Mangaonoho railway station | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||
Location | New Zealand | ||||||||||
Coordinates | 39°52′45″S175°39′47″E / 39.879220°S 175.663190°E | ||||||||||
Elevation | 257 m (843 ft) | ||||||||||
Line(s) | North Island Main Trunk | ||||||||||
Distance | Wellington 216.04 km (134.24 mi) | ||||||||||
History | |||||||||||
Opened | 14 April 1893 | ||||||||||
Closed | 31 January 1982 | ||||||||||
Electrified | June 1988 | ||||||||||
Services | |||||||||||
|
Mangaonoho railway station was a station on the North Island Main Trunk in New Zealand. [1] [2] For almost a decade, from 1893 to 1902, Mangaonoho was important as the northern terminus of the NIMT's southern section; even a refreshment room was planned. [3] The route north was delayed by construction of major viaducts, the first being Makōhine. To build Makōhine a railway workshop was set up just north of Mangaonoho. Unlike many other NIMT construction camps, Mangaonoho gradually declined after the line was completed. By 1911 the population was down to 167. [4] Decline continued, with removal of the stockyards in 1973 [3] and closure in 1982. [5] There is now only a single line through the former station site. [6]
The New Zealand Ministry for Culture and Heritage gives a translation of "the stream of Noho" for Mangaonoho. [7]
A platelayer's cottage and siding were built in 1892, and a sawmill was moved to the station in 1893. [3]
The 3 mi 70 ch (6.2 km) extension from Kaikarangi (or Rangatira as it then was) [8] was contracted to Cleghorn, Forest, and Magee of Auckland, in 1890, for £26,499 [9] and vested in the Railway Commissioners on 14 April 1893, [10] regular services ran from Monday 1 May 1893 [11] and a daily train ran from 4 December 1893. [10] However, the contract for building the station was only let in March 1893, [12] work was in progress on building the 4th class station by June that year and it continued into 1895. [3] The stationmaster's house was completed in 1895, as was a windmill for water-supply. [13] There was also an engine shed, with an F Class 0-6-0T stabled there, a 63 ft (19 m) by 32 ft (9.8 m) goods shed, a loading bank, cattle and sheep yards. A crane was added in 1897. A post office opened at the station on 6 June 1894. There was a tablet and fixed signals. A crossing loop could take 99 wagons. [3]
Mangaonoho became an accounting station on 27 April 1894 after a telegraph line was built from Hunterville. [3] It then had 3 staff and sold 5,752 tickets in the year to 31 March 1895. [14]
From 1 November 1894 the Hunterville branch had two trains a day each way to this timetable for the 22 mi 29 ch (36.0 km) to Marton -
The journey was shortened to about 90 minutes when the new Marton station opened at the junction in 1898. [16]
By 1902 the staff had increased to 6, the tickets to 13,425 and 1,726,600 board feet (4,074 m3), or superficial feet of timber were railed from Mangaonoho that year. [17] Mangaonoho didn't feature in revenue statements after 1904, when the staff was down to 1, [18] though 6,662 tickets had been sold in 1903, but only 33,000 board feet (78 m3) of timber were railed out. [19]
Decline started when the line opened to Mangaweka on 16 August 1902. Mangaonoho became a flag station and lost its stationmaster from 3 November 1902. The Post Office was removed on 16 January 1903, though reopened in 1908 and finally closed on 25 February 1963. Part of the goods shed was moved to Hunterville in 1906, leaving a 40 ft (12 m) by 30 ft (9.1 m) shed. In 1911 one cottage was moved to Te Wera and another to Whangamōmoana – requesting authority £131.10.0.Approval to remove the station building was given in 1971. On 19 September 1986 the station closed to all traffic. [3]
Mangaonoho Public Works Department workshop opened in 1896, [20] 1.37 km (0.85 mi) to the north of the station, [21] on what was Waterfall Rd [22] (now Ironworks Rd), [23] where a passing loop for 67 wagons [3] remains. [24] The works was fully operational from late 1898. Electricity lit the track and workshop to allow 16-hour working days. All the steelwork for the Makōhine Viaduct was ready in 1900. Up to 300 were employed in building the viaduct. Two of them died in accidents. [20]
In 1901 the workshop was also preparing steelwork for the Mangaweka Viaduct. [25] It later prepared the steel for Taonui and Hapuawhenua viaducts, opened in 1908. [12]
