Newport (steamboat)

Last updated
Steamer Newport before 1914.jpg
Newport with passenger barge Elk, circa 1910.
History
Name:Newport
Route: Yaquina Bay and Yaquina River
Launched: May 20, 1908 Yaquina City, Oregon
Completed: 1908
Identification: US registry #205273
General characteristics
Type: inland passenger, wood construction
Tonnage: 77 gross; 54 regis. tons
Length: 72 ft (21.95 m)
Beam: 16.4 ft (5.00 m)
Depth: 5.4 ft (1.65 m) depth of hold
Installed power: Originally steam engine, 160 indicated NHP; converted 1914 to gasoline-engine, 110 horsepower.
Propulsion: propeller

Newport was an American steamboat built in 1908 at Yaquina City, Oregon. Now a ghost town, Yaquina City was then the terminus of the Corvallis & Eastern Railroad. For many years Newport transported excursionists in the summer months across a short water route between Yaquina City and the town of Newport, Oregon.

Contents

Newport was originally built as a steam-powered vessel, and used some of the components, including the boiler, from an earlier steamer, the T.M. Richardson . [1]

Although only a small wooden vessel, Newport, with the aid of an unpowered barge lashed alongside, transported as many as 500 passengers at a time on the short trip across Yaquina Bay. In 1914, to accommodate anticipated greater patronage of the rail line, Newport was converted to gasoline engine power.

Purpose

In 1908, the Newport-Yaquina route was purchased by Jack Fogarty and Capt. Oscar F. Jacobson from Capt. Chatterton. Fogarty and Jacobson were brothers-in-law, O.F. Jacobson being married to Julia Fogarty (d.1918), Jack Fogarty’s sister. [2]

Passengers bound for Newport, Agate Beach, Otter Rocks, Seal Rocks, Waldport, Tidewater and Yachats would arrive by rail at Yaquina City, Oregon. [3] Baggage and cargo would be transferred from the train to the steamer by the train pulling out onto a pier and the baggage then being sent down a chute onto the steamer. [3]

Construction and dimensions

The basic dimensions of Newport were 72 ft (21.95 m) and 81 gross tons. [1] The boiler from the old steamer T.M. Richardson was to be placed in the new steamer, which was built at Yaquina City, Oregon to replace Richardson. [4]

Alternatively, the registered dimensions of the vessel, in 1909, were 72 ft (21.95 m) length, beam of 16.4 ft (5.00 m), depth of hold of 5.4 ft (1.65 m), 77 gross tons and 54 registered tons. [5] Total crew required was three. [5] The steam power plant generated 160 indicated horsepower. [5] The official registration number was 205273.

In February 1908, the Newport Navigation Company began preparing to build a new steamboat to be used on the run between Yaquina City, Oregon and Newport. [6] The new boat would be built at Yaquina City, Oregon and would replace T.M. Richardson which had been on the route for the previous fifteen to twenty years. [6] Construction was anticipated to begin soon after February 1908, and would be supervised by George Walker, a well-known boat builder. [6]

Newport was launched at 4:00 p.m. in the afternoon of Wednesday, May 20, 1908. [7] A large crowd was brought across the bay from Newport to witness the launch. [7] Julia Jacobson, wife of one of the owners, spoke the words “I christen thee Newport” as she broke a bottle of wine over the bows. [7]

The new vessel was 78 feet long overall, with a beam of 16 feet. [7] The boat was built for the Newport Navigation Company. [7]

The steamer Newport was taken out on a trial trip on Saturday, June 6, 1908. [8]

Early operations

Newport on Yaquina Bay, with passenger barge Elk lashed alongside. Steamer Newport leaving Newport OR circa 1910.jpg
Newport on Yaquina Bay, with passenger barge Elk lashed alongside.

