Location | Greater Bristol, United Kingdom |
---|---|
Proposer | West of England Combined Authority |
Status | Feasibility studies underway |
Type | Light rail/Rapid transit |
Cost estimate | £4.5 billion |
The city of Bristol in the United Kingdom has included a light rail transport system in its plans from the 1980s onwards. There has been no light rail in the city since the closure of Bristol Tramways in 1941.
Plans for a metro system were promoted by then MEP Richard Cottrell, and were unveiled in November 1987 under the title of Advanced Transport for Avon; the first route, from Wapping Wharf to Portishead and Portbury, was due to open by 1991 with the entire system complete by the late 1990s. The Parliamentary bill for the first route received Royal Assent in May 1989, but after objections from the Port of Bristol and Bristol South MP Dawn Primarolo, along with financial difficulties, the scheme folded with debts of £3.8 million. [1]
Following the demise of ATA, Avon County Council proposed a light rail project known as "The Westway", [2] which consisted of a route from the city centre following the Filton Bank railway line to Bradley Stoke, and a loop line through South Bristol. The first phase of this project was estimated to cost £400 million. [3] The project never materialised due to the 1996 abolition of Avon as a county.
The Bristol Supertram project proposed a light rail line from Bristol city centre to Aztec West, in part running alongside the Great Western Railway line from Temple Meads railway station to Bristol Parkway. The project received Royal Assent but issues arose between Bristol City Council and South Gloucestershire, the latter wishing for the route to be extended to serve Cribbs Causeway. As the extension was deemed unfeasible, South Gloucestershire withdrew support, and in March 2004, Bristol Council announced that the Supertram project would be cancelled. This allowed funds that were set aside for the project to be used to cover a projected council tax increase instead. [4] In 2005, an article in the Bristol Evening Post stated that Bristol City Council had spent £1.5 million on Supertram between 1998 and 2004. [5]
After the demise of the Supertram scheme, the transport focus for the region moved to bus-based transport, with a bus rapid transit scheme first being discussed by the West of England Local Enterprise Partnership in 2006. The MetroBus network began construction in 2015 and opened in stages through 2018 and 2019, at a cost of £230 million (including work which benefitted other road users). No mention of light rail was made in these subsequent years until November 2016, when the West of England LEP began a consultation process on their Transport Vision Summary Document, outlining potential light rail/tram routes from the city centre to Bristol Airport, the eastern and north west fringes of the city, and a route along the A4 road to Bath. [6]
In July 2017, a leaked draft of a document due to be published in October 2017 suggested an underground rail network around the most built-up areas of the city as one of many solutions to congestion said to cost £8.9 billion. [7] The full document had detailed analysis of a potential mass transit network with underground sections, with the route to the airport being determined as the best value for money, and most meeting the needs of this particular transport corridor. [8] In September 2017, mayor Marvin Rees vocally supported the creation of an underground line in the city. The service would run from Bristol Airport to Temple Meads, the centre and north of Bristol and then to Cribbs Causeway, and would cost an estimated £2.5bn. [9] The city council commissioned a £50,000 study to determine the financial viability of the project and Rees suggested £3m for a geological survey. [10] [9]
In January 2018, Bristol City Council announced that the project could cost £4 billion for three lines, including the initial airport-city centre route, as well as another heading north and a third heading east. [11] It is suggested that the eastern route could run as a light rail track alongside the Bristol and Bath Railway Path, which would not have to close. [12]
According to the city's 2050 vision document, the first mass transit route is hoped to begin construction in 2022 and be completed by 2028, with the entire four-line network complete by 2034. [13]
By March 2020, Transport Xtra reported that plans for the network were "still at the embryonic stage so only scant detail is available". Rees acknowledged that a 2022 start date is an "ambitious plan. But we've got to have ambition. With the population growing, and people becoming more car-dependent, we'll end up paying the price down the line. The transport problems we are dealing with in Bristol today is because of 40 or 50 years of failure to have any ambition." He further explained that a mass transit system is "the right thing for the city. Engineering-wise, it is perfectly possible to deliver. There are growing numbers of people in the travel to work areas [in Bristol], so there is a strong enough passenger base to make it viable. And those numbers are going to grow, so we need to take this opportunity to take millions of car journeys off Bristol's roads and develop the transport system that a world-class city needs." [14]
In February 2019, the West of England Combined Authority agreed to spend £200,000 to further develop an outline business case for the network, under guidance from the Department for Transport. Full business cases to meet funding requirements from DfT were estimated to cost around £100 million and take around six years to complete. [15] [16] In June 2019, Rees reiterated that the case for an underground rail line in Bristol depends on the growth of Bristol Airport. [17] Speaking at an event for Clean Air Day, he stated "We will also use the growth of Bristol Airport to strengthen the financial case for Bristol's mass transit system which we hope will be the means by which we takes millions of car journeys off of Bristol's roads and the carbon and nitrogen dioxide they bring. The weaker the airport, the weaker the business case for the underground. So you will need 10 words to explain how you will secure the investment the underground will need and avoid us being trapped in the current, inadequate arrangements."
