. [2]

NASA critical design review is due 15 June 2022. [3]

Mission objectives

LOXSAT aims to demonstrate on-orbit docking and cryogenic refueling operations using a cryogenic fluid transfer disconnect and latching mechanism developed for depot applications. It will also demonstrate repeated mating/de-mating and the transfer of liquid oxygen. [4]

A LOXSAT2 mission is being defined. [1]

LOXSAT1 will test technology for Eta's orbital depot "CryoDock". [3]

See also

Related Research Articles

<span class="mw-page-title-main">Space station</span> Habitat and station in outer space

A space station is a spacecraft capable of supporting a human crew in orbit for an extended period of time and is therefore a type of space habitat. It lacks major propulsion or landing systems. An orbital station or an orbital space station is an artificial satellite. Stations must have docking ports to allow other spacecraft to dock to transfer crew and supplies. The purpose of maintaining an orbital outpost varies depending on the program. Space stations have most often been launched for scientific purposes, but military launches have also occurred.

A solar thermal rocket is a theoretical spacecraft propulsion system that would make use of solar power to directly heat reaction mass, and therefore would not require an electrical generator, like most other forms of solar-powered propulsion do. The rocket would only have to carry the means of capturing solar energy, such as concentrators and mirrors. The heated propellant would be fed through a conventional rocket nozzle to produce thrust. Its engine thrust would be directly related to the surface area of the solar collector and to the local intensity of the solar radiation.

<span class="mw-page-title-main">STS-74</span> 1995 American crewed spaceflight to Mir

STS-74 was the fourth mission of the US/Russian Shuttle-Mir Program, and the second docking of the Space Shuttle with Mir. Space Shuttle Atlantis lifted off from Kennedy Space Center launch pad 39A on 12 November 1995. The mission ended 8 days later with the landing of Atlantis back at Kennedy. It was the second in a series of seven straight missions to the station flown by Atlantis.

<span class="mw-page-title-main">Uncrewed spaceflights to the International Space Station</span>

Uncrewed spaceflights to the International Space Station (ISS) are made primarily to deliver cargo, however several Russian modules have also docked to the outpost following uncrewed launches. Resupply missions typically use the Russian Progress spacecraft, European Automated Transfer Vehicles, Japanese Kounotori vehicles, and the American Dragon and Cygnus spacecraft. The primary docking system for Progress spacecraft is the automated Kurs system, with the manual TORU system as a backup. ATVs also use Kurs, however they are not equipped with TORU. The other spacecraft — the Japanese HTV, the SpaceX Dragon and the Northrop Grumman Cygnus — rendezvous with the station before being grappled using Canadarm2 and berthed at the nadir port of the Harmony or Unity module for one to two months. Progress, Cygnus and ATV can remain docked for up to six months. Under CRS phase 2, Cargo Dragon docks autonomously at IDA-2 or 3 as the case may be. As of December 2022, Progress spacecraft have flown most of the uncrewed missions to the ISS.

<span class="mw-page-title-main">Orbiter Processing Facility</span> Hangars formerly used for Space Shuttle maintenance at NASAs Kennedy Space Center

Orbiter Processing Facility (OPF) is a class of hangars where U.S. Space Shuttle orbiters underwent maintenance between flights. They are located west of the Vehicle Assembly Building, where the orbiter was mated with its External Tank and Solid Rocket Boosters before transport to the launch pad. OPF-1 and OPF-2 are connected with a low bay between them, while OPF-3 is across the street.

<span class="mw-page-title-main">Orbital Express</span> US project to autonomously service satellites in orbit ~2007

Orbital Express was a space mission managed by the United States Defense Advanced Research Projects Agency (DARPA) and a team led by engineers at NASA's Marshall Space Flight Center (MSFC). The Orbital Express program was aimed at developing "a safe and cost-effective approach to autonomously service satellites in orbit". The system consisted of two spacecraft: the ASTRO servicing satellite, and a prototype modular next-generation serviceable satellite; NEXTSat. The mission launched from Cape Canaveral Air Force Station on 8 March 2007, aboard an Atlas V expendable launch vehicle. The launch was part of the United States Air Force Space Test Program STP-1 mission.

<span class="mw-page-title-main">STS-135</span> 2011 American crewed spaceflight to the ISS and final flight of the Space Shuttle program

STS-135 was the 135th and final mission of the American Space Shuttle program. It used the orbiter Atlantis and hardware originally processed for the STS-335 contingency mission, which was not flown. STS-135 launched on July 8, 2011, and landed on July 21, 2011, following a one-day mission extension. The four-person crew was the smallest of any shuttle mission since STS-6 in April 1983. The mission's primary cargo was the Multi-Purpose Logistics Module (MPLM) Raffaello and a Lightweight Multi-Purpose Carrier (LMC), which were delivered to the International Space Station (ISS). The flight of Raffaello marked the only time that Atlantis carried an MPLM.