On November 7, 1908, Newport came upriver to Toledo, Oregon from Newport city with the barge Elk. [9] The barge was placed out of service for the winter, in fresh water at a mill owned by one Altree. [9]

Jack Fogarty was serving as engineer on the Newport in 1909, with George C. Walker as his relief. [10]

In mid-June, 1910, passengers arriving at Yaquina City for transport to Newport averaged over 50 daily, an unusually high number for that time of the year. [11] Captain Jacobson, of the Newport, reported this to have been the heaviest June travel in his experience. [11] Plans were being made for special railroad excursions for Independence Day celebrations in Newport. [11]

During peak travel times, generally during the summer vacation seasons, the passenger carrying capacity of Newport was augmented by lashing up alongside the steamer an unpowered barge, the Elk or the Julia. Elk, a scow with a cabin, was built in 1905 at Toledo, Oregon, was registered as an “unrigged vessel”, of 97 gross and 94 net tons, with the official merchant registry number 162693. [12] According to the official registry, four crewmen were required on board Elk. [12]

Newport with barge Julia lashed alongside. Built with a steamboat's hull, Julia was originally planned to be a powered vessel, but ended up being operated as an unpowered barge; the steamboat hull is clearly visible in this image. Newport and barge Julia.jpg
Newport with barge Julia lashed alongside. Built with a steamboat's hull, Julia was originally planned to be a powered vessel, but ended up being operated as an unpowered barge; the steamboat hull is clearly visible in this image.

The Julia, at 53 gross and net tons, was built in 1912, at George C. Walker’s then new shipyard in Toledo. [12] [13] Julia was originally intended to be a powered steamboat, 85 feet long and 18 feet beam, but used as a barge for the first summer season after completion. [14] No power plant was ever installed however, and Julia remained an unpowered barge. [14]

Like Elk, Julia was officially listed as an "unrigged vessel", but with a different official number, [12] Julia was named after Captain Jacobson’s wife. [15] Unlike the scow Elk, Julia was built with a river steamboat hull, allowing better speed to be made on excursions. [15] Julia could carry 300 people. [15] Reportedly Julia had “good seats and open decks.” [15]

Large crowds at the Newport waterfront

On Sunday, July 24, 1910, Newport transported in one trip, 500 persons to the dock at the Newport waterfront. [16] A crowd of 1,500 people gathered at the dock to greet the new arrivals. [16] A city marshall, M.B. Grant, had to clear a path through the crowd to allow the disembarking passengers to cross the dock from the steamer to the street. [16] While doing so, Grant encountered Howard Bush, a merchant from Summit, Oregon, and asked Bush to step back. [16] Bush refused, struck Grant a blow on his nose with a fist, and knocked Grant to the ground. [16]

Bush continued to attack Grant while the marshall was on the ground. [16] Another marshall, Blattener, pulled Bush off Grant. [16] Grant then subdued Bush with three blows of the billy club to Grant’s head, lacerating him severely. [16] Grant then arrested the by then submissive Bush, took him to jail, where his wounds were sewn up by a physician, Dr. Carter. [16] Grant was charged with interfering with a police officer, and released on $100 cash bail with orders to appear before a justice of the peace the next morning. [16]

Operations up to 1914

In mid-October 1911, Newport broke its propeller shaft. [17] The boat was brought to Toledo for repairs, which were completed by October 20, 1911. [17] The work was done by the Modern Improvement Company, of which George C. Walker, the relief captain of Newport, was a principal until January 2, 1912. [17] [18] [19]

The summer of 1913 was one of the busiest ever yet for tourism at Newport. As of August 4, 1913, over 3,500 persons had arrived at the city in the previous eight days. [20] Overcrowded trains on the Southern Pacific line to Yaquina City were reported to be running an average of an hour late. [20] It was said that the boiler on the Newport (which came from the condemned steamer T.M. Richardson ) was too small for its engine. [20] According to a newspaper report, “throngs, herded like cattle on boats and barges, pass about an hour on a ride of three minus and a half across the bay when compelled to go to restaurants.” [20] Reportedly hundreds of passengers had complained to the railway or the steamboat company, but nothing had been done to improve things. [20]

