Cyprus has a total of 108 dams and reservoirs, [1] with a total water storage capacity of about 330,000,000 m3. Dams remain the principal source of water both for domestic and agricultural use. Water desalination plants are gradually being constructed in order to deal with recent years of prolonged drought.
Name | District | Type | Completed | Capacity (m3) | Coordinates | |
---|---|---|---|---|---|---|
1 | Kouris | Limassol | Earthen | 1988 | 115,000,000 | 34°43′40″N32°55′04″E / 34.7278°N 32.9178°E |
2 | Asprokremmos | Paphos | Earthen | 1982 | 52,375,000 | 34°43′33″N32°33′15″E / 34.7259°N 32.5543°E |
3 | Evretou | Paphos | Rockfill | 1986 | 24,000,000 | 34°58′33″N32°28′22″E / 34.9757°N 32.4727°E |
4 | Geçitköy | Kyrenia | Rockfill | 2014 | 35,000,000 | 35°19′45″N33°04′15″E / 35.3292°N 33.0709°E |
5 | Kannaviou | Paphos | Earth/rockfill | 2005 | 18,000,000 | 34°55′40″N32°35′16″E / 34.9277°N 32.5878°E |
6 | Kalavasos | Larnaca | Rockfill | 1985 | 17,100,000 | 34°48′14″N33°15′38″E / 34.803972°N 33.260517°E |
7 | Lefkara | Larnaca | Earth/rockfill | 1973 | 13,850,000 | 34°53′40″N33°17′44″E / 34.8944°N 33.2956°E |
8 | Dipotamos [2] | Larnaca | Rockfill | 1985 | 15,500,000 | 34°51′06″N33°21′33″E / 34.851618°N 33.359274°E |
9 | Germasoyeia | Limassol | Earthfill | 1968 | 13,500,000 | 34°44′38″N33°05′03″E / 34.7439°N 33.0843°E |
10 | Achna | Famagusta | Earthfill | 1987 | 6,800,000 | 35°03′19″N33°48′52″E / 35.055321°N 33.814307°E |
11 | Kouklia | Famagusta | Earthfill | 1900 | 4,545,000 | 35°07′15″N33°45′38″E / 35.1207°N 33.7606°E |
12 | Arminou | Paphos | Earth/rockfill | 1998 | 4,300,000 | 34°52′31″N32°44′14″E / 34.8752°N 32.7371°E |
13 | Polemidia | Limassol | Earthfill | 1965 | 3,400,000 | 34°43′07″N32°59′20″E / 34.7187°N 32.9888°E |
14 | Tamasos | Nicosia | Earth/rockfill | 2002 | 2,800,000 | 35°01′00″N33°14′52″E / 35.0167°N 33.2479°E |
15 | Mavrokolympos | Paphos | Earthfill | 1966 | 2,180,000 | 34°51′23″N32°24′21″E / 34.8565°N 32.4058°E |
16 | Argaka | Paphos | n/a | n/a | 990,000 | 35°02′55″N32°30′08″E / 35.0486°N 32.5022°E |
17 | Pomos | Paphos | n/a | n/a | 860,000 | 35°08′42″N32°34′34″E / 35.1449°N 32.5762°E |
18 | Agia Marina | Paphos | n/a | n/a | 298,000 | 35°07′01″N32°32′28″E / 35.1170°N 32.5410°E |
19 | Vyzakia | Nicosia | n/a | n/a | 1,690,000 | 35°03′41″N33°01′38″E / 35.0615°N 33.0272°E |
20 | Xyliatos | Nicosia | n/a | n/a | 1,430,000 | 35°00′32″N33°02′14″E / 35.0089°N 33.0372°E |
21 | Kalopanagiotis | Nicosia | n/a | n/a | 363,000 | 35°00′22″N32°49′31″E / 35.0061°N 32.8254°E |
22 | Pera Pedi | Limassol | Gravity | n/a | 55,000 | 34°52'17.35"N 32°51'55.60"E |
23 | Prodromos | Nicosia | *Reservoir | n/a | 122,000 | 34°56'54.88"N 32°50'41.02"E |
24 | Saittas/Trimiklini | Limassol | Gravity | n/a | 340,000 | 34°51'49.04"N 32°54'51.68"E |
25 | Pomos | Paphos | Gravity | n/a | 859,000 | 35° 8'31.49"N 32°34'35.55"E |
26 | Ayia Marina | Paphos | Gravity | n/a | <750,000 | 35°7'15" N 32°32'30" E |
27 | Achera | Nicosia | Earthfill | n/a | n/a | 35° 4'5.65"N 33° 7'48.91"E |
28 | Klirou/Malounta | Nicosia | Earthfill | n/a | 82,000 | 35° 1'54.36"N 33°10'21.72"E |
29 | Tremithos-Kiti | Larnaca | Earthfill | n/a | 360,000 | 34°52'19.66"N 33°33'36.74"E |
30 | Lympia | Nicosia | Gravirt | n/a | 220,000 | 34°58'30.64"N 33°25'8.66"E |
31 | Anatoliko | Paphos | Earthfill | n/a | c.a300,000 | 34°45'17.32"N 32°29'24.23"E |
32 | Moni | Nicosia | *Reservoir | n/a | c.a125,000 | 35° 3'8.51"N 33° 5'26.60"E |
33 | Evrychou | Nicosia | Gravity | n/a | c.a150,000 | 35° 3'56.14"N 32°54'9.54"E |
34 | Lythrodontas | Nicosia | Earthfill | n/a | 32,000 | 34°56'36.33"N 33°16'29.27"E |
