M3 | |||
---|---|---|---|
Overview | |||
Status | Operational | ||
Line number | 3 | ||
Locale | Milan, Italy | ||
Termini | |||
Connecting lines | |||
Stations | 21 | ||
Service | |||
Type | Rapid transit | ||
System | Milan Metro | ||
Operator(s) | Azienda Trasporti Milanesi | ||
Depot(s) | Rogoredo Depot | ||
Rolling stock | UdT series 8000/8100 AnsaldoBreda Meneghino | ||
Daily ridership | 250,000 (2012) [1] | ||
History | |||
Opened | 3 May 1990 | ||
Technical | |||
Line length | 17.1 km (10.6 mi) | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
Electrification | 1,500 V DC overhead catenary | ||
|
Line 3 (Linea Tre in Italian, also known as M3) is an underground line in Milan, Italy. This line is part of the Milan Metro and operated by ATM. Construction began in 1981 in order to be ready for the 1990 Football World Cup. It is also called the Yellow Line (Linea Gialla) as identified by its yellow signage.
The line connects the southeastern suburb of San Donato Milanese to the northwestern area of the city, travelling through the city centre. It is 17.1 km long and has 21 stations. [2]
The proposal for a third metro line was approved by the municipal government of Milan in 1977. The route was chosen based on a study of main traffic routes in previous years. The final projected route was presented in early 1981. Works on the new line began on 8 September in the same year. [3] The first section, from Centrale to Duomo opened on 3 May 1990, just in time for the beginning of the World Cup. However, only a shuttle service was active between the two terminus. The line was extended to Porta Romana at the end of the year. [4]
New extensions to Sondrio to the north and to San Donato to the south opened on 12 May 1991. [5]
Further extensions of the new line happened slowly in the following years. Zara station was inaugurated only on 16 December 1995 and Maciachini on 8 December 2003. [5] The last extension (Maciachini-Comasina) opened in early 2011. [6]
The line, 16.6-kilometre long with 21 stations, runs from Comasina to San Donato, entirely underground
Station Name | Transfer | Opening |
---|---|---|
Comasina | 26 March 2011 | |
Affori FN | ||
Affori Centro | ||
Dergano | ||
Maciachini | 8 December 2003 | |
Zara | 16 December 1995 | |
Sondrio | 12 May 1991 | |
Centrale FS | 3 May 1990 | |
Repubblica | ||
Turati | ||
Montenapoleone | ||
Duomo | ||
Missori | (Sforza-Policlinico) (October 2024) | 16 December 1990 |
Crocetta | 6 December 1990 | |
Porta Romana | ||
Lodi T.I.B.B. | 12 May 1991 | |
Brenta | ||
Corvetto | ||
Porto di Mare | ||
Rogoredo FS | ||
San Donato |
Trains use an overhead contact system providing a voltage of 1,500 V DC. The track gauge is of the 1,435 mm (4 ft 8+1⁄2 in) standard gauge .
As of 2020, there are two types of rolling stocks being used on the line:
A southeastern extension of the line has been planned. The new extension will run from San Donato through the municipalities of San Donato Milanese, Peschiera Borromeo, Mediglia, Pantigliate, Settala and finish in Paullo. The extended section will be 14.8 km (9.2 mi) long and has 6 stations. Trains will run mostly underground (60%). [7]
Although the project was approved in 2010, it was put on hold in early 2011 due to lack of funds. [8] Works were postponed to a later date. [9]
Currently there are plans to replace 48 lifts and 52 elevators for the Milan-Cortina Winter Olympics in 2026. [10]
The Milan Metro is the rapid transit system serving Milan, Italy, operated by Azienda Trasporti Milanesi. The network consists of 5 lines with a total network length of 111.8 kilometres (69.5 mi), and a total of 125 stations, mostly underground. It has a daily ridership of about 1.4 million on weekdays. The Milan Metro is the largest rapid transit system in Italy in terms of length, number of stations and ridership; and the fifth longest in the European Union and the eighth in the Europe.