Band to greet passengers on arrival

In May 1913 plans were made to sponsor a local band in Newport, consisting then of 14 members, which among other things, would greet passengers arriving on the steamer Newport at the city dock. [21] The band was under the direction of J.P. Fenwick. [21] Motion pictures were shown in Newport on May 19 and 20, 1913, and the proceeds from the ticket sales were donated to the Newport band to buy new instruments and music so that the band could be expanded. [21] Captain R.D. Morse, of the gasoline launch Ahwaneda (built in 1912), offered to turn over the proceeds of three or four excursion trips to support the band. [21] In May, the plans were to meet the Newport on Sundays and three or four evenings during the week. [21] The band also intended to give concerts at Nye Beach on Sunday afternoons during the summer. [21]

Conversion to gasoline engine power

In January 1914, Capt. Oscar F. Jacobson travelled to Portland, Oregon where he purchased a 110 horse power Western Standard gasoline engine, which he intended to install in time for the next summer season. [22] The Newport Navigation Company, owners of the vessel, decided to make to the conversion in anticipation of increased patronage due to the improvement of the Corvallis & Eastern’s rail line to Yaquina, by the addition of ballast and the laying of heavier rail. [23]

The engine arrived at Toledo in early March, 1914. [24] Work on installing the new power plant began on the morning of March 6, 1914, when the steamer arrived at Toledo from Newport. [24] The new machinery was reported to be able to double the power of the vessel, and "greatly increase her efficiency in transporting the passengers from Yaquina to Newport during the big Summer rushes. [24] The travel time from Yaquina to Newport was expected to be reduced by ten minutes. [25] Running time would then be down to 15 minutes. [26]

The steamer was then owned by the Newport Navigation Company. [25] George C. Walker, an experienced Yaquina Bay steamboat man and boatbuilder, who by then was living in California, was requested by telegraph to return to Yaquina City to supervise the work. [27] The gasoline-powered Truant, itself a converted steamer, would replace Newport while the conversion was underway. [27]

The work was nearing completion on March 27, 1914. [28]

On Thursday, April 2, 1914, the Newport returned to the lower Yaquina Bay from Toledo, under power from the new gasoline engine. [29] With the conversion of Newport to gasoline power, there were no longer any steam-driven vessels operating on Yaquina Bay. [29]

Because of the increased speed due to the new engine, Newport was able to adjust its schedule, departing the Newport waterfront for Yaquina City at 7:00 a.m. daily, rather than the previous time of 6:45 a.m. [30] The schedule change took effect on April 22, 1914. [30]

Later operations

John Marshall, president of the Newport Navigation Company, at age 84 in 1919. John Marshall (steamboat engineer 02).png
John Marshall, president of the Newport Navigation Company, at age 84 in 1919.

In the parade of boats held on July 4, 1914, Newport and the barge Julia won first prize for decoration. [31] According to a newspaper report, “the Newport and the royal barge, Julia were beautifully and elaborately decorated with bunting, flags and chinese lanterns, making a most beautiful and brilliant experience. [31]

On Sunday, July 19, 1914, over 1000 people travelled on the railroad between Albany, Oregon and Yaquina City. [32] Two trains arrived and three trains departed from Yaquina City. [32] To accommodate the traffic, Newport made five trips that Sunday, with the barge Julia, between Yaquina City and the Newport waterfront. [32]

In April 1918, repairs to Newport were completed at the Anderson Boat Works at Toledo, Oregon. [33] The barge Julia was hauled out for repairs shortly after the work was complete on Newport. [33]

In March 1920, John “Johnny” Marshall, president of the Newport Navigation Company, visited Newport to inspect Newport, which was then operating between South Beach and Yaquina City. [34] Marshall was then 82 years of age, and was probably the most senior of the steamboat men then living. [34] [35]

Marshall had been friends with a number of historical figures, including Ulysses S. Grant, whom he had visited in the White House, and generals Hooker and George B. McClellan. [34] Marshall had served as engineer on a number of well-known vessels on the Columbia and Willamette rivers, including Enterprise (1855), Wide West , Hassalo, Senator, and Willamette Chief . [36]