A further 1.83 km (1.14 mi) north of the workshop, the 198 yd (181 m) long Makōhine tunnel was finished in 1894, after 14 months of construction, allowing the rails to reach the edge of the Makōhine gorge, for easy access to the viaduct site. [26] The lining of the tunnel was completed in August, except about 15ft kept open to enable the men to run the cutting to spoil. [13] It was 16 ft 10 in (5.13 m) high and 10 ft 4 in (3.15 m) wide (at the bottom). The walls were thick concrete, with an arch of concrete blocks. It was constructed by co-operative labour, who suffered no accidents. [27] However, a mother and four children died when a spoil heap from the tunnel cutting collapsed on them. [28] The tunnel was daylighted in 1984, prior to electrification. [1]
Makōhine viaduct | |
---|---|
Coordinates | 39°52′11″S175°40′58″E / 39.869771°S 175.682708°E |
Carries | Single track of the North Island Main Trunk |
Crosses | Makōhine Stream |
Owner | KiwiRail |
Characteristics | |
Design | Two steel trestle piers, two 75 metres (246 ft) steel Warren trusses and a central 53 metres (174 ft) truss. |
Material | Steel |
Total length | 228 metres (748 ft) |
Height | 72 metres (236 ft) |
No. of spans | 3 |
History | |
Engineering design by | Public Works Department |
Constructed by | PWD |
Construction start | 1896 |
Opened | 17 June 1902 |
Designated | 2 April 1985 |
Reference no. | 32 |
Location | |
Very close to the former tunnel, Makōhine is the southernmost of the five largest NIMT viaducts. [29] It spans the Makōhine Stream, which flows into the Rangitīkei River just over a kilometre downstream. [30] Like the river, the stream is incised into the soft late Pliocene to early Pleistocene sediments, which are part of the Whanganui Basin. [31]
Although the rails had reached the gorge in 1894, it wasn't until February 1896 that tenders were called. They exceeded expectations, [20] which were £30,000 to £50,000, [25] so PWD also used worker co-operatives for this contract. Further delays were caused by a steel strike in Britain (1,272 tonnes of steel were used) and heavy rain on the unstable soil, which affected pier foundations in 1897 and flooded the gravel pit in 1898. It wasn't until 1900 that pier construction began. The spans are longer than other NIMT viaducts to minimise the piers needed. The viaduct was opened by the Minister of Public Works, William Hall-Jones, on 17 June 1902. [20]
The viaduct was strengthened around 1932 to allow for the heavier K class, by adding intermediate vertical struts to the Warren trusses of the two main spans. The viaduct was again strengthened in the early 1980s to prepare for electrification, by replacing the smaller end spans, replacing wooden beams supporting the track with steel, and adding links to transmit traction and braking forces into the main structure. [20]
As the 1979 map above shows, the line to the south of Mangaonoho largely curved around the contours. No.19 tunnel was daylighted in 1972, on the section of line later bypassed. [32] A $1,403,897 1984 contract by John McLachlan Ltd. covered the deviation, [33] which straightened the line and bypassed No.8 tunnel with a large cutting at a lower level, built by Ian A. Martin Ltd at a cost of $853,461.
The North Island Main Trunk (NIMT) is the main railway line in the North Island of New Zealand, connecting the capital city Wellington with the country's largest city, Auckland. The line is 682 kilometres (424 mi) long, built to the New Zealand rail gauge of 1,067 mm and serves the large cities of Palmerston North and Hamilton.
Greatford railway station was a station on the North Island Main Trunk (NIMT) in New Zealand, south of Marton. It is in the Manawatū-Whanganui region. Only a substation and a passing loop remain.
Halcombe railway station was a station on the North Island Main Trunk (NIMT) in New Zealand, serving the village of Halcombe, in the Manawatū-Whanganui region. It opened in 1878 and closed in 1983. Originally it was the main intermediate station on the 85 mi 34 ch (137.5 km) Whanganui to Foxton railway. Only a single track remains through the station site, as the passing loops here and at Kakariki were replaced by the Rangitawa loop, 3.03 km (1.88 mi) to the north, on 14 December 1983.
Bunnythorpe railway station was a station on the North Island Main Trunk in New Zealand, serving the village of Bunnythorpe.
Ōhingaitirailway station was a station on the North Island Main Trunk in New Zealand.