Following a meeting in July 2019, WECA awarded another £1.3 million to further develop mass transit proposals; [18] [19] to look in more detail at demand, the scope of the project, and its potential outputs and benefits. Bristol City Council's Growth and Regeneration Scrutiny Commission the same month noted the network's "final proposal could be a mixture of on-street and underground running based on corridor characteristics and demand". [20] Adam Crowther, the Council's head of strategic city transport, said: "The one thing we probably won't have is the Tube. If you think of the London Underground, we're not going to have eight-carriage long trains running around. That would be far too much capacity for this region." [21] The Bristol Transport Strategy published the same month gave mention to the potential use of VAL technology, following the example of light metro systems in Rennes, Toulouse, Turin, Lille and Taipei. [22]
As part of forward plans for upgrades to Bristol Temple Meads railway station, Network Rail confirmed in early 2020 that it was assessing potential underground entrances to the mass transit system. [23] By late 2020 Rees had reported that the proposals were "moving on" but it was not a scheme that could be completed quickly. [24]
In November 2022, Mayor Rees made public the mass transit system's 2017 pre-feasibility study produced by CH2M and Steer Davies Gleave, [25] and the 2019 Early Options Development Report, undertaken by engineering group Jacobs Steer. [26] The CH2M report outlined the potential demand for an underground network and the ground conditions of the city; which were found to be favourable for tunnelling.
In the Jacobs report, four mass transit corridors were analysed in further detail; radial routes from Bristol city centre serving southern, northern, northeastern and southeastern areas. Options considered included overground routes using BRT (bus rapid transit) or light rail/trams, and underground options with technology type to be confirmed. Underground options on all four corridors were taken forward for further analysis. [26]
For the overground options, tram/light rail technology was considered more disruptive than BRT to the roads they would be built on for the northern and southern corridors, with BRT recommended for further consideration. For the northeastern corridor, only an underground option was taken forward, with all other proposals seen to be too disruptive to the area. On the southeast route, a tram option and a BRT option were both taken forward for further study.
The four mass transit corridors analysed in the 2022 Jacobs Steer report [26] were:
An overground BRT route on Route 1 was projected in 2018 prices to cost £370 million, and consist of 12.15 km (7.55 mi) of route from Temple Meads to the airport via Bedminster and the A38 road southward. Stops would be every 500m, serving key locations such as East Street in Bedminster, Parson Street railway station and a new A38 South Park & Ride at the junction with the South Bristol link road. [26] The underground option for Route 1 was projected to cost £1.12 billion, and consisted of a 9 km (5.6 mi) underground route from Temple Meads serving stations at Daventry Road (Knowle), Hengrove Park, Symes Avenue (Hartcliffe), Highridge Road (Bishopsworth) and the A38 South Park & Ride, where the route would then emerge for 6.8 km (4.2 mi) to the surface towards the airport.
Route 2 was projected to cost £220 million as a 12.6 km (7.8 mi) overground BRT, or £1.55 billion as a 14 km (8.7 mi) underground route. The overground option would start at Temple Meads and follow the A38 northward to a new Park & Ride at Almondsbury, with stops every 500m. The underground option would serve stations at Callowhill Court (Broadmead), Bristol bus station, The Arches (Montpelier), Longmead Avenue (Bishopston), Horfield Common, Southmead Hospital, Filton, the new Brabazon development, Cribbs Causeway, Aztec West and Almondsbury P&R.