In June 1920, the rail service to Yaquina City, and the processing of detraining and boarding the Newport, came under newspaper criticism. [3] Only one train per day was now running, and the cargo transfer facilities had deteriorated, with the pier that once supported the train having rotted partially away. [3]

In March 1922, Newport was undergoing repairs at Toledo, at the Altree shipyard. [37] The work included an overhaul, repaint, with new guard rails and the addition of some new timbers. [38] The schooner Sea Foam was placed on the run temporarily while Newport was out of service. [38]

Newport was scheduled to be back on the run on Wednesday, March 30, 1922.

Disposition

Newport continued to be registered as a passenger vessel in 1922–1923, although the gross tonnage of the vessel was now reported as 81. [39] Newport was listed as abandoned in the 1930 registry of merchant vessels. [40]

Relic

As of 2013, the wheel of the Newport was in the possession of the Lincoln County Historical Society and on exhibit. [41]

See also

Notes

  1. 1 2 Newell, Gordon R., ed. (1966). H.W. McCurdy Marine History of the Pacific Northwest. Seattle, WA: Superior Pub. Co. p. 151. LCCN   66025424.
  2. "Mrs. O.F. Jacobson Died Wednesday Morning". Lincoln County Leader . 25 (49). Toledo, OR: Collins & Hayden. Jan 25, 1918. p. 1 col. 6.
  3. 1 2 3 4 "Newport Asks Relief", Morning Oregonian , Portland, OR, 59 (18, 577), p. 8 col. 2, Jun 9, 1920
  4. "The Newport Launched". Lincoln County Leader . 16 (13). Toledo, OR: Collins & Hayden. May 22, 1908. p. 1 col. 3.
  5. 1 2 3 U.S. Dept. of the Treasury, Statistics Bureau (1910). Annual List of Merchant Vessels. Washington, DC: GPO. p. 264.
  6. 1 2 3 "The Newport Navigation Company is preparing for the construction …", Lincoln County Leader , Toledo, OR: Collins & Hayden, 15 (52), p. 1 col. 2, Feb 21, 1908
  7. 1 2 3 4 5 "The Newport Launched". Morning Oregonian . 48 (14, 813). Portland, OR. May 22, 1908. p. 16 col. 1.
  8. "The Steamer Newport made a trial trip …". Lincoln County Leader . 16 (16). Toledo, OR: Collins & Hayden. Jun 12, 1908. p. 1 col. 2.
  9. 1 2 "The Steamer Newport came up last Saturday …". Lincoln County Leader . 16 (38). Toledo, OR: Collins & Hayden. Nov 13, 1908. p. 1 col. 3.
  10. "George C. Walker went to the lower bay …". Lincoln County Leader . 17 (20). Toledo, OR: Collins & Hayden. Nov 13, 1908. p. 1 col. 1.
  11. 1 2 3 "Newport Crowded Early", The Sunday Oregonian , Portland, OR, 29 (25), p. 7 col. 3, Jun 19, 1910
  12. 1 2 3 4 U.S. Dept. of the Treasury, Statistics Bureau (1914). Annual List of Merchant Vessels (For fiscal year ending June 30, 1913). 45. Washington, DC: GPO. p. 352.
  13. "Newport — Joseph Blower, who died in a hospital …", Lincoln County Leader , Toledo, OR: Collins & Hayden, 21 (15), p. 1 col. 3, May 30, 1913
  14. 1 2 "George C. Walker, the shipbuilder, is getting his new shipyard built …", Lincoln County Leader , Toledo, OR, 20 (6), p. 5 col. 3, Mar 29, 1912
  15. 1 2 3 4 "The steamer Newport has a new barge …", Daily Capital Journal , Salem, OR: E. Hofer, 22 (126), p. Sec. 2 p. 2 col. 4, Jun 29, 1912
  16. 1 2 3 4 5 6 7 8 9 10 "Unruly Merchant Fights", Morning Oregonian , Portland, OR, 50 (15, 494), p. 5 col. 4, Jul 25, 1910