Mangaweka railway station was a station on the North Island Main Trunk (NIMT), serving the village of Mangaweka in the Manawatū-Whanganui region of New Zealand. The original station opened in 1902 and closed on 15 November 1981. A new station then opened to the east, on the Mangaweka deviation on 18 November 1981, though only for parcels, small lots, and as a passing loop, which still remains.
Utiku railway station was a station on the North Island Main Trunk in New Zealand, and in the Manawatū-Whanganui region. It opened in 1904 and closed in 1986. It was part of the 13+1⁄2 mi (21.7 km) Mangaweka to Taihape section, officially opened by the Prime Minister, Richard Seddon, on 21 November 1904. It closed in 1986. A passing loop remains.
Hunterville railway station was a station on the North Island Main Trunk in New Zealand, serving the township of Hunterville.
Silverhope railway station was a station on the North Island Main Trunk in New Zealand, 12 mi 9 ch (19.5 km) from Marton. Goods were first carried to the station on 19 October 1887, though the official opening of the 15 mi 57 ch (25.3 km) Marton to Hunterville section wasn't until Saturday 2 June 1888, when the station was served by two trains a week, reported as losing £15 a week. A Certificate of Inspection for the line was issued on Wednesday, 6 June 1888.
Rata railway station was a station on the North Island Main Trunk in New Zealand, between Marton and Hunterville, 9 mi 46 ch (15.4 km) from Marton. There is now just a single track through the station site, a new crossing loop having replaced those at Rata and Porewa from 14 December 1983, 3.04 km (1.89 mi) to the west of Rata. The realignment of State Highway 1 alongside the railway in 2006 took some former railway land.
Porewa railway station was a station on the North Island Main Trunk in New Zealand located in Pohonui-Porewa, on the Hunterville Branch, 6 mi 42 ch (10.5 km) from Marton. The station was in use from 1887 to 1982, but now has only a single track through the site.
Overton railway station was a very small flag station on the North Island Main Trunk and in the Manawatū-Whanganui region of New Zealand.
Cliff Road railway station was a flag station on the North Island Main Trunk in New Zealand. It opened in 1888 and closed in 1982. Only a single track now passes through the station site and no buildings remain.
Ohakune railway station is a station on the North Island Main Trunk (NIMT), which serves the town of Ohakune in the Manawatū-Whanganui region of New Zealand. It is served by KiwiRail's Northern Explorer long distance train between Wellington and Auckland. It was called Ohakune Junction from 10 August 1926 until Raetihi Branch closed in 1968, to avoid confusion with Ohakune Town station on that branch. It was the second highest operating railway station in New Zealand, after National Park.
Marton railway station was a station and rail junction on the Marton–New Plymouth Line, opened on 4 February 1878. After the North Island Main Trunk (NIMT) made a junction to the south of Marton, a new station was built there and the old station renamed and downgraded, in 1898.
Kakahi was a station on the North Island Main Trunk line, in the Ruapehu District of New Zealand, serving Kakahi. It formally opened on 9 November 1908. The rails were laid south of Piriaka by May 1904 and a daily ballast train was running by October, which also carried passengers. Kakahi Bridge has five spans of 44 ft (13 m) and one of 23 ft (7.0 m) supplied by G. Fraser & Sons of Auckland, which delayed construction to the south. It crosses the Kakahi Stream, which was sometimes called the Waitea River.
Rangataua was a station on the North Island Main Trunk line, in the Ruapehu District of New Zealand. Like most of the stations on the central part of the NIMT, a large timber trade exploited the native bush until it was largely felled. What is now the small village of Rangataua developed to the south of the station. Just a single track now passes through and virtually nothing remains of the once busy station and workshops.
Horopito was a station on the North Island Main Trunk line, in the Ruapehu District of New Zealand. It served the small village of Horopito and lies just to the north of two of the five largest NIMT viaducts. It and Pokaka also lay to the south of Makatote Viaduct, the late completion of which held up opening of the station.
Pokaka was a station on the North Island Main Trunk line, in the Ruapehu District of New Zealand. It served the small village of Pokaka and lay to the south of Makatote Viaduct, the late completion of which held up opening of the station.
Erua was a station on the North Island Main Trunk line, in the Ruapehu District of New Zealand. It served the small village of Erua. For a month in 1908 it was the terminus of the line from Auckland. Makatote Viaduct and tramway are about 3 mi (4.8 km) south of Erua.
Photos -