The Tokuyama Dam is an embankment dam near Ibigawa, Ibi District, Gifu Prefecture in Japan. The dam was completed in 2008 and will support a 153 MW hydroelectric power station that is expected to be fully operational in 2015. Unit 1 at 23 MW was commissioned in May 2014. The dam was originally intended to withhold the upper reservoir of a 400 MW pumped-storage power station until a design change in 2004. The dam is also intended for flood control and water supply. It is the largest dam by structural volume in Japan and withholds the country's largest reservoir by volume as well.
The Ranganadi Dam is a concrete-gravity diversion dam on the Ranganadi River in Arunachal Pradesh, India which serves a run-of-the-river scheme.
The Kölnbrein Dam is an arch dam in the Hohe Tauern range within Carinthia, Austria. It was constructed between 1971 and 1979 and at 200 metres (660 ft) high, it is the tallest dam in Austria. The dam's reservoir serves as the primary storage in a three-stage pumped-storage power system that consists of nine dams, four hydroelectric power plants and a series of pipeline and penstocks. The complex is owned by Verbund power company and is referred to as the Malta-Reisseck Power Plant Group. The installed capacity of the group is 1,028.5 MW and its annual generation is 1,216 gigawatt-hours (4,380 TJ).
Huai Kum Dam, is on the Nam Phrom River in Kaset Sombun District, Chaiyaphum Province, Thailand. It consists of a rockfill dam with clay core and a 1.2 MW semi-underground powerhouse which rises four metres high from the ground and 11 metres beneath the surface. The dam forms a reservoir with a storage capacity of 22 million cubic metres to supply water for the downstream irrigation areas of Chulabhorn Dam in Chaiyaphum Province whereas the power plant provides two million kWh of electric energy per year. The king and the queen accompanied by Princess Maha Chakri Sirindhorn and Princess Chulabhorn presided over the inauguration ceremony on 19 December 1980.
The Lam Phra Phloeng Dam, is a dam on the Lam Phra Phloeng River, part of the Mun River catchment, in the Pak Thong Chai District, Nakhon Ratchasima Province, Thailand. Construction of the dam was completed in 1963, and its reservoir has suffered from very high levels of sedimentation resulting from erosion within its catchment area. Its function is mainly irrigation water supply, although it generates electricity as well.
The Lam Takhong Dam is an embankment dam on the Lam Takhong River between Pak Chong District and Sikhio District in Nakhon Ratchasima Province, Thailand. The dam was originally constructed in 1974 for the purposes of irrigation and water supply but after 2002, its water storage also serves as the lower reservoir for the Lam Takhong pumped storage power plant, Thailand's first power plant of that type.
The Ubol Ratana Dam, formerly known as the "Phong Neeb Dam", is a multi-purpose dam in tambon Khok Sung, Ubolratana district, approximately 50 km (31 mi) north of Khon Kaen, Khon Kaen province, Thailand. It was the first hydroelectric power project developed in Thailand's northeastern area of Isan. The dam impounds the Nam Phong, which flows into the Chi River and thence to the Mun River, a tributary of the Mekong River. The dam was given its current name by royal permission in 1966, in honour of princess Ubol Ratana, the eldest child of King Bhumibol Adulyadej.
Qorlortorsuaq Dam is a hydroelectric dam near Qorlortorsuaq in the Nanortalik district of the Kujalleq municipality in southern Greenland. It has a capacity of 7.6 MW and it generates power for the neighbouring towns of Qaqortoq and Narsaq.