The only option seen as viable for Route 3 was a £1.05 billion, 10 km (6.2 mi) underground route from Temple Meads to Bristol and Bath Science Park via Lawrence Hill railway station, St George's Park, Kings Chase Shopping Centre (Kingswood) and Staple Hill Park.
For Route 4, the overground BRT or tram route would be either a 7.55 km (4.69 mi) or 8.35 km (5.19 mi) route, the former using the A4 road for its whole length or using former trackbed of the Bristol and North Somerset Railway in Brislington. The former option was projected to cost £130 million as a BRT and £590 million as a tram, and the latter £170 million as BRT or £650 million as a tram. Overground options were not considered feasible to extend to Keynsham, and would terminate at the new Park & Ride at Hicks Gate. An entirely underground route, at a cost of £890 million, would be 7.5 km (4.7 mi) in length, starting at Temple Meads and serving St Philip's Marsh, Arnos Vale, Brislington, the current Brislington Park & Ride (which is due to be relocated and replaced with new homes), a new Park & Ride at the Hicks Gate roundabout, and a terminus at Keynsham railway station.
The forecast annual demand for the mass transit system was projected to be 42.3 million if all four routes were underground, and 20.7 million for three of the four overground routes (excluding Route 3, for which an underground-only route was taken forward), based on demand in the morning peak. [26] Each line was projected as follows:
An extra 2.0 million per annum (1.3 million for overground options) was added to account for contra-flow traffic – peak travel from central Bristol to the outlying areas.
Light rail is a form of passenger urban rail transit using rolling stock derived from tram technology while also having some features from heavy rapid transit.
Bus rapid transit (BRT), also referred to as a busway or transitway, is a bus-based public transport system designed to have much more capacity, reliability, and other quality features than a conventional bus system. Typically, a BRT system includes roadways that are dedicated to buses, and gives priority to buses at intersections where buses may interact with other traffic; alongside design features to reduce delays caused by passengers boarding or leaving buses, or paying fares. BRT aims to combine the capacity and speed of a light rail transit (LRT) or mass rapid transit (MRT) system with the flexibility, lower cost and simplicity of a bus system.
The Leeds Supertram was a proposed light rail/tram system in Leeds and West Yorkshire in England. It would have been a three-line, 17-mile (27 km) system with 50 stations. It received provisional government approval in 2001, and was specifically for corridors ill-served by the existing heavy rail network. Supertram would have been 75% funded from the public sector, with final contracts for construction and a 27-year operating concession due to have been awarded in 2003. By 2004, disquiet about rising costs had caused the scheme to be scaled back, and it was finally cancelled in 2005 by the Transport Secretary, Alistair Darling.
Bristol is a city in south west England, near the Bristol Channel coast, approximately 106 miles (170 km) west of London. Several factors have influenced the development of its transport network. It is a major centre of employment, retail, culture and higher education, has many historic areas, and has a history of maritime industry. The city has a population of 450,000, with a metropolitan area of 650,000, and lies at the centre of the former County of Avon, which includes many dormitory towns, and has a population of one million.
The Glasgow Airport Rail Link (GARL) is a proposed link between Glasgow City Centre and Glasgow Airport. The original plans for an airport rail link were proposed during the 2000s to directly link Glasgow Central station with Glasgow Airport in Scotland. The link was intended for completion by 2013 and would have had a service of four trains per hour via Paisley Gilmour Street railway station.
The West London Tram was a proposed on-street light rail line that was to run along the Uxbridge Road (A4020) corridor in West London, England. The scheme was promoted by Transport for London (TfL). It was postponed indefinitely on 2 August 2007, as it was opposed by the then councils of all three bisected London Boroughs.
The majority of public transport users in the Bristol Urban Area are transported by bus, although rail has experienced growth and does play an important part, particularly in peak hours. There were plans for a light rail system, however this has now been dropped although it remains in the long-term local transport plan.