<span class="mw-page-title-main">Orbital propellant depot</span> Cache of propellant used to refuel spacecraft

An orbital propellant depot is a cache of propellant that is placed in orbit around Earth or another body to allow spacecraft or the transfer stage of the spacecraft to be fueled in space. It is one of the types of space resource depots that have been proposed for enabling infrastructure-based space exploration. Many different depot concepts exist depending on the type of fuel to be supplied, location, or type of depot which may also include a propellant tanker that delivers a single load to a spacecraft at a specified orbital location and then departs. In-space fuel depots are not necessarily located near or at a space station.

<span class="mw-page-title-main">Docking and berthing of spacecraft</span> Joining of two or more space vehicles

Docking and berthing of spacecraft is the joining of two space vehicles. This connection can be temporary, or partially permanent such as for space station modules.

<span class="mw-page-title-main">NASA Launch Services Program</span> NASA program

The NASA Launch Services Program (LSP) is responsible for procurement of launch services for NASA uncrewed missions and oversight of launch integration and launch preparation activity, providing added quality and mission assurance to meet program objectives. LSP operates under the NASA Space Operations Mission Directorate (SOMD).

<span class="mw-page-title-main">Space tug</span> Spacecraft used to transfer cargo from one orbit to another

A space tug is a type of spacecraft used to transfer spaceborne cargo from one orbit to another orbit with different energy characteristics. The term can include expendable upper stages or spacecraft that are not necessarily a part of their launch vehicle. However, it can also refer to a spacecraft that transports payload already in space to another location in outer space, such as in the Space Transportation System concept. An example would be moving a spacecraft from a low Earth orbit (LEO) to a higher-energy orbit like a geostationary transfer orbit, a lunar transfer, or an escape trajectory.

<span class="mw-page-title-main">Robotic Refueling Mission</span>

The Robotic Refueling Mission (RRM) is a NASA technology demonstration mission with equipment launches in both 2011 and 2013 to increase the technological maturity of in-space rocket propellant transfer technology by testing a wide variety of potential propellant transfer hardware, of both new and existing satellite designs.

<span class="mw-page-title-main">Boeing Crewed Flight Test</span> Planned first crewed flight of Boeing Starliner

Boeing Crew Flight Test will be the first crewed mission of the Boeing Starliner and the third orbital flight test of the Starliner overall after the two uncrewed flight tests, OFT-1 and OFT-2 in 2019 and 2022.

<span class="mw-page-title-main">Artemis 3</span> Third orbital flight of the Artemis program

Artemis 3 is planned as the first crewed Moon landing mission of the Artemis program and the first crewed flight of the Starship HLS lander. Artemis 3 is planned to be the second crewed Artemis mission and the first American crewed lunar landing since Apollo 17 in December 1972. As of 2023, the mission is scheduled for December 2025.

<span class="mw-page-title-main">Lunar Gateway</span> Lunar orbital space station under development

The Lunar Gateway, or simply Gateway, is the first planned extraterrestrial space station. It will be placed in lunar orbit and is intended to serve as a solar-powered communication hub, science laboratory, and short-term habitation module for government-agency astronauts, as well as a holding area for rovers and other robots. It is a multinational collaborative project involving four of the International Space Station partner agencies: NASA, European Space Agency (ESA), Japan Aerospace Exploration Agency (JAXA), and Canadian Space Agency (CSA). It is planned to be both the first space station beyond low Earth orbit and the first space station to orbit the Moon.

<span class="mw-page-title-main">Artemis 5</span> Fifth orbital flight of the Artemis program

Artemis 5 is the fifth planned mission of NASA's Artemis program and the first crewed flight of the Blue Moon lander. The mission will launch four astronauts on a Space Launch System rocket and an Orion to the Lunar Gateway and will be the third lunar landing of the Artemis program. In addition, Artemis V will also deliver two new elements to the Gateway Space Station.

<span class="mw-page-title-main">Starship HLS</span> Lunar lander variant of SpaceX Starship

Starship HLS, or Starship Human Landing System, is a lunar lander variant of the Starship spacecraft that is slated to transfer astronauts from a lunar orbit to the surface of the Moon and back. It is being designed and built by SpaceX under the Human Landing System contract to NASA as a critical element of NASA's Artemis program to land a crew on the Moon no earlier than 2026.

Rapidly Attachable Fluid Transfer Interface (RAFTI) is a standard interface was developed by Orbit Fab for transferring fluids, e.g., propellants, in space. It has been defined by a group of 30 companies.

Satellite refuelling is the operation of replenishing on board propellants and other consumables in satellites in orbit, e.g. in geostationary orbit around Earth.

<span class="mw-page-title-main">Orbit Fab</span> Aerospace company

Orbit Fab is an American startup based in Lafayette, Colorado, United States, that develops in-space refueling systems for satellites.

References

  1. 1 2 "NASA Awards Eta Space Contract for Gas Stations in Space". Eta Space (Press release). 29 April 2021. Retrieved 30 April 2021 via EIN Presswire.
  2. "Assembly Underway on Eta Space's LOXSAT". EINPressWire. 23 June 2023. Retrieved 21 November 2023.
  3. 1 2 PLAY IT COOL: THIS COMPANY IS BUILDING A CRYOGENIC GAS STATION IN SPACE May 2022
  4. "Altius Space Machines to support of Eta Space and NASA's LOXSAT Cryogenic Fluid Management Mission" (Press release). 25 Aug 2021.