The Miel I Dam, officially known as the Patángoras Dam, is a gravity dam on La Miel River just south of Norcasia in Caldas Department, Colombia. The dam was constructed between 1997 and 2002 for the primary purpose of hydroelectric power generation. At the time of its completion, the dam was the tallest roller-compacted concrete (RCC) dam in the world but was surpassed by the Longtan Dam in 2009.
The Yangyang Pumped Storage Power Station uses the water of the Namdae-Chun River to operate a 1,000-megawatt (1,300,000 hp) pumped storage hydroelectric power scheme, about 10 kilometres (6.2 mi) west of Yangyang in Gangwon Province, South Korea. The lower reservoir is created by the Yangyang Dam on the Namdae and the upper reservoir by the Inje Dam is located 937 metres (3,074 ft) above the power plant. Construction on the power plant began in 1996 and it was completed and dedicated on September 13, 2006. It is operated by Korean Midland Power Co., a subsidiary of Korea Electric Power Company and was completed at a cost of ₩1.1 trillion won. The first generator was operational on February 23, 2006 and the last August 10, 2006.
The Dniester Pumped Storage Power Station is a pumped storage hydroelectric scheme that uses the Dniester River 8 kilometres (5.0 mi) northeast of Sokyriany in Chernivtsi Oblast, Ukraine. Currently, four of seven 324-megawatt (434,000 hp) generators are operational and when complete in 2028, the power station will have an installed capacity of 2,268 megawatts (3,041,000 hp).
The Kazunogawa Pumped Storage Power Station is a pumped-storage hydroelectric power station near Kōshū in Yamanashi Prefecture, Japan. The station is designed to have an installed capacity of 1,600 megawatts (2,100,000 hp) and three of the four 400 megawatts (540,000 hp) generators are currently operational, for a total operational capacity of 1200 MW. Construction on the power station began in 1993 and the first generator was commissioned on 3 December 1999. The second was commissioned on 8 June 2000. The third one became operational on 9 June 2014, six year early due to post-power demand from the Great East Japan earthquake. The fourth and final generator is slated to be commissioned by 2024. It is owned by TEPCO and was constructed at a cost of US$2.2 billion.
The Afourer Pumped Storage Station is a pumped storage hydroelectric scheme located in the hills above Afourer of Azilal Province, Morocco. The scheme consists of two power stations with a combined installed capacity of 465 megawatts (624,000 hp). Construction on the project began in 2001 and was complete in 2004. It was funded by the Arab Fund for Economic & Social Development at a cost of US$220 million.
The Bao-Tavera Dam Complex refers to two earth-filled embankment dams located about 15 km (9.3 mi) south of Santiago in Santiago Province of the Dominican Republic. The Bao Dam on the Bao River is 113 m (371 ft) and withholds a reservoir with a maximum storage capacity of 280,000,000 m3 (230,000 acre⋅ft). It is the second tallest dam in the country behind the Monción Dam. The Tavera Dam, about 8 km (5.0 mi) east of Bao Dam, on the river Yaque del Norte is 82 m (269 ft) high and has a reservoir with a capacity of 170,000,000 m3 (140,000 acre⋅ft). A 1.5 km (0.93 mi) canal connects each reservoir, making them a complex. The purpose of the complex is to provide municipal water, water for irrigation and to generate hydroelectric power. Water from the Tavera Reservoir is piped downstream to the Tavera Hydroelectric Plant which is situated on the right bank of the Bao River before it meets the Yaque del Norte River. The power station contains two 48 MW Francis turbine-generators for an installed capacity of 96 MW. Construction on the Tavera Dam began in September 1969 and it was completed on 27 September 1973. The Bao Dam was completed in 1981. The power station was upgraded from 80 MW to 96 MW in 1992.
The Bihai Power Plant is a hydroelectric power plant in Xiulin Township, Hualien County, Taiwan.
The Lubuge Dam is a rock-fill embankment dam on the Huangni River, a tributary of the Nanpan River, located near Lubugexiang in Luoping County on the border of Guizhou and Yunnan Provinces, China. The primary purpose of the dam is hydroelectric power generation and it supports a 600 MW power station. Construction on the project began in 1982 and it was completed in 1991. Funded by the World Bank, it was the first loan offered by the bank to China's power sector.
Raiva Dam is a concrete gravity dam on the Mondego. It is located in the municipality Penacova, in Coimbra District, Portugal.