Rapid transit in the United Kingdom consists of four systems: the London Underground and the Docklands Light Railway in London; the Tyne and Wear Metro in Tyne and Wear; and the Glasgow Subway. The term may also include commuter rail systems with aspects of rapid transit such as the London Overground and Elizabeth line in London, and Merseyrail in the Liverpool City Region. Rapid transit has also been proposed in other UK cities including Sheffield, Manchester, Leeds, Birmingham, Cardiff, Bristol, and Cambridge.
Rail services in the West of England refer to passenger rail journeys made in the Bristol commuter area. 17 million passenger rail journeys were made in 2019-20 within the Gloucestershire, Wiltshire and Bristol/Bath region.
MetroWest, formerly known as the Greater Bristol Metro, is a project to improve the rail services in Bristol, England, and the surrounding region. It was first proposed at First Great Western's Stakeholder Event in March 2008. The aim of the project is to develop half-hourly services through central Bristol which will also serve the surrounding West of England region. Transport campaigning groups Friends of Suburban Bristol Railways (FoSBR) and Transport for Greater Bristol are actively supporting the proposal, as are the three unitary authorities under the West of England Combined Authority and North Somerset Council.
Bristol Supertram was a proposed light rail system for the Bristol and South Gloucestershire regions of England. In 2001, the project was given backing from the government to build a line that would link the city centre with the North Bristol region, but the project was cancelled in 2004.
This article lists proposed developments to transport in Bristol, England.
Trams in England encompass various tram networks integrated into the public transport system of England. Until 1935, there had been a large and comprehensive network of tram systems in towns and cities.
The Auckland Airport Line was a proposed heavy rail line in Auckland, New Zealand, that would have linked Auckland Airport with the Auckland central business district via central isthmus suburbs.
Between 2015 and 2023, Auckland, New Zealand's largest city, considered introducing light rail lines to replace some of its most heavily used bus routes. Many of these new light rail lines would have reused the routes of Auckland's former tram system. Light rail systems have been proposed in Auckland throughout the late-20th and early 21st centuries following the closure of the tram system in the 1950s.
The O-Train is a light rail rapid transit system in Ottawa, Ontario, Canada, operated by OC Transpo. The O-Train system has two lines, the electrically-operated Confederation Line and the diesel-operated Trillium Line. Since May 2020, Stage 2 construction has temporarily shut down Line 2, with replacement bus service being offered at all stations. When Line 2 reopens in 2024, it will extend southward to Limebank station and incorporate five newly constructed stations, as well as an additional line linking Line 2 to Ottawa International Airport which will replace the current bus service from route 97. By 2026, expansions along Line 1 and the construction of Line 3 stations in the west end are expected to be complete, bringing the system's length to 64.5 km (40.1 mi), four lines and 41 stations. The O-Train network is fully grade separated and does not have any level crossings with roads.
The Bristol airport rail link is a proposed light or heavy rail line to serve Bristol Airport in southwest England. The project is currently under consideration by the West of England Local Enterprise Partnership as a means to address "poor connectivity between North Somerset, Bristol Airport and Bristol".
The Phuket Island Light Rail Transit project is a planned 58.6-kilometre (36.4 mi) MRTA light rail transit system for Phuket and Phang Nga provinces in Thailand. The line will consist of 24 stations running from Takua Thung District in Phang Nga Province to Phuket City and terminating at Chalong intersection. The line will have at-grade and elevated sections. The cost of the project is estimated at 35 billion baht.
The Vermont Transit Corridor is a proposed 12.5-mile (20.1 km) bus rapid transit line in the Metro Busway network in Los Angeles, California with plans to convert it to rapid transit in the future. It is planned to operate on a north-to-south route on Vermont Avenue between the B Line's Vermont/Sunset station and the C Line's Vermont/Athens station on the Los Angeles Metro Rail system. The project feasibility study was released in February 2019 with a proposed completion date of 2028 for BRT and after 2067 for rail. It is part of Metro's Twenty-eight by '28 initiative and is partially funded by Measure M. The route will have signal priority at traffic lights and will have a dedicated right of way. Metro reports the initial cost is $425 million.