Milan Metro Line 3

Last updated
M3
Milano linea M3.svg
Milano metropolitana Lodi TIBB.JPG
Lodi T.I.B.B. station
Overview
StatusOperational
Line number3
Locale Milan, Italy
Termini
Connecting lines Milano linea M1.svg Milano linea M2.svg Milano linea M4.svg Milano linea M5.svg
Stations21
Service
Type Rapid transit
System Milan Metro
Operator(s) Azienda Trasporti Milanesi
Depot(s)Rogoredo Depot
Rolling stockUdT series 8000/8100
AnsaldoBreda Meneghino
Daily ridership250,000 (2012) [1]
History
Opened3 May 1990
Technical
Line length17.1 km (10.6 mi)
Track gauge 1,435 mm (4 ft 8+12 in) standard gauge
Electrification 1,500 V DC overhead catenary
Route map
Milano - mappa metropolitana M3.svg

Line 3 (Linea Tre in Italian, also known as M3) is an underground line in Milan, Italy. This line is part of the Milan Metro and operated by ATM. Construction began in 1981 in order to be ready for the 1990 Football World Cup. It is also called the Yellow Line (Linea Gialla) as identified by its yellow signage.

Contents

The line connects the southeastern suburb of San Donato Milanese to the northwestern area of the city, travelling through the city centre. It is 17.1 km long and has 21 stations. [2]

History

Inside an original line M3 train. Metro-milano-interno-a.jpg
Inside an original line M3 train.

The proposal for a third metro line was approved by the municipal government of Milan in 1977. The route was chosen based on a study of main traffic routes in previous years. The final projected route was presented in early 1981. Works on the new line began on 8 September in the same year. [3] The first section, from Centrale to Duomo opened on 3 May 1990, just in time for the beginning of the World Cup. However, only a shuttle service was active between the two terminus. The line was extended to Porta Romana at the end of the year. [4]

New extensions to Sondrio to the north and to San Donato to the south opened on 12 May 1991. [5]

Further extensions of the new line happened slowly in the following years. Zara station was inaugurated only on 16 December 1995 and Maciachini on 8 December 2003. [5] The last extension (Maciachini-Comasina) opened in early 2011. [6]

Route

The line, 16.6 kilometres long with 21 stations, runs from Comasina to San Donato, entirely underground.

Station NameTransferOpening
Comasina 26 March 2011
Affori FN Milano S2 (2025).svg Milano S4 (2025).svg Milano S12 (2025).svg Tren.svg
Affori Centro
Dergano
Maciachini 8 December 2003
Zara Milano linea M5.svg 16 December 1995
Sondrio 12 May 1991
Centrale FS Milano linea M2.svg Tren.svg 3 May 1990
Repubblica Milano S1 (2025).svg Milano S2 (2025).svg Milano S5 (2025).svg Milano S6 (2025).svg Milano S12 (2025).svg Milano S13 (2025).svg
Turati
Montenapoleone
Duomo Milano linea M1.svg
Missori Milano linea M4.svg (Sforza-Policlinico)16 December 1990
Crocetta 6 December 1990
Porta Romana
Lodi T.I.B.B. Milano S9 (2025).svg Milano S19 (2025).svg 12 May 1991
Brenta
Corvetto
Porto di Mare
Rogoredo FS Milano S1 (2025).svg Milano S2 (2025).svg Milano S12 (2025).svg Milano S13 (2025).svg Milano S19 (2025).svg Tren.svg
San Donato

Rolling stock

Trains use an overhead contact system providing a voltage of 1,500 V DC. The track gauge is of the 1,435 mm (4 ft 8+12 in) standard gauge .

As of 2020, there are two types of rolling stocks being used on the line:

Planned extension

A southeastern extension of the line has been planned. The new extension will run from San Donato through the municipalities of San Donato Milanese, Peschiera Borromeo, Mediglia, Pantigliate, Settala and finish in Paullo. The extended section will be 14.8 km (9.2 mi) long and has 6 stations. Trains will run mostly underground (60%). [7]

Although the project was approved in 2010, it was put on hold in early 2011 due to lack of funds. [8] Works were postponed to a later date. [9]

Currently there are plans to replace 48 lifts and 52 elevators for the Milan-Cortina Winter Olympics in 2026. [10]

Notes and references

  1. "Area C rilancia i mezzi pubblici è boom di passeggeri sul metrò". la Repubblica. 19 September 2012. Archived from the original on 22 September 2012. Retrieved 28 October 2012.
  2. Mancebo, Ivanka Garcia. "Milan Metro - Milan metro lines, schedules and prices". www.introducingmilan.com. Retrieved 2024-07-30.
  3. Severi, Vasini (1989). Metropolitana di Milano. Milano: Azienda Trasporti Municipali.
  4. "Milano sperimenta il suo terzo metrò". Corriere della Sera. 1 May 1990.
  5. 1 2 "La cronistoria della Metropolitana di Milano". CityRailways. Archived from the original on 20 March 2012. Retrieved 23 September 2011.
  6. "Nuove fermate linea 3". Corriere della Sera. Archived from the original on 21 June 2011. Retrieved 23 September 2011.
  7. "Prolungamento linee Metropolitane e Nodo Interscambio Fiera: Metropolitana linea 3". Comune di Milano. Retrieved 1 October 2011.
  8. "Metrò choc, bloccato il prolungamento fino a Paullo". Il Giorno. Archived from the original on 30 March 2012. Retrieved 1 October 2011.
  9. "Prolungamenti". Metropolitana Milanese. Archived from the original on 26 October 2011. Retrieved 1 November 2011.
  10. "Public transport. Metro accessibility, works in M3 to replace 48 elevators and 52 escalators - Municipality of Milan". Comune di Milano. Retrieved 2024-07-30.