  17. 1 2 3 "Captain Jacobson came up from Newport …". Lincoln County Leader . 19 (35). Toledo, OR: Collins & Hayden. Oct 20, 1911. p. 1 col. 4.
  18. "George C. Walker of the Modern Improvement Company …", Lincoln County Leader , Toledo, OR: Collins & Hayden, 17 (47), p. 5 col. 3, Jan 14, 1910
  19. "Modern Improvement Company Dissolved", Lincoln County Leader , Toledo, OR: Collins & Hayden, 19 (1), p. 4, Feb 23, 1912
  20. 1 2 3 4 5 "3500 Invade Newport", Morning Oregonian , Portland, OR, 53 (16, 441), p. 10 col. 1, Aug 5, 1913
  21. 1 2 3 4 5 6 "Newport Band in Favor", The Sunday Oregonian , Portland, OR, 32 (21), p. 7 col. 1, May 25, 1913
  22. "Capt. O.F. Jacobson, master of the steamer Newport …". Lincoln County Leader . 21 (48). Toledo, OR: Collins & Hayden. Jan 23, 1914. p. 1 col. 5.
  23. "Ferry Will Be Improved". Morning Oregonian . 54 (16, 624). Portland, OR. Mar 7, 1914. p. 14.
  24. 1 2 3 "The Newport Transportation Company this week received …". Lincoln County Leader . 22 (2). Toledo, OR: Collins & Hayden. Mar 6, 1914. p. 4 col. 3.
  25. 1 2 "Steamer Gets New Engine". Morning Oregonian . 53 (16, 589). Portland, OR. Jan 24, 1914. p. 14 col. 2.
  26. "To See Newport Aright Visit City in Winter". Morning Oregonian . 33 (1). Portland, OR. Jan 4, 1914. p. 9 col. 6.
  27. 1 2 "Gasoline to Replace Steam". Morning Oregonian . 54 (16, 624). Portland, OR. Mar 7, 1914. p. 14 col. 6.
  28. "The new engine was placed in the steamer Newport …". Lincoln County Leader . 22 (5). Toledo, OR: Collins & Hayden. Mar 27, 1914. p. 8 col. 2.
  29. 1 2 "The steamer Newport returned to the lower bay …". Lincoln County Leader . 22 (6). Toledo, OR: Collins & Hayden. Apr 3, 1914. p. 5 col. 1.
  30. 1 2 "Ferry Stops for Pioneer", Morning Oregonian , Portland, OR: Collins & Hayden, 54 (16, 665), p. 1 col. 6, Apr 24, 1914
  31. 1 2 "Newport — The two days' celebration at Newport was a success …", Lincoln County Leader , Toledo, OR, 22 (22), p. 1 col. 1, Jul 10, 1914
  32. 1 2 3 "Sunday more than 1000 people passed over the railroad …", The Sunday Oregonian , Portland, OR: Collins & Hayden, 22 (24), p. 1 col. 2, Jul 24, 1914
  33. 1 2 "Barge Julia Here for Repairs", Lincoln County Leader , Toledo, OR, 26 (9), p. 1 col. 5, Apr 19, 1918
  34. 1 2 3 "Ferryboat Is Inspected", Morning Oregonian , Portland, OR, 59 (18, 513), p. 26 col. 5, Mar 26, 1920
  35. "Captain Marshall 84 Years Old Today", Morning Oregonian , Portland, OR, 58 (18, 253), p. 12 col. 1, May 26, 1909
  36. Wright, E.W., ed. (1895). Lewis & Dryden's Marine History of the Pacific Northwest. Portland, OR: Lewis and Dryden Printing Co. p.  56 n.2. LCCN   28001147.
  37. "Capt. O.F. Jacobson was up from Newport …". Lincoln County Leader . 30 (5). Toledo, OR: Collins & Hayden. Mar 24, 1922. p. 4.
  38. 1 2 "Ferry Boat Run Restored", Morning Oregonian , Portland, OR, 60 (18, 830), p. 13 col. 2, Mar 29, 1921
  39. U.S. Dept. of Commerce, Navigation Bureau (1924). Annual List of Merchant Vessels. Washington, DC: GPO. p. 246. hdl:2027/uc1.b3330085.
  40. U.S. Dept. of Commerce, Navigation Bureau (1931). Annual List of Merchant Vessels. Washington, DC: GPO. p. 925. hdl:2027/uc1.b3330092.
  41. "Calling all Marine Artifacts", Daily News, NewsLincolnCounty.com, Apr 18, 2013, retrieved Nov 3, 2015