Line 1 is the first underground rapid transit line built in Milan, Italy. It is part of the Milan Metro and it is operated by ATM. Works on the line began in 1957, and the first part was opened on 1 November 1964, running from Sesto Marelli to Lotto station. The line is also called Red Line, as it is visually identified by red signs. Due to its premiership, the line gave its red color to the Milan Metro logo.
Line 2, is a subway line serving Milan, Italy, operated by ATM as part of the Milan Metro. It is also called the Green Line,, as it is visually identified by green signs.
The Turin Metro is the modern VAL rapid transit system serving Turin. It is operated by Gruppo Torinese Trasporti (GTT), a public company controlled by the municipality of Turin. The system comprises one 15.1-kilometre line with 23 stations connecting Fermi station in Collegno with Piazza Bengasi in Turin, near the border with the municipality of Moncalieri.
Line C is a Rome Metro line which runs from Monte Compatri-Pantano in the eastern suburbs of Rome, in Italy, to San Giovanni near the city centre, where it meets Line A. It is the third metro line to be built in the city and the first to be fully automated.
Line 6 is a 5.5-kilometre (3.4 mi) light metro line that forms part of the Naples Metro. The four-station first part of the line opened in 2007, but was then closed from 2013 to 2024. It was reopened for service and extended to eight stations on 17 July 2024.
Azienda Trasporti Milanesi S.p.A. is the municipal public transport company of Milan and 46 surrounding metropolitan municipalities. It operates 5 metro lines, 17 tram lines, 122 bus lines and 4 trolleybus lines, carrying about 776 million passengers in 2018.
The Passante Ferroviario di Milano is an underground railway which runs through Milan, Italy.
Line 5 is an underground rapid transit line in Milan, Italy, part of the Milan Metro. The line, also known as M5 or the Lilac Line, is 12.8-kilometre (8.0 mi) long and goes through the city from the north to the north-west. It opened in stages between 2013 and 2015.
Porta Venezia is an underground station on Line 1 of the Milan Metro. It was opened on 1 November 1964 as part of the inaugural section of the Metro, between Sesto Marelli and Lotto.
Rogoredo FS is a station on Line 3 of the Milan Metro in Milan, Italy. The station was opened on 12 May 1991 as part of the extension of the line from Porta Romana to San Donato.
San Donato is a station on Line 3 of the Milan Metro in Milan, Italy. The station was opened on 12 May 1991 as part of the extension of the line from Porta Romana. It is the southern terminus of the line.
Maciachini is an underground station on Line 3 of the Milan Metro which opened on December 8, 2003, thirteen years after the opening of the original trunk of the line. This station was the northern terminus of the line until March 26, 2011, with the extension of the line to Comasina.
The Milan tramway network is part of the public transport network of Milan, Italy, operated by Azienda Trasporti Milanesi (ATM).
Dergano is a station on Line 3 of the Milan Metro which opened on March 26, 2011, twenty-one years after the opening of the original trunk of the line. It is the first station following Maciachini, the former northern terminus of the line. Dergano station was opened with other three stations, forming the branch from Dergano with Comasina.
Line 4 is an underground rapid transit line in Milan, Italy, part of the Milan Metro. The line color is blue. The first section opened on 26 November 2022 and as of 2023 it is 7.3 km (4.5 mi) long with 8 stations. The full line opened on 12 October 2024 The line is 15.2 km (9.4 mi) long with 21 stations.
Milanofiori Forum is a station on Line 2 of the Milan Metro, in the southern suburb of Assago. The line here runs beside Autostrada A7, and it is the southernmost station of the network. The station was opened on 20 February 2011 as the terminus of a two-station extension from Famagosta.
Piola is a station of the Milan Metro, on line M2. The station grants direct access to the Politecnico di Milano (POLIMI).
Isola is a station on Line 5 of the Milan Metro. It takes its name from the Isola (island) district of Milan in which it is located, its name derived from the neighbourhood's position cut off from the city centre by the main railway.
The Milan Metro subway system is managed by a single ATM control centre, built in 2013 by Alstom.