Related Research Articles

Steamboats of the Oregon Coast

The history of steamboats on the Oregon Coast begins in the late 19th century. Before the development of modern road and rail networks, transportation on the coast of Oregon was largely water-borne. This article focuses on inland steamboats and similar craft operating in, from south to north on the coast: Rogue River, Coquille River, Coos Bay, Umpqua River, Siuslaw Bay, Yaquina Bay, Siletz River, and Tillamook Bay. The boats were all very small, nothing like the big sternwheelers and propeller boats that ran on the Columbia River or Puget Sound. There were many of them, however, and they came to be known as the "mosquito fleet."

Steamboats of Yaquina Bay and Yaquina River

Yaquina Bay, like Coos Bay, is a shallow coastal bay on the Oregon Coast in the Pacific Northwest of North America. The principal town on Yaquina Bay is Newport, Oregon. The Yaquina River flows into the bay. Until modern roads reached Newport in the late 1920s, the principal transportation method to and from Newport was by ship or boat.

<i>T.M. Richardson</i>

T.M. Richardson was a steamboat built in 1888 at Oneatta, Oregon, which served on Yaquina Bay and on the Yaquina River from 1888 to 1908. This vessel was commonly known as the Richardson or the T.M.

<i>Sarah Dixon</i> (sternwheeler) Steamboat operated on Oregon rivers

Sarah Dixon was a wooden sternwheel-driven steamboat operated by the Shaver Transportation Company on the Columbia and lower Willamette rivers from 1892 to 1926. Originally Sarah Dixon was built as a mixed use passenger and freight vessel, and was considered a prestige vessel for the time.

<i>Truant</i> (steamboat)

Truant was a steamboat that was operated in the Yaquina Bay region of Oregon from 1911 to 1919, transporting passengers and freight, and engaging in towing work. After 1919, Truant was transferred to the Columbia River.

<i>Tressa May</i>

Tressa May was a steamboat that was operated in the Yaquina Bay region of Oregon from 1883 to 1888.

W.H. Harrison was a steam schooner that operated from 1890 to 1905 on the coast of Oregon, the lower Columbia River, and southwest Washington state. At that time the salmon cannery industry was one of the major businesses of the coast. W.H. Harrison, while also carrying passengers and transporting general freight and lumber, was one of a number of steamers supplying materials to canneries along the coast, and transporting cases of canned salmon from the canneries.

<i>George R. Vosburg</i>

George R. Vosburg was a steam tug that operated from 1900 to 1912 on the Columbia River and the north coast of Oregon south from Astoria to the Nehalem River and Tillamook City. Generally called the Vosburg in practice, and referred to as Geo. R. Vosburg in official records, this vessel performed many tasks, from carrying cargo and passengers, and towing barges of rock for jetty construction. After 1925, this vessel was renamed George M. Brown, and was converted to diesel power. Under the name George M. Brown, this vessel remained in service until 1968 or later.

<i>Pomona</i> (sternwheeler) steamboat

Pomona was a steamboat which operated on the Willamette, Columbia and Cowlitz rivers from 1898 to 1940. Pomona was specially designed to operate in low water conditions such as typically prevailed in the summer months in Oregon. Pomona was one of the few steamers that could regularly navigate to Corvallis, Oregon which was the practical head of navigation on the Willamette. In 1926, Pomona was substantially rebuilt, and served afterwards as a towboat. In 1940, Pomona was converted into an unpowered floating storehouse.

<i>Grahamona</i>

Grahamona was a sternwheel steamboat built in 1912 for the Oregon City Transportation Company, commonly known as the Yellow Stack Line. Grahamona was specially designed to serve on the shallow waters of the upper Willamette River. It was one of the largest steamboats ever to operate on the upper Willamette. In 1920, Grahamona was sold and the name was changed to Northwestern. In 1939, the vessel was sold again, and transferred to Alaska for service on the Kuskokwim River.

The Lincoln County Leader was a weekly American newspaper published in Toledo, Oregon from 1893 to 1987. The newspaper was originally published as a Democratic paper, but its party affiliation changed with the ownership. For many years the newspaper was the primary journal in Lincoln County.

<i>Three Sisters</i> (sternwheeler)

Three Sisters was a sternwheel-driven steamboat that operated on the Willamette River from 1886 to 1896. The steamer was built as an extreme shallow-draft vessel, to permit it to reach points on the upper Willamette river such as Corvallis, Harrisburg and Eugene, Oregon during summer months when water levels in the river were generally low. The vessel was also known for having been washed up on a county road in Oregon during a flood in 1890.

<i>Bonita</i> (sternwheeler 1900) steamboat

Bonita was a steamboat which operated on the Willamette and Yamhill rivers. This boat was renamed Metlako in 1902, and operated under that name until 1924 on the Columbia River and its tributaries, the Cowlitz, Lewis and Lake rivers. In 1924, Metlako was renamed B. H. Smith Jr., operating under that name until 1931, when the steamer was abandoned. As Bonita, in September 1900, this vessel was the first steamer to pass through the Yamhill locks.

<i>Robert Young</i> (sternwheeler) stern-wheel driven steamboat

Robert Young was a stern-wheel driven steamboat that operated on the Columbia and Willamette rivers from 1918 to 1935. This vessel was originally named Nespelem, and operated under that name until 1920. From 1920 to 1935, this vessel was owned by the Western Transportation Company or one of its subsidiaries, and was employed primarily in service to paper mills.

<i>Gazelle</i> (motor vessel) Steamboat of Oregon, USA

Gazelle was a gasoline powered launch that operated on the Willamette and Columbia river from 1905 to 1911. For short periods of time Gazelle was operated on the Oregon Coast, on Yaquina Bay and also as an off-shore fishing vessel, in the Coos Bay area.

<i>Mascot</i> (sternwheeler)

Mascot was a sternwheel-driven steamboat built in 1890 which operated primarily on a route running from Portland, Oregon down the Willamette and Columbia rivers to points on the Lewis and Lake rivers. Points served included the town of Woodland, Washington, on the main branch of the Lewis, and La Center, Washington on the east fork.

<i>La Center</i> (sternwheeler) Steamboat

La Center was a small stern-wheel steamboat that operated from 1912 to 1931, mostly on the Lewis and Lake rivers in southwest Washington, on a route to and from Portland, Oregon along the lower Columbia and lower Willamette rivers.

<i>Northwest</i> (sternwheeler)

Northwest was a steamboat that operated on the Columbia, Cowlitz and lower Willamette rivers from 1889 to 1907. In 1907 Northwest was transferred to Alaska, where it sank on the Skeena River

<i>Jessie Harkins</i>

Jessie Harkins was a propeller-driven steamboat that operated on the Columbia River starting in 1903. It was rebuilt at least twice. Originally Jessie Harkins was one of the larger gasoline-engined vessels to operate on the Columbia River. Jessie Harkins was built for the Harkins Transportation Company.

<i>Chester</i> (sternwheeler)

Chester was a shallow draft steamboat built in 1897 that ran until 1917, mostly on the Cowlitz River in southwestern Washington.

References

Printed sources and reports

On-line newspaper collections